ML20054B138

From kanterella
Revision as of 07:41, 9 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Interim Deficiency Rept Re Defective Cooling Coils in Containment Coolers,Initially Reported 820304.Util Conducting Engineering Evaluation to Determine If Deficiency Caused by Leaks.Final Rept Expected by 820604
ML20054B138
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 04/05/1982
From: Foster D
GEORGIA POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
10CFR-050.55E, 10CFR-50.55E, GN-166, NUDOCS 8204160347
Download: ML20054B138 (1)


Text

I

,.e, p: '

Georgia Power Company Post Office Box 4545 Atlanta, Georgia 30302 ..

" ,Q{

Telephone 404 522-6060  ;) MO

  • VOgtle Project Southern Company Services, Inc.

Post Office Box 262s Birmingham, Alabama 35202 Telephone 205 870-6011 April 5, 1982 -

/ 19s / 'h %

United States Nuclear Regulatory Commission 2 s' .. ,

Office of Inspection and Enforcement L-b \go).#

e^k4 1

Region II - Suite 3100 - '

101 Marietta Street Atlanta, GA 30303 File: X7BG03-M22 Log: GN-166

%

  • c:j 5 J,, Tlj$8 h *

Reference:

Vogtle Electric Generating Plant - Unit'l and 2 '/s 50-424, 50-425 Leaks in Containment Cooling Coil Units Attention: Mr. James P. O'Reilly Gentlemen:

On March 4,1982 Georgia Power Company reported a potential deficiency to the Commission concerning some defective cooling coils in the containment coolers. Georgia Power Company is conducting an engineering evaluation to determine if the leaks could have prevented these coolers from performing their functional requirements. The engineering evaluation is scheduled for completion in mid-May.

Georgia Power Company expects to submit a final report to the NRC on this matter by June 4, 1982.

This reply contains no proprietary information and may be placed in the NRC Public Document Room.

Yours truly j s

D. O. Foster Project General Manager CWH/tlp xc: U. S. Huclear Regulatory Commission Attn: Victor J. Stello J$ Office of Inspection and Enforcement go. Washington, D. C. 20555 oo gg R. J. Kelly 0. Batum J. L. Vota o R. E. Conway H. H. Gregory, III b G. F. Head E. D. Groover o8 J. H. Boykin L. T. Gucwa 40 D. E. Dutton M. Malcom

  • a:pUN sC1 7 D. L. McCrary C. R. Miles, Jr.

@@ R. A. Thomas M. Manry _

m a.m J. A. Bailey R. W. Staffa 4 J2' t