Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20216J4111999-09-28028 September 1999 Proposed Tech Specs,Removing cycle-specific Min Critical Power Ratio Safety Limit Restriction ML20206R7931999-05-17017 May 1999 Revs Made to BSEP TS Bases Between 980605 & 990507,IAW TS 5.5.10.d ML20204G5991999-03-19019 March 1999 Proposed Tech Specs Re Balance of Plant/Emergency Bus AOT Extension ML20153D8791998-09-14014 September 1998 Proposed Tech Specs 3.8.1 & 3.8.7 Re Balance of Plant/ Emergency Bus Allowable Outage Time Extension ML20237C0251998-08-17017 August 1998 Proposed Tech Specs 5.2.2.f Requiring Operations Manager or Assistant Operations Manager to Hold SRO License ML20249B1161998-06-12012 June 1998 Proposed Tech Specs Page 3.3-56 for Issued Amends 203 & 233, Correcting Erroneous Inequality Sign for Allowable Value ML20248A4681998-05-22022 May 1998 Proposed Tech Specs Pages to Rev E of Proposed License Amend for Conversion to Improved TS ML20247H9481998-05-15015 May 1998 Revised TS Pages for Administrative Rev to Proposed Surveillance Requirements 4.7.2.b.2 & 4.7.2.c,to State That Charcoal Absorber Samples Will Be Tested IAW Methodology Provided by ASTM D3803-1989 at 30 C ML20217J9171998-04-24024 April 1998 Proposed Rev D to Improved Ts,Incorporates New ITS 3.6.3.2, Containment Atmospheric Dilution Sys ML20216G7961998-04-0909 April 1998 Proposed Tech Specs,Revising Basis for Removing Suppression Chamber Temp Water Temp Monitoring Instrumentation Requirements ML20217Q1041998-04-0303 April 1998 Proposed Tech Specs Pages to Modify TS 3.5.3.1 & Associated Bases Section 3/4.5.3.1,to Revise Specified Total Volume of Condensate Storage Tank from 150,000 Gallons to 228,200 Gallons ML20217F9101998-03-27027 March 1998 Proposed Tech Specs Re Safety Limit Min Critical Power Ratio ML20217D5451998-03-24024 March 1998 Proposed Tech Specs 3.0 & 4.0 Re Applicability & Surveillance Requirements ML20216J8571998-03-13013 March 1998 Proposed Rev C to Improved Ts,Incorporating NRC Comments on Improved TS Submittal Resulting from Internal Reviews ML20203H0481998-02-23023 February 1998 Proposed Tech Specs,Revising SLMCPR from 1.10 to 1.09 & Deleting Document Reference ML20199K7041998-01-27027 January 1998 Proposed Tech Specs 3/4.8 Re Electrical Power Sys ML20197B8741997-12-18018 December 1997 Proposed Tech Specs Pages Revising Proposed Amends in 971101 Request by Expanding Note in LCO 3.3.1.1,Table 3.3.1.1-1,to Allow 12 Hours to Adjust Allowable Value,Specified in COLR, After Sufficient Reduction in Feedwater Temperature ML20198P7091997-11-0606 November 1997 Proposed Tech Specs 3/4.7.2 & 3/4.3.5.5 Revising Design Basis Qualification Requirements for CREVS & CREVS Instrumentation ML20199A3011997-11-0606 November 1997 Proposed Tech Specs,Adding Footnote to SR 4.8.1.1.2.d to Allow Performance of SR 4.8.1.1.2.d.1,SR 4.8.1.1.2.d.4 & SR 4.8.1.1.2.d.5 in Operational Condition 1 Through 5 ML20198Q3011997-11-0404 November 1997 Proposed Tech Specs 3.0 & 4.0,revising Specific Terms in Proposed TSs 4.0.1 & 4.0.3 to Reflect Existing TS Terminology ML20198P2681997-10-29029 October 1997 Proposed Tech Specs,Revising Description of Control Rod Assemblies ML20212F1991997-10-28028 October 1997 Proposed Tech Specs Revising Proposed SRs to Remove Allowable Humidity & Temperature Testing