MONTHYEARL-2021-073, Environmental Protection Plan Report Request to Renew Industrial Wastewater Facility Permit2021-04-16016 April 2021 Environmental Protection Plan Report Request to Renew Industrial Wastewater Facility Permit L-2020-095, Environmental Protection Plan Iww Permit No. FL0002208 Minor Permit Revision for Chlorine Dioxide2020-06-0909 June 2020 Environmental Protection Plan Iww Permit No. FL0002208 Minor Permit Revision for Chlorine Dioxide L-2018-128, Environmental Protection Plan Report Unusual or Important Environmental Event - Turtle Mortality2018-06-14014 June 2018 Environmental Protection Plan Report Unusual or Important Environmental Event - Turtle Mortality L-2017-160, Environmental Protection Plan Report Minor Permit Revision Request for Blowdown Sample Panel Discharge Iww Permit No. FL00022082017-09-13013 September 2017 Environmental Protection Plan Report Minor Permit Revision Request for Blowdown Sample Panel Discharge Iww Permit No. FL0002208 L-2017-012, Environmental Protection Plan Report2017-01-24024 January 2017 Environmental Protection Plan Report L-2016-069, Environmental Protection Plan Report - Request to Renew Industrial Wastewater Facility Permit2016-03-29029 March 2016 Environmental Protection Plan Report - Request to Renew Industrial Wastewater Facility Permit ML15313A3992015-10-0707 October 2015 St. Lucie, Units 1 and 2 - Submittal of Environmental Protection Plan Report Providing Additional Information Requested Regarding Biological Plan of Study L-2015-260, St. Lucie, Units 1 and 2 - Submittal of Environmental Protection Plan Report Providing Additional Information Requested Regarding Biological Plan of Study2015-10-0707 October 2015 St. Lucie, Units 1 and 2 - Submittal of Environmental Protection Plan Report Providing Additional Information Requested Regarding Biological Plan of Study ML15313A4742015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Common and Sci Names ML15313A4652015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Sea Turtle Data ML15313A4412015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Taxonomy QA Info ML15313A4402015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Sampling Dates All ML15313A4392015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Lab Sorter QA Scans ML15313A4382015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, IP Volume Filtered ML15313A4372015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, IP Numbers ML15313A4222015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Gill Net Soak Time ML15313A4212015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Gill Net Length Data ML15313A4202015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Gill Net Batch Weight Data ML15313A4192015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Gill Net Num Col-Meas ML15313A4032015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Beach Seine Length Data ML15313A4022015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Beach Seine Batch Weight ML15313A4012015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Beach Seine No. Coll-Meas ML15313A4002015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Addendum to Final Report and List of Contents L-2015-260, St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Common and Sci Names2015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Common and Sci Names L-2015-260, St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Sea Turtle Data2015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Sea Turtle Data L-2015-260, St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Taxonomy QA Info2015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Taxonomy QA Info L-2015-260, St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Sampling Dates All2015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Sampling Dates All L-2015-260, St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Lab Sorter QA Scans2015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Lab Sorter QA Scans L-2015-260, St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, IP Volume Filtered2015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, IP Volume Filtered L-2015-260, St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, IP Numbers2015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, IP Numbers L-2015-260, St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Gill