Vermont Yankee Extended Power Uprate Schedule
ML042640055
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 10/13/2004
From: Reyes L
NRC/EDO
To: Diaz N, Mcgaffigan E, Merrifield J
NRC/Chairman, NRC/OCM
Ennis R, NRR/DLPM, 415-1420
References
Download: ML042640055 (3)


Text

October 13, 2004 MEMORANDUM TO: Chairman Diaz Commissioner McGaffigan Commissioner Merrifield FROM: Luis A. Reyes /RA/

Executive Director for Operations

SUBJECT:

VERMONT YANKEE NUCLEAR POWER STATION - EXTENDED POWER UPRATE REVIEW SCHEDULE PURPOSE:

This memorandum notifies the Commission that the staffs scheduled review completion date for the Vermont Yankee Nuclear Power Station (VYNPS) extended power uprate (EPU) license amendment request will be delayed primarily due to concerns regarding the steam dryer analysis. In addition, supplemental information is needed from the licensee to address technical issues raised during the engineering inspection recently performed at VYNPS.

BACKGROUND:

On September 10, 2003, Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations, Inc. (Entergy or the licensee), submitted an EPU license amendment request to the Nuclear Regulatory Commission (NRC) for VYNPS. The proposed amendment would allow an increase in the maximum authorized power level from 1593 megawatts thermal (MWt) to 1912 MWt (i.e., an increase of approximately 20 percent). In a letter dated February 20, 2004, the NRC staff informed Entergy that the staff had completed its acceptance review of the VYNPS EPU license amendment application and established a forecast review completion date of January 31, 2005.

REVIEW STATUS:

From the early stages of the VYNPS EPU review, the NRC staff has emphasized that steam dryer integrity was an area receiving a very high level of attention by the NRC due to industry operating experience with steam dryer failures following EPU implementation. Although the steam dryer performs a non-safety-related function, it must maintain its structural integrity to prevent the occurrence of loose parts in the reactor pressure vessel or attached piping systems that could degrade the ability of safety-related components to perform their safety function.

CONTACT: Rick Ennis, NRR/DLPM 301-415-1420

The Commissioners During the course of the review, in order to resolve the steam dryer concerns, the NRC staff has requested additional information, held three public meetings with Entergy, and performed an audit of the steam dryer analysis at the General Electric office in San Jose, California.

Based on review of the information provided in the application, the supplements received through October 7, 2004 (Supplements 1 through 19), and the results of the audit, the NRC staff has determined that the information submitted by the licensee to date does not yet provide sufficient assurance that the VYNPS steam dryer will remain capable of maintaining its structural integrity under EPU conditions. During the audit and the most recent public meeting, Entergy staff indicated that further information will be submitted to address the NRC staff concerns related to steam dryer integrity.

In addition to the steam dryer concerns, information is needed from the licensee to address technical issues raised during the engineering inspection recently performed at VYNPS.

Entergy has recently submitted some of this information. The remaining information is expected to be submitted in the near future.

SCHEDULE IMPACT:

The next major milestone in the VYNPS EPU review schedule is for the staff to provide a draft Safety Evaluation (SE) to the Advisory Committee on Reactor Safeguards (ACRS). This milestone supports an ACRS subcommittee meeting that is presently scheduled for November 2004, and an ACRS full-committee meeting in December 2004. Based on the current status of the review, the draft SE cannot be completed in time to support the ACRS meetings. Therefore, the staff has notified the ACRS that the November and December meetings need to be rescheduled.

Following receipt and review of the supplemental information, the staff will coordinate with the ACRS to reschedule the meetings. At that time, the staff will also further assess the overall review schedule and establish a new forecast review completion date. At present, it is clear that the forecast review completion date of January 31, 2005, will be delayed by at least several months. The NRC staff will not approve the VYNPS EPU, or any other changes to a reactors license, unless we can conclude that the proposed change can be executed in a manner that ensures the publics health and safety.

The Commissioners NEXT STEPS:

Following receipt of this memorandum by the Commission, the NRC staff will contact senior management at Entergy to inform them of the schedule impact and issue a letter to Entergy documenting the review status.

cc: SECY OGC DOC OCA OPA CFO

The Commissioners NEXT STEPS:

Following receipt of this memorandum by the Commission, the NRC staff will contact senior management at Entergy to inform them of the schedule impact and issue a letter to Entergy documenting the review status.

cc: SECY OGC DOC OCA OPA CFO DISTRIBUTION:

Public REnnis TScarbrough TMadden, OCA PDI-2 Reading DSkay CWu RBores, OCA JDyer WRuland RJasinski CAnderson, RGN-I RBorchardt JStang TJKim, EDO DFlorek, RGN-I BSheron RBarrett CMiller, EDO DPelton, RGN-I TMarsh CGrimes RVirgilio, STP ACRS JLyons EImbro SBurnell, OPA BPoole, OGC CHolden KManoly DScrenci, OPA VBucci, OIG AHowe DTerao NSheehan, OPA ADAMS Accession No: ML042640055 OFFICE PDI-VY/PM PDI-2/LA TECH ED EMEB/BC PDI-III/D OGC NAME REnnis CRaynor PKleene EImbro WRuland BPoole DATE 10/07/04 10/07/04 9/21/04 9/22/04 9/23/04 10/5/04 OFFICE PDI-VY/SC PDI-D DLPM/D NRR/D EDO NAME AHowe CHolden JLyons for JDyer LReyes TMarsh DATE 9/29/04 09/23/04 09/24/04 10/12/04 10/13/04

OFFICIAL RECORD COPY