MONTHYEARNPL-99-0569, Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with NPL-99-0051, Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with NPL-99-0449, Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with ML20209D2691999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pbnps,Units 1 & 2 NPL-99-0328, Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with ML20209D2751999-05-31031 May 1999 Revised MORs for May 1999 for Pbnps,Units 1 & 2 NPL-99-0273, Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-99-0193, Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with NPL-99-0134, Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with NPL-99-0008, Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with NPL-98-1006, Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0948, Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0826, Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20151W3851998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Pbnp Units 1 & 2 ML20151W4541998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 1 ML20151W4471998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 2 NPL-98-0653, Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 2 NPL-98-0558, Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 2 ML20151W4261998-06-30030 June 1998 Corrected Page to MOR for June 1998 for Pbnp Unit 2 ML20151W4221998-05-31031 May 1998 Corrected Page to MOR for May 1998 for Pbnp Unit 2 NPL-98-0481, Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4011998-04-30030 April 1998 Corrected Page to MOR for April 1998 for Pbnp Unit 2 NPL-98-0356, Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20216D7071998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3981998-03-31031 March 1998 Corrected Page to MOR for March for Pbnp Unit 2 NPL-98-0159, Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3891998-02-28028 February 1998 Corrected Page to MOR for Feb 1998 for Pbnp Unit 2 ML20216D7121998-02-28028 February 1998 Revised Corrected MOR for Feb 1998 for Point Beach Nuclear Plant,Unit 2 NPL-98-0084, Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20198M2251997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20198M2331997-11-30030 November 1997 Corrected Monthly Operating Repts for Nov 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9171997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Point Beach Nuclear Plant,Units 1 & 2 NPL-97-0715, Monthly Operating Repts for Oct 1997 for Point Beach Nuclear Plant,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9361997-10-31031 October 1997 Revised Monthly Operating Rept for Oct 1997 for Point Beach Nuclear Plant,Unit 2 NPL-97-0621, Monthly Operating Repts for Sept 1997 for Point Beach Nuclear Plant,Units 1 & 21997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9311997-09-30030 September 1997 Revised Monthly Operating Rept for Sept 1997 for Point Beach Nuclear Plant,Unit 2 NPL-97-0553, Monthly Operating Repts for Aug 1997 for Point Beach Nuclear Plant,Units 1 & 21997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9261997-08-31031 August 1997 Revised Monthly Operating Rept for Aug 1997 for Point Beach Nuclear Plant,Unit 2 ML20210H9531997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20210H9601997-06-30030 June 1997 Revised Monthly Operating Rept for June 1997 for Point Beach Nuclear Plant,Units 1 & 2,which Provides Corrected Forced Outage Rates NPL-97-0318, Monthly Operating Repts for May 1997 for Point Beach Nuclear Plant,Unit 1 & 21997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Point Beach Nuclear Plant,Unit 1 & 2 ML20141C2381997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20141C2461997-03-31031 March 1997 Corrected Operating Data Rept for Mar 1997 for Point Beach Nuclear Plant,Unit 1 ML20137P5781997-03-31031 March 1997 Monthly Operating Repts for March 1997 for Point Beach Nuclear Plant Units 1 & 2 ML20137P5711997-02-28028 February 1997 Corrected MOR for Feb 1997 for Point Beach Nuclear Plant Unit 1 ML20135F2721997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20134J8711997-01-31031 January 1997 Monthly Operating Repts for Jan 1996 for Point Beach Nuclear Plant,Units 1 & 2 ML20135F2771997-01-31031 January 1997 Revised Monthly Operating Rept for Jan 1997 for Point Beach Nuclear Plant,Unit 2 ML20133N0601996-12-31031 December 1996 Revised MOR Rept for Dec 1996 for Point Beach Nuclear Plant, Units 1 & 2 ML20133F6471996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Point Beach Nuclear Plant,Unit 1 & 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARNPL-99-0569, Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with ML20212D5961999-09-15015 September 1999 Safety Evaluation Supporting Licensee IPEEE Process.Plant Has Met Intent of Suppl 4 to GL 88-20 NPL-99-0051, Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with NPL-99-0449, Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with ML20196J4251999-06-30030 June 1999 Safety Evaluation Authorizing Proposed Alternatives Described in Relief Requests VRR-01,ROJ-16,PRR-01 & VRR-02 ML20209D2691999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pbnps,Units 1 & 2 ML20196F3341999-06-22022 June 1999 Safety Evaluation for Implementation of 422V+ Fuel Assemblies at Pbnp Units 1 & 2 