Transmittal of the Radiological Emergency Preparedness Final Report for the Medical Services Drills Evaluated on September 2012
ML12328A036
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 11/06/2012
From: Lawrence Hammond
US Dept of Homeland Security, Federal Emergency Management Agency
To: Collins E
Region 4 Administrator
References
Download: ML12328A036 (64)


Text

U.S. Department of Homeland Security Region VI 800 N. Loop 288 Denton, TX 76209-3698

~FEMA November 6, 2012 Mr. Elmo E. Collins, Jr.

Regional Administrator U.S. NRC, Region IV 612 E. Lamar Blvd, Suite 400 Arlington, TX 76011-4005

Dear Mr. Collins:

Enclosed is a copy of the radiological emergency preparedness final report for the Grand Gulf Nuclear Station Medical Services Drill drills evaluated on September 2012. FEMA Region VI staff evaluated the Riverland Medical Center and the Northeast Louisiana Ambulance Service.

Three Areas Requiring Corrective Action (ARCAs) were identified and two were corrected during the drill.

Based on the results of the drill, the offsite radiological emergency response plans and preparedness for the State of Louisiana and the affected local jurisdictions are deemed adequate to provide reasonable assurance that appropriate measures can be taken to protect the health and safety of the public in the event of a radiological emergency. Therefore, 44 CFR Part 350 approval of the offsite radiological emergency response plans and preparedness for the State of Louisiana-specific to Grand Gulf Nuclear Station will remain in effect.

A copy of this report was forwarded to the REP Headquarters Branch Chief and Headquarters Project Officer, U. S. Nuclear Regulatory Commission, in Washington, D.C. Should you have questions, please contact me at (940) 898-5199, or Nan Calhoun, Radiological Emergency Preparedness Site Specialist for Grand Gulf, at (940) 898-5398.

Sincerely, RAC Chair Enclosure cc: DHS/FEMA HQ-Vanessa Quinn LDEQ - Tim Knight GOHSEP - Earl Patrick Santos, Jr.

W 3 Entergy Ops. Inc. - Greg Fey

\II(*67 www.fema.gov IAI

Grand Gulf Nuclear Station After Action Report/

Improvement Plan Drill Date - September 25, 2012 Radiological Emergency Preparedness (REP) Program

  1. V.FE *viA_ Published October 31, 2012

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Grand Gulf Nuclear Station This page is intentionally blank.

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Grand Gulf Nuclear Station Grand Gulf Nuclear Station After Action Report/Improvement Plan Published October 31, 2012 Contents Executive Summary 3 Section 1: Exercise Overview 4 1.1 Exercise Details 4 1.2 Exercise Planning Team Leadership 4 1.3 Participating Organizations 5 Section 2: Exercise Design Summary 6 2.1 Exercise Purpose and Design 6 2.2 Exercise Objectives, Capabilities and Activities 6 2.3 Scenario Summary 6 Section 3: Analysis of Capabilities 7 3.1 Drill Evaluation and Results 7 3.2 Summary Results of Drill Evaluation 7 3.3 Criteria Evaluation Summaries 9 3.3.1 Support Jurisdictions 9 3.3.1.1 Riverland Medical Center 9 3.3.2 Private Organizations 10 3.3.2.1 Northeast Louisiana Ambulance Service 10 Section 4: Conclusion 12 Appendix A: Improvement Plan 13 Appendix B: Drill Evaluators and Team Leaders 14 Appendix C: Acronyms and Abbreviations 15 Appendix D: Exercise Plan 16 1

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Grand Gulf Nuclear Station This page is intentionally blank.

2

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Grand Gulf Nuclear Station EXECUTIVE

SUMMARY

On September 25, 2012 an out-of-sequence Medical Services drill was conducted for the Grand Gulf Nuclear Station (GGNS), located in Port Gibson, Claiborne County', Mississippi. Personnel from the U.S. Department of Homeland Security/Federal Emergency Management Agency (DHS/FEMA) Region VI evaluated all activities. The purpose of the drill was to assess the level of preparedness of local responders to react to a simulated radiological emergency at GGNS.

The previous plume exercise was conducted on November 1, 2011.

Personnel from the State of Louisiana, Riverland Medical Center, Northeast Ambulance Service and Grand Gulf Nuclear Station participated in the drill. Cooperation and teamwork of all the participants was evident during the drill and DHS/FEMA wishes to acknowledge these efforts.

This report contains the final evaluation of the out-of-sequence drill. The participants demonstrated knowledge of their emergency response plans and procedures. There were 3 Areas Requiring Corrective Action observed during this demonstration. Two of the Areas Requiring Corrective Action were corrected during the demonstration.

