(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
|
---|
Category:E-Mail
MONTHYEARML24310A1292024-11-0404 November 2024 Acceptance of Requested Licensing Action Amendment Request ML24306A1422024-11-0101 November 2024 NRR E-mail Capture - Point Beach Nuclear Plant, Units 1 and 2 - Acceptance of License Amendment Request to Adopt Alternative Seismic Method for 50.69 Categorization of SSCs ML24262A2232024-09-18018 September 2024 Part Event Notification 57330. Part 21 - Control Relay Defect ML24256A1402024-09-0505 September 2024 Preliminary Data Needs and Agenda to Support the Supplemental Environmental Audit for Point Beach, Units 1 and 2 - File Copy ML24226A6842024-08-13013 August 2024 NRR E-mail Capture - Point Beach, Units 1 and 2 - Acceptance of License Amendment Request to Adopt TSTF-577 ML24215A2092024-08-0101 August 2024 NRR E-mail Capture - Final RAI - Point Beach 1 & 2 - License Amendment Request to Modify Containment Average Air Temperature Requirements ML24199A2142024-07-17017 July 2024 NRR E-mail Capture - Point Beach Nuclear Plant, Units 1 and 2 - Acceptance of License Amendment Request to Modify Containment Average Air Temperature Requirements ML24149A3532024-05-24024 May 2024 Change in Estimated Review Schedule for Nextera Common Emergency Plan Amendment ML24122C6922024-05-0101 May 2024 NextEra Fleet EP Amendment - Demonstration Drill ML24108A1022024-04-17017 April 2024 NRR E-mail Capture - Point Beach Nuclear Plant, Units 1 and 2 - Acceptance of Revision to Reactor Vessel Surveillance ML24053A0112024-02-21021 February 2024 NRR E-mail Capture - Point Beach Nuclear Plant, Units 1 and 2 - Acceptance of Relief Request CISI-03-01 for Containment Unbonded Post-Tensioning System Inservice Inspection Requirements 3 ML23271A1542023-09-28028 September 2023 NRR E-mail Capture - Point Beach Nuclear Plant, Units 1 and 2 - Acceptance of License Amendment Request to Revise TS 5.5.17, Pre-Stressed Concrete Containment Tendon Surveillance Program ML23208A3072023-07-27027 July 2023 NRR E-mail Capture - Point Beach Nuclear Plant, Units 1 and 2 - Acceptance of Relief Requests Regarding I6-RR-1, I6-RR-2, and I6-RR-3 (EPIDs L-2023-LLR-0030, L-2023-LLR-0031, L-2023-LLR-0032) ML23173A1522023-06-22022 June 2023 Request for Additional Information NextEra Fleet Emergency Plan Amendment Request ML23136A2782023-05-0505 May 2023 Email to R Coffey Point Beach SLRA Second Annual Update - Request for Additional Information Set 1 ML23122A0132023-05-0101 May 2023 NRR E-mail Capture - Point Beach 1 & 2 - Final RAI - License Amendment Request Regarding Risk-Informed Approach to Address GSI-191 ML23109A1862023-04-19019 April 2023 And Turkey Point – Acceptance of Requested Licensing Action Proposed Alternative to Asme Section XI Authorizing Implementation of Asme Code Case N-752-1 ML23033A0292023-01-31031 January 2023 NRR E-mail Capture - Point Beach 1 & 2 - Final RAI (Volume 2) - License Amendment Request Regarding TSTS-505 ML22354A1612022-12-20020 December 2022 NRR E-mail Capture - Point Beach 1 & 2 - Final RAI - License Amendment Request Regarding TSTS-505 ML22291A3692022-10-18018 October 2022 NRR E-mail Capture - Point Beach Nuclear Plant, Units 1 and 2 - Acceptance of License Amendment Request to Use Beacon Power Distribution Monitoring System ML22249A0052022-09-0202 September 2022 NRR E-mail Capture - Point Beach Nuclear Plant, Units 1 and 2 - Acceptance of License Amendment and Exemptions Regarding Risk-Informed Approach to Address GSI-191 ML22229A1052022-08-17017 August 2022 Response to Questions Regarding Point Beach Nuclear Power Plant with Attachment ML22229A1022022-07-18018 July 2022 Original Request - Questions Regarding Point Beach Nuclear Power Plant ML22196A0062022-07-15015 July 2022 NRR E-mail Capture - Point Beach Nuclear Plant, Units 1 and 2 - Acceptance of Requested Licensing Action TSTF-505, Revision 2, Provide Risk Informed Extended Completion Times - RITSTF Initiative 4b ML22094A0802022-04-0404 April 2022 NRR E-mail Capture - Point Beach Nuclear Plant, Units 1 and 2 - Acceptance of Requested Licensing Action License Amendment Request to Adopt TSTF-366 ML22006A2012022-01-0606 January 2022 SLR - FW: Comments of Michael J Keegan on Dseis Point Beach ML22006A1952022-01-0606 January 2022 SLR - FW: (External_Sender) 3 Additional Organizations Endorsing the Coalition (Now 50 Organizations, and 27 Individuals) Public