MONTHYEARML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers U-603204, Final Part 21 Rept 21-99-003 Re Deficiency in Commercial Grade Dedication Process Used by Circuit Breaker Refurbishment Supplier Trentec for Westinghouse Breaker 1AP05EH.Issue Determined Not Reportable Per 10CFR211999-04-30030 April 1999 Final Part 21 Rept 21-99-003 Re Deficiency in Commercial Grade Dedication Process Used by Circuit Breaker Refurbishment Supplier Trentec for Westinghouse Breaker 1AP05EH.Issue Determined Not Reportable Per 10CFR21 U-603182, Part 21 Rept Re Deficiency in Commercial Grade Dedication Process Used by Circuit Breaker Refurbishment Supplier, Trentec.Condition Rept 1-99-01-136 Was Initiated to Track Investigation & Resolution of Issue1999-03-12012 March 1999 Part 21 Rept Re Deficiency in Commercial Grade Dedication Process Used by Circuit Breaker Refurbishment Supplier, Trentec.Condition Rept 1-99-01-136 Was Initiated to Track Investigation & Resolution of Issue U-603115, Part 21 Interim Rept 21-98-021 Re Deficiencies in Matl Dedication Process Used by Goulds Pumps in Supplying SR Parts to Npps.Issue Is Not Reportable Under 10CFR21. Dedication Process Did Not Affect Ability of Components1998-12-0404 December 1998 Part 21 Interim Rept 21-98-021 Re Deficiencies in Matl Dedication Process Used by Goulds Pumps in Supplying SR Parts to Npps.Issue Is Not Reportable Under 10CFR21. Dedication Process Did Not Affect Ability of Components U-603114, Part 21 Rept 21-98-049 Re W Dhp Circuit Breaker Refurbished by Nuclear Logistics,Inc Which Failed to Operate.Caused by Trip Latch out-of-adjustment & Incorrectly Sized Ratchet Lever Assembly Bushing.Breakers Were Returned to Vendor1998-11-25025 November 1998 Part 21 Rept 21-98-049 Re W Dhp Circuit Breaker Refurbished by Nuclear Logistics,Inc Which Failed to Operate.Caused by Trip Latch out-of-adjustment & Incorrectly Sized Ratchet Lever Assembly Bushing.Breakers Were Returned to Vendor U-603033, Part 21 Rept 21-98-039 Re Shrinkage of Medium & High Density Silicone Seals Designed & Installed by Bisco Using Dow Corning Sylgard 170 Matl.Caused by Coefficient of Thermal Expansion.Will Inspect & Rework/Repair Suspected Seals1998-07-20020 July 1998 Part 21 Rept 21-98-039 Re Shrinkage of Medium & High Density Silicone Seals Designed & Installed by Bisco Using Dow Corning Sylgard 170 Matl.Caused by Coefficient of Thermal Expansion.Will Inspect & Rework/Repair Suspected Seals ML20236E7991998-05-26026 May 1998 Final Part 21 Rept Re W Dhp Circuit Breaker Auxillary Switch Operating Assembly Anomalies.Caused by Loss of Breaker Safety Function.Dhp Circuit Will Be Inspected ML20248F3531998-05-21021 May 1998 Part 21 Rept Re Electronic Equipment Repaired or Reworked by Integrated Resources,Inc from Approx 930101-980501.Caused by 1 Capacitor in Each Unit Being Installed W/Reverse Polarity. Policy of Second Checking All Capacitors Is Being Adopted U-603004, Part 21 Rept Re 980107 Determination That Itt Barton Model 580A Series Differential Pressure Indicating Switches Operating Forces Too Low.Manufacturing Sys Allowed Switches to Be Mixed.Evaluation Concludes Issue Not Reportable1998-05-15015 May 1998 Part 21 Rept Re 980107 Determination That Itt Barton Model 580A Series Differential Pressure Indicating Switches Operating Forces Too Low.Manufacturing Sys Allowed Switches to Be Mixed.Evaluation Concludes Issue Not Reportable ML20216A9601998-05-0808 May 1998 Part 21 Rept Re Failure of 12 Volt DC Inverter Power Supply. Caused by Inadequately Sized Output Transistor Pair Combined W/Degraded Capacitors.Licensee Plans to Replace All Output Transistors & Degraded Capacitors U-602995, Part 21 Interim Rept 21-98-021 Re Deficiencies in Matl Dedication Process Used by Goulds Pumps During Use of Portable Metal Analyzer.Util Identified Discrepancies Which Are Acceptable W/Some Exception of Some Replacement Parts1998-05-0505 May 1998 Part 21 Interim Rept 21-98-021 Re Deficiencies in Matl Dedication Process Used by Goulds Pumps During Use of Portable Metal Analyzer.Util Identified Discrepancies Which Are Acceptable W/Some Exception of Some Replacement Parts U-602994, Part 21 Rept Re Final Rept 21-98-008,on 980113,reliance Electric Motors Supplied by Rockwell International for Hydrogen Recombiner Cooling Fans Do Not Have nameplate- Specified High Temperature Bearings.Fan Motors Acceptable1998-04-29029 April 1998 Part 21 Rept Re Final Rept 21-98-008,on 980113,reliance Electric Motors Supplied by Rockwell International for Hydrogen Recombiner Cooling Fans Do Not Have nameplate- Specified High Temperature Bearings.Fan Motors Acceptable U-602979, Final Part 21 Rept 21-97-059 Re Discrepancies Found During Receipt Insp of Three Refurbished safety-related W Dhp Circuit Breakers.Util Completed Evaluation,Per 10CFR21 & Concludes That Condition Is Not Reportable1998-04-0707 April 1998 Final Part 21 Rept 21-97-059 Re Discrepancies Found During Receipt Insp of Three Refurbished safety-related W Dhp Circuit Breakers.Util Completed Evaluation,Per 10CFR21 & Concludes That Condition Is Not Reportable U-602968, Interim Part 21 Rept 21-97-055 Re Westinghouse Dhp Circuit Breaker Auxiliary Switch Operating Assembly Anomalies. Initially Reported on 980116.Util Currently Evaluating Suppliers Response to Questions Re Issue1998-03-24024 March 1998 Interim Part 21 Rept 21-97-055 Re Westinghouse Dhp Circuit Breaker Auxiliary Switch Operating Assembly Anomalies. Initially Reported on 