Similar Documents at Salem |
---|
Category:TECHNICAL SPECIFICATIONS
MONTHYEARML18107A5171999-08-25025 August 1999 Marked-up Tech Spec Pages Deleting Footnotes That Were Added as One Time Changes & Proposing Change Identified Subsequent to 971114 Submittal That Corrects Error Issued in Amend 69 for Salem Unit 2 ML18107A4961999-08-23023 August 1999 Proposed Tech Specs,Modifying 3/4 7.7, Auxiliary Bldg Exhaust Air Filtration Sys. ML18107A4671999-07-29029 July 1999 Proposed Tech Specs Replacing Surveillance 4.6.1.1a with Appropriate NUREG-1431 Requirements ML18107A4601999-07-23023 July 1999 Proposed Tech Specs Pages Changing TS Surveillance Requirement 4.8.1.1.2 D 7 by Removing Restriction to Perform Test Every 18 Months During Shutdown ML18107A4241999-07-0202 July 1999 Proposed Tech Specs,Relocating TS 3/4.3.4 Lco,Surveillance Requirements & Bases from TS to UFSAR ML18107A3811999-06-10010 June 1999 Proposed Tech Specs 3/4.6.1, Containment Integrity, Clarifying When Verification of Primary Containment Integrity May Be Performed by Administrative Means ML18107A3601999-06-0404 June 1999 Non-proprietary Tech Specs Pages Re Transfer of PSEG Ownership Interests & Licensed Operating Authorities to New, Affiliated Nuclear Generating Company,Pseg Nuclear LLC ML18107A2131999-04-14014 April 1999 Proposed Tech Specs 3/4.9.12, Fhavs, Revised to Ensure Consistency Between TS Requirements for Fhavs & Sys Design Basis,As Well Better Alignment to Bases Provided in NUREG-1431 ML18106B1591999-03-31031 March 1999 Proposed Tech Specs Allowing Plant Operation to Continue to Thirteenth Refueling Outage (1R13),currently Scheduled to Begin on 990918 ML18106B0801999-02-22022 February 1999 Proposed Tech Specs Re CR Emergency Air Conditioning Sys ML18106B0641999-02-0808 February 1999 Proposed Tech Spec Pages,Modifying ECCS Subsystems Surveillance 4.5.3.2.b by Adding Option of Providing Necessary Isolation Function When Testing ML18106B0611999-02-0808 February 1999 Proposed Tech Specs SR 4.8.1.1.2.f Re Hot Restart & Definition of Standby Conditions. ML18106B0531999-02-0202 February 1999 Proposed Tech Specs 5.6.1.1,revising Max Permissible Enrichment of Stored New Fuel ML18106B0431999-01-19019 January 1999 Proposed Tech Specs Bases Section 3/4.1.2 Re Boration Sys ML18106B0241999-01-15015 January 1999 Proposed Tech Specs Re Deferral of Surveillance Requirements for Salem Generating Station,Unit 1 ML18106A9231998-10-12012 October 1998 Proposed Tech Specs Re Inserts & Marked Up Pages for LCR S98-03 ML18106A9181998-10-12012 October 1998 Proposed Tech Specs Re one-time Changes to Certain Unit 2 TS SR for Fuel Cycle 10 ML18106A8941998-09-29029 September 1998 Proposed Tech Specs Section 3/4.9.2,modified to Permit Use of Equivalent Methods to Obtain Containment Closure During Refueling Operations for Containment Equipment Hatch ML18106A8781998-09-17017 September 1998 Proposed Tech Specs Modifying 3/4.8.2.2,3/4.8.2.4 & 3/4.8.2.6 to Address Movement of Irradiated Fuel & Deleting LCO Re Requirement to Establish Containment Integrity ML18106A8371998-08-12012 August 1998 Proposed Tech Specs Modifying Allowed Continued Operation W/Inoperable Air Lock Door Provided That Operable Door Is Closed & Unlocked & Making Requirements for Inoperable Air Lock