3

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Grand Gulf Nuclear Station SECTION 1: EXERCISE OVERVIEW 1.1 Exercise Details Exercise Name Grand Gulf Nuclear Station Type of Exercise Drill Exercise Date September 25, 2012 Program Department of Homeland Security/FEMA Radiological Emergency Preparedness Program Scenario Type Radiological Emergency 1.2 Exercise Planning Team Leadership Lisa Hammond RAC Chair FEMA Region VI Technological Hazards Branch Chief 800 N. Loop 288 Denton, Texas, 76209 940-898-5199 lisa.hammond@fema.dhs.gov Nan Calhoun Federal Planning Team Lead FEMA Region VI Technological Hazards Program Specialist 800 North Loop 288 4

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Grand Gulf Nuclear Station Denton, Texas, 76209 940-898-5398 nan.calhoun@fema.dhs.gov Cheryl Chubb State Planning Team Lead Louisiana Department of Environmental Quality Environmental Scientist 602 N. Fifth St.

Baton Rouge, Louisiana, 70802 225-219-3626 cheryl.chubb@la.gov Richard Vandenakker Utility Planning Lead Grand Gulf Nuclear Station Senior Emergency Preparedness - Training Officer Emergency Preparedness P.O. Box 756 Port Gibson, Mississippi, 39150 601-437-6567 rvanden@entergy.com 1.3 Participating Organizations Agencies and organizations of the following jurisdictions participated in the Grand Gulf Nuclear Station drill:

Private Organizations Riverland Medical Center Entergy Operations, Inc.

Northeast Louisiana Ambulance Service 5

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Grand Gulf Nuclear Station SECTION 2: EXERCISE DESIGN

SUMMARY

2.1 Exercise Purpose and Design The DHS/FEMA Region VI Office evaluated the drill on September 25, 2012 to assess the capabilities of local emergency preparedness organizations in implementing their Radiological Emergency Response Plans and procedures to protect the public health and safety during a radiological emergency involving Grand Gulf Nuclear Station (GGNS). The purpose of this report is to present the results and findings on the performance of the offsite response organizations during a simulated radiological emergency.

2.2 Exercise Objectives, Capabilities and Activities Exercise objectives and identified Capabilities/REP Criteria selected to be exercised are discussed in the Exercise Plan (EXPLAN), Appendix D.

2.3 Scenario Summary The drill scenario was developed to evaluate the response of drill participants to an incident requiring evacuation of the public from the Louisiana portion of the 10-mile Emergency Planning Zone surrounding the Grand Gulf Nuclear Station. The drill scenario provided for the evaluation of Northeast Louisiana Ambulance Service's ability to transport a contaminated injured person as well as the Riverland Medical Center's ability to treat a radiologically contaminated injured individual.

6

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Grand Gulf Nuclear Station SECTION 3: ANALYSIS OF CAPABILITIES 3.1 Drill Evaluation and Results Contained in this section are the results and findings of the evaluation of all jurisdictions and functional entities that participated in the September 25, 2012 drill evaluation to test the offsite emergency response capabilities of Northeast Louisiana Ambulance Service to transport a contaminated injured person as well as the Riverland Medical Center to treat a contaminated injured individual.

Each jurisdiction and functional entity was evaluated on the basis of its demonstration of criteria delineated in the exercise evaluation areas as outlined in the April 2012, Radiological Emergency Preparedness Program (REP) Manual. Detailed information on the exercise evaluation area criteria and the extent of play agreement used in this drill are found in Appendix D of this report.

3.2 Summary Results of Drill Evaluation The matrix presented in Table 3.1 on the following page, presents the status of all drill evaluation area criteria that were scheduled for demonstration during this drill by all participating jurisdictions and functional entities. Exercise criteria are listed by number and the demonstration status is indicated by the use of the following letters:

M - Met (No Deficiency or ARCAs assessed and no unresolved ARCAs from prior exercise)

D - Deficiency assessed A - ARCAs assessed or unresolved ARCAs from previous exercises P - Plan Issue N - Not Demonstrated 7

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Grand Gulf Nuclear Station Table 3.1 - Summary of Drill Evaluation DATE: 2012-09-25 SITE: Grand Gulf Nuclear Station, MS M: Met, A: ARCA. D: Deficiency, P: Plan Issue, N: Not Demonstrated Mobilization 1a1 Facilities 1b1 Direction and Control 1c1 Communications Equipment 1dl Equipment and Supplies Ie1 M M ti, o on Making_ -_,_ _

EW Exp. Control Decisions 2al PARs 2bl PADs 2b2 PADs for Disabled/Functional Needs 2cl Ingestion PADs 2dl RRR Decisions 2el EW Exp. Control Implementation 3al M_M KI Public/Institutionalized 3b1 PAD Imp. Disabled/Functional Needs 30 PAD Imp. Schools 3c2 TACP Establishment 3d1 Impediments to Evacuation 3d2 Implementation of Ingestion PADs 3e1 Ingestion Strategies and Information 3e2 Imp. of RRR Decisions 3fl RESERVED 4al Field Team Management 4a2 Field Team Operations 4a3 Field Team Sampling 4b 1 Laboratory Operations 40 Initial Alert & Notification 5al Backup Alert & Notification 5a3 Exception Area Alerting 5a4 Subsequent Public Information 5b 1 SuPpo.. e1ratOons/faci"i..es Reception Center Operations 6al EW Monitoring & Decon 6b1 Congregate Care 6c0 Contaminated Injured Transport & Care 6d IA M 8

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Grand Gulf Nuclear Station 3.3 Criteria Evaluation Summaries 3.3.1 Support Jurisdictions 3.3.1.1 Riverland Medical Center In summary, the status of DHS/FEMA criteria for this location is as follows:

a. MET: L.e.1, 3.a.1, 6.d.1.
b. AREAS REQUIRING CORRECTIVE ACTION: 6.d.1.