980116.Util Currently Evaluating Suppliers Response to Questions Re Issue U-602960, Part 21 & Deficiency Rept Re Commerical Grade Dedication Program of Sentry Equipment Corp.Initially Reported on 980217.IP Performed an Addl Assessment at Sentry Facility on 980226.Next Rept Will Be Submitted by 9804111998-03-12012 March 1998 Part 21 & Deficiency Rept Re Commerical Grade Dedication Program of Sentry Equipment Corp.Initially Reported on 980217.IP Performed an Addl Assessment at Sentry Facility on 980226.Next Rept Will Be Submitted by 980411 U-602954, Interim Part 21 rept,21-98-008 Re Identification That Bearings Installed in Hydrogen Recombiner B Cooling Fan Motor 0HG04CB Were Not Same as Bearings Specified on Motor Nameplate.Will Complete Evaluation of Issue by 9805131998-03-0909 March 1998 Interim Part 21 rept,21-98-008 Re Identification That Bearings Installed in Hydrogen Recombiner B Cooling Fan Motor 0HG04CB Were Not Same as Bearings Specified on Motor Nameplate.Will Complete Evaluation of Issue by 980513 U-602952, Part 21 Interim Rept 21-98-001:ITT Barton Model 580A Series Dp Indicating Switch Operating Force Concerns.Initially Reported on 980107.Evaluation of Subj Issue Will Be Completed by 9805301998-03-0606 March 1998 Part 21 Interim Rept 21-98-001:ITT Barton Model 580A Series Dp Indicating Switch Operating Force Concerns.Initially Reported on 980107.Evaluation of Subj Issue Will Be Completed by 980530 U-602939, Part 21 Interim Rept 21-97-060 Re Sentry Equipment Corp Commercial Grade Dedication Program Deficiencies.Evaluation of Issue Will Be Completed by 9804041998-02-17017 February 1998 Part 21 Interim Rept 21-97-060 Re Sentry Equipment Corp Commercial Grade Dedication Program Deficiencies.Evaluation of Issue Will Be Completed by 980404 U-602932, Interim Part 21 Rept 21-97-059 Re Several Discrepancies Found During Receipt Insp of Three safety-related W Dhp Circuit Breakers.Sent Subject Circuit Breakers to Nuclear Logistics Inc for Refurbishment1998-02-13013 February 1998 Interim Part 21 Rept 21-97-059 Re Several Discrepancies Found During Receipt Insp of Three safety-related W Dhp Circuit Breakers.Sent Subject Circuit Breakers to Nuclear Logistics Inc for Refurbishment U-602925, Part 21 Rept 21-97-058 Re Oil Leaking Around Diaphragm of Replacement Pressure Reducing/Dump Valve Installed on Itt Barton Hydromotor Actuator.Caused by Poor Workmanship of Valve at Time of Manufacture.Valves Sent to Vendor1998-02-0606 February 1998 Part 21 Rept 21-97-058 Re Oil Leaking Around Diaphragm of Replacement Pressure Reducing/Dump Valve Installed on Itt Barton Hydromotor Actuator.Caused by Poor Workmanship of Valve at Time of Manufacture.Valves Sent to Vendor U-602920, Part 21 Interim Rept 21-97-044/047/048 Re 970929 Failure of safety-related Battery Charger.Caused by Inadequate Soldered Wire Connections.Util Will Issue Rept of Issues IAW Provisions of 10CFR21 & 10CFR50.73 by 9802171998-01-28028 January 1998 Part 21 Interim Rept 21-97-044/047/048 Re 970929 Failure of safety-related Battery Charger.Caused by Inadequate Soldered Wire Connections.Util Will Issue Rept of Issues IAW Provisions of 10CFR21 & 10CFR50.73 by 980217 U-602910, Part 21 Interim Rept 21-97-055,identified Adverse Trend in Auxiliary Switch Operating Assembly Anomalies in W Dhp Circuit Breakers on 971120.Condition Rept 1-97-11-388 Initiated to Track Investigation & Resolution1998-01-16016 January 1998 Part 21 Interim Rept 21-97-055,identified Adverse Trend in Auxiliary Switch Operating Assembly Anomalies in W Dhp Circuit Breakers on 971120.Condition Rept 1-97-11-388 Initiated to Track Investigation & Resolution U-602894, Final Part 21 Rept Re Discrepancies Between GE BWR Reactor Design Requirements Documents & Sys Vendor Manuals.Util Completed Evaluation & Concluded That Issue Is Not Reportable Per 10CFR21 as Reported in 971029 Rept1997-12-18018 December 1997 Final Part 21 Rept Re Discrepancies Between GE BWR Reactor Design Requirements Documents & Sys Vendor Manuals.Util Completed Evaluation & Concluded That Issue Is Not Reportable Per 10CFR21 as Reported in 971029 Rept U-602876, Interim Part 21 Rept Re 970929 Discovery of Deviations in safety-related Battery Chargers.Evaluation of Conditions Under Part 21 Continuing.Update on Resolution Progress Will Be Provided by 9801291997-12-0303 December 1997 Interim Part 21 Rept Re 970929 Discovery of Deviations in safety-related Battery Chargers.Evaluation of Conditions Under Part 21 Continuing.Update on Resolution Progress Will Be Provided by 980129 U-602855, Part 21 Rept Re Discrepancies Between GE BWR Design Requirements Documents & Sys Vendor Manuals.Util Does Not Have Firm Date for Resolving Issue But Will Provide Update on Resolution Progress by 9712181997-10-29029 October 1997 Part 21 Rept Re Discrepancies Between GE BWR Design Requirements Documents & Sys Vendor Manuals.Util Does Not Have Firm Date for Resolving Issue But Will Provide Update on Resolution Progress by 971218 U-602823, Part 21 Rept Re Improper Clearance for W Model 50DHP350 Circuit Breaker Arc Chute Rear Arc Horn.Caused by Installation of Arc Chute Having Potential to Cause Line Pole to Deflect.Replace Deficient Arc Chutes1997-08-28028 August 1997 Part 21 Rept Re Improper Clearance for W Model 50DHP350 Circuit Breaker Arc Chute Rear Arc Horn.Caused by Installation of Arc Chute Having Potential to Cause Line Pole to Deflect.Replace Deficient Arc Chutes ML20149F6031997-07-18018 July 1997 Part 21 