to Monthly Operating Rept for Dec 1978
ML20042A744
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 02/16/1982
From: Caba E
TOLEDO EDISON CO.
To:
Shared Package
ML20042A722 List:
References
NUDOCS 8203230734
Download: ML20042A744 (1)


Text

-

Rev. 1 - 2/9/79 Rev. 2 - 3/8/79 Rev. 3 - 2/16/82 .

OPERATING DATA REPORT DOCKET NO. 50-346 DATE Februarv 16, 1982 COMPLETED BY Fra,1 C. Caba TELEPlf0NE (419) 259-5000, Ext. 196 OPERATING STATUS Davis-Besse Unit 1 Notes

1. Unit Name.
2. Reporting Period: December, 1978
3. Licensed Thennal Power (SIW:): 2772
4. Nameplate Rating (Gross atWe): 925 ,
5. Design Electrical Rating (Net 31We): 906
6. Maximum Dependable Capacity (Gross 31We): to be determine 1
7. Maximum Dependable Capacity (Net alwe). to be determine 1
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Level To Which Restricted. if Any (Net MWe): None
10. Reasons For Restrictions,if Any:

This S.onth Yr.-to-Date Cumulative

11. Hours in Reporting Period 744 8,760 11,765
12. Number Of flours Reactor Was Critical 328.8 4,839.7 6,631.8
13. Reactor Resene Shutdown flours 367.7 406.6 790.3
14. Hours Generator On-Line 314.1 4,266.2 5,733.2
15. Unit Resene Shutdown flours 0 0 0
16. Gross Thermal Energy Generated (MWil) 6?6.864 8,523,538 10.187,570 .
17. Gross Electrical Energy Generated (MWil) 196,972 _, 2.859,306 3,383,755
18. Net Electrical Energy Generated (MWil) 175,312 2,611,642 3,041,460
19. Unit Senice Factor 42.2 48.7 51.4
20. Unit Asailability Factor 42.2 48.7 51.4
21. Unit Capacity Factor (Using MDC Net) to be determined
22. Unit Capacity Factor IUsing DER Net) 25.7 32.9 33.3 3 23. Unit Forced Outage Rate 57.8 27.7 26.7
24. Shutdowns Scheduled Oser Ne.st 6 Months (Type. Date.and Duration of Each):

None

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation >: Forecast Achiesed I

! INITIAL CRITICALITY INITIAL ELECTRICITY N/A COMMERCIA L OPER A TION g3h 0 (9/771 R .

l ___.