ML20195F9781999-06-10010 June 1999 Unit 2 Refueling 23 Inservice Insp Summary Rept for Form NIS-1 ML20209D2751999-05-31031 May 1999 Revised MORs for May 1999 for Pbnps,Units 1 & 2 NPL-99-0328, Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with NPL-99-0273, Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With ML20196F3521999-04-30030 April 1999 Non-proprietary WCAP-14788, W Revised Thermal Design Procedure Instrument Uncertainty Methodology for Wepc Point Beach Units 1 & 2 (Fuel Upgrade & Uprate to 1656 Mwt - NSSS Power) NPL-99-0193, Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with NPL-99-0134, Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with ML20207D6751999-02-22022 February 1999 Assessment of Design Info on Piping Restraints for Point Beach Nuclear Plant,Units 1 & 2.Staff Concludes That Licensee Unable to Retrieve Original Analyses That May Have Been Performed to Justify Removal of Shim Collars ML20206R9001999-01-13013 January 1999 SER Accepting Nuclear Quality Assurance Program Changes for Point Beach Nuclear Plant,Units 1 & 2 NPL-99-0008, Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with NPL-99-0091, 1998 Annual Results & Data Rept for Pbnps,Units 1 & 2. with1998-12-31031 December 1998 1998 Annual Results & Data Rept for Pbnps,Units 1 & 2. with ML20198C7671998-12-10010 December 1998 Safety Evaluation Accepting Licensee Proposed Alternative to ASME BPV Code,1986 Edition,Section XI Requirement IWA-2232, to Use Performance Demonstration Initiative Program During RPV Third 10-yr ISI for Plant,Unit 2 NPL-98-1006, Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20195J5101998-11-16016 November 1998 Proposed Revs to Section 1.3 of FSAR for Pbnp QA Program ML20198J5941998-11-0303 November 1998 1998 Graded Exercise,Conducted on 981103 NPL-98-0948, Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0880, Special Rept:On 980913,fire Alarm Control Panels Inoperable for More That Fourteen Days.Troubleshooting of D-401 Panel Following Installation of Replacement Batteries Revealed No Apparent Cause for Spurious Alarms.Panel D-401 Restored1998-10-21021 October 1998 Special Rept:On 980913,fire Alarm Control Panels Inoperable for More That Fourteen Days.Troubleshooting of D-401 Panel Following Installation of Replacement Batteries Revealed No Apparent Cause for Spurious Alarms.Panel D-401 Restored ML20154M9121998-10-14014 October 1998 Unit 1 Refueling 24 Repair/Replacement Summary Rept for Form NIS-2 ML20154L6751998-10-14014 October 1998 Unit 1 Refueling 24 ISI Summary Rept for Form NIS-1 NPL-98-0826, Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20151W3851998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Pbnp Units 1 & 2 NPL-98-0653, Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4471998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 2 ML20151W4541998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 1 ML20236Q3161998-07-10010 July 1998 Safety Evaluation Accepting Licensee Proposed Alternative to ASME Code Requirements PTP-3-01 & PTP-3-02 ML20236L6771998-07-0707 July 1998 Safety Evaluation Approving Wepco Implementation Program to Resolve USI A-46 at Point Beach NPP Units 1 & 2 NPL-98-0558, Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 2 ML20151W4261998-06-30030 June 1998 Corrected Page to MOR for June 1998 for Pbnp Unit 2 ML20151W4221998-05-31031 May 1998 Corrected Page to MOR for May 1998 for Pbnp Unit 2 NPL-98-0481, Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4011998-04-30030 April 1998 Corrected Page to MOR for April 1998 for Pbnp Unit 2 NPL-98-0356, Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20217F3131998-04-17017 April 1998 Safety Evaluation Accepting Proposed Alternative to ASME Code for Surface Exam of Nonstructural Seal Welds,For Plant, Unit 1 ML20216D7071998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3981998-03-31031 March 1998 Corrected Page to MOR for March for Pbnp Unit 2 NPL-98-0209, Special Rept Re Fire Barrier Inoperable for Greater than Seven Days.Compensatory Measures Implemented in Accordance W/Fire Protection Program Requirements During Time That Barriers Were Inoperable1998-03-30030 March 1998 Special Rept Re Fire Barrier Inoperable for Greater than Seven Days.Compensatory Measures Implemented in Accordance W/Fire Protection Program Requirements During Time That Barriers Were Inoperable ML20217A8501998-03-19019 March 1998 SER Accepting Proposed Changes Submitted on 980226 by Wiep to Pbnp Final SAR Section 1.8 Which Will Impact Commitments Made in Pbnp QA Program Description.Changes Concern Approval Authority for Procedures & Interviewing Authority ML20216J0101998-03-17017 March 1998 Safety Evaluation Accepting Third 10-yr Inservice Insp Interval Relief Request RR-1-18 for Plant NPL-98-0159, Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3891998-02-28028 February 1998 Corrected Page to MOR for Feb 1998 for Pbnp Unit 2 ML20216D7121998-02-28028 February 1998 Revised Corrected MOR for Feb 1998 for Point Beach Nuclear Plant,Unit 2 NPL-98-0084, Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20198L1151998-01-0808 January 1998 SER Accepting Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Point Beach Nuclear Plant,Units 1 & 2 1999-09-30
[Table view] |
Text
- - _ .