ISSUE NO.: 28-12-6dl-A-02 CRITERION: The facility/ORO has the appropriate space, adequate resources, and trained personnel to provide transport, monitoring, decontamination, and medical services to contaminated injured individuals.

CONDITION: The initial survey of the patient was conducted with the survey meter set to the x100 scale.

POSSIBLE CAUSE: The nurse did not adjust the survey meter back to the lowest scale, xO. 1, following the operation check of the meter.

REFERENCE:

NUREG 0654/FEMA REP 1 Criterion L. 1 EFFECT: With the survey meter set to the x100 scale, it was possible for radiological contamination to go undetected.

CORRECTIVE ACTION DEMONSTRATED: The staff member was provided training and successfully demonstrated the proper use of the survey meter, beginning all surveys on the lowest possible scale.

ISSUE NO.: 28-12-6dl-A-03 CRITERION: The facility/ORO has the appropriate space, adequate resources, and 9

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Grand Gulf Nuclear Station trained personnel to provide transport, monitoring, decontamination, and medical services to contaminated injured individuals.

CONDITION: The initial survey of the x-ray film as it was passed into the Buffer Zone from the Radiation Emergency Area was conducted too quickly and too far from the surface of the film to properly detect contamination.

POSSIBLE CAUSE: The Buffer Zone Nurse did not follow proper radiation survey techniques.

REFERENCE:

NUREG 0654/FEMA REP 1 Criterion L.1 EFFECT: Without proper survey of all potentially contaminated items leaving the Buffer Zone from the Radiation Emergency Area, it was possible for contamination to spread to clean areas in the hospital leading to additional exposure and contamination.

CORRECTIVE ACTION DEMONSTRATED: The staff member was provided training and successfully demonstrated the proper use of the survey meter and proper survey technique.

c. DEFICIENCY: None
d. PLAN ISSUES: None
e. NOT DEMONSTRATED: None
f. PRIOR ISSUES - RESOLVED: None
g. PRIOR ISSUES - UNRESOLVED: None 3.3.2 Private Organizations 3.3.2.1 Northeast Louisiana Ambulance Service In summary, the status of DHS/FEMA criteria for this location is as follows:
a. MET: 1.e.1,3.a.1.
b. AREAS REQUIRING CORRECTIVE ACTION: 6.d. 1.

ISSUE NO.: 28-12-6dl-A-01 10

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Grand Gulf Nuclear Station CRITERION: The facility/ORO has the appropriate space, adequate resources, and trained personnel to provide transport, monitoring, decontamination, and medical services to contaminated injured individuals.

CONDITION: Medical treatment of the patient was not given priority over monitoring and contamination control.

POSSIBLE CAUSE: Ambulance staff may be unfamiliar with the procedures, or need additional training.

REFERENCE:

NUREG-0654/FEMA-REP-1, L.4 Tensas Parish Office of Emergency Preparedness Emergency Medical Service (EMS)/Ambulance Procedure for Response to Radiological Emergencies, Revision 3 EFFECT: The patient would not be transported quickly to the medical facility for proper treatment.

RECOMMENDATION: Ensure that ambulance staff members are well trained and familiar with procedures.

c. DEFICIENCY: None
d. PLAN ISSUES: None
e. NOT DEMONSTRATED: None
f. PRIOR ISSUES - RESOLVED: None
g. PRIOR ISSUES - UNRESOLVED: None 11

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Grand Gulf Nuclear Station SECTION 4: CONCLUSION Based on the results of the drill, Riverland Medical Center satisfactorily demonstrated their required criteria and no additional demonstration is necessary until the next regularly scheduled drill/exercise at this location.

12

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Grand Gulf Nuclear Station APPENDIX A: IMPROVEMENT PLAN IsuItme :2 S -26 - -1IC ie in d ISSUE: Medical treatment of the patient was not given priority over monitoring and contamination control.

RECOMMENDATION: Ensure that ambulance staff members are well trained and familiar with procedures.

CORRECTIVE ACTION DESCRIPTION: Additional training will be provided to ambulance staff emphasizing medical treatment of patient over contamination control.