Rept Re R47 Incorrectly Installed on Electric Power Assembly.Recommends Evaluation of Timing Delay Requirements Applicable to Reactor Protective Sys ML20136D5641997-03-0707 March 1997 Part 21 Rept Re Transformer Not Being Stable in No Load Condition & Tripping When Lightly Loaded U-602704, Part 21 Rept Re Regulated Power Transformer 1AP75ERT Tripping Several Times.Caused by Addition of Step Load from Low or No Load Condition.Will Disconnect Four Potentially Affected Transformers from Div 2 Electrical Sys1997-02-27027 February 1997 Part 21 Rept Re Regulated Power Transformer 1AP75ERT Tripping Several Times.Caused by Addition of Step Load from Low or No Load Condition.Will Disconnect Four Potentially Affected Transformers from Div 2 Electrical Sys ML20133E8001997-01-0808 January 1997 Deficiency Rept Re Nonconformance Related to Masterflow 713 Grout,Which Master Builders,Inc Has Supplied as Nuclear SR Product to 18 Npps.Cause Unknown.Requests That Listed Info Be Provided to Gain Insight as to Scope & Possible Cause U-602677, Part 21 Rept Re Failure of Westinghouse Dhp Circuit Breaker to Close on Demand During Surveillance Test.Inspected, Cleaned,Adjusted & Lubricated Motor cut-off Switch & Spring Charge Indicator Mechanism in Subject Breaker1996-12-20020 December 1996 Part 21 Rept Re Failure of Westinghouse Dhp Circuit Breaker to Close on Demand During Surveillance Test.Inspected, Cleaned,Adjusted & Lubricated Motor cut-off Switch & Spring Charge Indicator Mechanism in Subject Breaker U-602634, Part 21 Rept Re Failure of Itt Barton Hydramotor Actuator Pump to Develop Hydraulic Pressure During Testing.Initially Identified on 960306.Pump Withdrawn from Stores & Installed During Actuator Overhaul1996-09-20020 September 1996 Part 21 Rept Re Failure of Itt Barton Hydramotor Actuator Pump to Develop Hydraulic Pressure During Testing.Initially Identified on 960306.Pump Withdrawn from Stores & Installed During Actuator Overhaul ML20116B9251996-07-25025 July 1996 Part 21 Rept Re Failure Analysis Concerning Pump Assembly NS109761EQX07 U-602580, Part 21 Rept Re Itt Barton Hydramotor Actuator Pump Assembly Failed to Develop Hydraulic Pressure During Testing.Caused by Pump Not Being Fitted Properly1996-05-0808 May 1996 Part 21 Rept Re Itt Barton Hydramotor Actuator Pump Assembly Failed to Develop Hydraulic Pressure During Testing.Caused by Pump Not Being Fitted Properly U-602579, Part 21 Rept Re Ideal Generators Installed W/Edgs Having Greater Generator Rotor Mass than Originally Calculated. Evaluated Impact of Issue of Generator Frequency & Torsional Vibration Prior to Interim Rept1996-05-0202 May 1996 Part 21 Rept Re Ideal Generators Installed W/Edgs Having Greater Generator Rotor Mass than Originally Calculated. Evaluated Impact of Issue of Generator Frequency & Torsional Vibration Prior to Interim Rept ML20108D1441996-05-0101 May 1996 Part 21 Rept Re Failure of Pump Assembly for Itt Barton Series NH95 Hydramotor Actuator.Did Not Develop Pressure Because Was Not Fitted Properly.Pump Assembly Has Been Returned to Itt Barton for Insp U-602564, Interim Part 21 Rept 21-96-001 Re Egds Rotor Mass Greater than Originally Calculated.Revised Calculation Shows Larger Rotor Mass & Rotational Inertia1996-03-13013 March 1996 Interim Part 21 Rept 21-96-001 Re Egds Rotor Mass Greater than Originally Calculated.Revised Calculation Shows Larger Rotor Mass & Rotational Inertia U-602532, Final Part 21 Rept 21-95-018 Re Failure of Power Shield Type SS-13 Solid State Trip Devices (Sstd) Mfg by Asea Brown Boveri,Ite,Gould & Brown Boveri.Util Inspected & Reworked,As needed,12 Type SS-13 Sstds in safety-related Breakers1995-12-20020 December 1995 Final Part 21 Rept 21-95-018 Re Failure of Power Shield Type SS-13 Solid State Trip Devices (Sstd) Mfg by Asea Brown Boveri,Ite,Gould & Brown Boveri.Util Inspected & Reworked,As needed,12 Type SS-13 Sstds in safety-related Breakers ML20094P5671995-11-20020 November 1995 Part 21 Rept Re Abb Power Shield Trip Units (Pstu),Type SS-13.On 951006,util Reported to NRC That Two Pstus,Type SS-13 Tripped VC & Vx Sys Circuit Breakers.Recommends Insp of Power Shield SS Trip Units Prior to Serial 80,000,in Svc U-602502, Interim Part 21 Rept 21-95-018 Re Failure of Solid State Trip Devices Type SS-13 Mfg by Gould/Ite (Now Abb,Asea Brown Boveri).Investigation Found Return Air Fan Circuit Breaker in Tripped Condition.Breaker Replaced W/Spare Breaker1995-10-0606 October 1995 Interim Part 21 Rept 21-95-018 Re Failure of Solid State Trip Devices Type SS-13 Mfg by Gould/Ite (Now Abb,Asea Brown Boveri).Investigation Found Return Air Fan Circuit Breaker in Tripped Condition.Breaker Replaced W/Spare Breaker U-602497, Part 21 Rept Re Inverter Pwm Drive Logic Card Failure. Inverter Out of Svc to Replace Logic Card W/Revised Card in Accordance W/Scheduled Maint Activity1995-09-26026 September 1995 Part 21 Rept Re Inverter Pwm Drive Logic Card Failure. Inverter Out of Svc to Replace Logic Card W/Revised Card in Accordance W/Scheduled Maint Activity U-602466, Follow-up to 10CFR21 Interim Rept 21-95-010 Re Elgar Inverter Pwm Drive Logic Card (J4) Failure.Elgar Performed Addl Testing of Cards at CPS & Developing Schedule for Evaluating Test Results.Update Will Be Provided by 9509271995-07-12012 July 1995 Follow-up to 10CFR21 Interim Rept 21-95-010 Re Elgar Inverter Pwm Drive Logic Card (J4) Failure.Elgar Performed Addl Testing of Cards at CPS & Developing Schedule for Evaluating Test