8911170040 891108'~ ~-2 PDR ADOCK 05000266 -- 3-R pgn
.- +.
].
OPERATING DATA REPORT DOCKET NO. 50-266 ,.
DATE November 6, 1989 4
COMPLETED BY C. W. KRAUSE TELEPHONE 414 221 2001 OPERATING STATUS
- 1. UNIT NAME: POINT BEACH NUCLEAR PLANT UNIT 1 . NOTES .
- 2. REPORTING PERIOD: OCTOBER 1989 . .
- 3. LICENSED THERMAL POWER (MWT): 1518 . .
- 4. NAMEPLATE RATING (GROSS MWE): 523.8 . .
- 5. DESIGN ELECTRICAL RATING (NET MWE): 497. . .
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509. . .
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485. . . . . . . . .. . . . . . . . . . . . . . . .
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
4 NOT APPLICABLE
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NOT APPLICABLE
- 10. REASONS FOR RESTRICTIONS, (IF ANY): NOT APPLICABLE THIS MONTH YR 'IO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 745 7,296 166,440
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 745.0 6,264.3 136,879.8
- 13. REACTOR RESERV'. SHUTDOWN HOURS 0.0 0.0 652.7
- 14. HOURS GENERATOR ON LINE 745.0 6,242.8 134,075.3
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 837.9
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,092,473 8,919,601 186,262,425
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 378,030 3,025,730 62,854,780
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 361,125 2,887,987 59,872,455
- 19. UNIT SERVICE FACTOR 100.0 85.6 80.6 j 20. UNIT AVAILABILITY FACTOR 100.0 85.6 81.1
- 21. UNIT CAPACITY FACTOR (USING MDC NET). 99.9 81.6 73.7
, 22. UNIT CAPACITY FACIVR (USING DER NET) 97.5 79.6 72.4
- 23. UNIT FORCED OUTAGE RATE O.0 0.0 1.9
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
! FORTY-TWO DAY REFUELING AND MAINTENANCE OUTAGE SCHEDULE TO CO!91ENCE MARCH 30, 1990 4 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: NOT SHUTDOWN DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC. LETTER DATED SEPTEMBER 22, 1977
-f
-. . . - . . - .. .- . .- . _ .- _.~. _ . .
-9 u; .
DOCKET NO.52-266 UNIT NAME Point Beach, Unit-1
.DATE November 6, 1989 COMPLETED BY C. W. Krause ,
TELEPHONE 414/221-2001 AVERAGE DAILY UNIT POWER LEVEL MONTH OCTOBER 1989 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL ?OWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1 284 11 495 21 495 2 425 12 496 22 496 3 493 13 495 23 494- __
4 494 14 498 24 495 5 494 15 473 25 496
6 493 16 494 26- 494 7 492 17 495 27 495 8 493 18 496 28 495 9 492 19 494 29 495 10 493 20 495 30 495 31 494 i -
1 EQR-28a (04-86)
... .- -. . __- a
- +.