CAPABILITY: PRIMARY RESPONSIBLE AGENCY:

Emergency Triage and Pre-Hospital Treatment Louisiana Department of Environmental Quality CAPABILITY ELEMENT: START DATE:

Training 2012-09-25 AGENCY POC: ESTIMATED COMPLETION DATE:

Cheryl Chubb 225-219-3626 2013-09-26 13

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Grand Gulf Nuclear Station APPENDIX B: DRILL EVALUATORS AND TEAM LEADERS DATE: 2012-09-25, SITE: Grand Gulf Nuclear Station, MS I A1TrI0 CalhounAKA Riverland Medical Center *Nan Calhoun FEMA RVI

_Linda Gee FEMA RVI Northeast Louisiana Ambulance Service *Timothy Pflieger FEMA RVI 14

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Grand Gulf Nuclear Station APPENDIX C: ACRONYMS AND ABBREVIATIONS ARCA Area Requiring Corrective Action CPM Counts per Minute DHS/FEMA Department of Homeland Security/Federal Emergency Management Agency DRD Direct Reading Dosimeter EMS Emergency Medical Service EPZ Emergency Planning Zone EW Emergency Worker EXPLAN Exercise Plan GGNS Grand Gulf Nuclear Station KI Potassium Iodide NELA Northeast Louisiana Ambulance ORO Offsite Response Organization PPE Personal Protective Equipment REA Radiation Emergency Area REP Radiological Emergency Preparedness TLD Thermoluminescent Dosimeter 15

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Grand Gulf Nuclear Station APPENDIX D: EXERCISE PLAN 16

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Grand Gulf Nuclear Station RADIOLOGICAL EMERGENCY MEDICAL DRILL SCENARIO (MS-i)

FOR GRAND GULF NUCLEAR STATION September 25, 2012 Participants Riverland Medical Center Northeast Louisiana Ambulance Service 17

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Grand Gulf Nuclear Station RADIOLOGICAL EMERGENCY MEDICAL DRILL SCENARIO (MS-i)

FOR GRAND GULF NUCLEAR STATION September 25, 2012 Prepared By: /

Name Date Reviewed By:- /

Name Date Approved By:- /

Name Date 18

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Grand Gulf Nuclear Station I. PURPOSE This simulated radiation medical emergency is being conducted in order to exercise the emergency medical response for Grand Gulf Nuclear Station (GGNS) at Riverland Medical Center and Northeast Armbulance Service. The basic objective is to assess the ability of the hospital and ambulance emergency service to handle contaminated and injured patients.

II. PROPOSED SCHEDULE DATE: September 25, 2012 TIME: 8:00 am Drill Starts (GGNS General Emergency) 8:30 am Accident Reported 9:00 am Patient Arrives at Hospital (Approximate) 11:00 pm Drill Terminates (Approximate) 11:15 pm ýEvaluator Comments 11:30 pm Player Critique LOCATION: Riverland Medical Center INJURY/ILLNESS: Fisherman bit by a snake on the way to his car to evacuate, runs off road and hits a tree. Injuries include: bite to right hand, bruise/laceration to forehead, bruised left knee (possible fracture/dislocation).

III. DISCLAIMER Real life emergencies take precedence over this demonstration. In case of an emergency, the demonstration will be cancelled and rescheduled for a later date.

19

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Grand Gulf Nuclear Station IV. EVALUATION AREAS AND EXTENT-OF-PLAY-OFFSITE A. EVALUATION AREA 1: EMERGENCY OPERATIONS MANAGEMENT Sub-element i.e - Equipment and Supplies to Support Operations Criterion 1.e.l: Equipment, maps, displays, dosimetry, potassium iodide (KI),

and other supplies are sufficient to support emergency operation. (NUREG-0654, H.7, 10; J.10.a, b, e J.11; K.3.a)

Location Riverland Medical Center, Northeast Louisiana Ambulance Service.

Extent of Play "Correction-on-the-spot" will be applicable for this demonstration.

B. EVALUATION AREA 3: PROTECTIVE ACTION IMPLEMENTATION Sub-element 3.a - Implementation of Emergency Worker Exposure Control Criterion 3.a.1: The OROs issue appropriate dosimetry and procedures, and manage radiological exposure to emergency workers in accordance with the plans and procedures. Emergency workers periodically and at the end of each mission read their dosimeters and record the readings on the appropriate exposure record or chart. (NUREG-0654, K.3.a, b)

Location Riverland Medical Center, Northeast Louisiana Ambulance Service.

Extent of Play "Correction-on-the-spot" will be applicable for this demonstration.

20

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Grand Gulf Nuclear Station C. EVALUATION AREA 6: SUPPORT OPERATION/FACILITIES Sub-element 6.d--Transportation and Treatment of Contaminated Injured individuals Criterion 6.d.l: The facility/ORO has the appropriate space, adequate resources, and trained personnel to provide transport, monitoring, decontamination, and medical services to contaminated injured individuals.

(NUREG-0654, F.2; H.10; K.5.a, b; L.1, 4)

Location Riverland Medical Center, Northeast Louisiana Ambulance Service.

Extent of Play The initial call(s) will be simulated by cell phone from the Tensas Emergency Director who will be on location at Riverland Medical Center.

No actual surgical procedures, X-ray, blood samples, starting of IV's etc. will be demonstrated. No actual transportation to Highway 605 to pickup the victim/patient.

To avoid taking the ambulance out of service for an extended time, the area behind the hospital will be used to simulate the accident scene. The ambulance will be staged at the hospital to start the demonstration.

Once the patient is loaded on the ambulance, play will pause for approximately 15 minutes to simulate the travel time between the accident scene on Highway 605 and Ferriday.

"Correction-on-the-spot" will be applicable for this demonstration.