Results.Update Will Be Provided by 950927 ML20084B0071995-05-22022 May 1995 Part 21 Rept Re Failure of Elgar Inverter Pwm Drive Logic Card on 950324.Cause of Failure Unknown.Subsequent Replacement Logic Card Identified as Deficient.Both Logic Cards Returned to Mfg for Analysis ML20072S0051994-08-18018 August 1994 Part 21 Rept Re Failure of Motor Operated Potentiometer Mfg by Basler Electric.Qualification Testing of Units Revised & Mkw Power Sys Will Perform Site Visit at Basler Electric to Verify Adequacy of Basler Electric C/A U-602305, Part 21 Rept Re Incorrect Size Telephone Coil Current Limiting Resistor in Westinghouse/Asea Brown Boveri CV-2 Voltage Relay1994-06-27027 June 1994 Part 21 Rept Re Incorrect Size Telephone Coil Current Limiting Resistor in Westinghouse/Asea Brown Boveri CV-2 Voltage Relay U-602299, Part 21 Defect 21-94-010 Re Incorrect Internal Wiring of Basler Electric motor-operated Potentiometer (Mop) by Mkw Power Sys.Correct Wiring Scheme Determined & Mop Rewired in Accordance W/Vendor Wiring Diagram1994-06-0606 June 1994 Part 21 Defect 21-94-010 Re Incorrect Internal Wiring of Basler Electric motor-operated Potentiometer (Mop) by Mkw Power Sys.Correct Wiring Scheme Determined & Mop Rewired in Accordance W/Vendor Wiring Diagram JSP-007-94, Part 21 Rept Defect 21-93-028 Re Failure of Instantaneous Trip Function on Ite Gould/Telemecanique Type He Molded Case Circuit Breaker.Deficient Breaker Placed on Hold Pending Disposition Through Plant Corrective Action Program1994-01-11011 January 1994 Part 21 Rept Defect 21-93-028 Re Failure of Instantaneous Trip Function on Ite Gould/Telemecanique Type He Molded Case Circuit Breaker.Deficient Breaker Placed on Hold Pending Disposition Through Plant Corrective Action Program JSP-006-94, Part 21 Rept Re Westinghouse 4160 Volt Alternating Current Breakers Incorrectly Configured & Poorly Constructed. Initially Reported on 931111.Affected Assemblies Placed on Hold Pending Disposition1994-01-0707 January 1994 Part 21 Rept Re Westinghouse 4160 Volt Alternating Current Breakers Incorrectly Configured & Poorly Constructed. Initially Reported on 931111.Affected Assemblies Placed on Hold Pending Disposition U-602227, Part 21 Rept 21-93-029 Re Potential for Motor Pinion Key Failure in Limitorque Actuators Due to Excessive Torque During Valve Backseating & Movats Testing.Initially Reported on 931210.Description of Actuator Should Be Model Sb..1993-12-22022 December 1993 Part 21 Rept 21-93-029 Re Potential for Motor Pinion Key Failure in Limitorque Actuators Due to Excessive Torque During Valve Backseating & Movats Testing.Initially Reported on 931210.Description of Actuator Should Be Model Sb.. JSP-552-93, Part 21 Defect 21-93-029:on 931007,discovered Broken Motor Shaft Pinion Key in Limitorque Actuator of motor-operated HPCS Sys Injection & Outboard Containment Isolation Valve 1E22-F004.Broken Motor Pinion Key Replaced1993-12-10010 December 1993 Part 21 Defect 21-93-029:on 931007,discovered Broken Motor Shaft Pinion Key in Limitorque Actuator of motor-operated HPCS Sys Injection & Outboard Containment Isolation Valve 1E22-F004.Broken Motor Pinion Key Replaced 1999-09-22
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARU-603277, Monthly Operating Rept for Sept 1999 for Clinton Power Station,Unit 1.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Clinton Power Station,Unit 1.With ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers U-603267, Monthly Operating Rept for Aug 1999 for Clinton Power Station,Unit 1.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Clinton Power Station,Unit 1.With U-603245, Monthly Operating Rept for Jul 1999 for CPS Unit 1.With1999-07-31031 July 1999 Monthly Operating Rept for Jul 1999 for CPS Unit 1.With ML20211C9621999-07-26026 July 1999 ISI Summary Rept U-603232, Special Rept:On 990531 Lpms Was Declared Inoperable Due to Receipt of High Vibration & Loose Parts Alarm Which Did Not Clear.Lpms Was Restored to Operable Status on 990707 After Alignment & Tension on Recorder Tape Drive Was Adjusted1999-07-0909 July 1999 Special Rept:On 990531 Lpms Was Declared Inoperable Due to Receipt of High Vibration & Loose Parts Alarm Which Did Not Clear.Lpms Was Restored to Operable Status on 990707 After Alignment & Tension on Recorder Tape Drive Was Adjusted U-603233, Monthly Operating Rept for June 1999 for Clinton Power Station,Unit 1.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Clinton Power Station,Unit 1.With U-603222, Monthly Operating Rept for May 1999 for Clinton Power Station.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Clinton Power Station.With ML20210K8391999-05-11011 May 1999 British Energy Annual Rept & Accounts 1998-99 ML20206H1231999-05-0505 May 1999 Illinois Power Co CPS Main CR Simulator Certification Rept U-603210, Monthly Operating Rept for Apr 1999 for Cps,Unit 1.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Cps,Unit 1.With U-603204, Final Part 21 Rept 21-99-003 Re Deficiency in Commercial Grade Dedication Process Used by Circuit Breaker Refurbishment Supplier Trentec for Westinghouse Breaker 1AP05EH.Issue Determined Not Reportable Per 10CFR211999-04-30030 April 1999 Final Part 21 Rept 21-99-003 Re Deficiency in Commercial Grade Dedication Process Used by Circuit Breaker Refurbishment Supplier Trentec for Westinghouse Breaker 1AP05EH.Issue Determined Not Reportable Per 10CFR21 U-603192, Monthly Operating Rept for Mar 1999 for Clinton Power Station,Unit 1.