Similar Documents at Hatch |
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217D2901999-10-13013 October 1999 Forwards SER Accepting Licensee 990305 Proposed Changes to Edwin I Hatch Nuclear Plant Emergency Classification Scheme to Add Emergency Action Levels Related to Operation of Independent Spent Fuel Storage Installation ML20217G0401999-10-0707 October 1999 Forwards Insp Repts 50-321/99-09 & 50-366/99-09 on 990607-11 & 0823-27.One Violation Occurred Being Treated as NCV ML20217G2631999-10-0707 October 1999 Informs That on 990930,NRC Staff Completed mid-cycle PPR of Hatch Plant & Did Not Identify Any Areas Where Performance Warranted More than Core Insp Program.Regional Initiative Insps to Observe Const Activities Will Be Conducted ML20216G0251999-09-24024 September 1999 Concludes That All Requested Info of GL 98-01 & Supplement 1 Provided & Licensing Action for GL 98-01 & Supplement 1 Complete for Plant ML20216H3641999-09-20020 September 1999 Forwards NRC Form 536 in Response to AL 99-03, Preparation & Scheduling of Operator Licensing Exams HL-5839, Forwards Three New & One Revised Relief Requests for Third 10-year Interval ISI Program for Plant,Developed to Clarify Documentation Requirements,To Propose Alternate Exam Requirements IAW ASME Code Cases N-598 & N-5731999-09-16016 September 1999 Forwards Three New & One Revised Relief Requests for Third 10-year Interval ISI Program for Plant,Developed to Clarify Documentation Requirements,To Propose Alternate Exam Requirements IAW ASME Code Cases N-598 & N-573 ML20217B5271999-09-16016 September 1999 Forwards Insp Repts 50-321/99-05 & 50-366/99-05 on 990711-0821.No Violations Noted ML20212A6411999-09-13013 September 1999 Forwards Safety Evaluation of Relief Request RR-V-16 for Third Ten Year Interval Inservice Testing Program HL-5837, Informs That Recent Evaluation of Inservice Testing Program Activities Has Resulted in Requirement for Snoc to Revise Two Existing Requests for Relief,Withdraw One Request for Relief & Revise One Existing Cold SD Justification1999-09-13013 September 1999 Informs That Recent Evaluation of Inservice Testing Program Activities Has Resulted in Requirement for Snoc to Revise Two Existing Requests for Relief,Withdraw One Request for Relief & Revise One Existing Cold SD Justification HL-5832, Submits Comments Concerning Reactor Vessel Integrity Database (Rvid),Version 2 for Plant Hatch,Per NRC1999-09-0101 September 1999 Submits Comments Concerning Reactor Vessel Integrity Database (Rvid),Version 2 for Plant Hatch,Per NRC ML20211Q4801999-09-0101 September 1999 Informs That on 990812-13,Region II Hosted Training Managers Conference on Recent Changes to Operator Licensing Program. List of Attendees,Copy of Slide Presentations & List of Questions Received from Participants Encl HL-5825, Forwards Response to Informal NRC RAI Re Proposed Emergency Actions Levels Associated with Independent Spent Fuel Storage Operations1999-08-20020 August 1999 Forwards Response to Informal NRC RAI Re Proposed Emergency Actions Levels Associated with Independent Spent Fuel Storage Operations HL-5827, Forwards Fitness for Duty Performance Data for six-month Reporting period,Jan-June 1999,as Required by 10CFR26.71(d)1999-08-19019 August 1999 Forwards Fitness for Duty Performance Data for six-month Reporting period,Jan-June 1999,as Required by 10CFR26.71(d) HL-5788, Forwards Owner Activity Repts,Form OAR-1 for Ei Hatch Nuclear Plant for First Period of Third 10-yr Interval ISI Program.Repts Are for Unit 2 Refueling Outages 13 & 141999-08-19019 August 1999 Forwards Owner Activity Repts,Form OAR-1 for Ei Hatch Nuclear Plant for First Period of Third 10-yr Interval ISI Program.Repts Are for Unit 2 Refueling Outages 13 & 14 HL-5824, Requests Exemption from Expedited Implementation Requirements of Paragraph 10CFR50.55a(g)(6)(ii)(B) as Applicable to Containment General Visual Exams of Subsection Iwe,Table IWE-2500-1,Category E-A,Item E1.111999-08-18018 August 1999 Requests Exemption from Expedited Implementation Requirements of Paragraph 10CFR50.55a(g)(6)(ii)(B) as Applicable to Containment General Visual Exams of Subsection Iwe,Table IWE-2500-1,Category E-A,Item E1.11 ML20210T6421999-08-17017 August 1999 Discusses Licensee 950814 Initial Response to GL 92-01, Rev 1,Supp 1, Rv Structural Integrity (Rvid), Issued on 950519 to Plant.Staff Revised Info in Rvid & Being Released as Rvid Version 2 ML20210V3311999-08-13013 August 1999 Provides Synposis of NRC OI Report Re Alleged Untruthful Statements Made to NRC Re Release of Contaminated Matl to Onsite Landfill.Oi Unable to Conclude That Untruthful state- Ments Were Provided to NRC ML20210Q4821999-08-0505 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Authorized Representative of Facility Must Submit Ltr,As Listed,Identifying Individual to Take Exam,Thirty Days Before Exam Date ML20210L7581999-08-0404 August 1999 Forwards Insp Repts 50-321/99-04 & 50-366/99-04 on 990530-0710.One Violation of NRC Requirements Occurred & Being Treated as Ncv,Consistent with App C of Enforcement Policy ML20210J9501999-08-0202 August 1999 Forwards SER Finding Licensee Established Acceptable Program to Verify Periodically design-basis Capability of safety-related MOVs at Edwin I Hatch Nuclear Plant,Units 1 & 2 ML20210J9021999-08-0202 August 1999 Forwards SER Finding Licensee Adequately Addressed Actions Requested in GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Edwin I Hatch Nuclear Plant,Units 1 & 2 HL-5814, Forwards New Relief Requests for Third 10-year Interval Inservice Insp Program for Ei Hatch Nuclear Plant.New Relief Requests Were Developed to Propose Alternate Insps & to Allow Use of ASME Code Cases N-605,N-508-1,N-323-1 & N-5281999-07-30030 July 1999 Forwards New Relief Requests for Third 10-year Interval Inservice Insp Program for Ei Hatch Nuclear Plant.New Relief Requests Were Developed to Propose Alternate Insps & to Allow Use of ASME Code Cases N-605,N-508-1,N-323-1 & N-528 05000366/LER-1999-007, Forwards LER 99-007-00 Re Personnel Error & Inadequate Corrective Action Causing Automatic Reactor Shutdown1999-07-27027 July 1999 Forwards LER 99-007-00 Re Personnel Error & Inadequate Corrective Action Causing Automatic Reactor Shutdown ML20210E1601999-07-20020 July 1999 Forwards Insp Repts 50-321/99-10 & 50-366/99-10 on 990616-25.One Violation Noted Being Treated as Ncv.Team Identified Lack of Procedural Guidance for Identification & Trending of Repetitive Instrument Drift & Calibr Problems HL-5810, Forwards Rev 17B to Ei Hatch FSAR & Rev 14B to Fire Hazards Analysis & Fire Protection Program, for Plant.Encls Reflect Changes Made Since Previous Submittal.With Instructions1999-07-15015 July 1999 Forwards Rev 17B to Ei Hatch FSAR & Rev 14B to Fire Hazards Analysis & Fire Protection Program, for Plant.Encls Reflect Changes Made Since Previous Submittal.With Instructions HL-5808, Forwards Ei Hatch Nuclear Plant,Unit 1 Extended Power Uprate Startup Test Rept for Cycle 19. Rept Summarizes Startup Testing Performed on Unit 1 Following Implementation of Extended Uprate During Eighteenth Refueling Outage1999-07-15015 July 1999 Forwards Ei Hatch Nuclear Plant,Unit 1 Extended Power Uprate Startup Test Rept for Cycle 19. Rept Summarizes Startup Testing Performed on Unit 1 Following Implementation of Extended Uprate During Eighteenth Refueling Outage HL-5807, Estimates That Seventeen (17) Submittals Will Be Made During Fy 2000 & Two (2) Submittals Will Be Made During Fy 2001,in Response to Administative Ltr 99-02, Operating Reactor Licensing Action Estimates1999-07-14014 July 1999 Estimates That Seventeen (17) Submittals Will Be Made During Fy 2000 & Two (2) Submittals Will Be Made During Fy 2001,in Response to Administative Ltr 99-02, Operating Reactor Licensing Action Estimates