Door ML18106A7931998-07-30030 July 1998 Proposed Tech Specs,Revising Acceptance Criteria for CR Emergency Air Conditioning Sys from Maintaining CR at 1/8-inch Positive Pressure W/Respect to Adjacent Areas to Stated Phrase ML18106A6961998-07-0707 July 1998 Proposed Tech Specs Section 4.2.1 Re Aquatic Monitoring of App B for Environ Protection Plan ML18106A6631998-06-17017 June 1998 Proposed Revised Tech Specs Bases Pages 3/4.1.3,3/4.1.2, 3/4.5.5 & 3/4.9.1,ensuring Acceptable Power Distribution Limits Are Maintained,Providing Operational Flexibility & Clarifying Statements ML18106A4291998-03-26026 March 1998 Proposed Tech Specs,Changing Applicability Statement from Mode 3 to Modes 1 & 2 ML18106A4241998-03-26026 March 1998 Proposed Tech Specs Incorporating Note at Bottom of Salem Unit 2 T3/4.8.2 Into Salem 1 TS & Adding Asterisks to Word Inverters. ML18106A3221998-02-18018 February 1998 Marked-up TS Pages for Section 4.2.1 of App B ML18106A3091998-02-0202 February 1998 Revised TS Bases Pages for Specs 3/4.3.3.1,radiation Monitoring instrumentation,3/4.3.3.8,radioactive Liquid Effluent Monitoring Instrumentation & 3/4.3.3.9,radioactive Gaseous Effluent Monitoring Instrumentation ML18106A2541998-01-0808 January 1998 Proposed Tech Specs Pages,Adding Asterisk to Word Operable in LCO & Associated Note at Bottom of Page ML18106A2141997-12-15015 December 1997 Proposed Tech Specs Pages,Revising TS to Adopt Option B to 10CFR50,App J,For Type B & C Testing & Modify Existing TS Wording for Previous Adoption of Option B on Type a Testing ML18106A1961997-12-11011 December 1997 Proposed Tech Specs Re one-time Exemption to Allow Containment Purging in Modes 3 & 4 ML18102B6791997-11-14014 November 1997 Proposed Tech Specs Providing Surveillance Requirements to Codify Existing Procedural Commitments for SW Accumulator Vessels ML18102B6751997-11-14014 November 1997 Proposed Tech Specs Re Administrative & Editorial Corrections ML18102B6631997-11-0404 November 1997 Proposed Tech Specs,Deleting 4.8.1.1.2.d.1,which Calls for Diesels to Be Subjected to Insp Based on Vendor Recommendations at Least Once Per 18 Months During Shutdown ML18102B6591997-11-0404 November 1997 Proposed Tech Specs,Revising Surveillance Requirement 4.6.2.1.b to Verify That on Recirculation Flow,Containment Spray Pumps Develop Differential Pressure of Greater than or Equal to 204 Psid ML18102B6431997-10-29029 October 1997 Proposed Tech Specs Revising SR 4.8.1.1.2.d.2 Proposed in 960925 Request to Change EDG Voltage & Frequency Limits as Result of Updated EDG Load Calculations & Ambiguity in Testing Methodology for EDG Start Timing ML18102B6391997-10-29029 October 1997 Proposed Tech Specs Changing SG Insp Schedule to Require Next Insp within 24 Months of Mode 2 for Unit 2 Fuel Cycle 10 ML18102B6491997-10-24024 October 1997 Proposed Tech Specs Pages,Modifying TS 3/4.7.7, Auxiliary Building Exhaust Air Filtration Sys & Bases ML18102B6461997-10-24024 October 1997 Proposed Tech Specs Revising Containment Hydrogen Analyzer SRs of TS 4.6.4.1 ML18102B6321997-10-21021 October 1997 Proposed Tech Specs,Extending Applicability of Power Range Neutron Flux TS Trip to Require Operability & Surveillance Testing in Mode 3,when Reactor Trip Sys Breakers Are in Closed Position