Letter Sequence Other |
---|
|
|
MONTHYEARML0224201352002-08-26026 August 2002 Meeting with Utility to Discuss Tornado Mitigation, Auxiliary Building, Flooding & Extension of Khu Completion Time for Oconee Plant Project stage: Meeting ML0224604882002-09-18018 September 2002 Duke Energy Company, Summary August 26 and 27, 2002, Meeting to Discuss Tornado Mitigation Flooding in the Auxiliary Building and Temporary Extension of Completion Times for Keowee Hydro Units Project stage: Meeting ML0326713342003-09-12012 September 2003 Supplement to the License Amendment Request for Temporary Extensions to the Completion Times for One or Two Keowee Hydro Units Inoperable, Technical Specification Change No. 2002-05 Project stage: Supplement ML0333500072003-12-0101 December 2003 Meeting Notice with Duke Energy Corporation Completion Time for the Keowee Hydro Units Project stage: Request ML0335201902003-12-16016 December 2003 Meeting Handout to Discuss Amendment to Temporarily Extend Completion Time of Keowee Hydro Units Project stage: Meeting ML0401300662004-01-12012 January 2004 Summary of December 16, 2003, Meeting to Discuss the Amendment Request to Temporarily Extend the Completion Times for the Keowee Hydro Units Project stage: Meeting ML0422905462004-08-0505 August 2004 License Amendment Nos. 339, 341, and 340, Extended the Completion Times for Keowee Hydro Units to Allow Additional Time for Maintenance and Upgrades Project stage: Other ML0422501652004-08-0505 August 2004 Technical Specifications, Extended the Completion Times for Keowee Hydro Units to Allow Additional Time for Maintenance and Upgrades Project stage: Acceptance Review ML0428101302004-10-0404 October 2004 Correction to Amendment Nos. 339, 341 and 340 Project stage: Other 2003-12-16
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000269/20240052024-08-26026 August 2024 Updated Inspection Plan for Oconee Nuclear Station, Units 1, 2 and 3 (Report 05000269/2024005, 05000270/2024005, and 05000287-2024005) IR 05000269/20243012024-08-0808 August 2024 – Operator Licensing Examination Approval 05000269/2024301, 05000270/2024301, and 05000287/2024301 IR 05000269/20240022024-07-25025 July 2024 Integrated Inspection Report 05000269/2024002 and 05000270/2024002 and 05000287/2024002 ML24192A1312024-07-15015 July 2024 Licensed Operator Positive Fitness-For-Duty Test ML24183A0972024-07-12012 July 2024 ISFSI; Catawba 1, 2 & ISFSI; McGuire 1, 2 & ISFSI; Oconee 1, 2, 3 & ISFSI; Shearon Harris 1; H. B. Robinson 2 & ISFSI; and Radioactive Package Shipping Under 10 CFR 71 (71-266 & 71-345) – Review of QA Program Changes EPID L-2024-LLQ-0002 ML24183A2352024-06-29029 June 2024 Update 3 to Interim Report Regarding a Potential Defect with Schneider Electric Medium Voltage Vr Type Circuit Breaker Part Number V5D4133Y000 ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc IR 05000269/20240012024-05-0303 May 2024 Integrated Inspection Report 05000269/2024001, 05000270/2024001 and 05000287/2024001 IR 05000269/20244022024-04-24024 April 2024 Security Baseline Inspection Report 05000269/2024402 and 05000270/2024402 and 05000287/2024402 ML24108A0792024-04-16016 April 2024 EN 57079 Paragon Energy Solutions Email Forwarding Part 21 Interim Report Re Potential Defect with Schneider Electric Medium Voltage Vr Type Circuit Breaker Part Number V5D4133Y000 IR 05000269/20244012024-03-28028 March 2024 – Security Baseline Inspection Report 05000269-2024401 and 05000270-2024401 and 05000287-2024401 ML24088A3052024-03-25025 March 2024 Fws to NRC, Agreement with Nlaa Determination for Tricolored Bat for Oconee Lr IR 05000269/20230062024-02-28028 February 2024 Annual Assessment Letter for Oconee Nuclear Station Units 1, 2 and 3 - (NRC Inspection Report 05000269/2023006, 05000270/2023006, and 05000287/2023006) ML24045A2972024-02-16016 February 2024 Ltr. to Dexter Sharp Chief Piedmont American Indian Assoc Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A2992024-02-16016 February 2024 Ltr. to Eric Pratt Chief the Santee Indian Organization Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3072024-02-16016 February 2024 Ltr. to Pete Parr Chief Pee Dee Indian