Ranges for Charcoal Adsorber ML20212F2241997-10-28028 October 1997 Proposed Tech Specs Revising Certain Instrumentation Allowable Values ML20217Q5131997-08-27027 August 1997 Proposed Tech Specs,Revising Labels for Coordinates of TS Figures 3.4.6.1-1,3.4.6.1-2,3.4.6.1-3a & 3.4.6.1-3b as Pressure (Psig) & Temp (F) Rather than Pressure Limit in Rv Top Head (Psig) ML20210P4651997-08-22022 August 1997 Proposed Tech Specs,Incorporating Power up-rate Amend 183 Provided as Replacement & Addressing Administrative Error W/Typed Bases Page Submitted w/970115 Amend Request ML20210P3601997-08-22022 August 1997 Proposed Tech Specs Bases Pages Incorporating 961101 Power up-rate Amendments ML20196J0701997-07-25025 July 1997 Proposed Tech Specs Clarifying Use of NRC Staff Approved Alternatives to Recommendations of NRC GL 88-01, NRC Staff Position of IGSCC in BWR Austenitic Stainless Steel Piping ML20149J3641997-07-18018 July 1997 Proposed Tech Specs 5.2.2.b & 5.4.2 Re Containment & RCS Design Features ML20148D3171997-05-23023 May 1997 Proposed Tech Specs 3/4.4.5 Re Reactor Coolant Sys Specific Activity ML20148E6911997-05-16016 May 1997 Corrected TS Page 3/4 5-2 to Amend 215 of License DPR-62 ML20140H1041997-05-0909 May 1997 Proposed Tech Specs Incorporating Administrative Update Resulting from Issuance on 970418 of Amends 184 & 215 to Units 1 & 2,respectively ML20138G1171997-04-30030 April 1997 Proposed Tech Specs 4.7.2.b & 4.7.2.c Revising Surveillance Requirements to Require Testing of Control Room Emergency Ventilation Sys Charcoal & Revising Acceptance Criteria for Subject Charcoal Testing ML20137Y7941997-04-14014 April 1997 Proposed Tech Specs 3.0 & 4.0 Re Applicability of LCO & Surveillance Requirements,Per GL 87-09 ML20137Y6911997-04-11011 April 1997 Proposed Tech Specs,Revising Requirements for Instrumentation Response Time Testing Associated W/Rps, Isolation Actuation Sys & ECCS ML20137N3081997-04-0202 April 1997 Corrected Page of TS 4.0.1 Re Applicability Surveillance Requirements ML20137N1011997-03-31031 March 1997 Proposed Tech Specs Rev 4.0.1 to Include Stipulation That Failure to Meet SR Constitutes Failure to Meet LCO ML20137M6541997-03-27027 March 1997 Proposed Tech Specs,Revising Definitions for Eccs,Isolation Sys & Reactor Protection Sys Response Times ML20137K9021997-03-24024 March 1997 Proposed Tech Specs Revising Definitions for ECCS Response Time,Isolation Sys Response Time, & Reactor Protection Response Time ML20137D8711997-03-22022 March 1997 Proposed Tech Specs Permitting Continued Operation W/O Completion of Instrumentation Response Time Testing,As Currently Defined in TS for Rps,Eccs & Isolation Actuation Instrumentation ML20137D8891997-03-21021 March 1997 Proposed Tech Specs Permitting Continued Operation W/O Completion of Instrumentation Response Time Testing,As Currently Defined in Ts,For Rps,Eccs & Isolation Actuation Instrumentation ML20136E7841997-03-0505 March 1997 Proposed Tech Specs Incorporating New TS Which Applies to Condenser Vacuum Pump Isolation Instrumentation ML20138K6731997-01-15015 January 1997 Proposed Tech Specs,Revising Minimum & Maximum Values of Pressure Suppression Pool Water Vols Contained in TS 3.6.2.1.a.1 & Corresponding Bases ML20133F4311997-01-0707 January 1997 Proposed Tech Specs Exchanging P-T Limits Curves