ML19277A068
From kanterella
Revision as of 16:51, 1 February 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
ML19277A068 | |
Person / Time | |
---|---|
Site: | Arkansas Nuclear |
Issue date: | 06/16/1981 |
From: | ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY |
To: | |
Shared Package | |
ML19277A067 | List: |
References | |
CEN-162(A)-NP, NUDOCS 8107300146 | |
Download: ML19277A068 (27) | |
Similar Documents at Arkansas Nuclear | |
---|---|
Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20217N3171999-10-19019 October 1999
[Table view]Rev 1,change 024-01-0 to OP-1903.011, Emergency Response Notifications ML20217J7641999-10-0505 October 1999 Rev 1 to Unit 1 Technical Requirement Manual, Replacing Index Page ML20216G0881999-09-19019 September 1999 Proposed Tech Specs Pages,Changing TS 4.18.5.a.9 & Associated Bases for One Cycle of Operation Through End of Cycle 16 for Suppl Use of OTSG Repair Roll Technology ML20212F5851999-09-17017 September 1999 Proposed Tech Specs Pages,Changing TS by Revising Curie Limits for Radioactive Gas Storage Tanks ML20216G0721999-09-17017 September 1999 Proposed Tech Specs,Revising Once Through SG Tubing Surveillance Requirements to Provide Alternate Repair Criteria for Volumetric Integranular Attack ML20211P0061999-09-0707 September 1999 Proposed TS in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria ML20211B3291999-08-19019 August 1999 Proposed TS 4.18.3.a.4 Clarification Supporting Tube End Cracking Alternative Repair Criteria ML20211C1701999-08-18018 August 1999 Proposed Tech Specs Revising ESAS Low RCS Pressure Setpoint to Ensure That TS Adequately Bounds Safety Analysis ML20211C4101999-08-18018 August 1999 Proposed Tech Specs Removing Requiremets for Tube Repair (Sleeving) & Clarifying Requirements for Preservice & ISI of Tubes to Facilitate Replacement of Original SGs ML20210N5541999-08-0404 August 1999 Rev 28,Permanent Change 4 to OP-1903.061, Communication Equipment Test ML20210N5571999-08-0404 August 1999 Rev 23,Permanent Change 5 to OP-1903.011, Emergency Response/Notifications ML20210K3571999-07-29029 July 1999 Proposed Tech Specs Revising SRs Pertaining to ISI Requirements for SG Tube Circumferential Cracking at top-of-tubesheet During 2P99 Planned mid-cycle Outage ML20210K5121999-07-29029 July 1999 Proposed Tech Specs,Revising Requirements Associated with Plant Station Batteries & DC Sources to 125 Vdc Switchyard Distribution Sys ML20209H5811999-07-14014 July 1999 Proposed Tech Specs Revising RB Structural Integrity Requirements Re ISI Reporting for Containment Structures, Tendons & Anchorages ML20209H8701999-07-14014 July 1999 Proposed Tech Specs 6.2.2 & 6.2.2.h,replacing Functional Description of Operations Staff Middle Manager with Ref to Functional Description Assistant Operations Manager & Revising TS Table 6.2-1 Item 5 & TS 6.2.2.f ML20209H9721999-07-14014 July 1999 Proposed Tech Specs Changes for Elimination of Programmatic Requirements Associated with PASS & Regulatory Relief from PASS Requirements of NUREG-0737 & RG 1.97 ML20195D2371999-06-0101 June 1999 Proposed Tech Specs Re Surveillance Requirements & Applicable Bases Relevant to ISI Requirements for Portions of once-through SG (OTSG) Tubes Adjacent to Primary Cladding Region of tube-to Tubesheet Roll ML20206T2651999-05-14014 May 1999 Proposed Tech Specs