ML20210J1091999-07-10010 July 1999 Submits Suggestions & Concerns Re Y2K & Nuclear Power Plants HL-5804, Informs NRC That on or After 991018,SNOC Plans to Begin Storing Spent Fuel in Ei Hatch ISFSI IAW General License Issued,Per 10CFR72.2101999-07-0909 July 1999 Informs NRC That on or After 991018,SNOC Plans to Begin Storing Spent Fuel in Ei Hatch ISFSI IAW General License Issued,Per 10CFR72.210 HL-5796, Forwards Response to NRC 990331 Request for Supplemental Info Re SNC Earlier GL 95-07 Responses.Gl 95-07 Evaluation Sheets for Units 1 & 2 RHR Torus Spray Isolation Valves Are Encl1999-07-0909 July 1999 Forwards Response to NRC 990331 Request for Supplemental Info Re SNC Earlier GL 95-07 Responses.Gl 95-07 Evaluation Sheets for Units 1 & 2 RHR Torus Spray Isolation Valves Are Encl HL-5801, Forwards New Relief Requests for Third 10-Yr Interval ISI Program for Ei Hatch Nuclear Plant.New Relief Requests RR-25 & RR-26 Were Developed to Propose Alternate Repair Techniques IAW ASME Code N-562 & N-561,respectively1999-07-0909 July 1999 Forwards New Relief Requests for Third 10-Yr Interval ISI Program for Ei Hatch Nuclear Plant.New Relief Requests RR-25 & RR-26 Were Developed to Propose Alternate Repair Techniques IAW ASME Code N-562 & N-561,respectively ML20209E4801999-06-30030 June 1999 Confirms 990630 Telcon Between M Crosby & DC Payne Re Arrangements Made for Administration of Licensing Exam at Plant During Weeks of 991018-1101 ML20196H8811999-06-25025 June 1999 Forwards Insp Repts 50-321/99-03 & 50-366/99-03 on 990418- 0529.No Violations Occurred.Conduct of Activities at Plant Generally Characterized by safety-conscious Operations & Sound Engineering & Maint Practices HL-5790, Responds to NRC RAI Re GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants1999-06-21021 June 1999 Responds to NRC RAI Re GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants ML20212J0541999-06-17017 June 1999 Responds to Requesting That NRC Staff ...Allow BWR Plants Identified to Defer Weld Overlay Exams Until March 2001 or Until Completion of NRC Staff Review & Approval of Proposed Generic Rept,Whichever Comes First ML20207E7561999-06-0303 June 1999 Informs of Completion of Review & Evaluation of Info Provided by Southern Nuclear Operating Co by Ltr Dtd 980608, Proposing Changes to Third 10-Yr Interval ISI Program Plan Requests for Relief RR-4 & R-6.Requests Acceptable HL-5763, Informs That Util Is Changing Responsibility for Periodic Concerns Program Review,Per Insp Repts 50-321/95-12 & 50-366/95-12.Reviews Will Now Be Performed Under Direction of Vice President & Corporate Counsel1999-05-20020 May 1999 Informs That Util Is Changing Responsibility for Periodic Concerns Program Review,Per Insp Repts 50-321/95-12 & 50-366/95-12.Reviews Will Now Be Performed Under Direction of Vice President & Corporate Counsel HL-5785, Forwards New Relief Requests RR-V-16 for Third 10-yr Interval Inservice Testing Program for Ei Hatch Nuclear Plant.Relief Request Was Developed to Propose Alternate Schedule for Replacement of HPCI Rupture Disks1999-05-18018 May 1999 Forwards New Relief Requests RR-V-16 for Third 10-yr Interval Inservice Testing Program for Ei Hatch Nuclear Plant.Relief Request Was Developed to Propose Alternate Schedule for Replacement of HPCI Rupture Disks ML20206Q0751999-05-0606 May 1999 Forwards Insp Repts 50-321/99-02 & 50-366/99-02 on 990307-0417.No Violations Noted ML20206G1611999-05-0404 May 1999 Forwards SER Approving Util 990316 Revised Relief Request RR-P-14,for Inservice Testing Program for Pumps & Valves Pursuant to 10CFR50.55a(a)(3)(ii) ML20206P6921999-04-27027 April 1999 Discusses 990422 Public Meeting at Hatch Facility Re Results of Periodic Plant Performance Review for Hatch Nuclear Facility for Period of Feb 1997 to Jan 1999.List of Attendees & Copy of Handouts Used by Hatch,Encl HL-5777, Notifies NRC That Exam Coverage for One Weld Exceeded Criteria for Plant.Reasons for Exam Coverage Being Less than Initially Estimated as Listed1999-04-26026 April 1999 Notifies NRC That Exam Coverage for One Weld Exceeded Criteria for Plant.Reasons for Exam Coverage Being Less than Initially Estimated as Listed HL-5758, Forwards Response to NRC 990129 RAI Re GL 96-05 Program at Ei Hatch Nuclear Plant1999-04-0909 April 1999 Forwards Response to NRC 990129 RAI Re GL 96-05 Program at Ei Hatch Nuclear Plant ML20205T1831999-04-0909 April 1999 Informs That on 990316,S Grantham & Ho Christensen Confirmed Initial Operator Licensing Exam Schedule for Ei Hatch NPP for FY00.Initial Exam Dates Are 991001 & 2201 for Approx 12 Candidates.Chief Examiner Will Be C Payne ML20205M3181999-04-0707 April 1999 Confirms Telcon Between D Crowe & Ph Skinner Re Mgt Meeting Scheduled for 990422 in Conference Room of Maint Training Bldg.Purpose of Meeting to Discuss Results of Periodic PPR for Plant for Period of Feb 1997 - Jan 1999 ML20205M3011999-04-0202 April 1999 Forwards Insp Repts 50-321/99-01 & 50-366/99-01 on 990124-0306.Non-cited Violation Identified HL-5761, Forwards Revised Ei Hatch Nuclear Plant Psp,Effective 990331,per 10CFR50.54(p)(2).Justification & Detailed Instructions Encl.Plan Withheld,Per 10CFR73.211999-03-31031 March 1999 Forwards Revised Ei Hatch Nuclear Plant Psp,Effective 990331,per 10CFR50.54(p)(2).Justification & Detailed Instructions Encl.Plan Withheld,Per 10CFR73.21 HL-5750, Forwards Status of Decommissining Funding,Per Requirements 10CFR50.75(f)(1),on Behalf of Licensed Owners of Ei Hatch Nuclear Plant1999-03-30030 March 1999 Forwards Status of Decommissining Funding,Per Requirements 10CFR50.75(f)(1),on Behalf of Licensed Owners of Ei Hatch Nuclear Plant ML20205H1491999-03-25025 March 1999 Forwards Info for OLs DPR-7 & NPF-5 Re Financial Assurance Requirements for Decommissioning Nuclear Power Reactors,Per 10CFR50.75(f)(1).Municipal Electric Authority of Georgia Is One of Licensed Owners of Ei Hatch,Owning 17.7% of Facility ML20205D3211999-03-24024 March 1999 Informs That Safety Sys Engineering Insp Previously Scheduled for 990405-09 & 19-23,rescheduled for 990607-11 & 21-25 1999-09-24
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20216H3641999-09-20020 September 1999 Forwards NRC Form 536 in Response to AL 99-03, Preparation & Scheduling of Operator Licensing Exams HL-5839, Forwards Three New & One Revised Relief Requests for Third 10-year Interval ISI Program for Plant,Developed to Clarify Documentation Requirements,To Propose Alternate Exam Requirements IAW ASME Code Cases N-598 & N-5731999-09-16016 September 1999 Forwards Three New & One Revised Relief Requests for Third 10-year Interval ISI Program for Plant,Developed to Clarify Documentation Requirements,To Propose Alternate Exam Requirements IAW ASME Code Cases N-598 & N-573 HL-5837, Informs That Recent Evaluation of Inservice Testing Program Activities Has Resulted in Requirement for Snoc to Revise Two Existing Requests for Relief,Withdraw One Request for Relief & Revise One Existing Cold SD Justification1999-09-13013 September 1999 Informs That Recent Evaluation of Inservice Testing Program Activities Has Resulted in Requirement for Snoc to Revise Two Existing Requests for Relief,Withdraw One Request for Relief & Revise One Existing Cold SD Justification HL-5832, Submits Comments Concerning Reactor Vessel Integrity Database (Rvid),Version 2 for Plant Hatch,Per NRC1999-09-0101 September 1999 Submits Comments Concerning Reactor Vessel Integrity Database (Rvid),Version 2 for Plant Hatch,Per NRC HL-5825, Forwards Response to Informal NRC RAI Re Proposed Emergency Actions Levels Associated with Independent Spent Fuel Storage Operations1999-08-20020 August 1999 Forwards Response to Informal NRC RAI Re Proposed Emergency Actions Levels Associated with Independent Spent Fuel Storage Operations HL-5827, Forwards Fitness for Duty Performance