Currently Located in Unit 1 & 2 TSs & Deleting Current 8,10 & 12 Effective Full Power Yr Hydrostatic Test P-T Limits Curves & Adding New Ones ML20133G2901996-12-23023 December 1996 Proposed Tech Specs 3/4.5 Re Emergency Core Cooling Sys ML20135D6301996-12-0404 December 1996 Proposed Tech Specs 3.1.2 & SR 4.1.2 Changing Method of Detecting Reactivity Anomalies & Editorial Changes to Bases for TS 3/4.1.2 ML20134K9381996-11-0101 November 1996 Proposed Tech Specs Re Full Implementation of BWROG Enhanced Option 1-A Reactor Stability Long Term Solution ML20129F5361996-10-16016 October 1996 Proposed Tech Specs,Revising Minumum Critical Power Ratio Safety Limit Ref in TS 2.1.2 from 1.07 to 1.10 for Unit 1 Cycle 11 Operation & Revises TS 5.3.1 to Reflect New Fuel Type Being Added to Unit 1 Reactor Core ML20128H2031996-10-0101 October 1996 Proposed Tech Specs,Allowing Uprate of Units to 105% of Rated Thermal Power ML20116E5451996-07-30030 July 1996 Proposed Tech Specs Revising MCPR Safety Limits in TS 2.1.2 from 1.07 to 1.09 for Cycle 11 Operation & Revising TS 5.3.1 to Reflect New Fuel Type GE13 to Be Inserted During Refueling Outage 10 ML20101R1851996-04-0808 April 1996 Proposed Tech Specs 2.1.2 Revising MCPR Safety Limits from 1.07 to 1.09 for Cycle 11 Operation,Ts 5.3.1 to Reflect GE13 Fuel & Figure 3.1.5-1 to Reflect Changes to Poison Matl Concentration Needed to Achieve Reactor Shutdown 1999-09-28
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20216J4111999-09-28028 September 1999 Proposed Tech Specs,Removing cycle-specific Min Critical Power Ratio Safety Limit Restriction ML20211G0501999-08-31031 August 1999 Rev 0 to NF-908.03, Brunswick Unit 2,Cycle 14 Neutronics Startup Rept ML20206R7931999-05-17017 May 1999 Revs Made to BSEP TS Bases Between 980605 & 990507,IAW TS 5.5.10.d ML20204D5241999-03-31031 March 1999 Rev 0 to Brunswick Steam Electric Plant,Unit 2 Simulator Certification Quadrennial Rept ML20204D4961999-03-31031 March 1999 Rev 0 to Brunswick Steam Electric Plant,Unit 1 Simulator Certification Rept ML20204G5991999-03-19019 March 1999 Proposed Tech Specs Re Balance of Plant/Emergency Bus AOT Extension ML20198K0411998-12-21021 December 1998 Rev 1 to Core Shroud Insp Plan Unit 2 B214R1 Outage Apr 1999 ML20153D8791998-09-14014 September 1998 Proposed Tech Specs 3.8.1 & 3.8.7 Re Balance of Plant/ Emergency Bus Allowable Outage Time Extension ML20238F6671998-08-28028 August 1998 Core Shroud Insp Plan Unit 2 B214R1 Outage Apr 1999 ML20237C0251998-08-17017 August 1998 Proposed Tech Specs 5.2.2.f Requiring Operations Manager or Assistant Operations Manager to Hold SRO License ML20237A5711998-07-16016 July 1998 Rev 10 to OENP-16.7, Administrative Control of Check Valve Disassembly Program ML20249B1161998-06-12012 June 1998 Proposed Tech Specs Page 3.3-56 for Issued Amends 203 & 233, Correcting Erroneous Inequality Sign for Allowable Value ML20249C0131998-06-11011 June 1998 Rev 0 to TR-ECCS-GEN-011, ECCS Suction Strainer Hydrodynamic Test Summary Rept ML20248A4681998-05-22022 May 1998 Proposed Tech Specs Pages to Rev E of Proposed License Amend for Conversion to Improved TS ML20247H9481998-05-15015 May 1998 Revised TS Pages for Administrative Rev to Proposed Surveillance Requirements 4.7.2.b.2 & 4.7.2.c,to State That Charcoal Absorber Samples