Revising SG Tubing SRs ML20206Q1281999-05-10010 May 1999 Proposed Tech Specs Bases,Page B 2-2,discussing Guidance to Be Used When Applying Later Editions & Addendas of ASME Code to RCS Components ML20206J8021999-05-0404 May 1999 PC-03 to Procedure/Work Plan 1904-002, Offsite Dose Projections Rdacs Computer Method ML20205P3731999-04-0909 April 1999 Revised Proposed TS Page 5-1 Re Design Features Conversion ML20205P4081999-04-0909 April 1999 Proposed Tech Specs Changes,Revising Reactor Bldg Structural Integrity Requirements ML20205P6291999-04-0909 April 1999 Proposed Tech Specs Changes,Revising Battery Requirements ML20205P6431999-04-0909 April 1999 Revised Proposed Technical Requirement Manual Pages ML20205P6931999-04-0909 April 1999 Proposed Tech Specs Change,Adding Specification 3.0.6 & Associated Bases to ANO-2 ML20207C0631999-02-25025 February 1999 Proposed Tech Specs Change Revising Action 2 Associated with Table 3.3-1, Reactor Protective Instrumentation. Change Adds Footnote to Action 2 Allowing Startup with Functional Units Associated with Channel D Excore Inoperable ML20207M7561999-02-24024 February 1999 Proposed Tech Specs,Allowing Startup & Continued Operation of Plant with Channel D Detector Until New Detector Is Installed During mid-cycle Outage Scheduled for Nov 1999 ML20198K1341998-12-17017 December 1998 Corrected Tech Specs Pages to 980629 Application for Amend to License NPF-6 ML20198A3661998-12-0808 December 1998 Proposed Tech Specs B3/4 6-3 & B3/4 6-4,deleting All Requirements Associated with Sodium H Addition Sys & Adding New Requirements for Trisodium Phosphate to Be Stored in Containers Located on Floor of Cb ML20196B4381998-11-24024 November 1998 Proposed Tech Specs Pages,Changing Administrative Controls Section to Implement Consolidated QA Plan Manual & Clarifying Responsibilities on STA Position on Shift ML20196C9761998-11-24024 November 1998 Rev 1 to Unit 2 Technical Requirements Manual ML20154D6681998-10-0101 October 1998 Rev 28 to Procedure/Work Plan 1904.002, Offsite Dose Projections Rdacs Computer Method ML20153D8491998-09-17017 September 1998 Proposed Tech Specs 2.2.1,3.3.1.1 & 3.3.2.1 Re Operating Bypass Setpoint ML20153H1651998-08-12012 August 1998 Rev 0 to ANO Units 1 & 2 Technical Requirements Manual ML20236Y5081998-08-0606 August 1998 Proposed Tech Specs Section 3.3.4.B Re Sodium Hydroxide Tank Limits ML20236Y5951998-08-0606 August 1998 Proposed Tech Specs,Revising Requirements Associated W/Units 1 & 2 Control Room Emergency Ventilation Sys ML20236Y5251998-08-0606 August 1998 Proposed Tech Specs Section 3.1.3.2,revising Action Requirements for CEA Position Indicator Channels ML20236Q2781998-07-13013 July 1998 Proposed Tech Specs Re Safety Limits & Limiting Safety Settings ML20236G6921998-06-29029 June 1998 Proposed Tech Specs,Revising TS 3.4.2 & TS 3.4.12 Re Reactor Coolant Sys Safety Valves & Low Temp Overpressure Protection ML20236G5631998-06-29029 June 1998 Proposed Tech Specs,Revising Table 3.3-4 to Provide Range of Acceptable Values for 4160 Volt Bus Loss of Voltage Values ML20236G5421998-06-29029 June 1998 Proposed Tech Specs,Revising Surveillance Testing Requirements for Unit 2 Direct Current Electrical Distribution Sys ML20236G4911998-06-29029 June 1998 Proposed Tech Specs Re MSSVs & Pressurizer Safety Valves ML20199F7211998-05-22022 May 1998 