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Clinton Power Station,Unit 1.With U-603182, Part 21 Rept Re Deficiency in Commercial Grade Dedication Process Used by Circuit Breaker Refurbishment Supplier, Trentec.Condition Rept 1-99-01-136 Was Initiated to Track Investigation & Resolution of Issue1999-03-12012 March 1999 Part 21 Rept Re Deficiency in Commercial Grade Dedication Process Used by Circuit Breaker Refurbishment Supplier, Trentec.Condition Rept 1-99-01-136 Was Initiated to Track Investigation & Resolution of Issue U-603176, Monthly Operating Rept for Feb 1999 for Clinton Power Station,Unit 1.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Clinton Power Station,Unit 1.With ML20207F2031999-02-10010 February 1999 Rev 1 to CPS COLR for Reload 6 Cycle 7 ML20202J0181999-02-0303 February 1999 SER Accepting Changes in Quality Assurance Program,Which Continues to Meet Requirements of App B to 10CFR50 U-603144, Monthly Operating Rept for Dec 1998 for Clinton Power Station,Unit 1.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Clinton Power Station,Unit 1.With U-603223, Illinova Corp 1998 Annual Rept. with1998-12-31031 December 1998 Illinova Corp 1998 Annual Rept. with U-603115, Part 21 Interim Rept 21-98-021 Re Deficiencies in Matl Dedication Process Used by Goulds Pumps in Supplying SR Parts to Npps.Issue Is Not Reportable Under 10CFR21. Dedication Process Did Not Affect Ability of Components1998-12-0404 December 1998 Part 21 Interim Rept 21-98-021 Re Deficiencies in Matl Dedication Process Used by Goulds Pumps in Supplying SR Parts to Npps.Issue Is Not Reportable Under 10CFR21. Dedication Process Did Not Affect Ability of Components U-603124, Monthly Operating Rept for Nov 1998 for Clinton Power Station,Unit 1.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Clinton Power Station,Unit 1.With U-603114, Part 21 Rept 21-98-049 Re W Dhp Circuit Breaker Refurbished by Nuclear Logistics,Inc Which Failed to Operate.Caused by Trip Latch out-of-adjustment & Incorrectly Sized Ratchet Lever Assembly Bushing.Breakers Were Returned to Vendor1998-11-25025 November 1998 Part 21 Rept 21-98-049 Re W Dhp Circuit Breaker Refurbished by Nuclear Logistics,Inc Which Failed to Operate.Caused by Trip Latch out-of-adjustment & Incorrectly Sized Ratchet Lever Assembly Bushing.Breakers Were Returned to Vendor U-603103, Monthly Operating Rept for Oct 1998 for Clinton Power Station,Unit 1.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Clinton Power Station,Unit 1.With U-603101, Special Rept:On 980918,discovered That Triaxial Seismic Accelerometers Had Not Been Properly Calibrated.Caused by Inadequate Calibration Procedure.Calibration to Be Performed off-site1998-10-28028 October 1998 Special Rept:On 980918,discovered That Triaxial Seismic Accelerometers Had Not Been Properly Calibrated.Caused by Inadequate Calibration Procedure.Calibration to Be Performed off-site ML20154F8701998-10-0606 October 1998 Safety Evaluation Authorizing Proposed Alternative to Requirements of OMa-1988,Part 10,Section 4.2.2.3 for 21 Category a Reactor Coolant Sys Pressure Isolation Valves U-603091, Monthly Operating Rept for Sept 1998 for Clinton Power Station,Unit 1.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Clinton Power Station,Unit 1.With ML20153F9871998-09-17017 September 1998 Safety Evaluation Accepting 980225 Proposed Rev 26 to Illinois Power Nuclear Program Qam ML20151U1391998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Clinton Power Station,Unit 1 ML20237E3991998-08-27027 August 1998 SER Accepting Licensee Response to NRC Bulletin 95-002, Unexpected Clogging of Residual Heat Removal Pump Strainer While Operating in Suppression Pool Cooling Mode, for Clinton Power Station ML20237A1521998-08-0707 August 1998 SER Re Mgt Services Agreement at Clinton Power Station. Approval Under 10CFR50.80 Not Required ML20151Y6591998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Clinton Power Station,Unit 1 U-603033, Part 21 Rept 21-98-039 Re Shrinkage of Medium & High Density Silicone Seals Designed & Installed by Bisco Using Dow Corning Sylgard 170 Matl.Caused by Coefficient of Thermal Expansion.Will Inspect & Rework/Repair Suspected Seals1998-07-20020 July 1998 Part 21 Rept 21-98-039 Re Shrinkage of Medium & High Density Silicone Seals Designed & Installed by Bisco Using Dow Corning Sylgard 170 Matl.Caused by Coefficient of Thermal Expansion.Will Inspect & Rework/Repair Suspected Seals U-603041, Monthly Operating Rept for June 1998 for Clinton Power Station,Unit 11998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Clinton Power Station,Unit 1 ML20151U1501998-06-30030 June 1998 Revised Monthly Operating Rept for June 1998 for Clinton Power Station,Unit 1 U-603023, Monthly Operating Rept for May 1998 for Clinton Power Station,Unit 11998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Clinton Power Station,Unit 1 U-603014, Special Rept:On 980512,lightning Struck Primary Meteorological Monitoring Instrumentation Tower Damaging 60- Meter Wind Speed & Associated Transmuter Circuit Card. Surveillance Testing Performed1998-05-28028 May 1998 Special Rept:On 980512,lightning Struck Primary Meteorological Monitoring Instrumentation Tower Damaging 60- Meter Wind Speed & Associated Transmuter Circuit Card. Surveillance Testing Performed ML20236E7991998-05-26026 May 1998 Final Part 21 Rept Re W Dhp Circuit Breaker Auxillary Switch Operating Assembly Anomalies.Caused by