TAC:MB9875
From kanterella
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Request for: Approved, Closed | |
| From | |
MONTHYEARULNRC-04868, Application of Proprietary Leak-Before-Break (LBB) Methodology Reports and Draft Regulatory Guide DG-11082003-06-27027 June 2003
[table view]Application of Proprietary Leak-Before-Break (LBB) Methodology Reports and Draft Regulatory Guide DG-1108 ML0318203192003-06-27027 June 2003 Release of Drawings Related to Callaway ULNRC-04592, Proposed Revision to Technical Specification 1.1, Definitions; Technical Specification 3.7.3 Main Feedwater Isolation Valves (Mfivs); and Steam Generator Tube Rupture with Overfill Re-Analysis2003-06-27027 June 2003 Proposed Revision to Technical Specification 1.1, Definitions; Technical Specification 3.7.3 Main Feedwater Isolation Valves (Mfivs); and Steam Generator Tube Rupture with Overfill Re-Analysis ML0329605212003-10-28028 October 2003 Notice of Meeting with Union Electric Company on Callaway Plant 05000483/LER-2003-008, Regarding Technical Specification Violation Due to Valve Control Circuit Modification2003-11-0606 November 2003 Regarding Technical Specification Violation Due to Valve Control Circuit Modification ML0331804352003-11-12012 November 2003 Meeting Handout to Discuss (1) the Licensees RAI Responses on Two Applications Dated 06/26/03 and (2) Potential Instrumentation Digital Upgrades ML0334214692003-12-0404 December 2003 Summary of Meeting W/Union Electric Co. Discussion Ontwo Licensee Applications and Potential Instrumentation Digital Upgrades at the Plant. (Tac. MB9875, MB9876 and MB9879) ML0407503102004-03-11011 March 2004 Technical Specification Pages for Callaway Amendment No. 159 ML0407207262004-03-11011 March 2004 3/11/04 Callaway Plant, Unit 1 - Issuance of Amd. 159 Main Feedwater/Auxiliary Feedwater Modification and Steam Generator Tube Rupture Re-Analysis (Tacs. MB9875/MB9876) 2003-11-06 | |
Retrieved from "https://kanterella.com/w/index.php?title=TAC:MB9875&oldid=2626799"