Data for six-month Reporting period,Jan-June 1999,as Required by 10CFR26.71(d)1999-08-19019 August 1999 Forwards Fitness for Duty Performance Data for six-month Reporting period,Jan-June 1999,as Required by 10CFR26.71(d) HL-5788, Forwards Owner Activity Repts,Form OAR-1 for Ei Hatch Nuclear Plant for First Period of Third 10-yr Interval ISI Program.Repts Are for Unit 2 Refueling Outages 13 & 141999-08-19019 August 1999 Forwards Owner Activity Repts,Form OAR-1 for Ei Hatch Nuclear Plant for First Period of Third 10-yr Interval ISI Program.Repts Are for Unit 2 Refueling Outages 13 & 14 HL-5824, Requests Exemption from Expedited Implementation Requirements of Paragraph 10CFR50.55a(g)(6)(ii)(B) as Applicable to Containment General Visual Exams of Subsection Iwe,Table IWE-2500-1,Category E-A,Item E1.111999-08-18018 August 1999 Requests Exemption from Expedited Implementation Requirements of Paragraph 10CFR50.55a(g)(6)(ii)(B) as Applicable to Containment General Visual Exams of Subsection Iwe,Table IWE-2500-1,Category E-A,Item E1.11 HL-5814, Forwards New Relief Requests for Third 10-year Interval Inservice Insp Program for Ei Hatch Nuclear Plant.New Relief Requests Were Developed to Propose Alternate Insps & to Allow Use of ASME Code Cases N-605,N-508-1,N-323-1 & N-5281999-07-30030 July 1999 Forwards New Relief Requests for Third 10-year Interval Inservice Insp Program for Ei Hatch Nuclear Plant.New Relief Requests Were Developed to Propose Alternate Insps & to Allow Use of ASME Code Cases N-605,N-508-1,N-323-1 & N-528 05000366/LER-1999-007, Forwards LER 99-007-00 Re Personnel Error & Inadequate Corrective Action Causing Automatic Reactor Shutdown1999-07-27027 July 1999 Forwards LER 99-007-00 Re Personnel Error & Inadequate Corrective Action Causing Automatic Reactor Shutdown HL-5810, Forwards Rev 17B to Ei Hatch FSAR & Rev 14B to Fire Hazards Analysis & Fire Protection Program, for Plant.Encls Reflect Changes Made Since Previous Submittal.With Instructions1999-07-15015 July 1999 Forwards Rev 17B to Ei Hatch FSAR & Rev 14B to Fire Hazards Analysis & Fire Protection Program, for Plant.Encls Reflect Changes Made Since Previous Submittal.With Instructions HL-5808, Forwards Ei Hatch Nuclear Plant,Unit 1 Extended Power Uprate Startup Test Rept for Cycle 19. Rept Summarizes Startup Testing Performed on Unit 1 Following Implementation of Extended Uprate During Eighteenth Refueling Outage1999-07-15015 July 1999 Forwards Ei Hatch Nuclear Plant,Unit 1 Extended Power Uprate Startup Test Rept for Cycle 19. Rept Summarizes Startup Testing Performed on Unit 1 Following Implementation of Extended Uprate During Eighteenth Refueling Outage HL-5807, Estimates That Seventeen (17) Submittals Will Be Made During Fy 2000 & Two (2) Submittals Will Be Made During Fy 2001,in Response to Administative Ltr 99-02, Operating Reactor Licensing Action Estimates1999-07-14014 July 1999 Estimates That Seventeen (17) Submittals Will Be Made During Fy 2000 & Two (2) Submittals Will Be Made During Fy 2001,in Response to Administative Ltr 99-02, Operating Reactor Licensing Action Estimates ML20210J1091999-07-10010 July 1999 Submits Suggestions & Concerns Re Y2K & Nuclear Power Plants HL-5801, Forwards New Relief Requests for Third 10-Yr Interval ISI Program for Ei Hatch Nuclear Plant.New Relief Requests RR-25 & RR-26 Were Developed to Propose Alternate Repair Techniques IAW ASME Code N-562 & N-561,respectively1999-07-0909 July 1999 Forwards New Relief Requests for Third 10-Yr Interval ISI Program for Ei Hatch Nuclear Plant.New Relief Requests RR-25 & RR-26 Were Developed to Propose Alternate Repair Techniques IAW ASME Code N-562 & N-561,respectively HL-5796, Forwards Response to NRC 990331 Request for Supplemental Info Re SNC Earlier GL 95-07 Responses.Gl 95-07 Evaluation Sheets for Units 1 & 2 RHR Torus Spray Isolation Valves Are Encl1999-07-0909 July 1999 Forwards Response to NRC 990331 Request for Supplemental Info Re SNC Earlier GL 95-07 Responses.Gl 95-07 Evaluation Sheets for Units 1 & 2 RHR Torus Spray Isolation Valves Are Encl HL-5804, Informs NRC That on or After 991018,SNOC Plans to Begin Storing Spent Fuel in Ei Hatch ISFSI IAW General License Issued,Per 10CFR72.2101999-07-0909 July 1999 Informs NRC That on or After 991018,SNOC Plans to Begin Storing Spent Fuel in Ei Hatch ISFSI IAW General License Issued,Per 10CFR72.210 HL-5790, Responds to NRC RAI Re GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants1999-06-21021 June 1999 Responds to NRC RAI Re GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants HL-5763, Informs That Util Is Changing Responsibility for Periodic Concerns Program Review,Per Insp Repts 50-321/95-12 & 50-366/95-12.Reviews Will Now Be Performed Under Direction of Vice President & Corporate Counsel1999-05-20020 May 1999 Informs That Util Is Changing Responsibility for Periodic Concerns Program Review,Per Insp Repts 50-321/95-12 & 50-366/95-12.Reviews Will Now Be Performed Under Direction of Vice President & Corporate Counsel HL-5785, Forwards New Relief Requests RR-V-16 for Third 10-yr Interval Inservice Testing Program for Ei Hatch Nuclear Plant.Relief Request Was Developed to Propose Alternate Schedule for Replacement of HPCI Rupture Disks1999-05-18018 May 1999 Forwards New Relief Requests RR-V-16 for Third 10-yr Interval Inservice Testing Program for Ei Hatch Nuclear Plant.Relief Request Was Developed to Propose Alternate Schedule for Replacement of HPCI Rupture Disks HL-5777, Notifies NRC That Exam Coverage for One Weld Exceeded Criteria for Plant.Reasons for Exam Coverage Being Less than Initially Estimated as Listed1999-04-26026 April 1999 Notifies NRC That Exam Coverage for One Weld Exceeded Criteria for Plant.Reasons for Exam Coverage Being Less than Initially Estimated as Listed HL-5758, Forwards Response to NRC 990129 RAI Re GL 96-05 Program at Ei Hatch Nuclear Plant1999-04-0909 April 1999 Forwards Response to NRC 990129 RAI Re GL 96-05 Program at Ei Hatch Nuclear Plant HL-5761, Forwards Revised Ei Hatch Nuclear Plant Psp,Effective 990331,per 10CFR50.54(p)(2).Justification & Detailed Instructions Encl.Plan Withheld,Per 10CFR73.211999-03-31031 March 1999 Forwards Revised Ei Hatch Nuclear Plant Psp,Effective 990331,per 10CFR50.54(p)(2).Justification & Detailed Instructions Encl.Plan Withheld,Per 10CFR73.21 HL-5750, Forwards Status of Decommissining Funding,Per Requirements 10CFR50.75(f)(1),on Behalf of Licensed Owners of Ei Hatch Nuclear Plant1999-03-30030 March 1999 Forwards Status of Decommissining Funding,Per Requirements 10CFR50.75(f)(1),on Behalf of Licensed Owners of Ei Hatch Nuclear Plant ML20205H1491999-03-25025 March 1999 Forwards Info for OLs DPR-7 & NPF-5 Re Financial Assurance Requirements for Decommissioning Nuclear Power Reactors,Per 10CFR50.75(f)(1).Municipal Electric Authority of Georgia Is One of Licensed Owners of Ei Hatch,Owning 17.7% of Facility ML20205H1411999-03-24024 March 1999 Forwards Info for OLs DPR-7 & NPF-5 Re Financial Assurance Requirement for Decommissioning Nuclear Power Reactors,Per 10CFR50.75(f)(1).Oglethorpe Power Corp Is One of Licensed Owners of Ei Hatch,Units 1 & 2,owning 30% of Facility HL-5754, Forwards Ei Hatch Nuclear Plant Unit 2 Extended Power Uprate Startup Test Rept for Cycle 15, IAW Regulatory Commitments.Testing Identified No Major Problems.Startup Testing for Unit 1 Is Scheduled for Spring 1999 RFO1999-03-22022 March 1999 Forwards Ei Hatch Nuclear Plant Unit 2 Extended Power Uprate Startup Test Rept for Cycle 15, IAW Regulatory Commitments.Testing Identified No Major Problems.Startup Testing for Unit 1 Is Scheduled for Spring 1999 RFO ML20205H1381999-03-22022 March 1999 Forwards Info for OLs DPR-7 & NPF-5 Re Financial Assurance Requirements for Decommissioning Nuclear Power Reactors,Per 10CFR50.75(f)(1).Georgia