ML18102B6201997-10-14014 October 1997 Proposed Tech Specs Modifying Pressure Isolation Valves LCO, LCO Action Statement,Surveillance Requirement & Table 4.4-4 to Be Consistent W/Salem Unit 2 ML18102B6081997-10-0606 October 1997 Proposed Tech Specs Revising LCOs 3.1.3.1, Movable Control Assemblies & 3.1.3.2.1, Position Indication Sys. ML18102B5571997-08-27027 August 1997 Proposed Tech Specs,Providing Revised TS Bases Pages for TS 3.7.3, CCW Sys, Which States That Three CCW Pumps Required to Meet LCO ML18102B5301997-08-19019 August 1997 Proposed Tech Specs,Providing Addl Operational Flexibility to Allow Orderly Resumption of Startup & Preclude Unwarranted Power Transients at Salem Unit 2 ML18102B5341997-08-18018 August 1997 Proposed Tech Specs,Incorporating Plant Computer (P-250) Into TS Bases for Movable Control Assemblies ML18102B4891997-08-0101 August 1997 Proposed Tech Specs Section 4.2.1 Rewording Section to State Util Will Adhere to Section 7,Incidental Take Statement Approved by Natl Maring Fisheries Svc ML18102B3911997-06-12012 June 1997 Proposed Tech Specs,Representing Addition of New Spec 3/4.7.10, Chilled Water Sys - Auxiliary Bldg Subsystem. ML18102B3061997-05-14014 May 1997 Proposed Tech Specs,Revising SR 4.7.6.1.d.1,to Indicate That Specified Acceptable Filter Dp Is to Be Measured Across Filter Housing & Reflecting Filter Dp Acceptance Value Greater than 2.70 Water Gauge ML18102B2631997-05-0101 May 1997 Proposed Tech Specs,Adding New Spec 3/4.7.10, Chilled Water Sys - Auxiliary Bldg Subsystem. ML18102B2601997-05-0101 May 1997 Proposed Tech Specs 3/4.7.7 Revising Certain Allowed Outage Times & Creating 3/4.7.11 to Address Switchgear & Penetration Area Ventilation Sys ML18102B0341997-04-25025 April 1997 Proposed Tech Specs 3.5.2 Eliminating Flow Path from RHR Sys to RCS Hot Legs as Specified in LCO 3.5.2.c.2 1999-08-25
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML18107A5291999-09-10010 September 1999 Revised Event Classification Guide,Including Rev 18 to Table of Contents,Rev 10 to Attachments 6 & 7 & Rev 11 to Attachment 9 ML20211Q8771999-08-27027 August 1999 Rev 0 to Inservice Testing Manual for Pumps & Valves Program ML18107A5171999-08-25025 August 1999 Marked-up Tech Spec Pages Deleting Footnotes That Were Added as One Time Changes & Proposing Change Identified Subsequent to 971114 Submittal That Corrects Error Issued in Amend 69 for Salem Unit 2 ML18107A5121999-08-23023 August 1999 Procedure 71151, Performance Indicator Verification. ML18107A5091999-08-23023 August 1999 Attachment 21 to Procedure 71111, Safety Sys Design & Performance Capability. ML18107A4961999-08-23023 August 1999 Proposed Tech Specs,Modifying 3/4 7.7, Auxiliary Bldg Exhaust Air Filtration Sys. ML18107A4671999-07-29029 July 1999 Proposed Tech Specs Replacing Surveillance 4.6.1.1a with Appropriate NUREG-1431 Requirements ML18107A4601999-07-23023 July 1999 Proposed Tech Specs Pages Changing TS Surveillance Requirement 4.8.1.1.2 D 7 by Removing Restriction to Perform Test Every 18 Months During Shutdown ML18107A4241999-07-0202 July 1999 Proposed Tech Specs,Relocating TS 3/4.3.4 Lco,Surveillance Requirements & Bases from TS to UFSAR ML18107A3811999-06-10010 June 1999 Proposed Tech Specs 3/4.6.1, Containment