EDO Principal Correspondence Control FROM: DUE: 02/04/10 EDO CONTROL: G20100024 DOC DT: 05/04/09 FINAL REPLY:
Rosalind Casey Carteret, New Jersey TO:
President Obama FOR SIGNATURE OF : ** GRN ** CRC NO: 10-0018 Leeds, NRR DESC: ROUTING:
Oyster Creek Nuclear Power Plant Borchardt (EDATS: SECY-2010-0038) Virgilio Mallett Ash Mamish Burns/Rothschild DATE: 01/14/10 Collins, RI Baggett, OEDO ASSIGNED TO: CONTACT:
NRR Leeds SPECIAL INSTRUCTIONS OR REMARKS:
Close out response to be provided via email to Sheila McKelvin, SECY to forward to the White House Correspondence Section.
-o 1-7 Ee lý ~c 0
EDATS Number: SECY-2010-0038 Source: SECY GeerlInfrato Assigned To: NRR OEDO Due Date: 2/4/2010 Other Assignees: SECY Due Date: 2/4/2010
Subject:
Oyster Creek Nuclear Power Plant
Description:
CC Routing: Regiont ADAMS Accession Numbers - Incoming: NONE Response/Package: NONE IOhrIfomto Cross Reference Number: G20100024, LTR- 10-0018 Staff Initiated: NO I
Related Task: Recurring Item: NO File Routing: EDATS Agency Lesson Learned: NO OEDO Monthly Report Item: NO Prcs I nfomaio Action Type: Letter Priority: Medium Sensitivity: None Signature Level: NRR Urgency: N0O Approval Level: No Approval Required OEDO Concurrence: NO OCM Concurrence: NO OCA Concurrence: NO Special Instructions: Close out response to be provided via email to Sheila McKelvin, SECY to forward to the White House Correspondence Section.
Dcumen Infraion Originator Name: Rosalind F. Casey Date of Incoming: 5/4/2009 Originating Organization: Citizens Document Received by SECY Date: 1/13/2010 Addressee: President Obama Date Response Requested by Originator: NONE Incoming Task Received: Letter Page 1 of I
9, OFFICE OF THE SECRETARY CORRESPONDENCE CONTROL TICKET Date Printed: Jan 13, 2010 12:31 PAPER NUMBER: LTR- 10-00 18 LOGGING DATE: 01/12/2010 ACTION OFFICE: EDO AUTHOR: Rosalind Casey AFFILIATION: NJ ADDRESSEE: The President
SUBJECT:
Concerns Oyster Creek Nuclear Power Plant ACTION: Direct Reply DISTRIBUTION: SECY to Ack LETTER DATE: 05/04/2009 ACKNOWLEDGED No SPECIAL HANDLING: White House ID 715457 NOTES: Provide copy of response to SECY for closeout with the White House Correspondence Section.
FILE LOCATION: ADAMS DATE DUE: 02/04/2010 DATE SIGNED:
2 4 EDO -- G201000 I
71$GjS. I VO 4(ek -g,ý tX4 J4ýAQ 6<
O4WARf/,Y v41,0
/a/,a -oaý 2
rS4>
~j.
f17~A~#
- 1) ~
4~ 4 ~ .~
V A
A
~~4L
2~5 /
a 44, 12 i1~&/t444 I)
Ada#
~4~Q6~?r7 a-/Igare Aý 4;v Alt- rInfwn
Dining with tV1,; ..rs While he smet.ý, *;: o ,ou p eSs coverage he gets at home, Gov. Jon Corzine has been a darling of the national media in recent months - appearing regularly on MSNBC and CNBC in particular. So it came as no surprise that the gover-nor is listed as a VIP guest at the annual White House Corre-spondents' Association dinner in Washington, D.C. on May 9.
The event at the Washington Hilton is expected to draw 2,000 politicos, journalists and celebrities. The guests range from movie star Ben Affleck to President Obama, who is ex-pected to follow tradition and perform a comedy routine.
Corzine will be sitting not with NBC, but at the CBS table
- along with Affleck, Environmental Protection Agency Ad-ministrator Lisa Jackson (formerly Corzine's chief of staff), for-mer secretary of state Colin Powell and other luminaries, according to the network's guest list.
On May 13, Corzine is also expected to attend the State-house version of the media mock-fest: the annual dinner and show hosted by the Legislative Correspondents Club. His aides did not respond to requests for comment late Friday.
R'ý FRIDAY, MAY 1, 2009 HOME NEWS TRIBUNýE:- ',.-, www.MyCentralJersey.com . -APAGE NEW.JERSE..
.... ..... :" 1 i-....