Tribe Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A2962024-02-16016 February 2024 Ltr. to David Hill Principal Chief Muscogee Creek Nation Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3082024-02-16016 February 2024 Ltr. to Ralph Oxendine Chief Sumter Tribe of Cheraw Indians Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A2942024-02-16016 February 2024 Ltr. to Carolyn Chavis Bolton Chief Pee Dee Indian Nation of Upper Sc Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A2952024-02-16016 February 2024 Ltr. to Chuck Hoskin, Jr, Principal Chief Cherokee Nation Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3042024-02-16016 February 2024 Ltr. to Lisa M. Collins Chief the Wassamasaw Tribe of Varnertown Indians Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3062024-02-16016 February 2024 Ltr. to Michell Hicks, Principal Chief Eastern Band of Cherokee Re Oconee Nuclear Station Units 1,2, and 3 Section 106 ML24045A3022024-02-16016 February 2024 Ltr. to Joe Bunch United Keetoowah Band of Cherokee Indians in Ok Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3012024-02-16016 February 2024 Ltr. to Harold Hatcher Chief the Waccamaw Indian People Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3032024-02-16016 February 2024 Ltr. to John Creel Chief Edisto Natchez-Kusso Tribe of Sc Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24030A0052024-02-16016 February 2024 Ltr. to Brian Harris, Chief, Catawba Indian Nation; Re., Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3052024-02-16016 February 2024 Ltr. to Louis Chavis Chief Beaver Creek Indians Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 IR 05000269/20230042024-02-13013 February 2024 Integrated Inspection Report 05000269/2023004, 05000270/2023004, and 05000287/2023004; and Inspection Report 07200040/2023001 ML24030A5212024-02-13013 February 2024 Letter to Elizabeth Johnson, Director, Shpo; Re Oconee Nuclear Stations Units 1, 2, and 3 Section 106 ML23304A1422024-02-0101 February 2024 Issuance of Environmental Scoping Summary Report Associated with the U.S. Nuclear Regulatory Commission Staffs Review of the Oconee Nuclear Station, Units 1, 2, & 3, Subsequent License Renewal Application ML24005A2492024-01-24024 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) ML23331A7982023-12-14014 December 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report (01R32) ML23262A9672023-12-13013 December 2023 Alternative to Use RR-22-0174, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section XI, Division 1 IR 05000269/20230032023-11-14014 November 2023 Integrated Inspection Report 05000269/2023003, 05000270/2023003, and 05000287/2023003; and IR 07200040/2023001; and Exercise of Enforcement Discretion ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 ML23219A1402023-10-10010 October 2023 Audit Report Proposed Alternative to Use ASME Code Case N-752, Risk Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems XI, Division 1 ML23269A1102023-10-0606 October 2023 Letter to Steven Snider-Revised Schedule for the Environmental Review of the Oconee Nuclear Station, Unit 1, 2, and 3, Subsequent License Renewal Application ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000269/20230112023-08-25025 August 2023 Comprehensive Engineering Team Inspection Report 05000269/2023011 and 05000270/2023011 and 05000287/2023011 IR 05000269/20230052023-08-25025 August 2023 Updated Inspection Plan for Oconee Nuclear Station Units 1, 2 and 3 (Report 05000269/2023005, 05000270/2023005, and 05000287/2023005) IR 05000269/20230022023-07-28028 July 2023 Integrated Inspection Report 05000269/2023002, 05000270/2023002 and 05000287/2023002 ML23208A0972023-07-27027 July 2023 Subsequent License Renewal List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected IR 05000269/20230102023-07-19019 July 2023 Biennial Problem Identification and Resolution Inspection Report 05000269/2023010 and 05000270/2023010 and 05000287/2023010 and Notice of Violation ML23178A0682023-07-0303 July 2023 Audit Plan Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 & 3 Systems Section XI, Division 1 ML23132A2392023-06-0101 June 2023 Summary of the April 2023 Remote Environmental Audit Related to the Review of the Subsequent License Renewal Application ML23144A0192023-05-25025 May 2023 Review of the Spring 2022 Steam Generator Tube Inspection Report (O3R31) IR 05000269/20230012023-05-12012 May 2023 Integrated Inspection Report 05000269/2023001 and 05000270/2023001 and 05000287/2023001 ML23121A0552023-05-0303 May 2023 Acknowledgement of Withdrawal Request to Revise TS 5.5.2 Containment Leakage Rate Testing Program ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI 2024-08-08