D. GENERAL EXTENT-OF-PLAY (EOP)

1. With regard to last minute additions or changes to any previously approved Extent-of-Play, all suggested changes must be forwarded to the RAC Chair for approval.
2. The goal of all offsite response organizations (ORO) is to protect the health and safety of the public. This goal is achieved through the execution of appropriate plans and procedures. It is recognized that situations may arise that could limit the organizations in the exact execution of these plans and procedures.

21

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Grand Gulf Nuclear Station

3. In the event of an unanticipated situation, OROs are permitted to exercise flexibility in the implementation of their plans and procedures in order to successfully achieve the objective of protection of public health and safety and protection of the environment.
4. As a statement of fact, no ORO will deliberately deviate from its plans and procedures with the intent of avoiding responsibility.

E.

References:

As indicated in the Extent-of-Play Agreement, the State of Louisiana requests the option to correct issues immediately as defined in FEMA Policy Paper, Strategic Review Steering Committee, Initiative 1.5, Correct Issues Immediately, effective March 31, 2000, signed by Kay C. Goss, CEM, Associate Director for Preparedness, Training and Exercises. Acceptable locations/activities for "on-the-spot-correction" are clearly indicated in the extent of play portion under each criterion.

22

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Grand Gulf Nuclear Station V. NARRATIVE SCENARIO A. INITIAL CONDITIONS Grand Gulf Station has declared a General Emergency based on Offsite Radiation Monitoring Team reports. An extended Protective Action Recommendation (PAR) has been issued. An evacuation of all people within five miles of Grand Gulf and ten miles downwind has commenced. The wind direction is from 90 degrees (blowing into the West), Protective Action Section (PAS) 12 is being evacuated to Tallulah and Ferriday. Areas within five miles of the plant are expected to be contaminated.

A fisherman in the area of Lake Lakanardia, approximately 6 miles west of Grand Gulf, heard the sirens and evacuated the area. It took him twenty minutes to return his boat to the shore, and ten more minutes to put it on the trailer. As he was tying down the boat a snake bit him on his right hand, injecting venom. Suffering pain and swelling in his right hand, as well as slight tachycardia, he entered his vehicle and started to evacuate. His vehicle had a standard transmission and due to his hand injury he had to shift with his left hand, while trying to steer with his knees, causing him loose control of the steering at the intersection of highways 604 and 605, striking a telephone pole on highway 605 (Refer to Attachment A.) He suffered the following injuries:

  • Snake bite with swelling and slight bleeding on right hand.
  • Bruise and laceration with moderate bleeding to forehead
  • Swelling/bruising with possible break/dislocation of left knee.

After the accident the fisherman contacted 9-1-1 on his cell phone.

B. NORTHEAST LOUISIANA AMBULANCE SERVICE NOTE: The accident scene will be set up in the back of Riverland Medical Center to prevent the ambulance from leaving it's service area.

Once the patient is loaded on the ambulance, play will pause for approximately 15 minutes to simulate the travel time between the accident scene on Highway 65 and Ferriday.

23

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Grand Gulf Nuclear Station CONTROLLER MESSAGE Cue Card: #1 Time: -0800 THIS IS A DRILL Controller: The controller will simulate a call from Grand Gulf Nuclear Station to the Tensas Parish 911 Center to report the General Emergency.

Message: Grand Gulf Nuclear Station has declared a General Emergency.

Anticipated Response: Tensas Parish Emergency Management will contact Riverland Medical Center.

Due to events in progress, the hospital should begin preparations for the treatment of the contaminated individual according to their procedures.

THIS IS A DRILL 24

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Grand Gulf Nuclear Station CONTROLLER MESSAGE Cue Card: # 2 Time: 0830 THIS IS A DRILL Controller: The controller will simulate from the Tensas Parish 911 Center relaying a call from the injured evacuee of the accident.

Message: There is a guy at the intersection of Highway 604 and 605. He says he was bitten by a snake and has run off the road and struck a telephone pole. His forehead and left knee hurt. His right hand, the one bit by the snake, is swelling up.

Anticipated Response: As soon as EMS receives the call, it will immediately notify the hospital.

The ambulance will proceed (simulated) to where the patient is, while the hospital finalizes the setup for a contaminated injured patient.

THIS IS A DRILL 25

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Grand Gulf Nuclear Station CONTROLLER MESSAGE Cue Card: # 3 Time: 0900 THIS IS A DRILL Controller: The controller will ensure the patient has been properly prepared for the exercise, including makeup and clothing. The controller will provide the ambulance crew any information required for them to make a diagnosis.

Message: Injury: Blow to forehead with minor bleeding and bruising.

Blow to the left knee with swelling/bruising and possible break/dislocation Snake bite to the right hand with envenomation.

Vitals: Initial - Use actual vitals.

During transport - Use actual vitals.

Victim complains of nausea and is disoriented.

Victim reports snake was brown with white belly, and about three feet long.

(Note: victim may complain of a rapid pulse [tachycardia] but pulse returned to normal by the time ambulance crew arrived)

Anticipated Response: Vital signs should be taken, the wounds should be bandaged, the right hand should be lowered to minimize spread of venom, the knee/leg should be splinted and/or stabilized as necessary. The patient should be removed from the area.