Integrity, Clarifying When Verification of Primary Containment Integrity May Be Performed by Administrative Means ML18107A3601999-06-0404 June 1999 Non-proprietary Tech Specs Pages Re Transfer of PSEG Ownership Interests & Licensed Operating Authorities to New, Affiliated Nuclear Generating Company,Pseg Nuclear LLC ML18107A2961999-05-12012 May 1999 Revised Event Classification Guide,Including Rev 16 to Table of Contents,Rev 8 to Attachment 6,rev 8 to Attachment 7 & Rev 9 to Attachment 9 ML18107A2131999-04-14014 April 1999 Proposed Tech Specs 3/4.9.12, Fhavs, Revised to Ensure Consistency Between TS Requirements for Fhavs & Sys Design Basis,As Well Better Alignment to Bases Provided in NUREG-1431 ML18106B1591999-03-31031 March 1999 Proposed Tech Specs Allowing Plant Operation to Continue to Thirteenth Refueling Outage (1R13),currently Scheduled to Begin on 990918 ML18106B0801999-02-22022 February 1999 Proposed Tech Specs Re CR Emergency Air Conditioning Sys ML18106B0641999-02-0808 February 1999 Proposed Tech Spec Pages,Modifying ECCS Subsystems Surveillance 4.5.3.2.b by Adding Option of Providing Necessary Isolation Function When Testing ML18106B0611999-02-0808 February 1999 Proposed Tech Specs SR 4.8.1.1.2.f Re Hot Restart & Definition of Standby Conditions. ML18106B0531999-02-0202 February 1999 Proposed Tech Specs 5.6.1.1,revising Max Permissible Enrichment of Stored New Fuel ML18106B0431999-01-19019 January 1999 Proposed Tech Specs Bases Section 3/4.1.2 Re Boration Sys ML18106B0241999-01-15015 January 1999 Proposed Tech Specs Re Deferral of Surveillance Requirements for Salem Generating Station,Unit 1 ML18106A9231998-10-12012 October 1998 Proposed Tech Specs Re Inserts & Marked Up Pages for LCR S98-03 ML18106A9181998-10-12012 October 1998 Proposed Tech Specs Re one-time Changes to Certain Unit 2 TS SR for Fuel Cycle 10 ML18106A8941998-09-29029 September 1998 Proposed Tech Specs Section 3/4.9.2,modified to Permit Use of Equivalent Methods to Obtain Containment Closure During Refueling Operations for Containment Equipment Hatch ML18106A8781998-09-17017 September 1998 Proposed Tech Specs Modifying 3/4.8.2.2,3/4.8.2.4 & 3/4.8.2.6 to Address Movement of Irradiated Fuel & Deleting LCO Re Requirement to Establish Containment Integrity ML18106A8371998-08-12012 August 1998 Proposed Tech Specs Modifying Allowed Continued Operation W/Inoperable Air Lock Door Provided That Operable Door Is Closed & Unlocked & Making Requirements for Inoperable Air Lock Door ML18106A7931998-07-30030 July 1998 Proposed Tech Specs,Revising Acceptance Criteria for CR Emergency Air Conditioning Sys from Maintaining CR at 1/8-inch Positive Pressure W/Respect to Adjacent Areas to Stated Phrase ML18106A6961998-07-0707 July 1998 Proposed Tech Specs Section 4.2.1 Re Aquatic Monitoring of App B for Environ Protection Plan ML18106A6631998-06-17017 June 1998 Proposed Revised Tech Specs Bases Pages 3/4.1.3,3/4.1.2, 3/4.5.5 & 3/4.9.1,ensuring Acceptable Power Distribution Limits Are Maintained,Providing Operational Flexibility & Clarifying Statements ML20216B0641998-05-0101 May 1998 Rev 1 to ECG-ATT 14, Four Hour Rept - NRC Operations & Rev 7 to ECG-HECG-TOC, Hope Creek Event Classification Guide Table of Contents/Signature Page ML18106A5571998-04-16016 