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility ML22321A0492022-12-0808 December 2022 Issuance of Amendment Nos. 426, 428 and 427, Additional Mode Change Limitations Applicable to the Adoption of TSTF- 359, Revision 9, Increase Flexibility in Mode Restraints ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 ML22096A1872022-07-15015 July 2022 Issuance of Amendment Nos. 424, 426, and 425 Revise TS 3.7.7, Low Pressure Service Water (LPSW) System to Extend the Completion Time for One Required Inoperable LPSW Pump ML22046A0222022-06-14014 June 2022 Issuance of Amendments to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML21362A7532022-01-0606 January 2022 Regulatory Audit in Support of the License Amendment Request for One-Time Note to Technical Specification 3.7.7, Low Pressure Service Water (LPSW) System ML21155A2132021-08-26026 August 2021 Plant ML21158A1952021-06-0707 June 2021 Application for Subsequent Renewed Operating Licenses. Part 2 of 8 ML21158A1982021-06-0707 June 2021 Application for Subsequent Renewed Operating Licenses. Part 5 of 8 ML21158A1962021-06-0707 June 2021 Application for Subsequent Renewed Operating Licenses. Part 3 of 8 ML21158A1992021-06-0707 June 2021 Application for Subsequent Renewed Operating Licenses. Part 6 of 8 ML21158A1972021-06-0707 June 2021 Application for Subsequent Renewed Operating Licenses. Part 4 of 8 RA-21-0132, Application for Subsequent Renewed Operating Licenses. Part 7 of 82021-06-0707 June 2021 Application for Subsequent Renewed Operating Licenses. Part 7 of 8 ML21006A0982021-03-15015 March 2021 Issuance of Amendment Nos. 421, 423, and 422 Revision of Licensing Basis for High Energy Line Breaks Outside of Containment (EPID L-2019-LLA-0184) (Public Version) ML20335A0012021-01-26026 January 2021 Issuance of Amendment Nos. 420, 422, and 421 Measurement Uncertainty Recapture Power Uprate ML20303A0242020-12-0909 December 2020 Issuance of Amendments 419, 421, 420 TSTF-272, Refueling Boron Concentration Clarification ML20296A2812020-11-25025 November 2020 Issuance of Amendment Nos. 418, 420 and 419 TSTF-421, Revision to RCP Flywheel Inspection Program ML20258A2712020-09-21021 September 2020 Correction Letter to Amendment Nos. 301, 329, 307, 303, 178, 317, 296, 416, 418, 417, and 268 ML20237F4352020-09-0404 September 2020 Issuance of Amendments Regarding the Technical Specification Requirements Pertaining to Mode Change Limitations ML20083F9272020-08-12012 August 2020 Issuance of Amendments to Relocate the Unit/Facility/Plant Staff Qualification Requirements to the Duke Energy Quality Assurance Program Description ML19260E0842019-10-31031 October 2019 Issuance of Amendments 415, 417, and 416, Regarding the Updated Final Safety Analysis Report Description of Tornado Mitigation ML19056A0862019-09-30030 September 2019 Issuance of Amendments Nos. 414, 416 and 415 Regarding the Physical Security Plan ML19183A3172019-07-17017 July 2019 Issuance of Amendments Regarding the Updated Final Safety Analysis Report Section for Fission Gas Gap Release Rates ML19140A0262019-06-14014 June 2019 Issuance of Amendments Regarding the Technical Specifications for Electrical Power Systems ML18311A1342018-12-17017 December 2018 Non Proprietary - Issuance of Amendments Regarding the Updated Final Safety Analysis Report Section for the Standby Shutdown Facility ML18172A1722018-08-15015 August 2018 Issuance of Amendments to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application ML18040A1942018-04-12012 April 2018 Issuance of Amendments Regarding the Technical Specifications for Control Room Habitability (CAC Nos. MF9555, MF9556, and