., 4
/g#
UNIT SHUTDOWNS AND POWER REDUCTIONS ~ DOCKET NO. 50-266 UNIT NAME Point Beach Unit 1 DATE- November-6,-1989' REPORT MONTH OCTOBER 1989 COMPLETED BY C. W. Krause TELEPHONE 414/221-2001 a
b v C^ ee t+4 Q es C -
oW C o La e
.* vi 4 o Ot o Ev C an o oc m SCO ce os No. Date $ 8$ $ MO Licensee Event $3 @'s Cause & Corrective Action Ei y- 84 yyy
- E; .C Report No. gu go To Prevent Recurrence un 9 890930 S O F 5 Not applicable ZZ ZZZZZZ Load reduced to low electrical demand and to aid nuclear fuel conservation. -
1 F: Forced 2 Reason: 3 Method: 4 Exhibit F-Instructions S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Test 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-0161)
D - Regulatory Restriction 4 - Continuation of E - Operator' Training & Previous Shutdown Licensing Exam 5 - Reduced Load sExhibit H-Same Source-F - Administrative 6 - Other (explain)
G - Operational Error (explain)
H - Other (explain)
EQR-28B (04-87)
- - . . . . - . . . - - .- . . . ... ..J
I l i
. NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE
, Docket No. 50-266 I
Unit Name Point Beach Unit 1 Date November 6, 1989 Completed By C. W. Krause Telephone 414/221-2001 l Unit 1 began the report period at 284 MWe. net (57%) due to low electrical system demand and an effort to conserve nuclear fuel.
The unit power generation was escalated to.494 MWe net (full power) on October 2, 1989, and was maintained at that power level for the remainder of the report period.
It was determined that the ATWS mitigating actuation circuitry (AMSAC) had an improper enabling / disabling setpoint. By design, the P-20 bistable was set at 40% turbine power based on first stage pressure. The Technical Specification change (15.3.5-3 Item 3.b) which added the channel, incorrectly based the setpoint on reactor power. The non-conservative setpoint was reset to 30%
turbine power to ensure the operation of the instrument channel at less than 40% reactor power. Licensee Event Report 89-008 was '
sent to the NRC to describe the circumstances of this event. A revision to the Technical Specifications will be submitted to the NRC to clarify the fact that turbine power greater than 40% is the power level at which AMSAC is required.
i-L
'.1 l
--m--~- -< ., _ - - _ - ~ , - - . , .-m-__.,-_.- - ~ .
_m -- , , - - ,
-a, <
.o ..
OPERATING DATA REPORT
! DOCKET No. 50-301 -
DATE November 6, 1989 COMPLETED BY C. W. KRAUSE TELEPHONE 414 221 2001 OPERATING STATUS
- 1. UNIT NAME: POINT BEACH NUCLEAR PLANT UNIT 2 . NOTES .-
- 2. REPORTING PERIOD: OCTOBER 1989 . .
- 3. LICENSED THERMAL POWER (MWT): 1518 . .
- 4. NAMEPLATE RATING (GROSS MWE): 523.8 . .
- 5. DESIGN ELECTRICAL RATING (NET MWE): 497. . .
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509. . .
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485. . . . . . . . . . . . . . . . . . . . . . . . .
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NOT APPLICABLE
( 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NOT APPLICABLE I 10. REASONS FOR RESTRICTIONS, (IF ANY): NOT APPLICABLE i
! THIS MONTH YR TO DATE CUMUIATIVE
- 11. HOURS IN PEPORTIUG PERIOD 745 7,296 151,225
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL O.0 6,331.6 132,433.8
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.6 216.7
- 14. HOURS GENERATOR ON LINE O.0 6,232.7 130,329.3
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 4.8 302.2
- 16. GROSS THERMAL ENERGY GENERATED (MWH) O 9,372,690 185,318,524 l 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) O 3,216,010 62,889,710
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) O 3,069,901 59,924,323
! 19. UNIT SERVICE FACTOR 0.0 85.4 86.2
( 20. UNIT AVAILABILITY FACTOR O.O 85.5- 86.4
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 0.0 86.8 81.0 .