Will Be Tested IAW Methodology Provided by ASTM D3803-1989 at 30 C ML20217J9171998-04-24024 April 1998 Proposed Rev D to Improved Ts,Incorporates New ITS 3.6.3.2, Containment Atmospheric Dilution Sys ML20217H3061998-04-16016 April 1998 Rev 0 to ISI Program for Class 1,2 & 3 Components & Supports ML20216G7961998-04-0909 April 1998 Proposed Tech Specs,Revising Basis for Removing Suppression Chamber Temp Water Temp Monitoring Instrumentation Requirements ML20217Q1041998-04-0303 April 1998 Proposed Tech Specs Pages to Modify TS 3.5.3.1 & Associated Bases Section 3/4.5.3.1,to Revise Specified Total Volume of Condensate Storage Tank from 150,000 Gallons to 228,200 Gallons ML20217F9101998-03-27027 March 1998 Proposed Tech Specs Re Safety Limit Min Critical Power Ratio ML20217D5451998-03-24024 March 1998 Proposed Tech Specs 3.0 & 4.0 Re Applicability & Surveillance Requirements ML20216J8571998-03-13013 March 1998 Proposed Rev C to Improved Ts,Incorporating NRC Comments on Improved TS Submittal Resulting from Internal Reviews ML20197A9371998-02-25025 February 1998 Rev 4 to 0AP-025, Bnp Integrated Scheduling ML20203H0481998-02-23023 February 1998 Proposed Tech Specs,Revising SLMCPR from 1.10 to 1.09 & Deleting Document Reference ML20203M4031998-02-18018 February 1998 Rev 0 to Pump & Valve IST Program Plan Third Interval for Cp&L,Units 1 & 2 ML20197A9281998-02-12012 February 1998 Rev 22 to 0A0P-13.0, Operation During Hurricane,Flood Conditions,Tornado or Earthquake ML20204A7551998-02-0202 February 1998 Rev 0 to ESR 97-00706, Benchmark of Dll Computer Program ML20199K7041998-01-27027 January 1998 Proposed Tech Specs 3/4.8 Re Electrical Power Sys ML20199A9291998-01-22022 January 1998 Core Shroud Insp Plan Unit 1 B112R1 Outage April 1998 ML20197B8741997-12-18018 December 1997 Proposed Tech Specs Pages Revising Proposed Amends in 971101 Request by Expanding Note in LCO 3.3.1.1,Table 3.3.1.1-1,to Allow 12 Hours to Adjust Allowable Value,Specified in COLR, After Sufficient Reduction in Feedwater Temperature ML20202D9151997-12-0202 December 1997 Rev 11 to 0AOP-34.0, Chlorine Emergencies ML20198T2961997-11-24024 November 1997 Rev 0 to B2C13, Brunswick Unit 2,Cycle 13 Neutronics Startup Rept ML20199J5711997-11-14014 November 1997 Rev 3 to 0AP-025, Bnp Integrated Scheduling ML20198T3131997-11-0707 November 1997 BSEP Unit 2 Power Uprate Startup Test Rept for Cycle 13 ML20198P7091997-11-0606 November 1997 Proposed Tech Specs 3/4.7.2 & 3/4.3.5.5 Revising Design Basis Qualification Requirements for CREVS & CREVS Instrumentation ML20199A3011997-11-0606 November 1997 Proposed Tech Specs,Adding Footnote to SR 4.8.1.1.2.d to Allow Performance of SR 4.8.1.1.2.d.1,SR 4.8.1.1.2.d.4 & SR 4.8.1.1.2.d.5 in Operational Condition 1 Through 5 ML20198Q3011997-11-0404 November 1997 Proposed Tech Specs 3.0 & 4.0,revising Specific Terms in Proposed TSs 4.0.1 & 4.0.3 to Reflect Existing TS Terminology ML20198P2681997-10-29029 October 1997 Proposed Tech Specs,Revising Description of Control Rod Assemblies ML20212F1991997-10-28028 October 1997 Proposed Tech Specs Revising Proposed SRs to Remove Allowable Humidity & Temperature Testing Ranges for Charcoal Adsorber ML20212F2241997-10-28028 October 1997 Proposed Tech Specs Revising Certain Instrumentation Allowable Values ML20199J5601997-10-13013 