Power Is One of Licensed Owners of Ei Hatch,Units 1 & 2,owning 50.1% of Facility ML20205H1581999-03-16016 March 1999 Forwards Info for OLs DPR-5 & NPF-7 Re Financial Assurance Requirements for Decommissioning Nuclear Power Reactors,Per 10CFR50.75(f)(1).Dalton Utilities Is One of Licensed Owners of Ei Hatch,Units 1 & 2,owning 2.2% of Facility HL-5753, Submits Response to Five Criteria Described in NUREG/CR-6396 Section 3.3.2.Attachment Contains Relief Request RR-P-14, Which Has Been Revised & Enhanced to Include Addl Info to Justify Proposed Alternative1999-03-16016 March 1999 Submits Response to Five Criteria Described in NUREG/CR-6396 Section 3.3.2.Attachment Contains Relief Request RR-P-14, Which Has Been Revised & Enhanced to Include Addl Info to Justify Proposed Alternative HL-5757, Informs That SNC Withdraws SNC Proposed Rev to Plant Hatch QA Program Submitted 9901271999-03-15015 March 1999 Informs That SNC Withdraws SNC Proposed Rev to Plant Hatch QA Program Submitted 990127 HL-5756, Submits Summary Rept of Present Level & Source of Onsite Property Damage Insurance Coverage for Ei Hatch Nuclear Plant,Units 1 & 21999-03-12012 March 1999 Submits Summary Rept of Present Level & Source of Onsite Property Damage Insurance Coverage for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5751, Forwards Change to Hatch EP for Review & Approval,Per Requirements of 10CFR50,App E,Section Iv.B.Bases for Proposed EALs & Statements of Agreement from State & Local Governmental Authorities1999-03-0505 March 1999 Forwards Change to Hatch EP for Review & Approval,Per Requirements of 10CFR50,App E,Section Iv.B.Bases for Proposed EALs & Statements of Agreement from State & Local Governmental Authorities HL-5735, Provides NRC with Update Status of Progress Util Is Making Toward Development of Product That Was Originally Identified in to NRC1999-03-0202 March 1999 Provides NRC with Update Status of Progress Util Is Making Toward Development of Product That Was Originally Identified in to NRC HL-5737, Forwards Part of Table (Table 1) Util Provided in 980728 Response to RAI for GL 92-01,Rev 1,Suppl 1,reflecting Lower Shell Axial Welds Identified as C-4-A Through C-4-C & Lower Intermediate Axial Welds Identified as C-3-A Through C-3-C1999-02-0505 February 1999 Forwards Part of Table (Table 1) Util Provided in 980728 Response to RAI for GL 92-01,Rev 1,Suppl 1,reflecting Lower Shell Axial Welds Identified as C-4-A Through C-4-C & Lower Intermediate Axial Welds Identified as C-3-A Through C-3-C HL-5733, Forwards Rev 17A to Ei Hatch FSAR & Rev 14A to Fire Hazards Analysis & Fire Protection Program, for Plant.Encl Reflects Changes Made Since Previous Submittal.With Instructions1999-01-29029 January 1999 Forwards Rev 17A to Ei Hatch FSAR & Rev 14A to Fire Hazards Analysis & Fire Protection Program, for Plant.Encl Reflects Changes Made Since Previous Submittal.With Instructions HL-5729, Submits Proposed Rev to Plant QA Program as Described in Chapter 17 of Unit 2 Fsar,Per 10CFR50.54(a)(3).Rev Would Relocate to Controlled Document Other than Fsar,Units 1 & 2 Lists of SR SSC Comprising Items Covered Under QA Program1999-01-27027 January 1999 Submits Proposed Rev to Plant QA Program as Described in Chapter 17 of Unit 2 Fsar,Per 10CFR50.54(a)(3).Rev Would Relocate to Controlled Document Other than Fsar,Units 1 & 2 Lists of SR SSC Comprising Items Covered Under QA Program HL-5728, Requests That RPV Shell Weld Ultrasonic Exams Be Performed Using Techniques & Procedures,Iaw ASME Section Xi,App Viii, 1992 Edition,1993 Addendum,In Lieu of ASME Section XI,1989 Edition Exam Techniques & Procedures1999-01-19019 January 1999 Requests That RPV Shell Weld Ultrasonic Exams Be Performed Using Techniques & Procedures,Iaw ASME Section Xi,App Viii, 1992 Edition,1993 Addendum,In Lieu of ASME Section XI,1989 Edition Exam Techniques & Procedures HL-5712, Forwards Ehnp Intake Structure License Rept, to Provide Example of Technical Content & Level of Detail Planned for Application for License Renewal,For NRC Review1999-01-0707 January 1999 Forwards Ehnp Intake Structure License Rept, to Provide Example of Technical Content & Level of Detail Planned for Application for License Renewal,For NRC Review HL-5725, Informs That SNC Intends to Examine Approx Dozen Weld Overlays During Unit 1 Spring 1999 Outage That to Date Have Not Been Examined Three Times Since Weld Overlay Was Supplied1999-01-0707 January 1999 Informs That SNC Intends to Examine Approx Dozen Weld Overlays During Unit 1 Spring 1999 Outage That to Date Have Not Been Examined Three Times Since Weld Overlay Was Supplied 05000366/LER-1998-004, Forwards LER 98-004-01 Re Personnel Error Which Resulted in Condition Prohibited by Ts.Rev Is Necessary Because Original LER Reported Inadvertent Criticality Could Have Occurred1999-01-0404 January 1999 Forwards LER 98-004-01 Re Personnel Error Which Resulted in Condition Prohibited by Ts.Rev Is Necessary Because Original LER Reported Inadvertent Criticality Could Have Occurred HL-5710, Requests Approval of Alternative Reactor Vessel Weld Exam for Ehnp,Unit 1,per 10CFR50.55a(g)(6)(ii)(A)(5) for Permanently Excluding Exam of RPV Circumferential Shell Welds1998-12-0202 December 1998 Requests Approval of Alternative Reactor Vessel Weld Exam for Ehnp,Unit 1,per 10CFR50.55a(g)(6)(ii)(A)(5) for Permanently Excluding Exam of RPV Circumferential Shell Welds HL-5708, Provides Updated Response to RAI for GL 96-06, Waterhammer in Containment Coolers1998-11-20020 November 1998 Provides Updated Response to RAI for GL 96-06, Waterhammer in Containment Coolers HL-5573, Withdraws Requesting Exemption from Requirements of GDC 56 with Respect to Ei Hatch,Unit 2 Reactor bldg-to- Suppression Chamber Vacuum Relief Sys Design Due to Listed Reasons1998-10-19019 October 1998 Withdraws Requesting Exemption from Requirements of GDC 56 with Respect to Ei Hatch,Unit 2 Reactor bldg-to- Suppression Chamber Vacuum Relief Sys Design Due to Listed Reasons HL-5687, Forwards Required 120-day Response to GL 98-04, Potential for Degradation of ECCS & Containment Spray Sys After LOCA Because of Const & Protective Coating Deficiencies & Foreign Matl in Containment1998-10-19019 October 1998 Forwards Required 120-day Response to GL 98-04, Potential for Degradation of ECCS & Containment Spray Sys After LOCA Because of Const & Protective Coating Deficiencies & Foreign Matl in Containment HL-5686, Informs That Corrective Actions Relative to Thermo-Lag 330-1 Issues Are Complete1998-10-16016 October 1998 Informs That Corrective Actions Relative to Thermo-Lag 330-1 Issues Are Complete HL-5697, Requests Delay of Insp of RPV Circumferential Shell Welds for Two Operating Cycles as Outlined in NRC Info Notice 97-63,Suppl 1 & That Proposed Alternative Be Authorized Per 10CFR50.55a(a)(3)(i),per1998-10-16016 October 1998 Requests Delay of Insp of RPV Circumferential Shell Welds for Two Operating Cycles as Outlined in NRC Info Notice 97-63,Suppl 1 & That Proposed Alternative Be Authorized Per 10CFR50.55a(a)(3)(i),per HL-5689, Forwards Request for NRC Finding of Exigent Circumstance Re License Amend for Extended Power Update Operation.Changes Would Be Made While Plant Is Operating,Which as Stated,Has Potential to Create Unnecessary Plant Transients1998-09-30030 September 1998 Forwards Request for NRC Finding of Exigent Circumstance Re License Amend for Extended Power Update Operation.Changes Would Be Made While Plant Is Operating,Which as Stated,Has Potential to Create Unnecessary Plant Transients HL-5673, Informs NRC That Util Intends to Load Four Lead Use Assemblies Into Unit 2 Core as Part of Reload 14/Cycle 15 During Fall 1998 Refueling Outage.Proprietary Info Encl. Proprietary Info Withheld,Per 10CFR2.7901998-09-18018 September 1998 Informs NRC That Util Intends to Load Four Lead Use Assemblies Into Unit 2 Core as Part of Reload 14/Cycle 15 During Fall 1998 Refueling Outage.Proprietary Info Encl. Proprietary Info Withheld,Per 10CFR2.790 HL-5680, Informs NRC of Util Plans & Schedule for Exam of Unit 1 RPV Shell Welds.Util Anticipates Having Final Relief Request Submitted to NRC for Review by 9907011998-09-18018 September 1998 Informs NRC of Util Plans & Schedule for Exam of Unit 1 RPV Shell Welds.Util Anticipates Having Final Relief Request Submitted to NRC for Review by 990701 1999-09-20
