ML16340C119

From kanterella
Revision as of 17:02, 24 February 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Semimonthly Status Rept Diablo Canyon Seismic Review Program, Per NRC Order CLI-81-30 & Progress Rept of Seismic Reverification Program
ML16340C119
Person / Time
Site: Diablo Canyon Pacific Gas & Electric icon.png
Issue date: 11/25/1981
From: Crane P
PACIFIC GAS & ELECTRIC CO.
To: Harold Denton, Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV), Office of Nuclear Reactor Regulation
Shared Package
ML16340C120 List:
References
CLI-81-30, NUDOCS 8112030319
Download: ML16340C119 (4)


Text

0 (RIOS)

REGULAiTORY INFORMATION O>>ISTR'IBUT'ION SYSTEM ACCESSIOV>> VBR:8] 12030349 DOC ~ OATEl: 81/11/25 >>VOTARIZED: >>VO OOCKE~T ¹ FACILi:50.-275 Diaolo Canyon Nuclear Power>> Plant'i Unit fi, Pacific Ga 05000275 AUTH~.NAME~ AU TH3R~ AF F IL IATiION CRAN=1iP,A, Pacific Gas L Eilectriic Co.

REC IP ~ VAR""I RECiIPIENT AFF ILKA>>TIO>>V>>

OENTOu<~l,R Office', of Nuclear Re'actor Regulationr Directe>i ENGELKEVi~R,H, Region>> 5p San Francisco~ Of fice of the>> Director" (81 /03'/Of )

SUBJECT':: Forwards "Semimonthly Status Re'pt Diablo Canyon Seismic Review Programq!'. per Vrc Orderi CLiI<<81 30 L "Progpess Rtept"

~

of Sei snj c Steve'ri f i ca t'ai on Program'.

D>>ISTRii8'JTION COD "I: 8001S COPIES R "CEII YED: LR'R ANCLt TITLE(:. ~SARi/FSAR Ai>>lDTS and Rel ate'd Correspondence

~ SIZE):-'++~

VOTES'.1 cy: J Hanche,t ti (Region>> Y).LPDR;2'cys 05000275 RECIPIENT COPIES RECIPIENT COPIES I'3i CODE/NAMEl LTTR E>>VCLi ID CODE'/NAME- Lf'TRl ENCL<

ACTKON:: A/O< L>>ICEVSNG 1 0 LKC BR 43 BC 1 0.

LiICi BR- ¹3>> L>>A 1 0 BUCKLEYiB~ 01. 1 1 INTE RN AL>>: ELOi 1 0 IEI 3 3l IEi/DEP/EPDB 35>> 1 36" 06'E'/DEP/EPLB 3>>

MPAt 1 0 >>VRR/DE'/CEB 11 1 1

'ERR'/OE/EQB 13>> 3 3 VRR/DE/GB'8 2>>

VRRi/OE/HGEBi 30. 2 2 VRR'/DE/MEB 18 1 1 NRRi/OE "/>>~lTEB 1 7 1 1 VRR/DE/QAB 2'1 1 1

>>VRR'/OE!'/S AB 24 1 VRR/DE/SEB 25 f f" VR'8'/OHF S/HF EBB 0. 1 1 VRR/DHFS/LQB 32" 1' 1>>

>>VRRi/DHFS/l)LB 3Q 1 1 VRR'/DHFS/PTRB20 1 1<

iVRR>>/OS Ii/AEB 1 VRR'/DSI'/ASB 27 1 1 I/CP8 10, 26'VRR'/OS 1- 1 NRR'/DS I/CSB 09 '

f ~

>>VRR'/OSIYElTSB 1 2! 1 1 VRR/DSI/I CSB 1

>>VRR>>/OS I'/PSB 19 1- 1 16'RR'/DSI'/RAB 23I 1- 1 3>>3t 22'RR'/DST'/LGB 1 1 RE/, i 0>>g 1 1 EXTERNALi: ACR6 Q]>> ie BiVLi(AMOTS ONLiY) 1 f>>

FERA-REP DIY 39. 1 LPORi 03>> gf NRC> PORE 0+>> 1 1 '4S IC>> 05 1 1 ~

N T'IS ] 1

>EC g~ )~

('

rnfl AI VU>>>>tBFRl AF COPIFC>> RFQUIRED:: LiTTR ~>> ENCLI

C 4"

0 0

PACIFIC GAB AND ELECTRIC COMPANY P. O. 8OX 7442 77 8EALE STREET, 31ST FLOOR, SAN FRANCISCO, CALIFORNIA 94106 TED'r~TF ~

TELECOPIER (415) 543 7813 TELEPHONE (415) 781-4211 November 25, 1981 Mr. Harold R. Denton, Director aK'<<>

Office of Nuclear Reactor Regulation DE Qg jggM SI U. S. Nuclear Regulatory CoITmission Washington, D. C. 20555 her. R. H. Engelken, Director Office of Inspection and Enforcement Region V U. S. Nuclear Regulatory Comnission 1450 htaria Lane, Suite 210 Walnut Creek, CA. 94596 Re: Docket No. 50-275 License No. DPR-76 Diablo Canyon Unit 1

Dear Sirs:

In accordance with CcIITIIission Order CLI-81-30, enclosed is our semi-monthly Status Report dated November 25, 1981 for the Diablo Canyon seismic review. This report sunmarizes the progress of our technical work from November 12, 1981 through November 23, 1981.

In addition, a report from our independent consultant, R..L. Cloud Associates, Inc., entitled "Progress Report of Seismic Re-verification Program, Diablo Canyon Nuclear Power Plant, Progress Report No. 2," is attached.

Very truly yours, Philip A. Crane, Jr.

Enclosure (40) cc(w/enc): hh . Frank J. Miraglia, Jr., Chief, Licensing Branch No. 3 Division of Licensing Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Col)ission Washington, D. C. 20555 Service List

~8112030319 811125 PDR ADOCK 05000275 R P.DR

P ~

E.

~5 1

~ '

1'l IP H R

gf< ~

p r