October 1997 Rev 2 to 0AP-022, Bnp Outage Risk Mgt ML20198P4841997-10-0808 October 1997 Rev 1 to BSEP Unit 2 Core Shroud Insp Plan Outage B213R1 ML20249C0041997-09-30030 September 1997 Rev 2 to TR-ECCS-GEN-01-NP, Hydrodynamic Inertial Mass Testing of ECCS Suction Strainers ML20249C0091997-09-30030 September 1997 Rev 1 to TR-ECCS-GEN-05-NP, Hydrodynamic Inertial Mass Testing of ECCS Suction Strainers Suppl 1 - Free Vibration Data Analysis ML20217E2791997-09-17017 September 1997 Tensil Testing & Charpy Impact Testing of Reactor Archive Matl ML20217Q5131997-08-27027 August 1997 Proposed Tech Specs,Revising Labels for Coordinates of TS Figures 3.4.6.1-1,3.4.6.1-2,3.4.6.1-3a & 3.4.6.1-3b as Pressure (Psig) & Temp (F) Rather than Pressure Limit in Rv Top Head (Psig) ML20210P4651997-08-22022 August 1997 Proposed Tech Specs,Incorporating Power up-rate Amend 183 Provided as Replacement & Addressing Administrative Error W/Typed Bases Page Submitted w/970115 Amend Request ML20210P3601997-08-22022 August 1997 Proposed Tech Specs Bases Pages Incorporating 961101 Power up-rate Amendments ML20196J0701997-07-25025 July 1997 Proposed Tech Specs Clarifying Use of NRC Staff Approved Alternatives to Recommendations of NRC GL 88-01, NRC Staff Position of IGSCC in BWR Austenitic Stainless Steel Piping ML20149J3641997-07-18018 July 1997 Proposed Tech Specs 5.2.2.b & 5.4.2 Re Containment & RCS Design Features 1999-09-28
[Table view] |
Text
.
3/4.2 POWER DISTRIBUTION LIMITS 3/4.2.1 AVERAGE PLANAR LINEAR HEAT GENERATION RATE LIMITING CONDITION FOR OPERATION 3.2.1 All AVERAGE PLANAR LINEAR HEAT GENERATION RATES (APLHGR's) for each type of fuel as a function of AVERAGE PLANAR EXPOSURC shall not exceed the following limits:
l
- a. During two recirculation loop operation, the limits are shown in Figures 3.2.1-1, 3.2.1-2, 3. 2.1-3, 3.2.1-4, 3.2.1-5, 3.2.1-6, 3.2.1-7, 3.2.1-8, or 3.2.1-9.*
APPLICABILITY: CONDITION 1, when TilERMAL POWER > 25% of RATED TilERMAL POWER.
I ACTION: With an APLHGR exceeding the limits of Figures 3.2.1-1, 3.2.1-2, 3.2.1-3, 3.2.1-4, 3.2.1-5, 3.2.1-6, 3.2.1-7, 3.2.1-8, or 3.2.1-9*, initiate corrective action within 15 minutes and continue corrective action so that APLHGR is within the limit within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> or reduce THERMAL POWER to less than 25% of RATED THERMAL POWER within the next 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
SURVEILLANCE REQUIREMENTS 4.2.1 All APLHGR's shall be verified to be equal to or less than the applicable limit determined from Figures 3.2.1-1, 3.2.1-2, 3.2.1-3, 3.2.1-4, 3.2.1-5, 3.2.1-6, 3.2.1-7, 3.2.1-8, or 3.2.1-9:*
- a. At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />,
- b. Within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> af ter completion of a THERMAL POWER increase of at least 15% of RATED THERMAL POWER, and
- c. Initially and at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> when the reactor is operating with a LIMITING CONTROL ROD PATTERN for APLHGR.
8207020241 820628 PDR P
ADOCK 05000324 PDR
- These limits differ from those found in General Electric reports Y1003J01A37, March 1982, " Supplemental Reload Licensing Submittal for Brunswick Steam Electric Plant, Unit 2, Reload 4," (with and without RPT) due to core spray sparger inspections.