Rev 8 to Simulator Mod Control,Training Desk Guide 6.3 ML20217N6141998-04-30030 April 1998 Proposed Tech Specs 1.6.1,revising Definition of Quadrant Power Tilt ML20217M2621998-04-30030 April 1998 Proposed Tech Specs Re DG Load Rejection Testing ML20217M4871998-04-28028 April 1998 Proposed Tech Specs Changing Order of Channel Rotation During Outage for Scheduling Flexibility,While Still Requiring Rotation Schedule to Be Established for Operating Cycle ML20217P8141998-04-0101 April 1998 Proposed Tech Specs Re Upper Tubesheet Volumetric Indications to Remain in Svc for Cycle 15 ML20216J7841998-03-17017 March 1998 Proposed Tech Specs Bases Change Concerning Plant Protection Sys Matrix Logic Testing ML20203D1061998-02-18018 February 1998 Proposed Tech Specs Revising Surveillance Testing Requirements for Emergency Feedwater Sys ML20202G9771998-02-0909 February 1998 Proposed Tech Specs Pages,Allowing Use of Repair Roll Technology (Reroll) for Upper Tubesheet Region of SGs 1999-09-07 Category:TEST REPORT MONTHYEARML20216G6371997-09-23023 September 1997
[Table view]ANO Unit 1 SG Tube Exam ML20216H9461997-09-0808 September 1997 Cycle 13 Startup Rept ML20101H8201992-04-30030 April 1992 Reactor Containment Bldg Integrated Leakage Rate Test Rept, for Apr 1992 ML20086J0771991-11-0707 November 1991 Simulator Performance Testing Rept ML20077G9801991-04-30030 April 1991 One,Unit II Reactor Containment Bldg Integrated Leakage Rate Test ML20059E7901990-01-22022 January 1990 ASTM E-72 Load Testing of 2-h Solid Stud Wall ML20247E8271988-11-30030 November 1988 Primary Reactor Containment Integrated Leakage Rate Test, Final Rept ML20155D4931988-05-20020 May 1988 Rev 1 to Reactor Containment Bldg Integrated Leak Rate Test,880501 ML20214K3641986-11-24024 November 1986 Rev 0 to Fracture Mechanics Analysis of Arkansas Nuclear One,Unit 1 `B' Pump Case-Surface Flaw ML20214K3951986-11-24024 November 1986 Rev 0 to Fracture Mechanics Analysis of Arkansas Nuclear One,Unit 1 `A' Pump Case - Supplementary Topics ML20214K3291986-11-18018 November 1986 Rev 0 to Arkansas Nuclear One,Unit 1 Pump Case - Crack Growth Due to Transients ML20213F4731986-11-0707 November 1986 Rev 0 to Fracture Mechanics Analysis of Arkansas Nuclear One-1 a Pump Case Indication ML20213F4791986-11-0707 November 1986 Rev 1 to Arkansas Nuclear One-1 Pump Case Stresses ML20214K3161986-11-0707 November 1986 Rev 0 to Fracture Mechanics Analysis of Arkansas Nuclear One,Unit 1 `B' Pump Case Indication ML20206T3181986-01-31031 January 1986 Vols I-III of IEEE 634-1978 Std Cable Penetration Fire Stop Qualification Test:Arkansas Nuclear Units 1 & 2, Russellville,Ar - Site Specific,Arkansas Power & Light Co Spec APL-2434, Final Rept ML20203A2311985-10-23023 October 1985 Corrosion Test of Mechanically Sleeved Unit 1 Once-Through Steam Generator Tube ML20099M3031985-01-31031 January 1985 Rev 1 to Nonproprietary Phase I of Arkansas Power & Light Inadequate Core Cooling Monitoring Sys Program Test Series Summary Rept ML20215B4391985-01-14014 January 1985 Rev 0 to Pistar Computer Program Verification Document Program Version 3.3.1 ML20112F7681984-12-31031 December 1984 Primary Reactor Containment Integrated Leakage Rate Test, Final Rept ML20128K3561984-12-17017 December 1984 Change Notice 1 to Primary Reactor Containment Integrated Leak Rate Test,Final Rept