ML20053C463
From kanterella
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
ML20053C463 | |
Person / Time | |
---|---|
Site: | Hatch |
Issue date: | 05/23/1982 |
From: | Greve T, Rogers W GEORGIA POWER CO. |
To: | |
Shared Package | |
ML20053C456 | List: |
References | |
HNP-8152-01, HNP-8152-1, NUDOCS 8206020187 | |
Download: ML20053C463 (3) | |
Similar Documents at Hatch | |
---|---|
Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20212J2721999-10-0101 October 1999
[Table view]Proposed Tech Specs,Modifying DG Fuel Oil Storage Requirements ML20210G2971999-07-29029 July 1999 Proposed Tech Specs LCO 3.1.7 Re Standby Liquid Control Sys ML20210A4041999-07-15015 July 1999 Ei Hatch Nuclear Plant Unit 1,Extended Power Uprate Startup Test Rept for Cycle 19 ML20204J6031999-03-19019 March 1999 Ei Hatch Nuclear Plant Unit 2 Extended Power Uprate Startup Test Rept for Cycle 15 ML20203C5931999-02-0505 February 1999 Proposed Tech Specs Pages Revising TS to Implement Previously Approved Generic Changes ML20199J9081999-01-21021 January 1999 Proposed Tech Specs Increasing Allowable Values for Reactor Bldg & Refueling Floor Ventilation Exhaust Radiation Monitors ML20197H5171998-12-0404 December 1998 Proposed Tech Specs Section 2.1.1.2,deleting Footnote Which Specifies That SLMCPRs Are for Cycle 18 Only & TS Section 5.6.5.b.2 ML20236U2551998-07-22022 July 1998 Proposed Tech Specs Increasing Allowable Values for High Radiation Trip for Reactor Bldg & Refueling Floor Ventilation Exhaust Monitors ML20217A0861998-04-30030 April 1998 Ei Hatch Nuclear Plant,Units 1 & 2,Process for Implementing Technical Requirements of 10CFR54,License Renewal Rule HL-5558, Edwin I Hatch Nuclear Plant,Unit 1,Power Uprate Startup Test Rept for Cycle 181998-02-17017 February 1998 Edwin I Hatch Nuclear Plant,Unit 1,Power Uprate Startup Test Rept for Cycle 18 ML20197K1861997-12-18018 December 1997 Marked-up Pages to Licenses DPR-57 & NPF-5,respectively. Proposed Changes Delete or Modify Existing License Conditions,Surveillance Requirements That Have Been Completed & Exemptions That Are No Longer in Effect ML20211J1861997-10-0101 October 1997 Corrected TS Pages Unit 1 & 2 Page 3.4-8,Unit 1 Page 3.5-6 & Unit 2 Page 3.5-5 Provided in Order for Util to Issue Amends 208 & 150 to Manual Holders ML20211A2301997-09-19019 September 1997 Proposed Tech Specs Page 2.0-1 & Corresponding mark-up Page Re SLMCPR ML20210J0491997-08-0808 August 1997 Proposed Tech Specs,Allowing Plant to Operate at Uprated Power Level of 2763 Mwt Which Represents Power Level Increase of 8% HL-5438, Ei Hatch Nuclear Plant - Unit 2 Power Uprate Startup Test Rept for Cycle 141997-07-21021 July 1997 Ei Hatch Nuclear Plant - Unit 2 Power Uprate Startup Test Rept for Cycle 14 ML20141B7591997-05-0909 May 1997 Proposed Tech Specs 2.1.1.2,revising Safety Limit Minimum Critical Power Ratio to Reflect Results of Cycle Specific Calculation Performed for Unit 1 Operating Cycle 18,expected to Commence in Nov 1997 ML20141B8561997-05-0909 May 1997 Proposed Tech Specs,Revising Operability Requirements for Rod Block Monitor Sys HL-5376, Proposed Tech Specs 3.4.9 Re Reactor Coolant Sys Pressure & Temp Limits1997-04-29029 April 1997 Proposed Tech Specs 3.4.9 Re Reactor Coolant Sys Pressure & Temp Limits ML20133F3641997-01-0707 January 1997 Proposed Tech Specs Providing Alternate Method of Testing S/Rvs During Shutdown Conditions Rather than During Unit Startup as Is Currently Done ML20138G6271996-12-19019 December 1996 Rev 11 to ODCM for Ei Hatch Nuclear Plant ML20132G2261996-12-17017 December 1996 Proposed Tech Specs Re pressure-temp Limits ML20132E0161996-12-13013 December 1996 Proposed Tech Specs Re Physical Security & Contigency Plan & Guard Training & Qualification Plan ML20135D4881996-12-0303 December 1996 Proposed