Net Soak Time2015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Gill Net Soak Time L-2015-260, St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Gill Net Length Data2015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Gill Net Length Data L-2015-260, St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Gill Net Batch Weight Data2015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Gill Net Batch Weight Data L-2015-260, St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Gill Net Num Col-Meas2015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Gill Net Num Col-Meas L-2015-260, St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Beach Seine Length Data2015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Beach Seine Length Data L-2015-260, St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Beach Seine Batch Weight2015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Beach Seine Batch Weight L-2015-260, St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Beach Seine No. Coll-Meas2015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Beach Seine No. Coll-Meas L-2015-260, St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Addendum to Final Report and List of Contents2015-09-30030 September 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Addendum to Final Report and List of Contents L-2015-260, Biological Plan of Study Implementation, Water Quality Data - Tables 1-202015-04-30030 April 2015 Biological Plan of Study Implementation, Water Quality Data - Tables 1-20 ML15314A5872015-04-30030 April 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Trawl Distance Data ML15314A5862015-04-30030 April 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Trawl Length Data ML15314A5842015-04-30030 April 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Trawl No. Coll-Meas ML15314A5832015-04-30030 April 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Trawl Length Data ML15314A5812015-04-30030 April 2015 St. Lucie, Units 1 and 2 - Uprate Calibration Log Scans ML15313A4662015-04-30030 April 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Final Report L-2015-146, Florida Power & Light Company - Biological Plan of Study Implementation for St. Lucie Plant EPU Final Report - August 2011 - February 20152015-04-30030 April 2015 Florida Power & Light Company - Biological Plan of Study Implementation for St. Lucie Plant EPU Final Report - August 2011 - February 2015 L-2015-260, St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Trawl Distance Data2015-04-30030 April 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Trawl Distance Data L-2015-260, St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Trawl Length Data2015-04-30030 April 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Trawl Length Data L-2015-260, St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Trawl No. Coll-Meas2015-04-30030 April 2015 St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Trawl No. Coll-Meas L-2015-260, St. Lucie, Units 1 and 2 - Uprate Calibration Log Scans2015-04-30030 April 2015 St. Lucie, Units 1 and 2 - Uprate Calibration Log Scans 2021-04-16
[Table view] Category:Technical Specifications
MONTHYEARML23275A1132023-10-0202 October 2023 Improved Technical Specifications Conversion License Amendment Request NRC Request for Additional Information and FPL Responses Database - Volume 3 L-2023-126, Enclosure 1: Contents of Improved Technical Specifications (ITS) Submittal2023-10-0202 October 2023 Enclosure 1: Contents of Improved Technical Specifications (ITS) Submittal ML23275A1262023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 5.0, Administrative Controls, Revision 2 - Volume 16 ML23275A1252023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 4.0, Design Features, Revision 2 - Volume 15 ML23275A1232023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.8, Electrical Systems, Revision 2 - Volume 13 ML23275A1242023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.9, Refueling Operations, Revision 2 - Volume 14 ML23275A1212023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.6, Containment Systems, Revision 2 - Volume 11 ML23275A1112023-10-0202 October 2023 Improved Technical Specifications (ITS) Revision 2 Submittal Volumes 1 Through 16 ML23275A1192023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.4, Reactor