- 22. UNIT CAPACITY FACTOR (USING DER NET) 0.0 84.7 79.7
- 23. UNIT FORCED OUTAGE RATE O.0 2.0 1.2
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
NONE
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DA*"E OF STARTUP: November 21, 1989 DATR REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977
c DOCKET NO. 50 -- . . ,
UNIT NAME Point Beach, Utut 2 DATE November 6, 1989 COMPLETED BY 'C. W. Kranse TELEPHONE 414/221-2001 AVERAGE DAILY UNIT POWER LEVEL MONTH OCTOBER 1989 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1 -2 11 0 21 -2 2 -1 12 -1 22 -2 3 _
0 13 -2 23 -2 4 0 14 -2 24 -2 5 0 15 -2 25 -2 6 0 16 -2 26 -2 7 0 17 -2 27 -2 8 _
0 18 -2 28 -1 9 0 19 -2 29 -2 10 0 20 -2 30 -1 31 -2 EQR-28a (04-86)
UNIT SHUTDOWNS ANT e M REDUCTIONS DOCKET NOo 50-301 UNIT NAME Point Beach Unit _2 DATE November 6, 1989 REPORT MONTH OCTOBER 1989 COMPLETED BY C. W. Krause-TELEPHONE 414/221-2001 c
3 o 4 c^ ce 44 Q es c om c o u e
- -4 4 o mo Et , c es
,e v :s m ocu ce oe No. Date $ S@
u: , ,0j$ Licensee Event $3 $*3 Cause & Corrective Action E4 gw (E y Report No. go gu To Prevent Recurrence E: .c vs 4 890923 S 745 C 1 Not Applicabl. ZZ ZZZZZZ Continue the annual refueling and maintenance outage, unit startup scheduled for November 21, 1989
{
1 F: Forced 2 Reason: 3 Method:
- Exhibit F-Instructions S: Scheduled A - Equips.ent Failure (explain) 1 - Manual for preparation of B - Maintenance or Test 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-Ol61)
D - Regulatory Restriction 4 - Continuation of E - Operator Training & Previous Shutdown Licensing Exam 5 - Reduced Load 5 Exhibit H-Same Source F - Administrative 6 - Other (explain)
G - Operational Error (explain)
H - Other (explain)
EQR-28B (04-87)
^
s
'd '
y ..
t NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE i
< Docket No. 50-301 l Unit Name Point Beach Unit 2 Date November 6, 1989 ;
completed By C. W. Krause !
Telephone 414/221-2001 !
?
l i
Unit 2 commenced the fifth week of its 15th refueling and 1 maintenance outage. The startup of the unit is projected to be !
November 21, 1989. !
- On October 6, 1989, during the performance of nuclear power ,
intermediate range instrument calibrations, an inadvertent !
reactor trip signal was generated. Subsequent investigation !
indicated a loose cable on an instrument power supply connection !
initiated the trip signal. Licensee Event Report 89-005 was i drkfted to describe the details of the event, j On October 13, 1989, while preparing to conduct reactor vessel inservice examinations, the reactor vessel lower internals '
engaged the internals support stand irregularly. Late the next day, Maintenance personnel freed the internals from the stano, ,
The internals were inspected and sustained no damage. l Inspections of the steam generators discovered 27 pluggable )
indications in the A generator and 6 pluggable indications in the i B generator. Two hundred ninety-eight (298) tubes were sleeved in ,
the B 9enerator as a conservative measure. In addition, 190 mechanical tube plugs in both steam generators were repaired with j the " plug in plug" method. Licensee Event Report 89-006 will be '
drafted to describe the details of the steam generater work. l
On October 27, 1989, while testing circuitry for a modification !
which would interrupt feed flow from the condensate and heater :
drain pumps during a steam line break accident, an inadvertant ;
safety injection signal was generated. Licensee Event Report -
89-007 will be drafted to describe the details of the event. i Outage maintenance activities include the replacement of D06 station battery; modifications to pressurizer valve operators PORV 2-430 and 2-431C nitrogen backup supplies; modifications to ,
the accumulator level transmitters; replacement of the feedwater i flow transmitters; replacement of main feed pump P-28B; the installation of a new containment penetration; Foxboro controller module refurbishment; replacement of the residual heat removal relief valve flange; replacement of six low pressure turbine blades; the installation of anticipated transient without scram (ATWS) mitigation instrument channel; the replacement of connectors for the rod position indication detectors; the reactor I
vessel ten year examination. ,
--