Loss of Breaker Safety Function.Dhp Circuit Will Be Inspected ML20248F3531998-05-21021 May 1998 Part 21 Rept Re Electronic Equipment Repaired or Reworked by Integrated Resources,Inc from Approx 930101-980501.Caused by 1 Capacitor in Each Unit Being Installed W/Reverse Polarity. Policy of Second Checking All Capacitors Is Being Adopted U-603004, Part 21 Rept Re 980107 Determination That Itt Barton Model 580A Series Differential Pressure Indicating Switches Operating Forces Too Low.Manufacturing Sys Allowed Switches to Be Mixed.Evaluation Concludes Issue Not Reportable1998-05-15015 May 1998 Part 21 Rept Re 980107 Determination That Itt Barton Model 580A Series Differential Pressure Indicating Switches Operating Forces Too Low.Manufacturing Sys Allowed Switches to Be Mixed.Evaluation Concludes Issue Not Reportable ML20216A9601998-05-0808 May 1998 Part 21 Rept Re Failure of 12 Volt DC Inverter Power Supply. Caused by Inadequately Sized Output Transistor Pair Combined W/Degraded Capacitors.Licensee Plans to Replace All Output Transistors & Degraded Capacitors U-602995, Part 21 Interim Rept 21-98-021 Re Deficiencies in Matl Dedication Process Used by Goulds Pumps During Use of Portable Metal Analyzer.Util Identified Discrepancies Which Are Acceptable W/Some Exception of Some Replacement Parts1998-05-0505 May 1998 Part 21 Interim Rept 21-98-021 Re Deficiencies in Matl Dedication Process Used by Goulds Pumps During Use of Portable Metal Analyzer.Util Identified Discrepancies Which Are Acceptable W/Some Exception of Some Replacement Parts U-603006, Monthly Operating Rept for Apr 1998 for Clinton Power Station,Unit 11998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Clinton Power Station,Unit 1 U-602994, Part 21 Rept Re Final Rept 21-98-008,on 980113,reliance Electric Motors Supplied by Rockwell International for Hydrogen Recombiner Cooling Fans Do Not Have nameplate- Specified High Temperature Bearings.Fan Motors Acceptable1998-04-29029 April 1998 Part 21 Rept Re Final Rept 21-98-008,on 980113,reliance Electric Motors Supplied by Rockwell International for Hydrogen Recombiner Cooling Fans Do Not Have nameplate- Specified High Temperature Bearings.Fan Motors Acceptable ML20216B1351998-04-21021 April 1998 Rev 0 to Illinois Power Co Clinton Power Station SVC Design Rept U-602979, Final Part 21 Rept 21-97-059 Re Discrepancies Found During Receipt Insp of Three Refurbished safety-related W Dhp Circuit Breakers.Util Completed Evaluation,Per 10CFR21 & Concludes That Condition Is Not Reportable1998-04-0707 April 1998 Final Part 21 Rept 21-97-059 Re Discrepancies Found During Receipt Insp of Three Refurbished safety-related W Dhp Circuit Breakers.Util Completed Evaluation,Per 10CFR21 & Concludes That Condition Is Not Reportable U-602976, Monthly Operating Rept for Mar 1998 for Clinton Power Station1998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Clinton Power Station ML20217H5771998-03-27027 March 1998 Safety Evaluation Concluding That No Significant Safety Hazards Introduced at CPS for Net 32% Ampacity Derating Factor for 1 H & 3 H Conduit Fire Barrier Sys & 1 H Cable Tray Fire Barrier Sys.Requests Response Addressing Issue U-602968, Interim Part 21 Rept 21-97-055 Re Westinghouse Dhp Circuit Breaker Auxiliary Switch Operating Assembly Anomalies. Initially Reported on 980116.Util Currently Evaluating Suppliers Response to Questions Re Issue1998-03-24024 March 1998 Interim Part 21 Rept 21-97-055 Re Westinghouse Dhp Circuit Breaker Auxiliary Switch Operating Assembly Anomalies. Initially Reported on 980116.Util Currently Evaluating Suppliers Response to Questions Re Issue U-602960, Part 21 & Deficiency Rept Re Commerical Grade Dedication Program of Sentry Equipment Corp.Initially Reported on 980217.IP Performed an Addl Assessment at Sentry Facility on 980226.Next Rept Will Be Submitted by 9804111998-03-12012 March 1998 Part 21 & Deficiency Rept Re Commerical Grade Dedication Program of Sentry Equipment Corp.Initially Reported on 980217.IP Performed an Addl Assessment at Sentry Facility on 980226.Next Rept Will Be Submitted by 980411 U-602954, Interim Part 21 rept,21-98-008 Re Identification That Bearings Installed in Hydrogen Recombiner B Cooling Fan Motor 0HG04CB Were Not Same as Bearings Specified on Motor Nameplate.Will Complete Evaluation of Issue by 9805131998-03-0909 March 1998 Interim Part 21 rept,21-98-008 Re Identification That Bearings Installed in Hydrogen Recombiner B Cooling Fan Motor 0HG04CB Were Not Same as Bearings Specified on Motor Nameplate.Will Complete Evaluation of Issue by 980513 1999-09-30
[Table view] |
Text
.,. . , . . - - . . .. -- . . . _ .
w E p-
+ -
i ILLIN018 POWER COMPANY 1605-L j)fI U-10048 .
CLINTON POWER STATION. P.O. BOX 678. CLINTON. ILLINOIS 61727
{'
(
June 6, 1983 Docket Number 50-461 i
g Mr. James-G. Keppler l
Regional Administrator, Region III
, U.S.-Nuclear Regulatory Commission-
- 799 Roosevelt Road
- .
Glen Ellyn, Illinois 60137
Subject:
Deficiency 82-07
. 10 CFR 50.55(e)
' Breakdown in Quality Assurance Program !
Criteria X, Inspection, and.XVI, Corrective Action Clinton Power Station ,
Dear Mr. Keppler:
l .
On July 8, 1982, Illinois: Power notified Mr. R. C. Knop, NRC o -Region III',.(Ref: IP memorandum Y-13621, 1605-L, dated July'8, '
-1982)oof a potential breakdown in the Construction Quality
-Assurance Program, in that certain portions of~ Criteria X and XVI l- of 10 CFR 50, Appendix B, may not be effectively implemented.