Coolant System, Revision 2 - Volume 9 ML23275A1182023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.3, Instrumentation, Revision 2 - Volume 8 ML23275A1202023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.5, Emergency Core Cooling Systems, Revision 2 - Volume 10 ML23275A1162023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.1, Reactivity Control Systems, Revision 2 - Volume 6 ML23275A1152023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.0, LCO and SR Applicability, Revision 2 - Volume 5 ML23275A1142023-10-0202 October 2023 Improved Technical Specifications Conversion, Chapter 2.0, Safety Limits, Revision 1 - Volume 4 ML23275A1222023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.7, Plant Systems, Revision 2 - Volume 12 ML23275A1122023-10-0202 October 2023 Improved Technical Specifications Conversion License Amendment Request Self-Identified Administrative Changes - Volume 2 ML23275A1172023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.2, Power Distribution Limits, Revision 2 - Volume 7 L-2022-014, Supplement to License Amendment to Allow Risk Informed Completion Times for the 120-Volt AC Instrument Bus Requirements2022-01-13013 January 2022 Supplement to License Amendment to Allow Risk Informed Completion Times for the 120-Volt AC Instrument Bus Requirements ML22013A6602021-11-11011 November 2021 Amendment 31 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications ML21265A2952021-09-15015 September 2021 Enclosure 2 - Volume 10 - St. Lucie Plant, Units 1 and 2, Improved Technical Specifications Conversion ITS Section 3.5 Emergency Core Cooling Systems (Eccs), Revision 0 ML21265A2962021-09-15015 September 2021 Enclosure 2 - Volume 11 - St. Lucie Plant, Units 1 and 2, Improved Technical Specifications Conversion ITS Section 3.6 Containment Systems, Revision 0 ML21265A2902021-09-15015 September 2021 Enclosure 2 - Volume 5 - St. Lucie Plant, Units 1 and 2, Improved Technical Specifications Conversion ITS Section 3.0 LCO and SR Applicability, Revision 0 ML21265A2912021-09-15015 September 2021 Enclosure 2 - Volume 6 - St. Lucie Plant, Units 1 and 2, Improved Technical Specifications Conversion ITS Section 3.1 Reactivity Control Systems, Revision 0 ML21265A2932021-09-15015 September 2021 Enclosure 2 - Volume 8 - St. Lucie Plant, Units 1 and 2, Improved Technical Specifications Conversion ITS Section 3.3 Instrumentation, Revision 0 ML21265A2942021-09-15015 September 2021 Enclosure 2 - Volume 9 - St. Lucie Plant, Units 1 and 2, Improved Technical Specifications Conversion ITS Section 3.4 Reactor Coolant System (Rcs), Revision 0 L-2021-159, Enclosures 1,3,4,5, and 6 - Contents of the St. Lucie Plant, Units 1 and 2, Improved Technical Specifications (ITS) Submittal2021-09-15015 September 2021 Enclosures 1,3,4,5, and 6 - Contents of the St. Lucie Plant, Units 1 and 2, Improved Technical Specifications (ITS) Submittal ML21265A3012021-09-15015 September 2021 Enclosure 2 - Volume 16 - St. Lucie Plant, Units 1 and 2, Improved Technical Specifications Conversion ITS Chapter 5.0 Administrative Controls, Revision 0 ML21265A2972021-09-15015 September 2021 Enclosure 2 - Volume 12 - St. Lucie Plant, Units 1 and 2, Improved Technical Specifications Conversion ITS Section 3.7 Plant Systems, Revision 0 ML21265A2862021-09-15015 September 2021 Enclosure 2 - Volume 1 - St. Lucie Plant, Units 1 and 2, Improved Technical Specifications Conversion Application of Selection Criteria to the St. Lucie Plant Units 1 and 2 Technical Specifications, Revision 0 ML21265A2982021-09-15015 September 2021 Enclosure 2 - Volume 13 - St. Lucie Plant, Units 1 and 2, Improved Technical Specifications Conversion ITS Section 3.8 Electrical Systems, Revision 0 ML21265A3002021-09-15015 September 2021 Enclosure 2 - Volume 15 - St. Lucie Plant, Units 1 and 2, Improved Technical Specifications Conversion ITS Chapter 4.0 Design Features, Revision 0 ML21265A2992021-09-15015 September 2021 Enclosure 2 - Volume 14 - St. Lucie Plant, Units 1 and 2, Improved Technical Specifications Conversion ITS Section 3.9 Refueling Operations, Revision 0 ML21265A2922021-09-15015 September 2021 Enclosure 2 - Volume 7 - St. Lucie Plant, Units 1 and 2, Improved Technical Specifications Conversion ITS Section 3.2 Power Distribution Limits, Revision 0 ML21265A2892021-09-15015 September 2021 Enclosure 2 - Volume 4 - St. Lucie