[Table view] Category:UTILITY TO NRC
MONTHYEARHL-1278, Responds to NRC Re Violations Noted in Insp Repts 50-321/90-15 & 50-366/90-15.Corrective Actions: Mispositioned Valves 1E21-F025B & 1E21-F027B Placed in Correct Positions & Technicians Disciplined1990-09-12012 September 1990 Responds to NRC Re Violations Noted in Insp Repts 50-321/90-15 & 50-366/90-15.Corrective Actions: Mispositioned Valves 1E21-F025B & 1E21-F027B Placed in Correct Positions & Technicians Disciplined HL-1176, Forwards Updated Listing of Outstanding Licensing Requests for Plant,Tabulated Chronologically by Util Submittal Date1990-09-12012 September 1990 Forwards Updated Listing of Outstanding Licensing Requests for Plant,Tabulated Chronologically by Util Submittal Date HL-1237, Requests Permission to Use Facility Reactor Bldg Crane to Move Large Shipping Casks,Per Tech Spec 3.10.F.1 & 4.10.F.11990-09-0404 September 1990 Requests Permission to Use Facility Reactor Bldg Crane to Move Large Shipping Casks,Per Tech Spec 3.10.F.1 & 4.10.F.1 HL-1250, Forwards Post-Refueling Outage Startup Test Rept,Unit 1 Cycle 13, Per Tech Spec 6.9.1.1.Rept Presents Static & Dynamic Functional Core Tests Performed During Startup from Spring 1990 Maint/Refueling Outage1990-08-27027 August 1990 Forwards Post-Refueling Outage Startup Test Rept,Unit 1 Cycle 13, Per Tech Spec 6.9.1.1.Rept Presents Static & Dynamic Functional Core Tests Performed During Startup from Spring 1990 Maint/Refueling Outage ML20059C6551990-08-27027 August 1990 Informs of Intention to Transfer Right of Way for Road 451 to Appling County So Road Can Be Straightened & Paved. Transfer Will Have No Significant Impact on Use of Road & Site Emergency Plan ML20028G8441990-08-27027 August 1990 Forwards Owners Data Rept for Inservice Insp Ei Hatch Nuclear Plant Unit 1 Feb-June 1990. HL-1245, Forwards Fitness for Duty Performance Data for First Six Month Reporting Period,Per 10CFR26.71d1990-08-23023 August 1990 Forwards Fitness for Duty Performance Data for First Six Month Reporting Period,Per 10CFR26.71d ML20056B3011990-08-20020 August 1990 Forwards Revised Ei Hatch Nuclear Plant,Units 1 & 2 Inservice Insp Program Second 10-Yr Interval, for Review & Approval.Program Will Be Implemented While Awaiting SER HL-1215, Informs of Implementation of Amend 169 to Facility Tech Specs1990-07-26026 July 1990 Informs of Implementation of Amend 169 to Facility Tech Specs HL-1035, Forwards Nuclear Decommissioning Funding Plan for Plant,Per 10CFR50.75(b) & 33(k).Reasonable Assurance That NRC Prescribed Min Funding Will Be Available to Decommission Each Unit on Current Expiration Date Exists1990-07-25025 July 1990 Forwards Nuclear Decommissioning Funding Plan for Plant,Per 10CFR50.75(b) & 33(k).Reasonable Assurance That NRC Prescribed Min Funding Will Be Available to Decommission Each Unit on Current Expiration Date Exists HL-1158, Forwards Rev 0 to SIR-90-039, Flaw Evaluation & Weld Overlay Designs for Ei Hatch Unit 1 Spring 1990 Refueling Outage. Rept Details IGSCC Exam Results,Weld Overlay Design & Evaluation of Weld Shrinkage Stresses1990-06-29029 June 1990 Forwards Rev 0 to SIR-90-039, Flaw Evaluation & Weld Overlay Designs for Ei Hatch Unit 1 Spring 1990 Refueling Outage. Rept Details IGSCC Exam Results,Weld Overlay Design & Evaluation of Weld Shrinkage Stresses ML20043E6691990-06-0707 June 1990 Forwards Rev 0 to Core Operating Limits Rept for Operating Cycle 13, Per Amend 168 to License DPR-57 ML20043C8621990-05-31031 May 1990 Submits Certification That Operator Licensing Simulation Facility Located at Plant Meets NRC Requirements ML20043A8081990-05-0707 May 1990 Forwards Response to NRC 900410 Ltr Re Violations Noted in Insp Repts 50-321/90-07 & 50-366/90-07.Encl Withheld (Ref 10CFR73.21) ML20042F3331990-05-0101 May 1990 Provides Response to Generic Ltr 89-19, Safety Implication of Control Sys in LWR Nuclear Power Plants. Plant Procedures Address Possibility of Vessel Overfill Events & Training Alert Operators to Potential Overfills ML20012C6351990-03-14014 March 1990 Responds to Generic Ltr 89-19 Re Safety Implementation of Control Sys in LWR Nuclear Power Plants,Per 890920 Request & Understands That NRC Has Agreed to Extend Response Deadline Until 900504 ML20012B7291990-03-0707 March 1990 Forwards Owners Data Rept for Inservice Insp Ei Hatch Nuclear Plant,Unit 2 Sept-Dec 1989 & Metallurgical Evaluation of Four Inch Pipe to Elbow Weld from Plant Hatch, Unit 2. ML20012B1161990-03-0707 March 1990 Forwards Results of Circuit Breaker Testing,Per Bulletin 88-010,per Telcon W/Lp Crocker ML20012A1261990-03-0101 March 1990 Forwards Completed Questionnaire in Response to Generic Ltr 90-01, Request for Voluntary Participation in NRC Regulatory Impact Survey. ML20012A9051990-02-27027 February 1990 Forwards Summary Rept of Present Level & Source of Onsite Property Damage Insurance Coverage for Plant ML20012B4101990-02-22022 February 1990 Discusses NRC 900221 Granting of Discretionary Enforcement to Continue Shutdown Cooling Operation Until Reactor Level Instrument 1B21-N080A Can Be Returned to Svc.Replacement Expected to Be Completed by 900222 ML20006F4561990-02-20020 February 1990 Responds to Request for Addl Info Re Generic Ltr 88-11, NRC Position on Radiation Embrittlement of Reactor Vessel Matl & Impact on Plant Operations. RTNDT Value for Unit 2 Closure Flange Region Addressed ML20006D7481990-02-0606 February 1990 Forwards Final Technical Rept, Edwin I Hatch Nuclear Plant Unit 2 Reactor Containment Bldg 1989 Integrated Leakage Rate Test for Fall 1989 Maint/Refueling Outage,Per IE Notice 85-071 ML20006C9481990-01-31031 January 1990 Responds to NRC 900102 Ltr Re Violations Noted in Insp Repts 50-321/89-28 & 50-366/89-28.Corrective Actions:Deficiency Card Documenting Event Initiated as Required by Plant Procedures ML20006A8911990-01-23023 January 1990 Responds to Generic Ltr 89-13 Re Svc Water Sys Problems Affecting safety-related Equipment.Util Plans to Augment Existing Programs or Implement New Programs to Meet Intent of Generic Ltr ML20005F9341990-01-10010 January 1990 Offers No Comments Re SALP Repts 50-321/89-22 & 50-366/89-22 Dtd 891205 ML20005E6491990-01-0202 January 1990 Responds to NRC 891208 Ltr Re Violations Noted in Insp Repts 50-321/89-30 & 50-366/89-30.Corrective Actions:Util Personnel Documented Engineering Judgment Used as Basis for Use of Agastat Relays in Question ML20005E5621989-12-28028 December 1989 Certifies That fitness-for-duty Program Meets 10CFR26 Requirements.Util Screens for Two Addl Substances Not Required by Rule,Benzodiazepine & Barbiturates.List Re Panel & Cutoff Levels Encl ML20005E1411989-12-28028 December 1989 Responds to Generic Ltr 89-10, Motor-Operated Valve Testing & Surveillance. Thermal Overloads on Most safety-related motor-operated Valves Are Jumpered During Operation.Epri Developing Program to Calculate Valve Thrust Requirements ML20005D9611989-12-22022 December 1989 Forwards Rev to Physical Security Plan.Rev Withheld (Ref 10CFR73.21) ML20011D8721989-12-21021 December 1989 Responds to NRC Bulletin 89-002, Stress Corrosion Cracking of High-Hardness Type 410 Stainless Steel Internal Preloaded Bolting in Anchor-Darling S350W.... Review of Sys Drawings Determined That No Subj Valves Installed at Facilities ML19332G0371989-12-13013 