Monthly Operating Rept for Dec 1989 for Fort St Vrain, Unit 1.W/900112 Ltr
ML19354E079
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 12/31/1989
From: Block M, Fuller C
PUBLIC SERVICE CO. OF COLORADO
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
P-90022, NUDOCS 9001250330
Download: ML19354E079 (8)


Text

.

O'rubiic service'

= ' -

P.o. Box B40 Denver, Co 80201 0840 16805 WCR 19 1/2, Platteville, Colorado 80651 January 12, 1990

-Fort St. Vrain Unit No. 1 P-90022 1.

1 U. S. Nuclear Regulatory Commission l ATTN: . Document Control Desk l-Mail,Stop P1-37 Washington, D.C. 20555 Docket No. 50-267

SUBJECT:

-DECEMBERL1989 MONTHLY OPERATIONS REPORT

Dear Sirs:

Enclosed, please find the Monthly Operations Report for the month of December 1990, submitted per- the requirements of Fort St. Vrain Technical' Specification AC 7.5.1, Nuclear Operations at Fort St. Vrain were terminated August 29, 1989.

If you have any questions, please. contact Mr. M. H. Holmes at (303)'

480-6960.'

Sincerely, LY Charles H. Fuller Manager, Nuclear Production.

_ Fort St. Vrain Nuclear Generating Station L

CHF:DLW/bhb 1

Enclosure cc:. Regional' Administrator,. Region-IV >

ATTN: Mr. T. F. Westerman, Chief Projects Section B Mr. Robert Farrell y Senior Resident Inspector

. Fort St. Vrain l ' il .

.i 0 -

c ! .. .

- 6% '

t i

PUBLIC SERVICE COMPANY OF COLORADO FORT ST. VRAIN NUCLEAR-GENERATING STATION s

s i

i h

.i MONTHLY DEFUELING GPERATIONS REPORT j NO. 191 December, 1989 l

l i <

\

c -: . *. .

. t. : ' .

.i This report contains the highlights of -the Fort St. Vrain, Unit No. 1, activities . operated under the provisions -of the Nuclear-Regulatory Commission Operating License No DPR-34. This report is-for the month of December,'1989, 1.0 NARRATIVE-

SUMMARY

OF OPERATING EXPERIENCE AND MAJOR SAFETY RELATED MAINTENANCE The reactor remained shutdown:the entire month of December,1989,-

following Public Service Company of Colorado's, decision to end~

nuclear operation at Fort St. Vrain.  ;

Preparations ,for defueling and decommissioning are ' proceeding. -

During the month of December,1989, all irradiated fuel elements. '

were removed from- regions 33,:-25,. 36, and 29.

- These fuel elements are currently beingy stored in~the' fuel storage wells.

2.0 SINGLE RELEASES OF RADI0 ACTIVITY OR RADIATION EXPOSURE'IN EXCESS OF 10% OF THE ALLOWABLE ANNUAL VALUE -

None 3.0 INDICATION OF FAILED FUEL RESULTING- FROM IRRADIATED FUEL EXAMINATIONS None 4.0 MONTHLY OPERATING DATA REPORT' Attached ,

l I

l U _

~

U L -*-

g e, .

s OPERATING DATA REPORT 100CKET NO. 50-267 DATE Jnnunrv l 'i . wri COMPLETED BY M. L. Block TELEPHONE (303)=620-1180-OPERATING STATUS NOTES la . Unit Name: Fort St. Vrain. D it No. 1 ,_,

2. Reporting Period: 891201 throunh 891231

- 3. - Licensed Thermal

  • Power (MWt): Ra?

4 Nameplate Rating (Gross MWe): -342'

5. Design Electrical Rating (Net MWe): 330
6. Maximum Depencable Capacity (Gross MWe): -~342 q
7. Maxieva Depencable Capacity (Net MWe): 330
8. If Changes Occur In' Capacity Ratings (!tems Numoer 3 Through =7) Since Last Report, Give Reasons:

None- ,_

9. Power Level To Which Restricted, if Any (Net MWe): - 0. 0 -
10. Reasons For Restrictions, If Any: ' Fort St. Vrain ceased nuclear operation on Aunust 29. 1989. -1 This Month. Year To Dat ' Cumulative .- .
11. Hours In Repor1 sing Period 714 .O' 8.760.0 42.089.0

-12. Numoer Of Hours Reactor Was Critical ' N/A ' N/A 'N/A

13. Reactor Reserve Shutdown Hours N /A :N/A N/A -l
14. Hours Generator On-Line N/A N/A- "N/A
15. Unit Reserve Shutdown Hours. M/A N/A N/A
16. Gross Thermal Energy Generated (MWH) N/A 1.552.941.'1 14.450.651.2'
17. Gross Electrical Energy Generated (MWH) N/A 576~430.0

. 4.R36.834.0  !

1

18. Net Electrical Energy Generated (MWH) -2.051.0 523.010.0 4.273.004.0 '
19. Unit Service Fact.or N/A N/A N/A ~ q
20. Unit Availability Factor ~ N/A N/A' N/A  !
l. 21. Unit Capacity Factor (Using'MDC Net) N/A N/A~ N/A
22. Unit Capacity Factor (Using DER Net) N/A- N/A N/A
23. Unit Forced Outage Rate N/A N/A N/A~ y
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of. Each): Fort St. Vrain ceased.

nuclear operation on August 29, 1989. '!