ML20215B5081984-11-0909 November 1984 Rev 1 to Gensap Program Verification Document Program Version 4.0 ML20096D8011984-08-31031 August 1984 Nonproprietary Final Rept of Arkansas Power & Light Inadequate Core Cooling Monitoring Sys Confirmatory Test Program ML20203A1971984-08-0909 August 1984 Rept of Once-Through Steam Generator Mechanical Sleeve 40% Wall Reduction Test 2CAN068408, Unit Two Cycle Four Startup Rept, for Period Ending 8403151984-03-15015 March 1984 Unit Two Cycle Four Startup Rept, for Period Ending 840315 ML20215B5681983-11-19019 November 1983 Computer Program Verification - Stardyne -3 DEC01/82A H Level Ncsi Cyber 730 ML20080T8391983-06-10010 June 1983 Exam of Once-Through Steam Generator Tubes B73-8 & B112-19 from ANO-1, Final Rept ML20071G1921983-05-12012 May 1983 Station,Unit 2,Cycle Three Startup Rept, for Period Ending 830104 ML20072P8111983-03-17017 March 1983 Cycle 2 Refueling Outage Fuel Exam Results ML20215B5451982-11-24024 November 1982 Suppl a to Rev 0 to Gensap Verification. Baseplate II Verification Rept Encl ML20215B5301982-10-23023 October 1982 Rev 0 to Gensap Program Verification ML19350F1251981-06-30030 June 1981 Nonproprietary Version of Reactor Vessel Open Core Flow Model Test Rept. ML19277A0681981-06-16016 June 1981 Nonproprietary Version of Cpc/Ceac Sys Phase II Software Verification Test Rept. ML20009G3181981-06-12012 June 1981 Inservice Testing AND-Unit 1,Check Valve Reliability Analysis. ML20079F9071981-06-0202 June 1981 Nonproprietary ANO-2 Cycle 1 Refueling Outage Fuel Exam Results ML20004C5111981-05-31031 May 1981 B&W Post-Test Evaluation of Loft Test L3-1. ML20004C5161981-05-20020 May 1981 B&W Post-Test Analysis for Semiscale Test S-07-10D. ML20126K9701981-02-25025 February 1981 Primary Reactor Containment Integrated Leakage Rate Test ML20053E9161980-12-12012 December 1980 Rept on Floor & Wall Penetration Fire Stops. ML20003E6161980-10-31031 October 1980 Cesec Simulation of NSSS Transients Tests at AR Nuclear One-Unit 2. ML20151A3841980-07-28028 July 1980 Revision a to Electrical Wire & Cable Isolation Barrier Matls Test for Susquehanna Steam Electric Station,Units 1 & 2 for Bechtel Power Corp ML19323H2841980-04-30030 April 1980 AR Nuclear 1 Steam Electric Station,Unit 2,Startup Rept, Suppl 3 for Period Ending 800430 ML19318C3421980-04-30030 April 1980 Rept on Wall Penetration Fire Stops. ML19344D2581980-01-29029 January 1980 Startup Rept,Suppl 2 for Period Ending 800129. ML19260C3601979-12-17017 December 1979 Pages S1-47,S1-48,S1-A1 & S1-A2 to 791211 Suppl to Startup Rept ML19256G5611979-12-17017 December 1979 Four Pages Omitted from 791211 Submittal of Suppl 1 to 790913 Startup Rept ML19210E2641979-11-29029 November 1979 Revised Pages to Startup Rept Cycle 4 Correcting Error in Moderator Coefficient Extrapolated to 95% Full Power & Indicating Location of in-core Instrumentation Used to Determine Core Power Distribution ML19211A2891979-10-31031 October 1979 Suppl 1 to Startup Rept for Period Ending 791031 ML19209A5141979-09-25025 September 1979 Cycle 4 Startup Rept for Period Ending 790704 ML19208A9361979-07-31031 July 1979 Startup Rept. ML19344A6631979-05-14014 May 1979 Class IE Prequalification Tests for Itt Barton Pressure Differential Switch,Model 580. 1997-09-08 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML19277A068&oldid=2377991"