December 1989 Summarizes Util Plans to Recaulk & Seal Plant Refueling Floor Precast Concrete Panel Walls,Per 891129 Telcon. Special Purpose Procedure Developed to Ensure That Containment Integrity Maintained During Recaulking ML19332G0201989-12-12012 December 1989 Forwards Addl Info Re Use of Code Case N-161 for Upgrading Ultrasonic Insp & Testing Instrument Calibr Blocks ML19332F3571989-12-0707 December 1989 Provides Feedback on NRC Pilot Project Involving Electronic Distribution of NRC Generic Communications.Sys Found to Be Most Useful Re Generic Ltrs & Bulletins Where Timely Receipt Critical ML19332E1521989-11-29029 November 1989 Responds to NRC 891101 Ltr Re Violations Noted in Insp Repts 50-321/89-19 & 50-366/89-19.Corrective Actions:Procedure 31GO-INS-001-OS Revised to Include Requirements to Record & Compare Valve Stroke Times Following Valve Maint ML19332D0921989-11-22022 November 1989 Responds to Generic Ltr 89-21 Re Status of Implementation of USI Requirements.Closure Plan for USI A-10 Will Be Submitted in 1990.Response to USI A-47 Re Safety Implications of Control Sys Will Be Submitted in Mar 1990 ML19332E4451989-11-21021 November 1989 Certifies That Initial & Requalification License Operator Training Programs at Plant Accredited & Based on Sys Approach to Training,Per Generic Ltr 87-07 ML19327C2451989-11-13013 November 1989 Forwards Amend 13 to Indemnity Agreement B-69 ML19332B9461989-11-10010 November 1989 Forwards Updated Chronological Tabulated List of Outstanding Licensing Requests for Plant.List Identifies Priority Items for Early NRC Approval ML19327C0321989-11-0606 November 1989 Advises That No Corrections Necessary Re 890331 Response to NRC Bulletin 88-010,Suppl 1.Documentation Available at Plant Site for Review ML19325E8821989-11-0101 November 1989 Responds to Generic Ltr 89-07, Power Reactor Safeguards Contingency Planning for Surface Vehicle Bombs. Contingency Plan Developed Which Has Been Added to Security Plan to Include short-term Actions Against Attempted Sabotage ML19324B8741989-10-27027 October 1989 Transmits Proposed Program for Completing Individual Plant Exam Process,Per Generic Ltr 88-20 & NUREG-1335.Program Should Identify Method & Approach Selected for Performing Exam ML19325E5491989-10-27027 October 1989 Submits Update on Lighting Observed During NRC Insp on 891002-06.All Temporary Lighting Reinstalled.Mfg of Four Cluster Lights,Holophane,Has Been Onsite & Will Give Recommendations for Permanent Lighting ML19327B6151989-10-24024 October 1989 Responds to Generic Ltr 89-16, Hardened Vent, by Encouraging Licensees to Voluntarily Install Hardened Vent Under 10CFR50.59 ML19327B3001989-10-23023 October 1989 Documents NRC Agreement W/Util Justification for Use of Pathway Corp as Replacement Bellows Vendor,Based on 891004 Telcon.Util Proceeding W/Procurement of Replacement Bellows ML19327B1551989-10-17017 October 1989 Forwards Revs 0 to Corporate Emergency Implementing Procedures,Including HNEL-EIP-01,HNEL-EIP-02,HNEL-EIP-03, HNEL-EIP-04,HNEL-EIP-05,HNEL-EIP-06,HNEL-EIP-07,HNEL-EIP-08, HNEL-EIP-10 & HNEL-EIP-11 ML19325C7451989-10-11011 October 1989 Advises That Effective 890913 Th Hunt No Longer Employed by Util.Operator License Terminated ML20248H3061989-10-0404 October 1989 Forwards Revised Tech Specs to Util 890622 Application for Amends to Licenses DPR-57 & NPF-5,per NRC Request,Re cycle- Specific Parameter Limits ML20247G4631989-09-14014 September 1989 Responds to NRC Re Violations Noted in Insp Repts 50-321/89-08 & 50-366/89-08.Corrective Actions:Procedure Revised to Include Periodic Analysis of Fuel Oil Parameters & Change Sampling Methodology ML20246D4541989-08-22022 August 1989 Forwards Corrected Tech Spec Changes Re Reactor Protection Sys Instrumentation Surveillance Requirements,Per NRC Request 1990-09-04
[Table view] |
Text
-
-
- Georgia Power Cornpany 8 333 Piedmont Awenue At:anta. Geo gia 30308 Telephone 404 526-7020 , ,
MaMng Address ' '
Post Off.ce Box 4545 Attanta. Georg.a 30302 December 15,1.9pgen;7 p,, rgia power J. T. Beckham, Jr. tnd southem electnc system Vee Presrcent and General Vanager Nuclear Generat.on U. S. Nuclear Regulatory Comission
REFERENCE:
Office of Inspection and Enforcement RII: JP0 Region II - Suite 2900 50-321 101 Marietta Street, NW I&E Bulletin Atlanta, Georgia 30303 82-03 ATTENTION: Mr. James P. O'Reilly GENTLEMEN:
Georgia Power Company (GPC) hereby submits the following infonnation concerning inservice inspection activities at Plant Hatch Unit 1 in response to Items 1 and 4 of NRC I&E Bulletin 82-03. The subject bulletin pertains to stress corrosion cracking in austenitic stainless steel Recirculation System piping. A response to Items 2 and 3 of the bulletin will be submitted pursuant to bulletin requirements prior to resuming power operation af ter completion of the maintenance / refueling outage currently in ,
progress.
Response to Item 1 Please refer to the response to Item 4d for discussion on the qualification of ultrasonic test procedures employed during inservice inspection activities at Plant Hatch Unit 1.
l Response to Item 4a (1)
A total of fifty-one (51) circumferential and branch connection welds and six (6) longitudinal welds were examined ultrasonically during the 1982 inservice inspection. Please refer to Attachment 1 for isometric drawings of the Recirculation System piping. Welds which have been examined during the 1982 inservice inspection are denoted by circled weld numbers.
Response to Item 4a (2)
Please refer to Attachment 2 for criteria identification for weld sample selection. Discussed are the original scope of examinations, additional code-required examinations resulting from reportable indications observed in the original scope of examinations, and additional i
examinations in excess of code requirements performed by GPC.
8301040568 821215 DR ADOCK 05000321 PDR bf
Georgia Power d U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement December 15, 1982 Page Two Response to Item 4a (3)
The following piping materials are used in the Recirculation System at Plant Hatch Unit 1:
12" Recirculation - Type 304 austenitic stainless steel, welded pipe (with filler metal) per ASTM A-358 Class 1 with ASTM A-240 base material; .568 inch min. wall (based on nominal 0.D.). :
22" Recirculation - Type 304 austenitic stainless steel welded pipe (with filler metal) per ASTM A-358 Class 1 with ASTM A-240 base material; .975 inch min. wall.
28" Recirculation - Suction side: Type 304 austenitic stainless steel welded pipe (with filler metal) per ASTM A-358 Class 1 with ASTM A-240 base material; 1.088 inch min, wall.
Discharge side: Type 304 austenitic stainless steel welded pipe (with filler metal) per ASTM A-358 Class 1 with ASTM A-240 base material; 1.263 inch min. wall.
Note: Four inch (4") Recirculation not addressed since piping removed during 1977 maintenance / refueling outage and capped.
Response to Item 4a (4)
Approximately thirty (30) man-rem were incurred in the perfonnance of f the inservice inspection. The exposure incurred does not include l radiation exposure resulting from insulation removal and opening of sacrificial shield doors.
Response to Item 4b l
The following is a summary description of procedures and techniques used during ultrasonic examination of austentic stainless steel piping at the Plant Hatch Unit 1.
ht!!%
j Georgia Power A 4
U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement December 15, 1982
- Page Three
, Response to Item 4b (Continued)
! A. Procedures
- 1. Southern Company Services (SCS) UT-H-400
- 2. Southwest Research Institute (SwRI) 600-3/59
- 3. Southwest Research Institute (SwRI) 700-5/8 l These procedures require a 3/8" diameter, 1.5 MHz 450 angle beam i transducer to be used during the ultrasonic examination of l austentic piping.