During transport to the hospital the patient should be observed and vital signs retaken. All information should be relayed to the hospital.

THIS IS A DRILL 26

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Grand Gulf Nuclear Station CONTROLLER MESSAGE Cue Card: #4 Time: A0915 THIS IS A DRILL Controller: The Northeast Louisiana Ambulance Service should make the following call to the hospital.

Message: We are transporting a patient. He is injured and radiologically contaminated. Injuries include: possible broken/dislocated left knee, snake bite to right hand, and minor abrasions/laceration to the forehead.

Patient is disoriented. ETA is thirty minutes.

Anticipated Response: The hospital should continue preparations to treat a contaminated/injured patient.

THIS IS A DRILL 27

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Grand Gulf Nuclear Station CONTROLLER MESSAGE Cue Card: #5 Time: ~0930 THIS IS A DRILL Controller: When the hospital staff meets the ambulance, the ambulance crew will provide the following message:

Message: The patient was bitten on the right hand by a snake, then struck a telephone pole while evacuating the Grand Gulf area. He is injured and radiologically contaminated. Injuries include: possible broken or dislocated left knee, bruise and laceration to the forehead, and envenomed snake bite to the right hand. There is moderate bleeding from the forehead and right hand. Patient is disoriented and and complains of nausea. Vital signs are stable, there have been no changes during transport.

The patient is ready for transfer.

Anticipated Response: Hospital staff should transfer the patient from the ambulance gurney to the hospital gurney and proceed to the Radiological Emergency Area.

THIS IS A DRILL 28

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Grand Gulf Nuclear Station CONTROLLER MESSAGE Cue Card: #6 THIS IS A DRILL Controller: The controller will provide the REA team additional information required to make a diagnosis and treat the patient, as requested.

Messa2e: Injuries: Left knee - Swelling and bruising.

Right hand - Abrasions and lacerations to an area roughly 2" x 2" on palm with moderate bleeding Forehead - Bruising and small laceration.

X-Rays: X-Rays are to be simulated C-Spine - Give Cue Card #6A to REA staff, if requested.

Left Knee - Give Cue Card #6B to REA staff, if requested.

Right Hand - Give Cue Card #6C to REA staff, if requested.

Survey Readin2s: For survey readings, see Cue Card #7.

Anticipated Response: The REA team should have the patient's wounds surveyed for contamination and act accordingly. See Cue Card # for more information. REA staff should determine the left knee is broken, but the right wrist is -sprained. REA staff should treat the patient's injuries and contamination, while performing contamination control.

Blood or other samples, IV's, and surgical procedures, if required, will be simulated.

THIS IS A DRILL 29

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Grand Gulf Nuclear Station CONTROLLER MESSAGE Cue Card: # 6A 30

Unclassified Radiological Emergency Preparedness Program (REP)

After Action ReporttImprovement Plan Grand Gulf Nuclear Station CONTROLLER MESSAGE Cue Card: # 6B Left Knee X-Ray

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Grand Gulf Nuclear Station CONTROLLER MESSAGE Cue Card: # 6C 32

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Grand Gulf Nuclear Station CONTROLLER MESSAGE Cue Card: #7 THIS IS A DRILL Controller: The controller will provide the REA team additional information required to make a diagnosis and treat the patient, as requested.

Cue Cards: Cue Card #7A - overview of injured areas and contamination levels Cue Card #7B - summary of decontamination efforts, survey readings, cue cards Cue Card #7C - #7G - right hand survey cue cards Cue Card #7H - #7M - forehead survey cue cards Cue Card #7N - #7U - right leg survey cue cards Anticipated Response: The REA team should have the patient's wounds surveyed for contamination.

Decontamination should start with wounds, then intact skin. The wound with the highest reading should be decontaminated first.

The team should decon the areas in the following order:

1. Right Hand (Wound: 2500 cpm)
2. Forehead (Wound: 1500 cpm)
3. Right Leg (External/Intact skin: 2000 cpm)

Note: The hospital staff will use both mR/hr and cpm for radiation measurements. (Monitoring of the REA will be in mR/hr, while contamination surveys will be in cpm.)

THIS IS A DRILL 33

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Grand Gulf Nuclear Station CONTROLLER MESSAGE Cue Card: # 7A THIS IS A DRILL Patient Survey Form Patents Name: AAre:

Date: Time: Survey Meter- Type: Set#.

Anterior Posterior I I -

-w

%/

-Ylnnrrrnr w%

Am Typ* d T sm amr CPU CPmAw Qg inG& usd(u- &aMw1pow ifJ-msw)

C ~~Am& d.~

1 Wund1% 500 500 Rinse 2X 2 Wound 1% 1500 <100 Rinse 2x 3 Intact Skin 2% 2000 <100 Rinse IX, Scrub 2X I:2=W024. v E 34

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Grand Gulf Nuclear Station CONTROLLER MESSAGE Cue Card: #7B THIS IS A DRILL Survey Information Cue Card# I Scale Reading Note Description 7C xl Off scale Right Hand -1 Before decontamination 7D xl0 2500 cpm Hand-2 " _