Comments Nrc’S Dsgeis on NextEra Point Beach Nuclear Power Plant Subsequent License Renewal, D ML22006A2762022-01-0606 January 2022 SLR - FW: Subsequent License Renewal of Point Beach Nuclear Plant Unit Numbers 1 and 2, Manitowoc County, Wisconsin ML22004A3212022-01-0404 January 2022 SLR - FW: Comments of Michael J Keegan on Dseis Point Beach ML22004A0012022-01-0404 January 2022 SLR - FW: Comments of Michael J Keegan on Dseis Point Beach ML22004A1672022-01-0404 January 2022 SLR - Ref: Point Beach ML22004A3182022-01-0404 January 2022 SLR - FW: EPA Comment Letter - Point Beach SEIS ML22004A3192022-01-0404 January 2022 SLR - FW: Point Beach ML22004A3202022-01-0404 January 2022 SLR - FW: (External_Sender) 3 Additional Organizations Endorsing the Coalition (Now 50 Organizations, and 27 Individuals) Public Comments Nrc’S Dsgeis on NextEra Point Beach Nuclear Power Plant Subsequent License Renewal, D ML22004A1732022-01-0404 January 2022 SLR - FW: (External_Sender) 3 Additional Organizations Endorsing the Coalition (Now 50 Organizations, and 27 Individuals) Public Comments Nrc’S Dsgeis on NextEra Point Beach Nuclear Power Plant Subsequent License Renewal, D ML22006A1942022-01-0404 January 2022 SLR - (External_Sender) 3 Additional Organizations Endorsing the Coalition (Now 50 Organizations, and 27 Individuals) Public Comments Nrc’S Dsgeis on NextEra Point Beach Nuclear Power Plant Subsequent License Renewal, Docke ML22006A1992022-01-0303 January 2022 SLR - (External_Sender) Comments of Michael J Keegan on Dseis Point Beach ML22004A3172021-12-21021 December 2021 SLR - (External_Sender) EPA Comment Letter - Point Beach SEIS ML21362A6822021-12-17017 December 2021 SLRA Safety RAIs Set 14 Final Email ML21362A6712021-12-15015 December 2021 SLRA Safety RAIs Set 13 Final Email ML22006A2752021-12-0202 December 2021 SLR - (External_Sender) Subsequent License Renewal of Point Beach Nuclear Plant Unit Numbers 1 and 2, Manitowoc County, Wisconsin ML21341A6102021-11-16016 November 2021 SLRA Safety RAI Set 12 Final Email ML21314A4212021-11-10010 November 2021 Fws to NRC, Concurrence with ESA Determination for Point Beach Subsequent License Renewal ML21307A1522021-11-0909 November 2021 NRC to Fws, Request for Concurrence with Endangered Species Act Determinations for Point Beach Subsequent License Renewal ML21287A0852021-10-14014 October 2021 SLRA Safety RAI Set 11 Final Email ML21286A6032021-10-0505 October 2021 SLRA Safety RAIs Set 10 Final Email ML21279A1202021-10-0505 October 2021 Email: Wi SHPO Review Point Beach Nuclear Plant SLR ML21273A0232021-09-0202 September 2021 SLRA Safety RAI Set 9 Final Email ML21242A2292021-08-27027 August 2021 SLRA Draft Safety RAI Set 9 Email ML21242A2282021-08-27027 August 2021 SLRA Draft Safety RAI Set 9 2024-09-05
[Table view] |
Text
- . - - - - - - . - a-
- I Justrne Burza - Re, Point Beach Unit 1 Cont Call tk C-fA )r-SI£7C Pane 1
, I From: David Hills To: Melvin Holmberg Date: 5/12/04 9:27AM
Subject:
Re: Point Beach Unit 1 Conf Call Mel, Thanks for the Info. What level of management will the licensee have on the callf
'I7 ZAX L-
>>> Melvin Holmberg 05112104 09:14AM >>> ZC "A-^
David, Harold Chernoff is setting up a conference call at 2:00 pm CST with the licensee so that we can participate with NRR staff on the discussionrbf theyFO n the Ul head inspectionlrepairs.
He will request 8 lines. Note that last time he was-Unly allowed 4 lines ue to the timeframe of the call.
I CC: Andrea Keim; Harold Chemoff; Lakshminaras Raghavan; Patrick Louden; R. Michael Morris; Timothy Steingass; William Koo Informabon in isrecord was de&etOWd inaccoce Xre d nofoforma n
':2I
-:._A F. ; _. . -: _ - A:
I \TEMP\GWO00001.TMP Mail Envelope Properties (40A2345B.CDA: 22: 24268)
Subject:
Re: Point Beach Unit 1 Conf Call Creation Date: 5/12/04 9:27AM From: David Hills Created By: DEH~nrc.gov Recipients nrc.gov chpo.CHDO MSH (Melvin Holmberg)
PLL CC (Patrick Louden)
RMM3 CC (R. Michael Morris) nrc.gov owf2_po.OWFNDO ATK CC (Andrea Keim)
TXS3 CC (Timothy Steingass)
WHK CC (William Koo) nrc.gov owf4_po.OWFNDO HKC CC (Harold Chernoff)
LXR1 CC (Lakshminaras Raghavan)
Post Office Route chpo.CHDO nrc.gov owf2_po.OWFNDO nrc.gov owf4_po.OWFNDO nrc.gov Files Size Date & Time MESSAGE 1767 05/12/04 09:27AM Options Expiration Date: None Priority: Standard Reply Requested: No Return Notification: None Concealed
Subject:
No Security: Standard