April 1998 Rev 21 to EOP-CFST-1, Shutdown Margin Status Tree & Rev 10 to Table of Contents ML20239A1251998-03-31031 March 1998 Rev 11 to Salem Nuclear Generating Station Odcm ML18106A4241998-03-26026 March 1998 Proposed Tech Specs Incorporating Note at Bottom of Salem Unit 2 T3/4.8.2 Into Salem 1 TS & Adding Asterisks to Word Inverters. ML18106A4291998-03-26026 March 1998 Proposed Tech Specs,Changing Applicability Statement from Mode 3 to Modes 1 & 2 ML18106A3921998-03-13013 March 1998 Rev 9 to ECG-SECG-TOC & Rev 2 to ECG-ATT.04, General Emergency. ML18106A8281998-03-0404 March 1998 Rev 1 to Reactivity Manipulations Documentation Guide. ML18106A3221998-02-18018 February 1998 Marked-up TS Pages for Section 4.2.1 of App B ML18106A3091998-02-0202 February 1998 Revised TS Bases Pages for Specs 3/4.3.3.1,radiation Monitoring instrumentation,3/4.3.3.8,radioactive Liquid Effluent Monitoring Instrumentation & 3/4.3.3.9,radioactive Gaseous Effluent Monitoring Instrumentation ML18106A2541998-01-0808 January 1998 Proposed Tech Specs Pages,Adding Asterisk to Word Operable in LCO & Associated Note at Bottom of Page ML18106A2141997-12-15015 December 1997 Proposed Tech Specs Pages,Revising TS to Adopt Option B to 10CFR50,App J,For Type B & C Testing & Modify Existing TS Wording for Previous Adoption of Option B on Type a Testing ML18106A1961997-12-11011 December 1997 Proposed Tech Specs Re one-time Exemption to Allow Containment Purging in Modes 3 & 4 ML18102B6791997-11-14014 November 1997 Proposed Tech Specs Providing Surveillance Requirements to Codify Existing Procedural Commitments for SW Accumulator Vessels ML18102B6751997-11-14014 November 1997 Proposed Tech Specs Re Administrative & Editorial Corrections ML18102B6591997-11-0404 November 1997 Proposed Tech Specs,Revising Surveillance Requirement 4.6.2.1.b to Verify That on Recirculation Flow,Containment Spray Pumps Develop Differential Pressure of Greater than or Equal to 204 Psid ML18102B6631997-11-0404 November 1997 Proposed Tech Specs,Deleting 4.8.1.1.2.d.1,which Calls for Diesels to Be Subjected to Insp Based on Vendor Recommendations at Least Once Per 18 Months During Shutdown ML18102B6431997-10-29029 October 1997 Proposed Tech Specs Revising SR 4.8.1.1.2.d.2 Proposed in 960925 Request to Change EDG Voltage & Frequency Limits as Result of Updated EDG Load Calculations & Ambiguity in Testing Methodology for EDG Start Timing ML18102B6391997-10-29029 October 1997 Proposed Tech Specs Changing SG Insp Schedule to Require Next Insp within 24 Months of Mode 2 for Unit 2 Fuel Cycle 10 ML18102B6491997-10-24024 October 1997 Proposed Tech Specs Pages,Modifying TS 3/4.7.7, Auxiliary Building Exhaust Air Filtration Sys & Bases ML18102B6461997-10-24024 October 1997 Proposed Tech Specs Revising Containment Hydrogen Analyzer SRs of TS 4.6.4.1 ML18102B6321997-10-21021 October 1997 Proposed Tech Specs,Extending Applicability of Power Range Neutron Flux TS Trip to Require Operability & Surveillance Testing in Mode 3,when Reactor Trip Sys Breakers Are in Closed Position ML18102B6201997-10-14014 October 1997 Proposed Tech Specs Modifying Pressure Isolation Valves LCO, LCO Action Statement,Surveillance Requirement & Table 4.4-4 to Be Consistent W/Salem Unit 2 1999-09-10