Tech Specs Revising SLMCPR Values Based Upon Unique plant-evaluations for Current Cycle 13 & Use of GE-13 Fuel in Next Cycle 14 ML20129H9181996-10-29029 October 1996 Proposed Tech Specs,Associating Changes W/Installation of Digital Power Range Neutron Monitoring Sys & Incorporation of long-term Stability Solution Hardware ML20128M8701996-10-0707 October 1996 Proposed Tech Specs to Licenses DPR-57 & NPF-5,increasing Nominal Mechanical Pressure Relief Setpoints for All SRVs & Allow Operation W/One SRV & Associated Functions Inoperable ML20113F5541996-09-19019 September 1996 Proposed Tech Specs,Clarifying Applicability of Certain Surveillances Addressing Rvp & Temp Limits & Replacing Vessel Pressure & Temp Limit Curves W/New Curves ML20117M2251996-09-11011 September 1996 Proposed Tech Specs,Authorizing Southern Nuclear to Become Licensed Operator & to Have Exclusive Responsibility & Control Over Physical Const,Operation & Maint of Plant HL-5192, Edwin I Hatch Nuclear Plant,Unit 1,Power Uprate Startup Test Rept for Cycle 171996-07-18018 July 1996 Edwin I Hatch Nuclear Plant,Unit 1,Power Uprate Startup Test Rept for Cycle 17 ML20115J4861996-07-16016 July 1996 Proposed Tech Specs,Reflecting Changes Through June 1996, Satisfying Requirements of 10CFR50.71 ML20212C1491996-05-31031 May 1996 Stability Monitor ML20117H1391996-05-21021 May 1996 Proposed Tech Specs 3.5.2,ECCS - Shutdown & 3.5.2.2.b SR for Units 1 & 2 Revise to Change Unit 1 CST Water Level Requirement from 12 Feet to 13 Feet & Change Unit 2 CST Water Level Requirement from 12 Feet to 15 Feet ML20100P1041996-03-0404 March 1996 Ei Hatch Nuclear Plant Unit 2 Power Uprate Startup Test Rept for Cycle 13 ML20100H7431996-02-21021 February 1996 Proposed Tech Specs,Revising Changes of Drywell Air Temp LCO from 350 F to 150 F ML20094K3831995-11-10010 November 1995 Proposed Tech Specs,Reflecting Implementation of 10CFR50,App J,Option B ML20093G9401995-10-0505 October 1995 Inservice Insp Program Third 10-Year Interval for Ei Hatch Nuclear Plant Units 1 & 2 ML20092H6461995-07-24024 July 1995 Ei Hatch Nuclear Plant Units 1 & 2 IST Program ML20085K4011995-06-20020 June 1995 Proposed Tech Specs for Power Uprate ML20086E8471995-06-19019 June 1995 Rev 0 to Field Disposition Instruction (Fdi) HT2-0121-12900. Fdi Documents Design Requirements & Matl Required to Install Stabilizers for Shroud Horizontal Welds ML20086E8311995-06-0909 June 1995 Rev 0 to Fabrication Spec 25A5719, Fabrication of Shroud Stabilizer ML20086E8141995-06-0606 June 1995 Rev 1 to Code Design Spec 25A5717, Shroud Stabilizers ML20085A1661995-06-0606 June 1995 Proposed Tech Specs Re Secondary Containment Draw Down & Vacuum Surveillance Requirement Acceptance Criteria ML20086E8121995-05-17017 May 1995 Rev 0 to Design Spec 25A5718, Shroud Repair Hardware ML20082V3791995-05-0404 May 1995 Proposed Tech Specs,Minimizing Thermal Stratification Events ML20082L3331995-04-14014 April 1995 Proposed Tech Specs Re Elimination of Selected Response Time Testing Requirements from TS ML20081F3471995-03-14014 March 1995 Proposed Improved Ts,Permitting Drywell & Wetwell Purge Valves Isolated by Drywell Radiation Monitor Signal to Be Opened W/Inoperable Drywell Radiation Monitor ML20077S0331995-01-13013 January 1995 Proposed Tech Specs Allowing Plant to Operate at Uprated Power Level of 2558 Mwt ML20077D8921994-12-0202 December 1994 Proposed Deleted ETS ML20078G7161994-11-0101 November 1994 Proposed Tech Specs,Converting Current TSs to Improved TS Consistent w/NUREG-1433 ML20076L6911994-10-19019 October 1994 Proposed Improved Tech Specs,Rev F ML20149G3751994-10-13013 October 1994 Proposed Tech Specs,Lowering ATWS-RPT Setpoint by Approx 2 Ft 2 Inches Allowing Restarting Recirculation Pump Following RPT When Temp Differential Between Coolant at Reactor Bottom Head & Reactor Steam Dome Cannot Be Obtained 1999-07-29 Category:TEST/INSPECTION/OPERATING PROCEDURES MONTHYEARML20217A0861998-04-30030 April 1998