MF9557; EPID L-2017-LLA-0219) ML17124A6082017-11-20020 November 2017 Issuance of Amendments Regarding the Technical Specifications for Electrical Power Systems (CAC Nos. MF7417, MF7418, and MF7419; EPID L-2016-LLA-0002) ML17188A3872017-08-21021 August 2017 Issuance of Amendments Regarding Application to Consolidate Emergency Operations Facilities and Associated Emergency Plan Changes (CAC Nos. MF7650 Through MF7660) ML17167A2652017-07-12012 July 2017 Issuance of Amendments Regarding the Technical Specifications for Dry Spent Fuel Storage Cask Loading and Unloading (CAC Nos. MF8161, MF8162, and MF8163) ML17103A5092017-05-11011 May 2017 Issuance of Amendments Allowing the Use of the Copernic Fuel Performance Code ML17066A3742017-04-26026 April 2017 Issuance of Amendments Re. Application to Revise TSs to Adopt TSTF-427, Rev. 2, Using the Consolidated Line Item Improvement Process (CAC Nos. MF8039 Through MF8049) ML16159A3362016-07-19019 July 2016 Issuance of Amendments Regarding Request to Use an Alternate Fission Gas Gap Release Fraction (CAC Nos. MF6480 Through MF6486) ML16174A0722016-06-27027 June 2016 Correction to License Pages Issuance of Amendments Regarding Adoption of TSTF-523 (Cac Nos. MF6413 Through MF6422) ML16138A3322016-06-0606 June 2016 Issuance of Amendments to Correct Usage Problem with Technical Specification 3.8.1 ML16109A0932016-05-26026 May 2016 Issuance of License Amendments Regarding Emergency Action Level Scheme Change ML16088A3302016-04-29029 April 2016 Issuance of Amendments to Add High Flux Trip for Three Reactor Coolant Pump Operation ML16085A1132016-04-29029 April 2016 1 & 2; Shearon Harris Nuclear Power Plant 1; Catawba Nuclear Station 1 & 2; Mcguire Nuclear Station 1 & 2; and Oconee Nuclear Station 1, 2, & 3: Issuance of Amendments Regarding Adoption of TSTF-523 (CAC Nos. MF6413-MF6422) ML16075A3012016-04-26026 April 2016 Issuance of Amendments Regarding the Revision of the Steam Generator Technical Specifications to Reflect the Adoption of TSTF-510(CAC Nos. MF6139,MF6140,MF6141,MF6142,MF6143,MF6144. ML15166A3872015-09-24024 September 2015 Issuance of Amendments Regarding Allowed Maximum Rated Thermal Power ML15170A0552015-07-27027 July 2015 Issuance of Amendments Regarding Adoption of TSTF-513 ML15174A2672015-07-0707 July 2015 Issuance of Amendments Regarding the Inservice Testing Program ML15050A6712015-06-19019 June 2015 Issuance of Amendments Regarding Inspection Plan for Reactor Vessel Internals ML15133A4532015-06-11011 June 2015 McGuire Nuclear Station, Oconee Nuclear Station - Issuance of Amendments Regarding Changes to Cyber Security Plan Implementation Schedule Milestone 8 ML15093A3492015-04-23023 April 2015 Issuance of Amendments Regarding Keowee Hydro Unit (Khu) Steady State Frequency Requirements ML15002A3242015-02-12012 February 2015 McGuire Nuclear Station, and Oconee Nuclear Station - Issuance of Amendments Regarding Changes to Organization, Unit Staff Responsibility, Unit Staff Qualifications, Programs and Manuals, and High Radiation Areas ML14195A3552014-10-21021 October 2014 Issuance of Amendments ML14254A2462014-09-25025 September 2014 Issuance of Amendments Regarding Quality Assurance Requirements for the Standby Shutdown Facility Equipment ML14206A7902014-08-13013 August 2014 Issuance of Amendments Regarding Implementation of the Protected Service Water System 2023-08-29
[Table view] |
Text
August 5, 2004 Mr. Ronald A. Jones Vice President, Oconee Site Duke Energy Corporation 7800 Rochester Highway Seneca, SC 29672
SUBJECT:
OCONEE NUCLEAR STATION, UNITS 1, 2 AND 3 RE: ISSUANCE OF AMENDMENTS (TAC NOS. MB6144, MB6145, AND MB6146)
Dear Mr. Jones:
The Nuclear Regulatory Commission has issued the enclosed Amendment Nos. 339, 341, and 340 to Renewed Facility Operating Licenses DPR-38, DPR-47, and DPR-55, respectively, for the Oconee Nuclear Station, Units 1, 2, and 3. The amendments consist of changes to the Technical Specifications in response to your application dated August 22, 2002, as supplemented by letters dated September 12, 2003, February 4, February 16, March 23, April 28, June 17, July 6, July 12, July 19, and July 29, 2004.
