Correction Letter - Byron Station, Units 1 & 2, and Braidwood Station, Units 1 & 2, Amendments, Pressurizer Safety Valve Setpoints
ML042440820
Person / Time
Site: Byron, Braidwood  Constellation icon.png
Issue date: 09/03/2004
From: Dick G
NRC/NRR/DLPM/LPD3
To: Crane C
Exelon Generation Co
Dick G F, NRR/DLPM, 415-3019
References
TAC MB9760, TAC MB9761, TAC MB9762, TAC MB9763
Download: ML042440820 (8)


Text

September 3, 2004 Mr. Christopher M. Crane, President and Chief Nuclear Officer Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

CORRECTION LETTER - BYRON STATION, UNITS 1 AND 2, AND BRAIDWOOD STATION, UNITS 1 AND 2 - AMENDMENTS, RE: PRESSURIZER SAFETY VALVE SETPOINTS, (TAC NOS. MB9762, MB9763, MB9760, AND MB9761)

Dear Mr. Crane:

By letter dated August 26, 2004, the U.S. Nuclear Regulatory Commission (Commission) issued Amendment No. 138 to Facility Operating License No. NPF-37 and Amendment No.

138 to Facility Operating License No. NPF-66 for the Byron Station, Units 1 and 2, respectively, and Amendment No. 131 to Facility Operating License No. NPF-72 and Amendment No. 131 to Facility Operating License No. NPF-77 for the Braidwood Station, Units 1 and 2, respectively.

The amendments revised the band of the pressurizer safety valve tolerance specified in the technical specifications.

Subsequent to the issuance of the amendments, which had 30-day implementation dates, it was brought to our attention that the Exelon Generation Company LLC letter of March 3, 2004 (ML040650522), requested different amendment implementation. Enclosed are the corrected pages. Please replace the pages in your copy of the amendments with the enclosed pages.

We apologize for any confusion or inconvenience that may have been caused by not including the requested dates.

Sincerely,

/RA/

George F. Dick, Jr., Project Manager, Section 2 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation

Enclosure:

As stated

September 3, 2004 Mr. Christopher M. Crane, President and Chief Nuclear Officer Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

CORRECTION LETTER - BYRON STATION, UNITS 1 AND 2, AND BRAIDWOOD STATION, UNITS 1 AND 2 - AMENDMENTS, RE: PRESSURIZER SAFETY VALVE SETPOINTS, (TAC NOS. MB9762, MB9763, MB9760, AND MB9761)

Dear Mr. Crane:

By letter dated August 26, 2004, the U.S. Nuclear Regulatory Commission (Commission) issued Amendment No. 138 to Facility Operating License No. NPF-37 and Amendment No.

138 to Facility Operating License No. NPF-66 for the Byron Station, Units 1 and 2, respectively, and Amendment No. 131 to Facility Operating License No. NPF-72 and Amendment No. 131 to Facility Operating License No. NPF-77 for the Braidwood Station, Units 1 and 2, respectively.

The amendments revised the band of the pressurizer safety valve tolerance specified in the technical specifications.

Subsequent to the issuance of the amendments, which had 30-day implementation dates, it was brought to our attention that the Exelon Generation Company LLC letter of March 3, 2004 (ML040650522), requested different amendment implementation. Enclosed are the corrected pages. Please replace the pages in your copy of the amendments with the enclosed pages.

We apologize for any confusion or inconvenience that may have been caused by not including the requested dates.

Sincerely,

/RA/

George F. Dick, Jr., Project Manager, Section 2 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation

Enclosure:

As stated DISTRIBUTION:

PUBLIC PDIII-2 R/F WRuland AMendiola GDick PCoates OGC ACRS GHill (8) TBoyce AStone, RIII DLPM DPR SSun WPoertner ADAMS Accession Number: ML042440820 OFFICE PM:PDIII-2 LA:PDIII-2 SC:EMEB SC:SRXB OGC w/nlo SC:PDIII-2 NAME GDick PCoates DTerao JUhle RHoefling AMendiola DATE 09/01/04 09/01/04 09/01/04 09/01/04 09/02/04 09/03/04 OFFICIAL RECORD COPY

Byron/Braidwood Stations cc:

Ms. C. Sue Hauser, Project Manager Attorney General Westinghouse Electric Corporation 500 S. Second Street Energy Systems Business Unit Springfield, IL 62701 Post Office Box 355 Pittsburgh, PA 15230 Illinois Emergency Management Agency Joseph Gallo Division of Disaster Assistance &