[Table view] |
Text
REACTIVITY CONTRC~YSTEMS POSITION INDICATION SYSTEM SHUTDOWN LIMITING CONDITION FOR OPERATION
===============================================----===========
3.1.3.4 All shutdown rods shall be FULLY WITHDRAWN.
APPLICABILITY: MODES 1*, and 2*#~
ACTION:
With a maximum of one shutdown rod not FULLY WITHDRAWN, except for surveillance testing pursuant to Specification 4.1.3.1.2, within one hour either:
- a. FuL!.'.l, WITIIDRAW~ .'the rod, or,
- b. Declare the rod to be inoperable and apply Specification 3.1.3.1.
SURVEILLANCE REQUIREMENTS 4.1.3.4 Each shutdown rod shall be determined to be FULLY WITHDRAWN by use of the group demand counters, and verified by the analog rod position indicator~~OP
- a. Within 15 minutes prior to withdrawal of any rods in control' banks A, B, C, or D during an approach to reactor critieally, and co..li*~y b* At least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter.
- For power levels one hour thermal *"soak time" i's permitted.**
During this soak time, the absolute value of rod motion is limited to six .I ste s. '
With Keff greater than or equal to 1.0 I
@Surveillance 4.1.3.4.a is applicable prior to withdrawing control banks in preparation for startup (Mode 2).
SALEM - UNIT 1 3/4 1-22 Amendment No. 73 8905310127 890522 PDR ADOCK 05000272 p PNU ;
REACTIVITY CONTR~YSTEMS POSITION.INDICATION SYSTEM SHUTDOWN LIMITING CONDITION FOR OPERATION 3.1.3.5 The control banks shall be limited in physical insertion as shown in Figures 3.1-1 and 3.1-2.
APPLICABILITY: MODES 1*, and 2*#
ACTION:
With the control banks inserted beyond the above insertion limits, except for surveillance testing pursuant to Specification 4.1.3.1.2, either:
- a. Restore the control banks to within the limits within two hours, or
- b. Reduce THERMAL POWER within two hours to less than or equal to that fraction of RATED THERMAL POWER which is allowed by the bank positionusingthe-above-figures, or
- c. Be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
SURVEILLANCE REQUIREMENTS
=====~==========================***-
4.1.3.5 The position of each control bank shall be determined to be within the insertion limits at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> by use of the group demand counters and verified by the analog rod position indicator~except during I
time intervals when the Rod Insertion Limit Monitor is inoperable, then verify the indiv-idual rod-positions at least once per 4 hour~AOP
- See -Special Test Exceptions* 3 .10. 2 and 3 .10. 3 * ., ..,
- one hour thermal "soak time", is_ permitted.
,4P~: During this soak time, the absolute value of rod motion is*-liinited to six steps.
- With Keff greater than or equal to 1.0
- SALEM - UNIT 1 3/4 1-23 Amendment No. 73 L_
REACTIVITY CONTR~YSTEMS .e
,.POSITION INDICATION SYSTEM SHUTDOWN
- LIMITING CONDITION FOR OPERATION 3.1.3.4 All shutdown rods shall be fully withdrawn.
APPLICABILITY: MODES 1*, and 2*#@
ACTION:
With a maximum of one shutdown rod not fully withdrawn, except for surveillance testing pursuant to Specification 4.1.3.1.2, within one hour either:
- a. Fully withdraw the rod,~,
- b. Declare the rod to be inoper_able and apply Specification 3 .1. 3 .1.