This. notification was followed by~three (3) interim reports (IP
- letter U-0525, W. C. Gerstner to J. G. Keppler, 1605-L, August 6, j 1982; IP letter U-0567, D. P. Hall to J. G. Keppler, 1605-L,
- dated October 19, 1982;- and IP. letter U-10022, D. P. Hall to
! J. G. Keppler,-1605-L, dated January 31, 1983). Our investiga-
- tion into this matter is complete, and this letter.represeQts a ,
- final report per-10'CFR 50.55(e)(3) on this reportable defs-
.ciency.
7 l . Statement of Reportable Deficiency Concerning Criterion X, Inspection, it has been determined
~t hat a program of' quality control inspections to verify confor-mance with documented instructions, procedures, and drawings for accomplishing construction work was not conducted in a timely ~
manner. Concerning Criterion XVI, Corrective Action, it has been
! determined that conditions adverse to' quality were not corrected.
'promptly. Together these elements indicate that a significant breakdown in the Construction Quality Assurance Program had occurred, aN
$ *'FAs?fI I M
~
~~'
- 0306170383 830606 91983 4 PDR-ADOCK 05000461 S PDR
_ . _.._ _ - _ -__ . _ . . . _ . , _ _ _ . . _ _ , . . _ . . _ _ . _ _ _ - . _ _ . _ . _ ..=_ _._. _ . -
~
< - , - c
.= .
~ Mr. : James G. Keppler ' Page 2
' NRC '
Investigation Results
. Criterion X Regarding Criterion X,IInspection, which reads in part, "A program for. inspection of activities;affecting quality shall be established and executed...",'it has become apparent that numer-ous' final-inspections have not been conducted-in a timely manner due to the method in which in-process construction work was controlled and scheduled. A backlog of partially completed
, . construction work was created, which resulced in delays in the submittal of completed work by construction personnel to the Quality Control organization for. final inspections. Of-particular concern are inspections that. affect the following components:
- 1. Large bore pipe and supports
- 2. Small bore pipe and supports
- 3. Instrumentation piping
- 4. Electrical hangers
- 5. Electrical conduit
- 6. Structural steel l In the. area of electrical inspection, investigation determined that procedures for the. control of installation and inspection of conduit did not provide for timely completion and inspection of the work. Installation of electrical hangers occurred at a faster rate than inspections were performed due to the manner-in which. work travelers were scheduled and processed.
A backlog of' electrical-hanger installation' documentation, in the final review cycle, also developed due to the time necessary to-revise Electrical Hanger Drawings (EHD) to incorporate field changes. As a result,'the final inspection of electrical hanger hardware and completion-of associated documentation were delayed and a~ hardware / software backlog developed.
In the area of piping and supports, investigation determined that systems for scheduling and controlling the installation'of piping and supports do not provide for timely completion and subsequent final inspection of the work.
In-the area-of structural steel, it was determined that Quality Control' inspections did'not lag behind construction.
However,. installation and inspection documentation'for structural steel was not.being~ reviewed and forwarded to the CPS Document Records' Center in a timely manner. This situation was corrected by-placing additional emphasis on theitimely review and finalization of structural steel-inspection documentation.
Mr. James G. Keppler Page 3 NRC Illinois Power has determined the extent of the backlog of partially completed. construction work in each area of concern.
This action included the establishment of rules to gauge the backlog of partially completed construction work by review of work traveler status. Those travelers that contained work that has not yet commenced, or where a minimal amount of work has been initiated, have been identified and- controlled to prevent unchecked or arbitrary release of this work. Priority has been placed on substantially completed travelers, allowing the work to be expedited and presented to Quality Control for final inspection. Priority has also been placed on those travelers that must be worked and completed first, in support of the reduction of these travelers.
To prevent further backlog of in-process work, restraints have been placed on the amount of in-process work which can be gerformed at any given time, through implementation of in-process traveler control". Procedural enhancements to strengthen controls by which installation / inspection documentation is processed have also been made. Additional personnel have been added and existing manpower reallocated to reduce the backlogs in the final review process of installation documentation. These efforts have resulted in the establishment of schedules to reduce the backlog of partially completed work to an acceptable level.
Criterion XVI Regarding Criterion XVI, Corrective Action, which states in part, " Measures shall be established to assure that conditions adverse to quality such as failures, malfunctions, deficiencies, deviations, defective material and equipment, and nonconformances are promptly identified and corrected , it had become apparent that corrective action for some identified nonconformances was not being promptly implemented. This problem evidenced itself in a trend of Nonconformance Reports (NCRs) and Deviation Reports (DRs) in which the rate of closure was not keeping pace with the rate of issuance. Other evidence of this problem is shown in the number of open NRC inspection items, 10 CFR 50.55(e) deficien-cies, IP Quality Assurance surveillance findings , IP Management Corrective Action Requests, and Baldwin Associates Corrective Action Requests.
A Corrective Action Recovery Plan has been implemented to evaluate and enhance corrective action systems for providing timely resolution to new quality problems and preventing their recurrence. Major elements of the plan include the establishment of a Corporate Nuclear Procedure on corrective action. This procedure requires the assignment of time frames for obtaining resolution of the adverse condition, classifies the adverse condition as critical, major, or minor, and establishes accountability for implementation of corrective action. Proce-dures that implement the corrective action program have been revised to incorporate the requirements of the Corporate Nuclear
- - . . . - . - - . . -
r y Mr. Jamno G.. Keppler Page 4
. NRC 1
Procedure. Further, a computerized Corrective Action Tracking and Trending System is being established to consolidate and increase the effectiveness' of the corrective action . trending
~'
program and tonassure timely action is taken on quality concerns.
Illinois Power Company management philosoghy for the Clinton l project' is to '"do it -right the first time . This philosophy, and the Company's commitment to build a quality plant, is being com-
- municated to employees at all-levels, both company and contrac-tor.
An NCR/DR Recovery Plan has been' generated and implemented.
to evaluate and improve the system for processing and closing NCRs/DRs and to. reduce the' backlog of open NCRs/DRs. Procedures '
for processing NCRs/DRs have been streamlined to reduce the time necessary in handling; the documents -through the .various stages of i
processing. A computer tracking system has been implemented to identify each open NCR/DR, organization responsible for taking action on the item, date received and date for completion;of action, status, and hindrances such as'stop work ~ orders which
- prevent the action from being implemented.