B. Calibration Standards i
Stainless steel curved calibration blocks incorporating 1/8" i diameter side drilled holes at 1/4T, 1/2T, and 3/4T depths were utilized.
C. Scanning Sensitivity For manual UT examinations, scanning was performed at 14 dB above
- the Primary Reference Level. However, upon concurrence of an NDE Level III, this level could be reduced if baseline screen noise hindered the interpretation of the ultrasonic scope C RT. This scanning level was always at least 6 dB above the Primary Reference
. Level. For mechanized examinations, scanning was performed at 6 dB above the Primary Reference Level.
D. Recording Criteria All indications which produced a response greater than 20% of the Distance Amplitude Curve (Primary Reference Level) which were not i
determined to be caused by outside diameter geometry were recorded. In addition, the examiners were instructed that any
- indication interpreted to be significant should be recorded.
Response to Item 4c Examinations conducted since 1977 in the Recirculation System have been performed using 1.5 MHz transducers. Reportable indications were 1
identified using such equipment on the 4" RWCU Return piping during the 1981 inservice inspection at Plant Hatch Unit 1. The subject piping is 1 scheduled for replacement during the maintenance / refueling outage j currently in progress pursuant to a commitment made to NRC. No other 1 reportable indications due to intergranular stress corrosion cracking
! (IGSCC) have been observed using 1.5 MHz transducers at Plant Hatch Unit 1.
i 7tV7 /$
(
Georgia Power b U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement December 15, 1982 Page Four Response to Item 4d In cooperation with Electric Power Research Institute (EPRI) and Battelle Laboratories, an evaluation of the crack detection capabilities of ultrasonic procedures and techniques was developed at the Battelle-Columbus Laboratories in Columbus, Ohio. Portions of five 28" stainless steel recirculation system piping welds which contained liquid penetrant-identified IGSCC indications from the Nine Mile Point Nuclear Plant were prepared for ultrasonic examination. SCS and SwRI examined the 5 specimens using procedures and techniques mentioned in the response to Item 4b (excluding the mechanized procedure) and demonstrated to the satisfaction of NRC Inspectors, Mr. Bill Crowley and Mr. James Coley, the ability to adequately detect and evaluate IGSCC.
These specimens and the UT procedures and techniques were representative i of examinations that were performed at the Plant Hatch Unit 1. However, the SwRI remotely operated mechanized ultrasonic equipment procedures and techniques were not demonstrated at Battelle Laboratories. Upon review of the SwRI procedures and techniques, the ultrasonic examinations conducted with the remotely operated mechanized equipment were determined to be adequate in the detection of IGSCC.
Enclosed as Attachment 3 is a summary of reportable indications observed during the inservice inspection just completed on Plant Hatch Unit 1.
Should you have any questions in this regard, please contact this office.
J. T. Beckham, Jr. states that he is Vice President of Georgia Power Company i
and is authorized to execute this oath on behalf of Georgia Power Company, and that to the best of his knowledge and belief the facts set forth in this letter are true.
GEORGIA POWER COMPANY
'?NN t ' '
/ J. T. Beckham, Jr'.
Sworn to and subscribed before me this 15th day of December, 1982
_ . a ',y y (- 2 . _/
l u-
,/ ' g,hotarpPublic JAE/mb Enclosure
! xc: H. C. Nix, Jr.
Senior Resident Inspector USNRC, Document Control Desk (Washington) wm
- , . . - ~ . - . -_ , , - _ - - - . . _ , _ , - , . . _ - - . _ - . -- _ _ - - . . _ - . - _ _ , -- __ . . , . - _ _ , -
(-
6 ATTACHMENT 1 ISOMETRIC DRAWINGS FOR RECIRCULATION SYSTEM
- - - - . - - _ , .. - - ,.. . . - - - - - - - . - - - - - - - - - - - , - - - - - - - - - - - - -. ~ . -- - - - - - . - . - ,
r f, Q .
4LUO O
_3 p g
\ RPV
'N -</ C Ng - + :-NIA 4-. ,_'
7 /h [ 12"FIG. A8R-l B-H
, c h DISSIM!L 1 AR METAL) 55'-7 T 9 4 LO _ 22 A M - - - * , '
!*- 2 2" A M
_ b 0 WELD)
N' n 3LD-I flG. 6-/ fo FIG. S-S 4 LU-I ' W '2 0 0 66 '
5(g Q;gt e . Q N, - de- E ll- RH R - 24 "- A-R E T URN 5- "
- FIG B-21
- 5(O e Q ,
14 BC -g
,,,f15 'L0 -14' B C -2 (c;wu - 4, d'-L.
h hML 1- 4 )H A-2 ,,,1' g , , , , *- GR ATI NG
/
( D4 RL I- 2 }55 A-!+_.]
2n2I m--GR ATING g 4 sC'I eR2 HL ON PUMP Q O $C '
il L D y'
NOM DIA. 28" \
6LU -
STANDARD 22-H , q@ 5 99 PUMPJ f
\ - 10
d 4 g U-O M ATERI AL l'l SS / v
+ 9
/ > # \
O&
\* 2.
T6 'dg & IO iA *O 0
4 N >z Og b 'O
'O GEORGI A POWER COMPANY EDWIN I. H ATCH NO. I B31 - RECIRC A -
M AIN RECIRCUL ATION LOOP *A" 8-N
m f-) - .
40g o 3W 4o 2 N ,12*BR-C TNx 4-"\ r FIG B-# 9 4LD 22" B M ; l+-- 2 2 ' B M
'\\ 3LD-I DISSIMIL AR FIG. B-3 7 FIG. 8- 17 4LU-I 17 -"
5- CleRL 8- 4)SSB-IR g il + Ell-RHR-24*- B- RETUR N SB- w Ell-RHR-20*- B- DISC HA R G E ,, A N 3 WELD) 16 -<, -
15,B C - 3 16LU FIG $-M -
6LD g( - 15,B C -2 2
sg,
/\ ' Q B-1 9 gt , 9) (is st i. %)2B-2_ ag rrr, .-- G R ATI N G
- 77 r rn-GRATING p15BC-8 III y (c, a S s 6#
UI 'e 62 9 t4 LD - I 0
? D NOM. DIA 28 7LU -
p
$}
/y I3
\ \ \
~
M,w
." Il 13 LU A MAfE L S.S
/ I T j D /a 0 S b l O
-q, g
'o O(o.g -
6e 0 +& . O. '
Y
.4
? .
GEORGI A POWER COMPANY ,
,. . EDWIN I HATCH NO.1 .
938 - AECIRC B ,
NAIN RECIRCUL ATION LOOP ,B g ,3 q
^
l -
,, % }
i w
t
].
Y N I A .
PO d;
MN
. O C H C 6 R 1 l ,
E T -
i ,
A s OV WH B O
/ P v 4 1
$ A
.- G N 3 I N, -
R I g A O W v H ED GE "A a[
f l I ,
s
, 4 D
L
/ [* '
O F
SS m c, k I N
( A g M-M e A l
i o ,
w2'* f'#. 2N 2O I
^.
s C T RA I L CU EC RRI m-
,f -
1 C 3E BR
- l ,
I ,
t 4
s i ,0 v
8
/w />~
'q' d A
f / N
- H l
I
< [
\
U O L
I 9
H 2 2 s 2 2 s D
A R L I
A D A I D R N E M A T O T A N S M
^I f Y#
g 1
O 0 C N RH EC WT OA PH D"b A I
. 7 1
3 I 4 * - G R
N B B Ow H ED GE k , }
A < .
L, Y
un 4 .
c ,8 O
u D L
A k
o J O t F I
N 9 w- +c,8 MA
- M 4, B s -
G 2N Ep'o 2O I
'v k ,
T A < '
C U
L R A L I
CU 2,2 EC RR I
C -
1 C O s 3E 8R k i A o '
t vn s vn &
k ,
A ,
x C
/#
" HS 22 22S D L AR A iA D D RI NE M AT OTA NSM C.b
<O,
- 2 LD 0 2LD0 2LDO r 2LDO -
,'j/,'g -3LD
/,/~~ $E"D , 63' E"o ,/ 'E" ((~2LDO 3to
/ -4LU '
LU // 4LU
, ' ,'/j ~ 4LU I,'j/ 4 fj
',! / 4
,/j/
/' l 4
.-' ,j r-- 5(DSM) ,y
- 5(DSM)
/,I DSM)
/ ,
r--- 5(DSM)
/ ',7'/ l j -
- ,i j /lf - 4
/,r j j ,/ , '
I f ' / ! gi[~5(DSV)!,// 9 (' ./ /, g s.
l .
gs/ k g '\
,\ . u 3LUI u s b- 2 L DI U
- LUI LUI UI LUI h h "
\\-2 LDI 2 LDI 2LDI -2 L DI L 2LU 2 2 2 2 D 2LU 2LU 2LU 2LU
/ m
^
[ , m
~ ~
v _ h f _
m
~
/
/
s v
^
Y" v
^
t
'f '"
FIG. S -16
\ \,, . AR~g \* #2
~\ ,, . \* \ I2*4g_g gy.