The amendments revise Technical Specification 3.8.1, AC Sources - Operating, to temporarily extend the completion times (CTs) for the Keowee hydro units (KHUs) to allow additional time for maintenance and upgrades. The amendments extend by 17 days (from 45 days to 62 days) the CT when one KHU is not operable and extend by 120 hours0.00139 days <br />0.0333 hours <br />1.984127e-4 weeks <br />4.566e-5 months <br /> (from 60 hours6.944444e-4 days <br />0.0167 hours <br />9.920635e-5 weeks <br />2.283e-5 months <br /> to 180 hours0.00208 days <br />0.05 hours <br />2.97619e-4 weeks <br />6.849e-5 months <br />) the CT when both KHUs are not operable.
A copy of the related Safety Evaluation is also enclosed. A Notice of Issuance will be included in the Commission's biweekly Federal Register notice.
Sincerely,
/RA/
Leonard N. Olshan, Sr. Project Manager, Section 1 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-269, 50-270, and 50-287
Enclosures:
- 1. Amendment No. 339 to DPR-38
- 2. Amendment No. 341 to DPR-47 Document transmitted herewith contains sensitive unclassified information. When
- 3. Amendment No. 340 to DPR-55
- 4. Safety Evaluation (OUO) separated from Enclosure 4 & 5, this
- 5. Safeguards Material document is decontrolled.
cc w/o Enclosure 4 and 5: See next page
ML042290546 *No major changes to SE NRR-058 OFFICE PDII-1/PM PDII-1/LA (A) SPSB/BC
- EEIB/SC* OGC* PDII-1/SC (A)
NAME LOlshan DClarke MTschiltz SMorris RJenkins CMarco SCoffin DATE 3/05/04 3/05/04 07/15/04 07/17/04 07/19/04 8/03/04 8/05/04
SUBJECT:
OCONEE NUCLEAR STATION, UNITS 1, 2 AND 3 - ISSUANCE OF AMENDMENTS (TAC NOS. MB6144, MB6145 AND MB6146)
Date: August 5, 2004 DISTRIBUTION (w/o Enclosure 5):
PUBLIC PDII-1 R/F RidsNrrDlpmLpdii (EHackett)
RidsNrrDlpmlpdii-1 (JNakoski/SCoffin)
RidsNrrPMLOlshan RidsNrrLACHawes/DClarke RidsOgcRp RidsAcrs AcnwMailCenter GHill (6)
TBoyce RidsRgn2MailCenter RidsNrrDlpmDpr
DUKE ENERGY CORPORATION DOCKET NO. 50-269 OCONEE NUCLEAR STATION, UNIT 1 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 339 Renewed License No. DPR-38
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment to the Oconee Nuclear Station, Unit 1 (the facility)
Renewed Facility Operating License No. DPR-38 filed by the Duke Energy Corporation (the licensee) dated August 22, 2002, as supplemented by letters dated September 12, 2003, February 4, February 16, March 23, April 28, June 17, July 6, July 12, July 19, and July 29, 2004, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations as set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations set forth in 10 CFR Chapter I; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is hereby amended by page changes to the Technical Specifications as indicated in the attachment to this license amendment, and Paragraph 3.B of Renewed Facility Operating License No. DPR-38 is hereby amended, and Paragraph 3.H is added, to read as follows:
B. Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 339 , are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
H. Duke shall comply with commitments of Attachment 2 to letter dated July 29, 2004, associated with TSC 2002-05.
- 3. This license amendment is effective as of its date of issuance and shall be implemented within 30 days of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
Stephanie M. Coffin, Acting Chief, Section 1 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation
Attachment:
Technical Specification Changes Date of Issuance: August 5, 2004
DUKE ENERGY CORPORATION DOCKET NO. 50-270 OCONEE NUCLEAR STATION, UNIT 2 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 341 Renewed License No. DPR-47
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment to the Oconee Nuclear Station, Unit 2 (the facility)
Renewed Facility Operating License No. DPR-47 filed by the Duke Energy Corporation (the licensee) dated August 22, 2002, as supplemented by letters dated September 12, 2003, February 4, February 16, March 23, April 28, June 17, July 6, July 12, July 19, and July 29, 2004, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations as set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations set forth in 10 CFR Chapter I; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is hereby amended by page changes to the Technical Specifications as indicated in the attachment to this license amendment, and Paragraph 3.B of Renewed Facility Operating License No. DPR-47 is hereby amended, and Paragraph 3.H is added, to read as follows:
B. Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 341, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