7E xl0 500 cpm Hand-3 After 1st rinse 7F xl 500 cpm Hand-4 7G -- -- -- Unable to decon further 7H xl Off scale Forehead -1 Before decontamination 71 x10 1500 cpm Forehead -2 "_

7J xl0 500 cpm Forehead -3 After 1st rinse 7K xl 500 cpm Forehead -4 "

7L xl0 <100 Forehead -5. After 2 drinse 7M x1 <100 Forehead - 6 7N xl Off scale Right Leg -1 Before decontamination 70 xl0 2000 cpm Leg -2 "1 7P xl0 1200 cpm Leg -3 After rinsing 7Q xl Off scale Leg -4 "

7R xl0 700 cpm Leg -5 After 1st scrubbing 7S x1 Off scale Leg -6 "4 7T x10 <100 cpm Leg -7 After 2nd scrubbing 7U xl <100 cpm Leg -8 35 THIS IS A DRILL

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Grand Gulf Nuclear Station CONTROLLER MESSAGE Cue Card: # 7C THIS IS A DRILL Note: Right Hand - 1 BATM1xIO OFF' Xi~100 in

,61k *lkV V xlO xl THIS IS A DRILL 36

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Grand Gulf Nuclear Station CONTROLLER MESSAGE Cue Card: # 7D THIS IS A DRILL Note: Hand - 2 OFF jAT / 101 in

    • ý xlO THIS IS A DRILL 37

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Grand Gulf Nuclear Station CONTROLLER MESSAGE Cue Card: # 7E THIS IS A DRILL Note: Hand - 3 BATM~

'OFF j X1006

  • kq

.&Luv or  ?(0 THIS IS A DRILL 38

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Grand Gulf Nuclear Station CONTROLLER MESSAGE Cue Card: # 7F THIS IS A DRILL Note: Hand - 4 OFF jA /

X10O0 F

X10O

-xlO XL THIS IS A DRILL

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Grand Gulf Nuclear Station CONTROLLER MESSAGE Cue Card: # 7G THIS IS A DRILL Controller: The controller will continue to provide Cue Card #7E or Cue Card

  1. 7F, depending upon scale, to the REA staff.

Message: For xlO scale, show Cue Card #7E to the REA staff.

For xl scale, show Cue Card #7F Anticipated Response: The REA team should determine that the hand wound cannot be cleaned further without more damage to the wound. The REA staff should contact REAC/TS for information on how to proceed.

The phone call to REAC/TS will not be simulated. Controllers will ensure that the REAC/TS office number, 865-576-3131 is used instead of the actual REACMTS Emergency Number. Controllers should also ensure that the hospital says "This is a drill".

THIS IS A DRILL 40

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Grand Gulf Nuclear Station CONTROLLER MESSAGE Cue Card: # 7H THIS IS A DRILL Note: Forehead- 1 OFFJ xlO00 xl00 xl0 THIS IS A DRILL 41

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Grand Gulf Nuclear Station CONTROLLER MESSAGE Cue Card: # 71 THIS IS A DRILL Note: Forehead - 2 BATO OF" 1 / xIO00 f xl00 xl0 xl THIS 14PA DRILL

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Grand Gulf Nuclear Station CONTROLLER MESSAGE Cue Card: # 7J THIS IS A DRILL Note: Forehead - 3 BATM~

OFF xIO0 I

f

/

00,X100 00 XlO

,%.xi THIS IS A DRILL 43

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Grand Gulf Nuclear Station CONTROLLER MESSAGE Cue Card: # 7K THIS IS A DRILL Note: Forehead - 4 BATM~ IO

'OFF Ij 10,

~ft L1UU XJ-AL THIS IS A DRILL 44

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Grand Gulf Nuclear Station CONTROLLER MESSAGE Cue Card: # 7L THIS IS A DRILL Note: Forehead - 5 BATn~ lO OFF' A0 I/ , It

.VV, Sx10 x

A THIS IS A DRILL 45

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Grand Gulf Nuclear Station CONTROLLER MESSAGE Cue Card: # 7M THIS IS A DRILL Note: Forehead - 6 OFF Ii BAT1JlOO

'X100

'Mf

'--xlO

  • 'xl THIS &SADRILL

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Grand Gulf Nuclear Station CONTROLLER MESSAGE Cue Card: # 7N THIS IS A DRILL Note: Riaht Le2 1

.BATI 01T I X1000

'al

/ kJ.&JVV x1 047 THIS IS A DRILL

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Grand Gulf Nuclear Station CONTROLLER MESSAGE Cue Card: #70 THIS IS A DRILL Note: Le2 2 BATM~

OFF, j 1 6060 THIS

~x1i THIS %~A DRILL DRIL IA

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Grand Gulf Nuclear Station CONTROLLER MESSAGE Cue Card: # 7P THIS IS A DRILL Note: Leg 3 BAT~

-XIOO

"%-: xl THIS IS A DRILL 49

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Grand Gulf Nuclear Station CONTROLLER MESSAGE Cue Card: # 7Q THIS IS A DRILL Note: Leg 4 OFBATM~ x1000 F ~ I / --A flf J d**VV

-xlO XTL THIS IS A DRILL 50

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Grand Gulf Nuclear Station CONTROLLER MESSAGE Cue Card: # 7R THIS IS A DRILL Note: Leg 5

'OFF' 0 W1

-XlO

-x,1 THIS !5*A DRILL

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Grand Gulf Nuclear Station CONTROLLER MESSAGE Cue Card: # 7S THIS IS A DRILL Note: Lea 6 jBATM X00 OFF 1 /I.,.