SURVEILLANCE REQUIREMENTS 4.1.3.4 Each shutdown rod shall be determined to be fully withdrawn by use the group ~d counters, and verified by the analog- rod position::--- - ..
indicator~
,w~*..
- a. Within 15 minutes prior to withdrawal of any rods in control banks A,. B, C, or D during an approach to reactor criti~, .and co.1'1ty b* At least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> therea~ter.
- For power eve s e ow 50% one hour thermal 11 soak time is permitted.
A-00! During this soak time, the absolute value of rod motion is limited to steps-.
@Surveillance 4.1.3.4.a is applicable prior to withdrawing any control banks in preparation for startup (Mode 2).
- With Keff greater than or equal to 1.0
- SALEM - UNIT 2 3/4 1-19 Amendment No. 48
REACTIVITY CONTR-fYSTEMS
'. POSITION INDICATION SYSTEM SIUJTDOWN LIMITING CONDITION FOR OPERATION 3.1.3.5 The control banks shall be limited in physical insertion as shown in Figures 3.1-1 and 3.1-2.
APPLICABILITY: MODES 1*, and 2*#
ACTION:
With the control banks inserted beyond the above insertion limits, except for surveillance testing pursuant to Specification 4.1.3.1.2, either:
- a. Restore the control banks to within the limits within two hours, or
- b. Reduce THERMAL POWER within two hours to less than or equal to that fraction of RATED THERMAL POWER which is allowed by the bank position using the above figures, or
- c. Be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
SURVEILLANCE REQUIREMENTS 4.1.3.5 The position of each control bank shall be determined to be within the insertion limits at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> by use of the group demand counters and verified by the analog rod position indicators~except during time intervals when the Rod Insertion Limit Monitor is inoperable, then verify
- the individual rod positions at least once per 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />s~
ADP~ - -
- See S ecial Test Exceptions 3*.10. 2 and 3 .10. 3
- For power levels below 50% one hour thermal "soak time" is permitted.
During this soak time, the absolute value of rod motion is limited to steps.
- With Keff greater than or equal to 1.0
- SALEM -*UNIT 2 '3/41-20 Amendment No. 48
REACTIVITY CONTROI~'STEMS POSITION INDICATION SYSTEM SHUTDOWN LIMITING CONDITION FOR OPERATION
============================================================
3.1.3.4 All shutdown rods shall be FULLY WITHDRAWN.
APPLICABILITY: MODES 1*, and 2*#@
ACTION:
With a maximum of one shutdown rod not FULLY WITHDRAWN, except for surveillance testing pursuant to Specification 4.1.3.1.2, within one hour either:
- a. FULLY WITHDRAW the rod, or,
- b. Declare the rod to be inoperable and apply Specification 3.1.3.1.
SURVEILLANCE REQUIREMENTS
============================================================
4.1.3.4 Each shutdown rod shall be determined to be FULLY WITHDRAWN by use of the group demand counters, and verified by the analog rod position indicators~d::
- a. Within 15 minutes prior to withdrawal of any rods in control banks A, B, C, or D during an approach to reactor criticality, and
- b. At least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter.
- See Special Test Exceptions 3.10.2 and 3.10.3
~*'*For power levels below 50% one hour thermal "soak time" is permitted.
During this soak time, the absolute value of rod motion is limited to six steps.
- With Keff greater than or equal to 1.0
@Surveillance 4.1.3.4.a is applicable prior tu withdrawing control banks in preparation for startup (Mode 2).
SALEM - UNIT 1 3/4 1-22 Amendment No.