[Table view]Ei Hatch Nuclear Plant,Units 1 & 2,Process for Implementing Technical Requirements of 10CFR54,License Renewal Rule ML20138G6271996-12-19019 December 1996 Rev 11 to ODCM for Ei Hatch Nuclear Plant ML20093G9401995-10-0505 October 1995 Inservice Insp Program Third 10-Year Interval for Ei Hatch Nuclear Plant Units 1 & 2 ML20092H6461995-07-24024 July 1995 Ei Hatch Nuclear Plant Units 1 & 2 IST Program ML20086E8471995-06-19019 June 1995 Rev 0 to Field Disposition Instruction (Fdi) HT2-0121-12900. Fdi Documents Design Requirements & Matl Required to Install Stabilizers for Shroud Horizontal Welds ML20086E8311995-06-0909 June 1995 Rev 0 to Fabrication Spec 25A5719, Fabrication of Shroud Stabilizer ML20086E8141995-06-0606 June 1995 Rev 1 to Code Design Spec 25A5717, Shroud Stabilizers ML20086E8121995-05-17017 May 1995 Rev 0 to Design Spec 25A5718, Shroud Repair Hardware ML20106A6521992-02-29029 February 1992 Proposed Rev 3 to Ei Hatch Nuclear Plant Solid Radwaste PCP, Per GL 89-01 ML20106A6501992-02-0707 February 1992 Rev 7 to Ei Hatch Nuclear Plant ODCM, Reflecting Proposed Changes,Per GL 89-01 ML20056B3031990-08-0101 August 1990 Ei Hatch Nuclear Plant,Units 1 & 2 Inservice Insp Program Second 10-Yr Interval ML20149N1141988-01-0404 January 1988 Revised Second 10-Yr Interval Inservice Insp Program,1980 Edition of ASME Section XI W/Addenda Through Winter 1981 ML20211H5491987-02-20020 February 1987 IGSCC-Susceptible Primary Pressure Boundary Stainless Steel Piping & Components Insp/Mitigation Program, 1987 Maint/Refueling Outage ML20245B8301986-12-10010 December 1986 Rev 0 to SO-OPS-05-1286, Spent Fuel Pool Transfer Canal Gates ML20245B8171986-12-0505 December 1986 Rev 0 to SO-OPS-02-1286, Processing of Water from Yard Drains ML20245B8201986-12-0505 December 1986 Rev 0 to SO-OPS-01-1286, Radwaste Discharges. Supporting Documentation Encl ML20203L9291986-08-0101 August 1986 Rev 0 to Training Procedure 72TR-TRN-002-0S, License Requalification Training Program ML20137V9031985-12-0505 December 1985 Rev 1 to Emergency Implementing Procedure 62RP-RAD-009-05, Airborne Radioactivity Concentration Determination ML20076J1871985-11-0808 November 1985 Rev 2 to Technical Note 20684-EIH, Thermo-Lag 330 Fire Barrier Sys Installation Procedures Manual Prepared for Bechtel Power Corp for Georgia Power Co ML20076J1911985-11-0404 November 1985 Rev 1 to Technical Note 20684-EIH, Thermo-Lag 330 Fire Barrier Sys Installation Procedures Manual Prepared for Bechtel Power Corp,For Georgia Power Co ML20076J1961985-10-23023 October 1985 Rev 0 to Technical Note 20684-EIH, Thermo-Lag 330 Fire Barrier Sys Installation Procedures Manual Prepared for Bechtel Power Corp,For Georgia Power Co ML20135F3161985-08-26026 August 1985 Rev 1 to Emergency Operating Procedures Implementation Plan for Emergency Response Capability Project ML20132E5471985-08-23023 August 1985 Rev 0 to Engineering Svc Procedure 42EN-ENG-011-OS, Scram/ Transient Reporting ML20209F2391985-07-0101 July 1985 Recirculation,Rhr & Reactor Water Cleanup Sys Piping Weld Joint Insp/Mitigation Program for 1985 Maint/ Refueling Outage ML20128A0561985-06-25025 June 1985 Inservice Insp Program,1980 Edition of ASME Section XI W/Addenda Through Winter 1981 ML20126E8331985-06-11011 June 1985 Emergency Plan Implementing Procedures & Deleted Title Sheets,Including Procedures HNP-8007 Re Decontamination of Clothing & Hats & HNP-8004 Re Dosimetry Issuance & Tracking ML20116D4401985-04-23023 April 1985 Revised Emergency Procedures HNP-8109 Re Continuous Air Monitors Models AM-3D & AM-33-1,HNP-8122 Re Radiation Monitor Model RM-16 & HNP-8146 Re Rascal