I--*' 5J

- x40 xl THIS IS A DRILL 52

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Grand Gulf Nuclear Station CONTROLLER MESSAGE Cue Card: # 7T THIS IS A DRILL Note: Leg 7 OFF 1

.AO06

( i,1I fAi j lV Xl0 THIS IS A DRILL 53

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Grand Gulf Nuclear Station CONTROLLER MESSAGE Cue Card: # 7U THIS IS A DRILL Note: Le2 8 BATM~

OFF I /X1000

.XIVIu L xlO1 THIS W4 A DRILL

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Grand Gulf Nuclear Station CONTROLLER MESSAGE Cue Card:# 8 THIS IS A DRILL Controller: Once the patient is successfully transferred from the room, the controller will instruct REA staff to demonstrate exit procedures.

NOTE: At this point, the drill is still in progress and has not been terminated.

After one person has demonstrated exit procedures, ask the FEMA evaluator if they would like to see another person demonstrate the exit procedures or if one was satisfactory.

Message: Demonstrate the REA exit procedures.

Anticipated Response: One REA team member will demonstrate removal of the personal protective equipment and exit survey technique.

If required by FEMA, other team members may also demonstrate the proper exit procedures.

THIS IS A DRILL 55

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Grand Gulf Nuclear Station CONTROLLER MESSAGE Cue Card: # 9 THIS IS A DRILL Controller: The controller will request personnel to describe how the REA would be returned to normal operations.

Note: FEMA may require some of the procedure be demonstrated, such as surveying and testing for contamination. Confirm with FEMA evaluator what they require before notifying the drill team.

Message: Please describe how you would return the REA to normal operations.

[Note: The contents of this message may change depending upon FEMA requirements.]

Anticipated Response: Staff will describe and/or demonstrate how they would survey and test for contamination, what they would do with the waste, and any other requirements to return the room to normal operations.

THIS IS A DRILL 56

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Grand Gulf Nuclear Station CONTROLLER MESSAGE Cue Card: # 10 THIS IS A DRILL Controller: Once verbal confirmation has been received from FEMA that all requirements have been successfully demonstrated, the drill will be terminated.

Message: The drill is terminated.

Anticipated Response: The area will be returned to normal by the hospital staff.

THIS IS A DRILL 57

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Grand Gulf Nuclear Station ATTACHMENT A Accident Scene 1 4.............................

Victim Travel path

--- ----- - Ambulance Route to Hospital I

i Accident Scene ( -".

,Querters Op I4souc Sit o*e.

i I

Boat Launch (Where _

snake bite occurred)0 OJISIO Tensas

-I wrt 58

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Grand Gulf Nuclear Station Attachment A Accident Scene 2 View looking North on highway 605.

59

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Grand Gulf Nuclear Station Attachment B Snake Bite Injury Information for Controllers and Victim Grass Snake

Reference:

http://en.wikipedia.org/wiki/Snakebite#Signsand~s)ymptoms Common Effects - The most common symptoms of all snakebites are overwhelming fear, panic, and emotional instability, which may cause symptoms such as nausea and vomiting, diarrhea, vertigo, fainting, tachycardia, and cold, clammy skin. Television, literature, and folklore are in part responsible for the hype surrounding snakebites, and a victim may have unwarranted thoughts of imminent death.

Dry snakebites, and those inflicted by a non-venomous species, can still cause severe injury to the victim. There are several reasons for this: a snakebite which is not treated properly may become infected (as is often reported by the victims of viper bites whose fangs are capab2le of inflicting deep puncture wounds), the bite may cause anaphylaxis in certain people, and the snake's saliva and fangs may harbor many dangerous microbial contaminants, including Clostridium tetani. If neglected, an infection may spread and potentially kill the victim.

Most snakebites, whether by a venomous snake or not, will have some type of local effect. There is minor pain and redness in over 90% of cases, although this varies depending on the site.

NOTE:

For the purposes of this scenario we will limit the effects to pain, nausea and disorientation, no loss of consciousness.

We will moulage swelling, redness, fang marks, slight bleeding but no blisters.

Appearance - The grass snake is typically dark green or brown in colour with a characteristic yellow collar behind the head, which explains the alternative name ringedsnake. The colour may also range from grey to black, with darker colours being more prevalent in colder regions, presumably owing to the thermal benefits of being dark in colour. The underside is whitish with irregular blocks of black, which are useful in recognizing individuals. Females are considerably larger than males, typically reaching a size of 90-110 centimetres (2 ft 11 in-3 ft 7 in) when fully grown. Males are approximately 20 centimetres (8 in) shorter and significantly smaller in girth. Weight is about 240 grams (8 oz).

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Grand Gulf Nuclear Station This page is intentionally blank.

61