Advises That Installation of Mods to post-accident Sampling Sys Delayed Until 900901.Delay Due to Work Control Process & Commitment Tracking Tools Failing to Recognize Significance of Item.Procedure Upgrades Will Be Completed by 901001
ML18095A196
Person / Time
Site: Salem  PSEG icon.png
Issue date: 05/09/1990
From: Miltenberger S
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NLR-N90098, NUDOCS 9005160116
Download: ML18095A196 (4)


Text

f *

~l,A"'f ri ~ 1~

NLR-N90098 United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Gentlemen:

IMPLEMENTATION OF MODIFICATIONS TO THE SALEM POST ACCIDENT SAMPLING SYSTEM (PASS)

SALEM GENERATING STATION UNIT NOS. 1 AND 2 FACILITY OPERATING LICENSE NOS. DPR-70 AND DPR-75

  • DOCKET NOS. 50-272 AND 50-311 Public Service Electric and Gas Company (PSE&G) committed, in a letter dated April 14, 1989, to modifying the Salem PASS to provide backup grab sample capability, by the first quarter of 1990. PSE&G failed to complete those modifications in accordance with the committed schedule. The underlying root cause of that failure is under investigation. Initial indications are that our work control process and commitment tracking tools failed to adequately recognize the regulatory significance of this item.

Our investigation is continuing at this time. A supplemental report will be submitted within 60 days identifying the final root cause determination and our corrective actions to assure future* compliance.

The revised date for complete modification installation is September 1, 1990. Procedure upgrades and training*will be completed by October 1, 1990. Should you have any questions on this transmittal, please do not hesitate to contact us.

Sincerely, 4~~

s. E. Miltenberge~

Vice President ano/-

Chief Nuclear Off 1cer WPG/dlc

1

  • Document Control Desk 2

.e NLR-N90098 c- Mr. J. c. Stone Licensing Project Manager Mr. T. Johnson Senior Resident Inspector Mr. T. Martin, Administrator Region I Mr. Kent Tosch, Chief New Jersey Department of Environmental Protection Division of Environmental Quality Bureau of Nuclear Engineering CN 415 Trenton, NJ 08625

)

.~,:... "

I

~ r '

~.,\ J "

Document Control Desk 3 NLR-N90098 BC Vice President - Nuclear Operations (cover letter only)

General Manager - Salem Operations General Manager - Quality Assurance/Nuclear Safety Review Manager - Offsite Safety Review Manager - External Affairs Onsite Safety Review Engineer - Salem station Licensing Engineer - Salem Associate General Solicitor J. B. Caldwell (Records Management)

Conner and Wetterhahn Microfilm Copy File No. 1.2.1, 5.2 L. Moore

~

f' 1 '\

l , '

~:. r

)