4% MA BYTODD B.BATES -
- The tritium, levels found is the oldest (nuclear) The tritium was found. covered tritium contami- po, fer ffi'6i00,00 hofmes, is Gannett New Jersey in the wells wereup to 300 power plant in the country leaking from. holes in two nation in a concrete vault the oldest in the nationi.
times higher than the gov- that's relicensed, so we're pipes - at the plant, _said. near. its turbine building
. Radioactive tritium has ernment limits allowed for like the test site." David Benson,. a plant earlier this month. It als0. oc Tritifin isý a naturally contaminated four moni- drinking water.:
But Nell A. Sheehan, a spokesman.
has. located: 'Oyster Creek-and stopped found tritium in a.monitor- for curring, radioactive tornig wells at the Oyster. "It's just kind of scary,". spokesman for the U.S. Nu-hast locatd, hand. sopped ing well and three addi-P.. pr im of hydrogen that is both leaks,'. he said. More. oduced when-: cosmic Creek nuclear power plant said Michele Nelsen of clear Regulatory Commis- i c s l tional . wells that were:, ra5is hit air molecules. It's in Lacey, but the isotope waretown, a property inspections will be pur- drilled. recgitiy,' ac sion, which oVersees the- ording - fou nd at very low or trace has not been detected be- manager who lives about 3. plant, said, 'There s no in-. lev 'els;- in J grouhdwater to NRC and pinnt officials.'
yond the plant, according miles from the plant. "I dication, there's any (con- The nlant. shut. down . . . . wo rldwide and also is a by-to a federal official and mean basically, we're. like tamination escaping)* 'to. since Saturday because of The 636-megawatt plant,: product of nuclear power-plant spokesman. the guinea pigs here' This the environment." tnts. ' . : . . .
a failed traiisfcrmer, dis- which generates enough' pla
Tritium leak 1,A6EYT0WNS~iII' Jj A1 natio¶'s 5ldest nuclear power kept to A-plant Nuclear plant officials plant, was granted a new 20-year LACEY - Envir-onmental operating license earlier this month experts and Exelon probing possible leak by the NRC.
Corp. engineers have Operators of the Oyster Creek confirmed that an ele- nuclear power plant say they are vated level of radioac-tive tritium found in investigating possible release of a Wyeth gets OK on drug could not confirm when the plant low-level radioactive substance this water at Oyster Creek Wyeth Pharmaceuticals said the plans to reopen, or the expected Generating Station on week. Ewrnnoon r*nmm,-,,i,*-, 6-, -ant edl time for 4epairs, but said it will use April 15 was confined to Officials at the plant, told the nl . drug the timh for additional summer the plant site. Nuclear Regulatory Commission ti* 'opo- maintenaiwce when power demand that detectable levels of tritium i CM t in- typically peaks.
The tritium level C: No biownouts or blackouts 102,000 picocuries per were found in a cable vault while have beeii reported since the 6,p.m.
liter - was five times workers were replacing a- cable to "eted
-5 shutdown, alid no radiation was re-higher than the federal an emergency service water pump U leased.
Environmental Protec- on Wednesday. rized tion Agency limit for. PJM interconnection, the over-They said no release seems to tural drinking water. A pico- seer of the regional electric grid be occurring, but the source of tri- lead-curie is a measure of ra- said power has been diverted from tium water was not known. ir ased other location. to make up the dif-dioactivity. Ls 20 ference.
Tritium occurs naturally in the pt Tritium is a low-level ilfe- Oyster Creek, in Lacey Town-environment at veriy low levels and ti
- the ship, opened in 1969 and is the na-radiation emitter that is may be released as steam from fa- yE teno- tion's oldest nuclear power plant. It used commercially to make luminous dials cilities such as nuclear reactors. p:
is operational about 85 percent of and instruments. It also can leak into soil and Dgula- the time in a given year, Benson ground water. tc se as said, which is close to the national The Lacey facility, which is the a tusal average. "When we finish these re-
- Wire-service reports OS. . pairs, our station will be in a good
- Susan Todd position to be reliable for the sum-Power plant still closed mer when people need energy the most," he said.
The Oyster Creek nuclear - Danny Teigman
~kze~ ,~ power plant remains shut down for maintenance after power was lost to one of the plant's two transform-ers Sat urday night.
Plan:pokesman David Benson f
a>s- C0 ca P) 0* C) M4- 0 . Z' n.-,CCMC $os
-ýn):~cs' rý, ý 4-. 4,? g) cc,) a) $ In O'.-d C a 1)
'0 . .2d (3. W)C.
4,b i CU
-,A 0 , 0
.,- 0j Ei~) CC10
,)
. 04 n 'co
~ rw
~ CI .-
.0 . a, 0 a) 2~ to ~ C a)- .,
U)# C) U)W0)
- - *-- g-~-C .- =..
'C-0)' 0.nC) . nQ'rV CU 0v (1) - C.),~
$"4 4 W
Cýb C~
0 (L)O~ a) 03 CZ~5a) .- -
> a) ,- aW 0ýt ) U U jL ) -a 0 g ý: ' 0i.S i a) S. 0 ona
LOOSISIM"V KER 4 V~~i -
ML3 W64101ý 0I 1 1111 1 H1 11 H 11 1 1111111H 4- j
'p 5<