Plant, Units 1 and 2, Improved Technical Specifications Conversion ITS Chapter 2.0 Safety Limits, Revision 0 ML21265A2882021-09-15015 September 2021 Enclosure 2 - Volume 3 - St. Lucie Plant, Units 1 and 2, Improved Technical Specifications Conversion ITS Chapter 1.0 Use and Application, Revision 0 ML20141L6642020-05-0404 May 2020 Amendment 30 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications ML19203A1662019-07-26026 July 2019 Issuance of Exigent Amendment No. 248 Technical Specification 3/4.8.1 Change to Allow for a One-Time Extension of the Allowed Outage Time for One Emergency Diesel Generator ML18274A2242018-11-0202 November 2018 Issuance of Amendment Nos. 246 and 197 Regarding Technical Specifications Site Area Map L-2018-049, Application to Add Limiting Condition for Operation (LCO) 3.0.6 to the Technical Specifications2018-05-29029 May 2018 Application to Add Limiting Condition for Operation (LCO) 3.0.6 to the Technical Specifications L-2018-006, Third Response to Request for Additional Information Regarding License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Risk Informed Extended Completion Times - RITSTF Initiative 4b2018-02-0101 February 2018 Third Response to Request for Additional Information Regarding License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Risk Informed Extended Completion Times - RITSTF Initiative 4b ML16341C1752016-12-19019 December 2016 Correction to Amendment No. 237 Regarding the Update to Appendix B to the Renewed Facility Operating Licenses to Incorporate the 2016 Biological Opinion ML16166A4242016-10-0505 October 2016 St. Lucie Plant, Unit Nos. 1 and 2 - Issuance of Amendments Regarding the Use of a New Computer Code to Model the Containment Vacuum Analyses ML16183A1382016-09-19019 September 2016 Issuance of Amendments Regarding Technical Specification Change to Eliminate the Moderator Temperature Coefficient Surveillance Test at the End of Cycle ML16124A3832016-05-25025 May 2016 St. Lucie Plant, Unit No. 1 - Issuance of Amendment Regarding Changes to the Snubber Surveillance Requirements (CAC No. MF6490) ML16063A1212016-04-19019 April 2016 Redacted - Issuance of Amendment Regarding License Amendment Request for the Transitioning to Areva Fuel ML15344A3462016-03-31031 March 2016 Issuance of Amendments Regarding Transition to a Risk-Informed, Performance-Based Fire Protection Program in Accordance with Title 10 of the Code of Federal Regulations Section 50.48(c) (CAC Nos. MF1373 & MF1374) ML16034A0802016-03-0707 March 2016 Issuance of Amendments Regarding Technical Specification Change to Remove Communications and Manipulator Crane Requirements and Relocate to Licensee-Controlled Documents L-2015-303, Technical Specification Correction for License Amendment Request to Standardize the Required Actions for Inoperability of Auxiliary Feedwater Pumps2015-12-15015 December 2015 Technical Specification Correction for License Amendment Request to Standardize the Required Actions for Inoperability of Auxiliary Feedwater Pumps ML15280A4222015-10-19019 October 2015 Unit 2 Technical Specification Pages 6-15b ML15191A4032015-08-31031 August 2015 Issuance of Amendments to Adopt TSTF-426, Revision 5, Revise or Add Actions to Preclude Entry Into Limiting Condition for Operation 3.0.3 - RITSTF Initiative 6B and 6C 2023-10-02
[Table view] |
Text
APPENDIX B TO FACILITY OPERATING UCENSE NO. NPF-16 ST. LUCIE UNIT 2 I
ENVIRONMENTAL PROTECTION PLAN (NON-RADIOLOGICAL)
St. Lucie Unit 2 Amendment Nb. 103
1.0 Objectives of the Environmental Protection Plan The Environmental Protection Plan (EPP) is to provide for protection of the local area environment of the St. Lucie Nuclear plant during construction and operation.
The principle objectives of the EPP are to:
- 1. Verify that the plant is operated in an environmentally acceptable manner, as established by the Final Environmental Statement (FES) and other NRC environmental impact assessments.
- 2. Coordinate NRC requirements and maintain consistency with other Federal, State and local requirements for environmental protection.
- 3. Keep NRC informed of the environmental effects of facility construction and operation and of actions taken to control those effects.
Environmental concerns identified in the Unit 2 FES which relate to water quality matters are to be regulated by way of the licensee's Wastewater permit.