H. Duke shall comply with the commitments of Attachment 2 to letter dated July 29, 2004, associated with TSC 2002-05.
- 3. This license amendment is effective as of its date of issuance and shall be implemented within 30 days of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
Stephanie M. Coffin, Acting Chief, Section 1 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation
Attachment:
Technical Specification Changes Date of Issuance: August 5, 2004
DUKE ENERGY CORPORATION DOCKET NO. 50-287 OCONEE NUCLEAR STATION, UNIT 3 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 340 Renewed License No. DPR-55
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment to the Oconee Nuclear Station, Unit 3 (the facility)
Renewed Facility Operating License No. DPR-55 filed by the Duke Energy Corporation (the licensee) dated August 22, 2002, as supplemented by letters dated September 12, 2003, February 4, February 16, March 23, April 28, June 17, July 6, July 12, July 19, and July 29, 2004, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations as set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations set forth in 10 CFR Chapter I; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is hereby amended by page changes to the Technical Specifications as indicated in the attachment to this license amendment, and Paragraph 3.B of Renewed Facility Operating License No. DPR-55 is hereby amended, and Paragraph 3.H is added, to read as follows:
B. Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 340, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
H. Duke shall comply with the commitments of Attachment 2 to letter dated July 29, 2004, associated with TSC 2002-05.
- 3. This license amendment is effective as of its date of issuance and shall be implemented within 30 days of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
Stephanie M. Coffin, Acting Chief, Section 1 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation
Attachment:
Technical Specification Changes Date of Issuance: August 5, 2004
ATTACHMENT TO LICENSE AMENDMENT NO. 339 RENEWED FACILITY OPERATING LICENSE NO. DPR-38 DOCKET NO. 50-269 AND TO LICENSE AMENDMENT NO. 341 RENEWED FACILITY OPERATING LICENSE NO. DPR-47 DOCKET NO. 50-270 AND TO LICENSE AMENDMENT NO. 340 RENEWED FACILITY OPERATING LICENSE NO. DPR-55 DOCKET NO. 50-287 Replace the following pages of the Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Remove Insert 3.8.1-4 3.8.1-4 3.8.1-5 3.8.1-5 3.8.1-6 3.8.1-6 3.8.1-7 3.8.1-7 3.8.1-8 3.8.1-8 B 3.8.1- 1 through -25 B 3.8.1-1 through -26
Oconee Nuclear Station, Units 1, 2, and 3 cc:
Ms. Lisa F. Vaughn Ms. Karen E. Long Duke Energy Corporation Assistant Attorney General Mail Code - PB05E North Carolina Department of Justice 422 South Church Street Post Office Box 629 Post Office Box 1244 Raleigh, North Carolina 27602 Charlotte, North Carolina 28201-1244 Mr. R. L. Gill, Jr.
Ms. Anne W. Cottingham, Esquire Manager - Nuclear Regulatory Winston and Strawn Issues and Industry Affairs 1400 L Street, NW Duke Energy Corporation Washington, DC 20005 526 South Church Street Mail Stop EC05P Manager, LIS Charlotte, North Carolina 28202 NUS Corporation 2650 McCormick Drive, 3rd Floor Mr. Richard M. Fry, Director Clearwater, Florida 34619-1035 Division of Radiation Protection North Carolina Department of Environment, Senior Resident Inspector Health, and Natural Resources U.S. Nuclear Regulatory Commission 3825 Barrett Drive 7812B Rochester Highway Raleigh, North Carolina 27609-7721 Seneca, South Carolina 29672 Mr. Peter R. Harden, IV Mr. Henry Porter, Director VP-Customer Relations and Sales Division of Radioactive Waste Management Westinghouse Electric Company Bureau of Land and Waste Management 6000 Fairview Road Dept. of Health and Env. Control 12th Floor 2600 Bull Street Charlotte, North Carolina 28210 Columbia, South Carolina 29201-1708 Mr. Henry Barron Mr. Michael A. Schoppman Group Vice President, Nuclear Generation Framatome ANP and Chief Nuclear Officer 1911 North Ft. Myer Drive Post Office Box 1006-EC07H Suite 705 Charlotte, North Carolina 28201-1006 Rosslyn, Virginia 22209 Mr. B. G. Davenport Regulatory Compliance Manager Oconee Nuclear Site Duke Energy Corporation ON03RC 7800 Rochester Highway Seneca, South Carolina 29672