E BRUNSWICK - UNIT 2 3/4 2-1 Amendment No.
~
i 5
r.n b '
A i
E n
o 14 _-
13.6 13g _ ;,% 373
.4 b 13 5m N \ .12.6 ,12.6
]{
m
-- ,~
w z -
T d3 (12.2 b" hy 12 PEIMISSIl LE xy REC ION 01 +
E et OPI RATIO! \
p; -
gg kJ1.1 m
a A
10.0 ,
I
@ 0 5000 10000 15000 20000 25000 30000 35000 40000 h AVERAGE PLANAR EXPOSURE N FUEL TYPE 1 & 2 (7x7) .
@ MAXIMUM AVERAGE PLANAR LINEAR HEAT GENERATION RATE (MAPLHGR)
VERSUS AVERAGE PLANAR EXPOSURE FIGURE 3.2.1- 1
' NOTE: See Footnote for Specification 3.2.1
i.
I s E .
E a
s t4 S
I E
4 w 14 .-
13 p h 13.5 g r -
% 13.4 E
v m 13.0 .
13 NN 12.6 12.6 hh
~
ds '
m ;s y q2.2 b , PEI MISSII: LE o ' REC ION 01 ,
n ta OPI RATIO! \
gw 11 (11.1 5a
\
in n ,
h .. . . .
@ 0 5000 10000 15000 20000 25000 30000 35000- 40000 AVERAGE PLANAR EXPOSURE FUEL TYPE 3 (7x7) '
@ MAXIMUM AVERAGE PLANAR LINEAR llEAT GENERATION RATE (MAPLilGR)
VERSUS AVERAGE PLANAR EXPOSURE \
FIGURE 3.2.1-2
~
NOTE:- See Footnote for Specification 3.2.1
0 0
0 \
5 0
. 4 0
1 7
1 \
N .
1\
( 0 0
0 I
5 3
x '
6 2 )
1 m,
0 R
. 0 G 0 H
M
( .
1 q - E T 2 A
g 0 R 3 0
, 0 )N 7 n o
xIOER 5
~
2 7 i TU t (AS a E
6 R 03 ROEP i c
U S 2 NX f 2 EE i 1
0 P O D7 G R -
3 c e
0 X TA p 10 0
E EAN 1 PEA 2 S
2 R YHL r A T P 3 o N R f A LAE E e L EEG R
_ P UNA U t
N E L
I I T 0
0
,0 G
A E
R LE I RA A
V F t o
o IOO 5 E NS F
_ S I 1 V AU SNT A LS e IOA PR e MIR E S F C I EEP EV G
PRO A :
R E
. 0 E T 0 V O
,0 A N 0
1 M
I X
A M
0 c 0
. m0 5
P 6
3 I 1 i '
w 0 4 3 1 1 1 1
_( Nh l a e kM 5a i
N mUa xE4g 5!jRf E4w
!j
~ $gko" y*
f
~
O
- s n
i O
4 g 12.-
9 w
N 11.1 m il.2 gg,1 E
" 10.9 _- - w 11 g N w
35 z
h a6 h
N 10.3 y
$ g 10 10.2 J 0. 0
$ $g PEI MISSIl LE y REC ION 01 '
a OPI RATIO 7 N
h9 z
g A
ht a 8.8 l .
3 0 5000 10000 15000 20000 25000 30000 35000 40000 o
h AVERAGE PLANAR EXPOSURE
" FUEL TYPE 8D274L (8x8) -
y MAXIMUM AVERAGE PLANAR LINEAR HEAT GENERATION RATE (MAPLHGR)
VERSUS AVERAGE PLANAR EXPOSURE FIGURE 3.2.1-4
, NOTE: See Footnote for Specification 3.2.1.
i E
E en
$ ,e P.
E
- 1 w 12.-
O .