Corrective. Action Criterion X In the area of Criteria X, Inspection, the following actions
- have' been, or are:being taken to ensure timeliness of. inspection:
] 1. A Baldwin Associates procedure has been written and implemented to place restraints on the conduct of construction activities. These restraints allow only limited amounts of work packages to be in-progress at any given time, and require inspection of this work when completed prior to further release of additional work.
- 2. Increased emphasis has been placed on the completion
,, and inspection of work which has been started, over
! initiation of 'new work. Also, the splitting up of work ;
i packages reflecting large amounts of work into smaller packages, such that.the completed portions of the work
, could be separated from in-process /not started work and
. inspected, promotes timely inspection and reduces the F
in-process work backlog.
if. - Manpower has been added or reallocated as necessary to E support the' efforts of reducing the in-process work and 1 documentation backlogs.
4.. Procedural changes were made to strengthen the documentation system, promote timely inspections, and to support the quality recovery effort. .These enhanced procedures _ include those associated with:
~r- * -------~<w -,-s as.< +n . --, - - -, - , - --,,v, --n -, sn ,-,,,---,,mrm wn, -en,r - n v.--w -n w, - g , m,---mv , w w,, - - -
Mr. James-G. Kcppler Page 5 NRC' Piping and Supports (large and small bore)
- ; Electrical Conduit Electrical Hangers Instrumentation Piping
- 5. A computerized Traveler Tracking System has been developed to assist in maintaining current status and location of work travelers through the various stages of processing.
'6. Tracking mechanisms and manloaded schedules have been established to follow and control the reduction of the in-process work backlog. The status of efforts and results are reported to CPS management on a weekly basis.
- 7. . An Illinois Power Quality Assurance Effectiveness Plan has been established and will assess the effectiveness of the traveler control-program.
Criterion XVI In the area of Criteria XVI, Corrective Action, the follow-
- ing actions'have been or are being taken:
1.- Jul Illinois Power Corporate Nuclear Procedure has been issued which defines the Illinois Power Company Corrective Action Program. Major elements of the Corporate Nuclear Procedure include, but are not -
limited to:
~
Establishment of severity levels of adverse condi-tions to provide for timely resolution of the e
conditions.
Establishment of accountability for implementing corrective action on an adverse condition.
Assessment of effectiveness of corrective action through the evaluation of. trends.
!' 2. Illinois Power and Baldwin Associates procedures and l instructions related to corrective action programs have e
been revised to reflect and implement the requirements of the Illinois Power Corporate Nuclear Procedure, i
l 3. Training has been given-to personnel responsible for i implementation of the corrective action program in the ;
( revised procedures and the Corporate Nuclear Procedure. '
l
[ 4. The position of Corrective Action Coordinator has been L established with the responsibility for issuing l-
Pr. ..
' Mr. James G. Kcppler Page 6
' NRC' periodic corrective action progress and status reports, consolidating trending of corrective action program items, ensuring corrective action training and alerting management of problem areas requiring additional management attention.
- 5. Illinois Power is' enhancing corrective action tracking and trending systems utilized at CPS. These systems are computerized to allow for timely recall, up-to-date statusing, and specialized sorts of the data base in support of the Corrective Action Program.
- 6. Manpower levels were-increased and additional emphasis was placed on processing new NCRs/DRs and working off the existing backlog, as follows:
Increased emphasis by Architect / Engineer. personnel in the dispositioning of NCRs.
Increased emphasis by Architect / Engineer personnel on incorporation of NCRs into design documents.
IP personnel assigned as necessary to assist contractor in support of the NCR/DR program.
- 7. A " quality' awareness program" is being developed to improve quality consciousness among all personnel at CPS.
- 8. Procedures for processing NCRs/DRs have been reviewed and revised to streamline the NCR/DR documentation process , reduce handling time, and promote timely implementation of remedial and corrective actions on the items.
- 9. A temporary computer tracking system has been developed and is being implemented to track NCRs/DRs through the various phases of processing. This system will assist l in identifying those NCRs/DRs which are not promptly resolved and organizations responsible for taking action on'the items. This temporary system is being replaced with a permanent system as revised programs i
and procedures to implement the system are-developed.
- 10. Training concerning revised procedures has been given to personnel ~ responsible for implementing the NCR/DR program.
- 11. An Illinois - Power Quality Assurance Effectiveness Plan has been established to assess the effectiveness of efforts in reducing the backlog of open NCRs/DRs.
'h
-,.--___.-mm.,_ . _ , . _ . , , ---,,,6,..,. ., ,,y.. ,- . ..,~...om ,. ..----.-m.--- _,,r, , - - .- ., w y ,,- 3
6". :...
Mr. James G. Keppler 'Page 7 NRC Summary Concerning Criterion X, Inspection,.it has been determined that a program of. quality control inspections to. verify confor-mance with documented instructions, procedures and drawings for accomplishing construction work was not conducted in a timely manner. The process of controlling and-scheduling ~in-process:
construction work in support of the inspection effort was inade-quate. The in-place quality control inspection elements were adequate, however, they were not fully exercised.
Concerning Criterion XVI, Corrective Action, it has been determined that-conditions adverse to quality were not corrected
_promptly. Many organizational elements participate in the.
correction of deficiencies. Although an individual deficiency correction may not be a' specific quality assurance function, the overall management and support is an integral part-of an effec-tive corrective action program.
- In_ evaluating these elements and the guidance provided in amplification of 10 CFR 50.55(e), it was concluded that the-total quality assurance program did not support the desired process of timely inspection of construction work and timely ~ correction of conditions adverse to quality and, therefore, a significant breakdown had occurred.
We trust that this' final letter provides you sufficient information-to perform an assessment of this reportable defi-ciency and to evaluate our overall approach to resolve the problems.
Sincerely yours ,
D. P.. Hall Vice President ,
REC /lf-s cc: H. H. Livermore, NRC Resident Inspector Director, Office of I&E, USNRC, Washington, D.C. 20555 Illinois Department of Nuclear Safety Manager-Quality Assurance