Gallo & Ross Preparedness 1025 Connecticut Ave., NW, Suite 1014 110 East Adams Street Washington, DC 20036 Springfield, IL 62701-1109 Howard A. Learner Byron Station Plant Manager Environmental Law and Policy Exelon Generation Company, LLC Center of the Midwest 4450 N. German Church Road 35 East Wacker Dr., Suite 1300 Byron, IL 61010-9794 Chicago, IL 60601-2110 Site Vice President - Byron U.S. Nuclear Regulatory Commission Exelon Generation Company, LLC Byron Resident Inspectors Office 4450 N. German Church Road 4448 N. German Church Road Byron, IL 61010-9794 Byron, IL 61010-9750 U.S. Nuclear Regulatory Commission Regional Administrator, Region III Braidwood Resident Inspectors Office U.S. Nuclear Regulatory Commission 35100 S. Rt. 53, Suite 79 801 Warrenville Road Braceville, IL 60407 Lisle, IL 60532-4351 Chairman Ms. Lorraine Creek Will County Board of Supervisors RR 1, Box 182 Will County Board Courthouse Manteno, IL 60950 Joliet, IL 60434 Chairman, Ogle County Board Braidwood Station Plant Manager Post Office Box 357 Exelon Generation Company, LLC Oregon, IL 61061 35100 S. Rt. 53, Suite 84 Braceville, IL 60407-9619 Mrs. Phillip B. Johnson 1907 Stratford Lane Ms. Bridget Little Rorem Rockford, IL 61107 Appleseed Coordinator 117 N. Linden Street George L. Edgar Essex, IL 60935 Morgan, Lewis and Bockius 1800 M Street, NW Washington, DC 20036-5869

Byron/Braidwood Stations Document Control Desk - Licensing Manager Licensing - Braidwood, Byron Exelon Generation Company, LLC and LaSalle 4300 Winfield Road Exelon Generation Company, LLC Warrenville, IL 60555 4300 Winfield Road Warrenville, IL 60555 Site Vice President - Braidwood Exelon Generation Company, LLC 35100 S. Rt. 53, Suite 84 Braceville, IL 60407-9619 Senior Vice President - Nuclear Services Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Vice President of Operations - Mid-West Pressurized Water Reactors Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Director - Licensing and Regulatory Affairs Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Regulatory Assurance Manager - Braidwood Exelon Generation Company, LLC 35100 S. Rt. 53, Suite 84 Braceville, IL 60407-9619 Regulatory Assurance Manager - Byron Exelon Generation Company, LLC 4450 N. German Church Road Byron, IL 61010-9794 Associate General Counsel Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Vice President - Licensing and Regulatory Affairs Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555

(2) Technical Specifications The Technical Specifications contained in Appendix A as revised through Amendment No. 138 and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, are hereby incorporated into this license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3. This license amendment is effective as of the date of its issuance and shall be implemented upon startup of Byron Station, Unit 1, Cycle 14 in the Spring of 2005.

FOR THE NUCLEAR REGULATORY COMMISSION

/RA/

Anthony J. Mendiola, Chief, Section 2 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance: August 26, 2004

(2) Technical Specifications The Technical Specifications contained in Appendix A (NUREG-1113), as revised through Amendment No. 138 and the Environmental Protection Plan contained in Appendix B, both of which were attached to License No. NPF-37, dated February 14, 1985, are hereby incorporated into this license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3. This license amendment is effective as of the date of its issuance and shall be implemented upon startup of Byron Station, Unit 2, Cycle 13 in the Fall 2005.

FOR THE NUCLEAR REGULATORY COMMISSION

/RA/

Anthony J. Mendiola, Chief, Section 2 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance: August 26, 2004

(2) Technical Specifications The Technical Specifications contained in Appendix A as revised through Amendment No. 131 and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, are hereby incorporated into this license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3. This license amendment is effective as of the date of its issuance and shall be implemented upon startup of Braidwood Station, Unit 1, Cycle 12 in the Fall 2004.

FOR THE NUCLEAR REGULATORY COMMISSION

/RA/

Anthony J. Mendiola, Chief, Section 2 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance: August 26, 2004

(2) Technical Specifications The Technical Specifications contained in Appendix A as revised through Amendment No. 131 and the Environmental Protection Plan contained in Appendix B, both of which were attached to License No. NPF-72, dated July 2, 1987, are hereby incorporated into this license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3. This license amendment is effective as of the date if its issuance and shall be implemented upon startup of Braidwood Station, Unit 2, Cycle 12 in the Spring of 2005.

FOR THE NUCLEAR REGULATORY COMMISSION

/RA/

Anthony J. Mendiola, Chief, Section 2 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance: August 26, 2004