- REACTIVITY CONTRO~YSTEMS POSITION INDICATION SYSTEM SHUTDOWN LIMITING CONDITION FOR OPERATION
============================================================
3.1.3.5 The control banks shall be limited in physical insertion as shown in Figures 3.1-1 and 3.1-2.
APPLICABILITY: MODES l'°', and 2*11 ACTION:
With the control banks inserted beyond the above insertion limits, except for surveillance testing pursuant to Specification 4.1.3.1.2, either:
- a. Restore the control banks to within the limits within two hours, or
- b. Reduce THERMAL POWER within two hours to less than or equal to that fraction of RATED THERMAL POWER which is allowed by the bank position using the above figures, or
- c. Be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
SURVEILLANCE REQUIREMENTS
======================~=================================================-
4.1.3.5 The position of each control bank shall be determined to be within the insertion limits at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> by use of the group demand counters and verified by the analog rod position indicators** except during time intervals when the Rod Insertion Limit Monitor is inoperable, then verify the individual rod positions at least once per 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />s*'1'.
- See Special Test Exceptions 3.10.2 and 3.10.3
)'d'For power levels below 50% one hour thermal "soak time" is permitted.
During this soak time, the absolute value of rod motion is limited to six steps.
UWith Keff greater than or equal to 1.0 SALEM - UNIT 1 3/4 1-23 Amendment No.
REACTIVITY CONTROL~STEMS POSITION INDICATION SYSTEM SHUTDOWN LIMITING CONDITION FOR OPERATION 3.1.3.4 All shutdown rods shall be fully withdrawn.
APPLICABILITY: MODES 1*, and 2*U@
ACTION:
With a maximum of one shutdown rod not fully withdrawn, except for surveillance testing pursuant to Specification 4.1.3.1.2, within one hour either:
- a. Fully withdraw the rod, or,
- b. Declare the rod to be inoperable and apply Specification 3.1.3.1.
SURVEILLANCE REQUIREMENTS 4.1.3.4 Each shutdown rod shall be determined to be fully withdrawn by use of the group demand counters, and verified by the analog rod position indicators1dc:
- a. Within 15 minutes prior to withdrawal of any rods in control banks A, B, C, or D during an approach to reactor criti*cality, and
- b. At least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter.
- See Special Test Exceptions 3.10.2 and 3.10.3 1c1cFor power levels below 50% one hour thermal "soak time" is permitted.
During this soak time, the absolute value of rod motion is limited to six steps.
@Surveillance 4.1.3.4.a is applicable prior to withdrawing any control banks in preparation for startup (Mode 2).
UWith Keff greater than or equal to 1.0 SALEM - UNIT 2 3/4 1-19 Amendment No.
REACTIVITY CONTRO liYSTEMS POSITION INDICATION SYSTEM SHUTDOWN LIMITING CONDITION FOR OPERATION
=============================================================
3.1.3.5 The control banks shall be limited in physical insertion as shown in Figures 3.1-1 and 3.1-2.
APPLICABILITY: MODES P, and 2*kf1 ACTION:
With the control banks inserted beyond the above insertion limits, except for surveillance testing pursuant to Specification 4.1.3.1.2, either:
- a. Restore the control banks to within the limits within two hours, or
- b. Reduce THERMAL POWER within two hours to less than or equal to that fraction of RATED THERMAL POWER which is allowed by the bank position using the above figures, or
- c. Be in at least HOT STANDBiY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
SURVEILLANCE REQUIREMENTS
=============================================================
4.1.3.5 The position of each control bank shall be determined to be within the insertion limits at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> by use of the group demand counters and verified by the analog rod position indicators** except during time intervals when the Rod Insertion Li.mit Monitor is inoperable, then verify the individual rod positions at least once per 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />s***
- See Special Test Exceptions 3.10.2 and 3.10.3 id'For power levels below 50% one hour thermal "soak time" is permitted.
During this soak time, the absolute value of rod motion is limited to six steps.
- With Keff greater than or equal to 1.0 I
I I
SALEM - UNIT 2 3/4 1-20 Amendment No. I I
I I