Portable Rate Meter-Scaler/Model PRS-1 Operation & Calibr ML20245B7911985-04-17017 April 1985 Rev 0 to 10AC-MGR-04-0, Deficiency Control Sys. Supporting Documentation Encl ML20107G1421985-02-15015 February 1985 Revised Emergency Implementing Procedures,Including Rev 3 to HNP-8161 Re Eberline Model PCM-1 Portable Monitor Operation & Calibr & Rev 2 to HNP-8036 Re Waste Classification & Manifest Reporting Resin Shipments ML20215F7371984-12-26026 December 1984 Rev 1 to Administrative Control Procedure 40AC-FPX01-0, Fire Protection Program. Portions of Procedures 34AB-OPS-056-1S & 34AB-OPS-056-2S Encl ML20101B0551984-12-17017 December 1984 Rev 5 to Emergency Plan Implementing Procedure HNP-8134, Whole Body Counter Sys ML20108E0921984-11-29029 November 1984 Rev 10 to Procedure Data Package HNP-1-3980-1, Kinemetrics SMA-3 ML20107H5701984-10-31031 October 1984 Detailed Control Room Design Review Program Plan ML20155C8961984-09-30030 September 1984 Rev 1 to Offsite Dose Calculation Manual ML20155C8841984-09-30030 September 1984 Rev 1 to Solid Radwaste Process Control Program ML20098G3401984-09-30030 September 1984 Offsite Dose Calculation Manual ML20098G3381984-09-30030 September 1984 Solid Radwaste Process Control Program ML20108E0741984-06-13013 June 1984 Rev 10 to Procedure HNP-1-3980-M, Seismic Instrumentation Functional Test & Calibr ML20084H4971984-05-0101 May 1984 Rev 0 to Procedures Generation Package for Emergency Operating Procedures,Including plant-specific Technical Guidelines for Units 1 & 2,plant-specific Writers Guide & Implementation Plan for Emergency Response Project ML20086U4131984-02-29029 February 1984 Vendor Equipment Technical Info Program, Per Generic Ltr 83-28,Section 2.2.2,final Draft ML20087N9101984-01-26026 January 1984 Public Version of Transmittal & Title Page to Deleted Emergency Plan Implementing Procedures,Including Procedure HNP-8031 Re Determination of Specific Activity of Spent Resin & Curie Contents of Liner & 840322 Memo ML20087M7911984-01-25025 January 1984 Public Version of Transmittal & Title Pages of Deleted Emergency Plan Implementing Procedures HNP-8019, Insp of Steel Radwaste Shipping Drums & HNP-8422, Handling & Loading of Chem-Nuclear Cask & 840322 Memo ML20087M9321984-01-20020 January 1984 Public Version of Rev 7 to Emergency Plan Implementing Procedure HNP-8101, Teletector Model 6112B/D Operation & Calibr & Jm Felton 840322 Release Memo ML20081B6731984-01-18018 January 1984 Public Version of Rev 0 to Emergency Plan Implementing Procedure HNP-8161, Eberline Model PCM-1 Portal Monitor & Rev 17 to HNP-8008, Radiation Work Permit & Jm Felton 830307 Release Memo ML20087P0191984-01-13013 January 1984 Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures HNP-8038 Re Waste Classification & Manifest Reporting & HNP-8042 Re Radiological Work Practices & 840326 Memo ML20079H9011983-12-0707 December 1983 Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures HNP-8035 Re Pulmonary Function Screening Program & HNP-8016 Re Shipment of Radioactive Matl ML20093D4881983-10-31031 October 1983 Public Version of Revised Emergency Plan Implementing Procedures,Including HNP-4858, Naturally Occurring Phenomenon & HNP-8108, Pocket Dosimeter Use & Performance Test. W/831031 & 840709 Release Memo ML20108E0491983-10-28028 October 1983 Rev 4 to Procedure HNP-4858, Naturally Occurring Phenomenon ML20080L0651983-10-12012 October 1983 Rev 1 to Procedure HNP-4848, Determination of Extent of Core Damage Under Accident Conditions ML20081L9461983-10-12012 October 1983 Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures HNP-4827 Re Offsite Radiological Environ Monitoring During Emergencies & HNP-4852 Re Offsite Dose Estimation 1998-04-30 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20053C463&oldid=2629676"