ST. LUCIE - UNIT 2 11 Amendment No. 126
2.0 Environmental Protection Issues In the FES-OL, the staff considered the environmental impacts associated with the operation of the St. Lucie Plant Unit 2. Certain environmental issues were identified which required study or license conditions for resolution of environmental concerns and to assure adequate environmental protection.
With assumption of aquatic monitoring programs by U.S. Environmental Protection Agency (EPA) through the NPDES program as delineated in NPDES Permit FL0002208 effective January 29, 1982, NRC will rely on EPA for resolution of issues involving the monitoring of water quality and aquatic biota. The only exception will involve the aquatic and terrestrial marine turtle programs which will be conducted under NRC jurisdiction (Section 2.1 of this EPP).
On May 1, 1995, the FDEP was granted authority by the U.S. Environmental Protection Agency (EPA) to administer the NPDES permitting programs. Pursuant to the Florida Administrative Code (FAC)62-620.105(10), the EPA-issued NPDES permit and the State-issued wastewater permit for each facility were to be combined into one document. The resulting single document, Wastewater Permit No. FL0002208, combines the NPDES Permit FL0002208 and the State Wastewater Permit 1056-194945.
2.1 Terrestrialaquatic issues raised in the Unit 2 FES-OL on marine turtles will be addressed by programs as follows:
- 1. Beach nesting surveys
- 2. Engineering/behavioral studies to evaluate and/or mitigate intake entrapment
- 3. Studies to evaluate and/or mitigate intake canal mortality
- 4. Light screen provisions at the beach to prevent hatchling misorientation
- 5. Nest survey and relocation programs in the vicinity of the beach and near-shore construction areas
- 6. Capture and release program including gross necropsy examinations on selected turtles NRC requirements with regard to marine turtles issues are specified in Subsection 4.2.1 of this EPP.
ST. LUCIE - UNIT 2 2-1 Amendment No. 126
6~~~~~~~~~~~~~~~~
3.0 Consistency Requirements 3.1 Plant Design and Operation The licensee may make changes in station design or operation or perform tests or experiments affecting the environment provided such changes, tests or experiments do not involve an unreviewed environmental question. Changes in-plant design or operation or performance of tests or experiments which do not significantly affect the environment are not subject to this requirement.
Before engaging in unauthorized construction or operational activities which may affect the environment, the licensee shall perform an environmental
-evaluation of such activity.* When the evaluation indicates that such activity involves an unreviewed environmental question, the licensee shalt provide a written evaluation of such activities and obtain prior approval from the NRC.
A proposed change, test or experiment shall be deemed to involve an unreviewed environmental question if it concerns (1) a matter which may result in a significant increase in any adverse environmental impact previously evaluated in the final environmental statement (FES), supplements to the FES, environ-mental impact appraisals, or in any decisions of the Atomic Safety and
- Activities are excluded from this requirement if all measurable nonradiological effects are confined to the on-site areas previously disturbed during site preparation, plant construction and previous plant operation.
3-1
Licensing Board; or (2) a significant change in effluents or power level (in accordance with 10 CFR Part 51.5(b)(2)); or (3) a matter not previously reviewed and evaluated in the documents specified in (1) of this Subsection, which may have a significant adverse environmental impact.
The licensee shall maintain records of change in facility design or operation and of tests and experiments carried out pursuant to this Subsection. These records shall include a written evaluation which provides bases for the determination that the change, test, or experiment does not involve an unreviewed environmental question.
Activities governed by Section 3.3 of this EPP are not subject to the requirements of this section.
3.2 Reporting Related to the Wastewater Permit and State Certification (pursuant to Section 401 of the Clean Water Act)
- 1. Violations of the Wastewater Permit or the State 401 Certification Conditions shall be reported to the NRC by submittal of copies of the reports required by the Wastewater Permit or State Certifications.
- 2. The licensee shall provide the NRC with.2 copy of any 316(b) studies related documentation and other biotic monitoring reports required by Wastewater Permit conditions at the same time they are submitted to the permitting agency.