11.1 11 2
'g -
u ^
,11.0
$m 10.8 [ \
, / ,10.5 M wE \
n am Nh 5 10 -- 10-9
$" 4y PEIMISSII LE gy REC ION 01 -
OPI RATIOI \
al l8$ % '
8.
a N .. ,
. 1 g 0 5000 10000 15000 20000 25000 30000 35000 40000 AVERAGE PLANAR EXPOSURE FUEL TYPE 8D27411 (8x8) -
@ MAXIMUM AVERAGE PLANAR LINEAR IIEAT GENERATION RATE (MAPLliGR)
VERSUS AVERAGE PLANAR EXPOSURE FIGURE 3.2.1- 5 NOTE: See Footnote for Specification 3.2.1.
7
. O$
8 4
m
$6 5
4
. i m
E 3
8g51~l E
c c
Bjs!a "f~ gll'~i EEE s awe 80 ng g
~ is e;
38 i e d$ j
,s ,t e R
i '
5 c m g
4 n R 4 -
0 4ry, o
'2 d !; 3.'
o A
2- 7
%_n__________________
i g -
2 '
R P:
I 4
u 12.-
G t
b g 10.9 _11.0 m il.0 E
10.6
~ /
. 10.5 Y w 10 N $g . PEIMISSIl- LE 9,g 7
gd REC ION 01 +
E OPI RATIO 1 (
0N
>; g .
g- 9.2 h9 z T U
- 8. p
,, i g 0 5000 10000 15000 20000 25000 30000 35000 40000 o
h AVERAGE PLANAR EXPOSURE FUEL TYPE 8DRB265H '
y MAXIMUM AVERAGE PLANAR LINEAR HEAT GENERATION RATE (MAPLHGR)
VERSUS AVERAGE PLANAR EXPOSURE FIGURE 3.2.1- 6 NOTE: See Footnote for Specification 3.2.1.
~ . -
i E
m .
5 '
R I
E 4
y 12 .-
9 R
E v m 11.0 10.9 11 NN 10.8 r-
- 10.8
- p. A e m g
10 2
%g 10 m Qy PEIMISSII LE N xd REC ION 01 -
g OPI RATIO! ,g_s E"a N N
~
h9 m
-1>-
a
<. . i g 0 5000 10000 15000 20000 25000 30000 35000 40000 AVERAGE PLANAR EXPOSURE
" FUEL TYPE 8DRB283 -
y MAXIMUM AVERAGE PLANAR LINEAR HEAT GENERATION RATE (MAPLHGR)
VERSUS AVERAGE PLANAR EXPOSURE FIGURE 3.2.1-7
, NOTE: SEE FOOTNOTE FOR SPECIFICATION 3.2.1.
i e ..
m 5 .-
O E
4 w 12 -
9 g
v 10.9 m- --
11.1 11.1 w m in_9 Nm /
\ w 10.1 w z . =
) dS 10.5 i
~
a s 10 x b kN PEIMISSIl- LE gh REC ION 01 . 9.3 8
8 OPI RATIOT (
h9 n
d 8.6 p g 0 5000 10000 15000 20000 25000 30000 35000 40000 h AVERAGE PLANAR EXPOSURE u
" FUEL TYPE P8DRB26511 -
@ MAXIMUM AVERACE PLANAR LINEAR IIEAT GENERATION RATE (MAPLilGR)
VERSUS AVERACE PLANAR EXPOSURE FIGURE 3.2.1-8
, NOTE: SEE FOOTNOTE FOR SPECIFICATION 3.2.1.
i .
E S-r 7:
l N 12 .-
O R
v is 11,0 . . 11.0 11 "
$w 7 'N
{ 10 [ \ 7
~n < ~
e.
v om Y h 10 .0.2 [l y <$ PE1MISSIl. LE x E} REC ION 01 -
gg OPI: RATT0f 9.4 Bd h9 N \ 8.9 5
a u
@ 0 5000 10000 15000 20000 25000 30000 35000 40000 AVERAGE PLANAR EXPOSURE rt FUEL TYPE P8DRB284 (P8x8R) -
@ MAXIMUM AVERAGE PLANAR LINEAR llEAT GENERATION RATE (MAPLilGR)
VERSUS AVERAGE PLANAR EXPOSURE FIGURE 3.2.1- 9
, NOTE: SEE FOOTNOTE FOR SPECIFICATION 3.2.1.