ML19341D447

From kanterella
Revision as of 08:10, 31 January 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LER 81-009/03L-0
ML19341D447
Person / Time
Site: Millstone Dominion icon.png
Issue date: 02/27/1981
From: Mroczka E
NORTHEAST NUCLEAR ENERGY CO.
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19341D448 List:
References
MP-2-4607, NUDOCS 8103050608
Download: ML19341D447 (1)


Text

_ , _. ,

, e -

d iY C CEE.CEIE!!I R O E T E :3?* .

h=hk5hk!$,Eb, f c i " *""

l_.i = =;==

/(

Mr. Boyce H. Grier Director, Region I i t@ f'MGkQ

'gf Q-g\ # i --

[~-;

Office of Inspection and Enforcement Q/

U. S. fluclear Regulatory Commission - G, Og3 i '!

631 Park Avenue # '

?/

King Of Prussia, Pennsylvania 19406 ro [6,'

e [ t .-3

Reference:

Facility Operating License No. OPR-65 Docket No. 50-336 Reportable Occurrence R0-50-336/81-9/3L-0

Dear Mr. Grier:

This letter forwards Licensee Event Report 81-9/3L-0 required to be submitted within thirty days pursuant to Millstone Unit 2 Appendix A Technical Specifications, Section 6.9.1.9.b, conditions leading to operation in a degraded mode permitted by a limiting condition for operation. An additional three copies of the report are enclosed.

Yours t'ruly, NORTHEAST fiUCLEAR ENERGY COMPANY

' , ign .,e/

. . Mroczka Stati n Superintendent Millstone Nuclear Power Station EJM/RTB:ss

Attachment:

LER 81-9/3L-0 cc: Director, Office of Inspection and Enforcement, Washington, D.C. (30)

Director, Office of Management Information and Program Control, Washington, D.C. (3)

U. S. Nuclear Regulatory Commission, c/o Document Management Branch, Washington, D.C. 20555 g S

8103050408 -

//

T