E

25. If Shut Down At End Of Report Period. Estimated Date Of Startup: N/A

'26. Units In Test Status (Prior To Connercial Operation): Forecast AcMevd INITIAL CRITICALITY N/A N/A INITIAL ELECTRIC!iY N/A N/A' q COMMERCIAL OPERATION N/A N/A

}

1: <

1

)

h

[ _ l

~

t. .

. . AVERAGE DAILY UNIT POWER LEVEL

,- .s- -

-Month DECEMBER

  • ~

DAY AVERAGE DAILY POWER LEVEL ' DAY AVERAGE GAILY POWER LEVEL-(MWe-Net) .(MWe-Net) 1 0.0 17 0.0 2 0.0 18 0.0 3 0.0 19 0.0 _

4 0.0' 20 0.0 5 0.0 21 0.0 6 , 0.0 22 0.0 7 0.0' 23 0.0 8 0.0 24. 0.0 9 0.0 25 0.0 10 0.0 26 0.0 11 0.0 27 - 0.0 12 0.0 28 0.0 13 0.0 29 0.0 1 14 0.0 30 0.0-15 0.0 31 0.0 16 0.0

]

Nuclear Operations at Fort St. Vrain were terminated on August 29, 1989.

l 4

l

. .i

DATE Janua ry 15. 1990

~

COMPLETED BY M. L.. Block TELEPHONE (3031 620-1180 REPORT MONTH DECEMBER. 1989 1 l l METHOD Ofl 1 l l l l .,

I l SHUTTING l 1 l l CAUSE AND CORRECTIVE ACTION I '

NO. I DATE l TYPE DURATION l REASON IDOWN i LER g ISYSTEMICOMPONENTI TO PREVENT RECURRENCE 1' I inEACTOR l CODE ICODE I

  • l l I I I l 189-091 891201 I r1 744.0 F 1- I N/A .

N/A I N/A I Nuclear Operations were terminated on l l l i l t i l i August 29, 1989, see LER 89-018. I -

I I I I i 1 1 -l

'!l I I I I. 1 I I I I I I i 1 'l  :

1 1 .

I i I i i l I I i l

' i I i l l I I I I I I I I I I l' I .I l i I l- I -1 4 i i I I . 1 I I- 1 I I l-i 1 I I 1

'I l  ! l l 1 'I I I I -1 i I-I I I I ' t.

I I I I I

1. I l' - 1 I

I .

I I I  ! ~I I I l' I l' l

! 1 1 1 I I I I 't. I I l- I!: l- l-I I I i 1 l 1 I 1

I l- 1 I s I l~ l l I l!

lj i . I I

-I I I I I i 1 1 1 I I I I I I I I l' I I I I i 1 1- I l- 1 I d

, , 9 s a.. y, u.,N -

'w

+__w __a__ ___ _ _ _ _ _ _ _ , _ _ _ s

~ ..

o , * , ,

l- I l l 1. Name of Facility i Fort St. Vrain Unit No. 1 l j J

l . I l l 2. Scheduled date for next l None, no further refueling at l

-l refueling shutdown. I FSV is expected. l

.l .

I l .

l 3.. Scheduled date for restart i N/A l l l following refueling. l l l l .l l l l 4. . Will-refueling or resumption ofl N/A~ l l operation thereafter require a l l l technical specification change l l l or other license amendment? I l' l l l' l If answer is yes, .what, in- l ---------------- l l general, will these be? -l l l l l l If answer is .no, has the reload l l ,

l fuel derign and' core configura-l l-

l. tion been reviewed by your l -

.l l Plant 5afety Review Committee l N/A l l to detarmine whether any unre- l l l viewec safety questions'are l l 3 i associated with the core reloadj l ,

l (Reference 10 CFR Section l l l 50.59)? I l.

I I l-l If no such review has taken l N/A l ,

l place, when is it scheduled? I l ,

I I l l 5. Scheduled date(s) for submit- l- l' ting proposed licensing action l ----------------

l l' l and supporting information. l l l l 1

  • l l 6. Important licensing considera- l l l tions associated with refuel- l l l ing, e.g., new or different l l  ;

, l fuel de si gn or suppli er, unre- l ---------------- l l l viewed design or performance l l l analysis methods, significant- l l l changes in fuel. design, new I l l- operating procedures. l l l 1 l l 7. .The number of fuel assemblies l l l (a) in the core and (b) in the l a) 1326 HTGR fuel elements l l spent fuel storage-pool. I b) 156 spent fuel elements l l-m ~ -o

.J% ,-

q I - l- l The present licensed spent fuell-l-8. l l pool storage capacity and the I l. i l- size of any increase in l Capacity is limited in size to -l ,

I licensed c rage capacity that l about one-third of core l-I has been requested.or is' l (approximately 500 HTGR clements).l -1 l planned, in number of fuel -l No change is planned. l l assemblies, i l 1 I I:

l 9. The projected date of the.last l No further refueling is :l i l refueling that can be dis- -l-anticipated at Fort St. Vrain.

  • l-l charged to the spent-fuel pool l _l- , .

I assuming the present licensed. l l l capacity. l l.

Under Agreements AT(04-3)-633 and DE-SC07-791001370 bet.een'Public Service Company of Colorado',- General Atomic Company, and 00E, spent fuel discharged during the defueling process will be stored by DOE at the Idaho Chemice.1; Processing Plant. 'The storage capacity !is presently sized to accommodate eight fuel segments. It is estimated 1 ,

that the eighth fuel segment will be discharged in 1991. Discussions-concerning the disposition of ninth fuel segment are in. progress with 00E. Nuclear Operations at Fort St. Vrain.were terminated-August 29, 1989.