W A q ., 'f A R~y I2 49, Fg'i 28* R 16 F,G. g'UIRC~4
/ Lj NOM DI A 12" STANDARD 17-H MATERIAL SS B 31- RECIRC - t2- AR - F B li- RECIRC AR - G B 34 - RE C IR C AR - H B it - RECIRC AR- J B18- RECIRC AR- K GEORGl A POWER COMPANY
,E(.14CUL A llCN RISERS *A LOOP EDWIN 1 HATCH NO 1 B Its
r ."\
/- 2LDO - 2LDO -2LDO - 2 LDO 2LDO
, 3LUO ,- 3LUO j g 3 LOO j g 3LUO / - 3LUO
,r - - 3 L D
/ f
v s j FIG . G - 17 iN \ \y \ \
2ge B R.g %-b Y,,g, BR'C BR .g 4_
- G .,, '/q NOM. DI A. 12" 8 STANDARD 17-H MAT E RI AL SS Bit- RECIRC BR A Bil- RECIRC BR-B Bil- RECIRC BR-C B31- RECIRC BR-D B it- RECIRC BR- E GEORG1 A POWER COMPANY RECIRCUL AT!ON RI"?RS - B' LOOP 8-to l
l
ATTACHMENT 2 EXAMINATION SAMPLE BASIS / LISTING l
l t
1 ._
e ORIGINAL SCOPE OF EXAMINATIONS Welds from the Recirc System were picked on the basis of ASME Section XI Code, NUREG-0313, Rev. 1 guidance (high stress welds with Sm 2 2.4), and commitments to NRC resulting from the Spring 1982 chloride intrusion. A total of nineteen circumferential welds were examined in the 4",12", 22" and 28" Recirc System piping. In addition, six longitudinal welds were examined. The following welds were examined:
! Weld #
Circumferential and Branch Connections 4A-1A 4A-10A 4B-1A 4B-10A 12 AR-K-1 12 AR-G-4 12 AR-G-5 12 BR-B-1 12 BR-D-4 12 BR-D-5 22 AM-1 22 AM-1BC-1 22 BM-3 22 BM-3BC-1 22 BM-4 28 A-1 28 A-2 28 A-14 28 A-15 Longitudinal 12 AR-G-4LU 12 BR-D-4LU 22 BM-3LD 28 A-2LD 28 A-14LU-0 28 A-14LU-I e ADDITIONAL CODE-REQUIRED EXAMINATIONS As a result of reportable indications observed in the original scope of examinations for Recirc, nineteen additional examinations were performed. Welds were chosen on the basis of high preliminary stress rule index (SRI) numbers provided by GE. The following J circumferential welds were examined:
Weld i SRI f % Carbon Content
- 12 AR-F-3 1.534 .075 l 12 AR-H-4 1.382 .075 l 12 AR-J-2 1.476 .075 12 BR-A-2 1.409 .075 12 BR-C-4 1.346 .075 12 BR-E-3 1.566 .075 22 AM-1BC-2 1.025 .060 22 AM-2 0.921 .056 ,
22 AM-3 1.041 .059 22 AM-3BC-1 1.041 .060 22 AM-3BC-2 1.063 .060 22 BM-1BC-1 0.99 .060 22 BM-1BC-2 0.988 .060 22 BM-2 1.037 .059 22 BM-3BC-2 1.016 .060 28 B-3 1.484 .059 28 B-7 1.415 .059 28 B-10 1.524 .069 28 B-15 1.496 .059
- Note: % Carbon Content unavailable at time of second sample determination; provided later by GE.
e ADDITIONAL EXAMINATIONS PERFORMED FOR GPC Eleven additional examinations were performed and were chosen on the basis of revised high SRI and carbon content. The following circumferential welds were examined:
Weld # SRI # % Carbon Content
- 12 AR-G-2 1.474 .075 12 AR-G-3 1.557 .075 12 AR-H-2 1.537 .075 12 AR-H-3 1.519 .075 12 AR-J-3 1.473 .075 12 BR-A-3 1.508 .075 12 BR-A-4 1.255 .075 12 BR-B-2 1.441 .075 12 BR-B-3 1.447 .075 12 BR-C-2 1.527 .075 12 BR-D-3 1.577 .047
i ATTACHMENT 3
SUMMARY
OF REPORTABLE INDICATIONS
The following is a summary of reportable indications found during the inservice inspection just completed on Plant Hatch Unit 1:
Weld No. IB31-lRC-22AM-1 Pipe to Cap Reference Location: 00 is top dead center of manifold looking toward cap.
Indications: Thirty-one 1/4" to 3/8" long axial indications on cap, 55-100% DAC, located uniformly around cap with a cluster at the bottom of the cap. Maximum depth is 63% through wall located 49" CW from 00 Weld No. IB31-1RC-22AM-1BC-1 Branch Connection Reference Location: 00 is at the top dead center of the manifold on the upstream side (toward cross). Clockwise is measured from 00 looking up the riser (900 is toward the reactor).
Indications: Seven 1/4" to 1/2" long indications on the weldolet oriented perpendicular to the weld, 20-50% DAC. Five are located from 63" to 77" CW from 00 and have no appreciable depth.
Two are located at approximately 200 CW from 00 with one having a maximum depth of 12% and the other having no appreciable depth.
Weld No. IB31-lRC-22AM-4 Pipe to Cap Reference Location: 00 is top dead center of manifold looking toward cap.
Indications: Thirty-two 1/4" to 1/2" long axial indications on cap ,
30-140% DAC, located uniformly around cap with clusters at top and bottom of cap. Maximum depth is 72% through wall located 56" CW from 00 Note: Weld IB31-lRC-22AM-4 added after reportable indications observed l in pipe to cap welds in original scope of examinations.
j Weld No. 1831-lRC-22BM-1 j Pipe to Cap l
Reference Location: Oo is top dead center of manifold looking toward cap.
Indications: Five 1/4" long axial indications on cap, 40-105% DAC. Two are located approximately 23" CW from 00 and three 60" CW f rom 00 (near top of cap). Maximum depth is 64% through wall located in the cluster of three near the top of the cap.
Note: Weld IB31-lRC-228M-1 added af ter reportable indications observed in pipe to cap welds in original scope of examinations.
Weld No.1831-lRC-22BM-4 Pipe to Cap Reference Location: 0o is top dead center of manifold looking tow 6rd cap.
Indications: Seventeen 1/4" to 1/2" long axial indications on cap, 30-130% DAC. Twelve of the seventeen indications are clustered near bottom of cap. The others are randomly distributed around the circumference of the weld. Maximum depth is 67% through wall located 66 1/2" CW from Oo in a cluster at the top.
Weld No. lEll-1RHR-208-D-3 Elbow to Pipe Reference Location: Looking toward pipe side with 00 on outside of elbow.
Indications: One 1/4" long axial indication on pipe side, 170% DAC, located 23" CW from 00, 94% through wall depth.
Four 1/4" to 3/8" long axial indications on pipe size, 40-140% DAC, located 34" to 37" CW from 00, depth less than above.
One 1 1/2" long circumferential indication on pipe size, 200% DAC, located 27" CW from 00, less than 10% through wall depth.
One 1 1/2" long circumferential indication on elbow side, 100% DAC, located 47" CW from 00, 33% through wall depth.
Weld No. lEll-lRHR-24B-R-13 Pipe to Pipe Reference Location: Oo is at the top dead center of the pipe looking toward the reactor recirculation system.
Indications: Six 1/4" to 3/8" long axial indications located on the upstream side of the weld. Three indications are located approximately 1" to 3" CW from 00 (top of pipe) and three indications are located approximately 14" to 17" CW from 0o. The maximum through wall depth is 47% for an indication located at the top of the pipe (5" CW on I.D.
surface).
Weld No. 1B31 -l RC-28A-14 was ultrasonically examined by SwRI and preliminary evaluations revealed the possibility of a 5 1/2" linear indication. This was reported to GPC by SwRI on a Customer Notification Form. However, extensive investigation, which included a complete reexamination by another inspection contractor (also NDE Level III review),
review of the construction (preservice) radiographs, and a reexamination and evaluation by another SwRI NDE Level III, concluded this indication to be inside surface geometry, i.e., counterbore. In addition, a SCS NDE Level III representating GPC reviewed the radiographs and ultrasonic data and concurred with the investigation and the weld was accapted for service.
- _ _ _ - _ - - _ _