- 3. Changes and additions to the Wastewater Permit or the State Certifications shall be reported to the NRC within 30 days following the date the ST. LUCIE - UNIT 2 3-2 Amendment No. 126
change is approved. If a permit or certification, in part or in its entirety, is appealed and stayed, the NRC shall be notified within 30 days following the date the stay is granted.
- 4. The NRC shall be notified of changes to the effective Wastewater Permit proposed by the licensee by providing NRC with a copy of the proposed change at the same time it is submitted to the permitting agency.
The licensee shall provide the NRC a copy of the application for renewal of the Wastewater Permit at the same time the application is submitted to the permitting agency.
3.3 Changes Required for Compliance with Other Environmental Regulations Changes in plant design or operation and performance of tests or experiments which are required to achieve compliance with other Federal, State, or local environmental regulations are not subject to the requirements of Section 3.1 ST. LUCIE - UNIT 2 3-3 Amendment No. 126
4.0 Environmental Conditions 4.1 Unusual or Important Environmental Events Any occurrence of an unusual or important event the indicates or could result in significant environmental impact causally related to station operation shall be recorded and promptly reported to the NRC Operations Center within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> via Emergency Notification System described in 10 CFR 50.72. In addition, the reporting requirements time frame shall be consistent with 10 CFR 50.72 for environmental protection issues. The initial report shall be followed by a written report as described in Section 5.4.2. The initial report shall be followed by a written report as described in Section 5.4.2. No routine monitoring programs are required to implement this condition. Events covered by Section 3.2 of this EPP will be subject to reporting requirements as defined in that section and not subject to these requirements.
The following are examples of unusual or important events: excessive bird impaction events; onsite plant or animal disease outbreaks; mortality (causally related to station operation), or unusual occurrence of any species protected by the Endangered Species Act of 1973; unusual fish kills; increase in nuisance organisms or conditions; and unanticipated or emergency discharge of waste water or chemical substances.
4.2 Terrestrial/Aquatic Issues The certifications and permits required under the Clean Water Act provide mechanisms for protecting water quality and indirectly, aquatic biota. The NRC will rely on the decisions made by the State of Florida under the authority of the Clean Water Act and, in the case of sea turtles, decisions made by the NMFS under the authority of the Endangered Species Act, for any requirements pertaining to terrestrial and aquatic monitoring.
In accordance with Section 7(a) of the Endangered Species Act, on May 4, 2001, the NMFS issued a revised Biological Opinion that revised the ITS and modified some of the terms and conditions of the previous Opinion. After discussions among the NRC, NMFS, and FPL and in response to an NRC letter dated June 8,2001, the NMFS issued a clarification of the issues in the new Biological Opinion and the ITS on October 8, 2001. The revised Biological Opinion concludes that continued operation of the St. Lucie Plant circulating seawater cooling system is not likely to jeopardize the
-continued existence of the listed species. No critical habitat has been designated for the specified species in the action area; therefore, none will be affected.
ST. LUCIE - UNIT 2 4-1 Amendment No. 4O3. 126
FPL shall adhere to the specific requirements within the ITS in the Biological Opinion as clarified by the NMFS and NRC. Changes to the ITS or the terms and conditions must be preceded by consultation between the NRC, as the authorizing agency, and NMFS.
4.2.1 DELETED l 4.2.2 DELETED I ST. LUCIE - UNIT 2 42 Amendment No. 403, 126
INTENTIONALLY DELETED ST. LUCIE - UNIT 2 4-3 Amendment No. 403. 126
INTENTIONALLY DELETED ST. LUCIE - UNIT 2 4-4 Amendment No. 4O3, 126
4.2.3 Light Screen to Minimize Turtle Disorientation Suitable plants (i.e., native vegetation such as live oak, native figs, wild tamarind, and others) shall be planted and maintained as a light screen along the beach dune line bordering the plant property to minimize turtle disorientation.
In addition, FPL owner controlled area lighting shall be shielded so that none of the light is diverted skyward.
4.3 General Exceptions The environmental conditions of the EPP Section 4 are contingent upon licensee or its contractors being able to obtain the necessary FDEP endangered species permits to take, handle, and experiment with sea turtles. If licensee is unable to obtain the necessary permits, then NRC shall be notified of alternatives by the licensee.
ST. LUCIE - UNIT 2 45 Amendment No. 4Q3. 126
5.0 Administrative Procedures 5.1 Review and Audit The licensee shall provide for review and audit of compliance with the Environmental Protection Plan. The audits shall be conducted independently of the individual or groups responsible for performing the specific activity. A description of the organization structure utilized to achieve the independent review and audit function and results of the audit activities shall be maintained and made available for inspection.
5.2 Records Retention Records and logs relative to the environmental aspects of plant operation shall be made and retained in a manner convenient for review and inspection. These records and logs shall be made available to NRC on request.
Records of modifications to plant structures, systems and components detennined to potentially affect the continued protection of the environment shall be retained for the life of the plant. All other records, data and logs relating to this EPP shall be retained for five years or, where applicable, in accordance with the requirements of other agencies.
5.3 Changes in Environmental Protection Plan Request for change in the Environmental Protection Plan shall include an assessment of the environmental impact of the proposed change and a supporting justification. Implementation of such changes in the EPP shall not commence prior to NRC approval of the proposed changes in the form of a license amendment incorporating the appropriate revision to the Environmental Protection Plan.
5.4 Plant Reporting Requirements 5.4.1 Routine Reports 5.4.1.lMonthly Reports Copies of monthly reports covering sea turtle entrapment, capture, rehabilitation, and sea turtle mortalities shall be furnished to NMFS.
5-1 St. Lucie Unit 2 Amendment No. 103
5.4.1.2Annual Environmental Operating Report An Annual Environmental Operating Report describing implementation of this EPP for the previous calendar year shall be submitted to the NRC prior to May 1 of each year.
The report shall include summaries and analyses of the results of the environmental protection activities required by Section 4.2 of this Environmental Protection Plan for the report period, including a comparison with preoperational studies, operational controls (as appropriate), and previous non-radiological environmental monitoring reports, and an assessment of the observed impacts of the plant operation on the environment. If harmful effects or evidence of trends towards irreversible damage to the environment are observed, the licensee shall provide a detailed analysis of the data and a proposed course of action to alleviate the problem.
The Annual Environmental Operating Report shall also include:
(a) A list of EPP noncompliances and the corrective actions taken to remedy them.
(b) A list of all changes in station design or operation, tests, and experiments made in accordance with Subsection 3.1 which involved a potentially significant unreviewed environmental issue.
(c) A list of nonroutine reports submitted in accordance with Subsection 5.4.2.
(d) A discussion of the sea turtle entrapment, capture efforts, turdle mortalities, available information on barrier net inspections and mnaintenance, and the Taprogge condenser tube cleaning system operation including sponge ball loss at St. Lucie Plant In the event that some results are not available by the report due date, the report shall be submitted noting and explaining the missing results. The missing data shall be submitted as soon as possible in a supplementary report 5.4.2 Nonroutine Reports A written report shall be submitted to the NRC in accordance with 10 CFR 50.4 within 30 days of occurrence of a nonroutine event. The report shall (a) describe, analyze, and evaluate the event, including extent and magnitude of the impact and plant operating characteristics, (b) describe the probable cause of the event, (c) indicate the action taken to correct the reported event, (d) indicate the 5-2 St. Lucie Unit 2 Amendment No. 103
corrective action taken to preclude repetition of the event and to prevent similar occurrences involving similar components or systems, and (e) indicate the agencies notified and their preliminary responses.
Events reportable under this subsection which also require reports to other Federal, State, or local agencies shall be reported in accordance with those reporting requirements in lieu of the requirements of this subsection. The NRC shall be provided a copy of such reports within 30 days of the date they submitted to the other agency.
5-3 St. Lucie Unit 2 Amendment N1o. 103