MONTHYEARB17894, Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 2.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 2.With B17896, Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 1.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 1.With B17898, Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 3.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 3.With B17879, Monthly Operating Rept for Aug 1999 for Millstone Nuclear Power Station,Unit 2.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Millstone Nuclear Power Station,Unit 2.With B17874, Monthly Operating Rept for Aug 1999 for Millstone Nuclear Power Station,Unit 3.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Millstone Nuclear Power Station,Unit 3.With B17878, Monthly Operating Rept for Aug 1999 for Mnps,Unit 1.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Mnps,Unit 1.With B17858, Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 3.With1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 3.With B17856, Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 1.With1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 1.With ML20211A6561999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 2 ML20209J0541999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Millstone Unit 2 B17833, Monthly Operating Rept for June 1999 for Millstone Power Station,Unit 1.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Millstone Power Station,Unit 1.With B17830, Monthly Operating Rept for June 1999 for Millstone Nuclear Power Station,Unit 3.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Millstone Nuclear Power Station,Unit 3.With ML20211A6751999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Millstone Nuclear Power Station,Unit 2,providing Revised Average Daily Unit Power Level & Operating Data Rept ML20209J0661999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Millstone Unit 2 ML20211A6631999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Millstone Nuclear Power Station,Unit 2,providing Revised Average Daily Unit Power Level,Operating Data Rept & Unit Shutdowns & Power Reductions B17808, Monthly Operating Rept for May 1999 for Millstone Nuclear Power Station,Unit 3.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Millstone Nuclear Power Station,Unit 3.With B17807, Monthly Operating Rept for May 1999 for Mnps,Unit 1.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Mnps,Unit 1.With B17804, Monthly Operating Rept for May 1999 for Mnps,Unit 2.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Mnps,Unit 2.With B17777, Monthly Operating Rept for Apr 1999 for Millstone Unit 2. with1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Millstone Unit 2. with B17782, Monthly Operating Rept for Apr 1999 for Millstone Nuclear Power Station,Unit 1.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Millstone Nuclear Power Station,Unit 1.With B17775, Monthly Operating Rept for Apr 1999 for Millstone Nuclear Power Station Unit 3.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Millstone Nuclear Power Station Unit 3.With B17748, Monthly Operating Rept for Mar 1999 for Millstone Nuclear Power Station Unit 3.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Millstone Nuclear Power Station Unit 3.With B17735, Monthly Operating Rept for Mar 1999 for Millstone Nuclear Power Station,Unit 2.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Millstone Nuclear Power Station,Unit 2.With B17747, Monthly Operating Rept for Mar 1999 for Millstone Nuclear Power Station,Unit 1.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Millstone Nuclear Power Station,Unit 1.With B17693, Monthly Operating Rept for Feb 1999 for Mnps,Unit 2.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Mnps,Unit 2.With B17694, Monthly Operating Rept for Feb 1999 for Millstone Nuclear Power Station,Unit 1.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Millstone Nuclear Power Station,Unit 1.With B17701, Monthly Operating Rept for Feb 1999 for Millstone Nuclear Power Station,Unit 3.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Millstone Nuclear Power Station,Unit 3.With B17627, Monthly Operating Rept for Dec 1998 for Millstone Nuclear Power Station,Unit 1.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Millstone Nuclear Power Station,Unit 1.With B17617, Monthly Operating Rept for Dec 1998 for Millstone Unit 2. with1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Millstone Unit 2. with B17461, Monthly Operating Rept for Dec 1998 for Millstone Nuclear Plant,Unit 3.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Millstone Nuclear Plant,Unit 3.With B17460, Monthly Operating Rept for Nov 1998 for Millstone Nuclear Power Station,Unit 3.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Millstone Nuclear Power Station,Unit 3.With B17576, Monthly Operating Rept for Nov 1998 for Millstone Nuclear Power Station,Unit 2.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Millstone Nuclear Power Station,Unit 2.With B17579, Monthly Operating Rept for Nov 1998 for Millstone Nuclear Power Station,Unit 1.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Millstone Nuclear Power Station,Unit 1.With ML20195E1871998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Mnps,Unit 2 B17545, Monthly Operating Rept for Oct 1998 for Mnps,Unit 1.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Mnps,Unit 1.With ML20195F9821998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Millstone,Unit 3 B17497, Monthly Operating Rept for Sept 1998 for Millstone Nuclear Power Station,Unit 2.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Millstone Nuclear Power Station,Unit 2.With ML20195F9871998-09-30030 September 1998 Corrected Page to MOR for Sept 1998 for Millstone,Unit 3 B17493, Monthly Operating Rept for Sept 1998 for Mnps,Unit 1.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Mnps,Unit 1.With B17458, Monthly Operating Rept for Sept 1998 for Mnps,Unit 3.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Mnps,Unit 3.With B17437, Monthly Operating Rept for Aug 1998 for Millstone Nuclear Power Station,Unit 21998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Millstone Nuclear Power Station,Unit 2 ML20195E2061998-08-31031 August 1998 Revised Monthly Operating Rept for Aug 1998 for Mnps,Unit 2 B17441, Monthly Operating Rept for Aug 1998 for Millstone Nuclear Power Station,Unit 1.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Millstone Nuclear Power Station,Unit 1.With B17450, Monthly Operating Rept for Aug 1998 for Millstone Nuclear Power Station,Unit 3.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Millstone Nuclear Power Station,Unit 3.With B17410, Monthly Operating Rept for July 1998 for Millstone Nuclear Power Station,Unit 31998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Millstone Nuclear Power Station,Unit 3 B17406, Monthly Operating Rept for July 1998 for Millstone Nuclear Power Station,Unit 11998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Millstone Nuclear Power Station,Unit 1 B17404, Monthly Operating Rept for July 1998 for Millstone Nuclear Power Station,Unit 21998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Millstone Nuclear Power Station,Unit 2 B17365, Monthly Operating Rept for June 1998 for Millstone Nuclear Power Station,Unit 21998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Millstone Nuclear Power Station,Unit 2 B17366, Monthly Operating Rept for June 1998 for Millstone Nuclear Power Station,Unit 31998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Millstone Nuclear Power Station,Unit 3 B17369, Monthly Operating Rept for June 1998 for Mnps,Unit 11998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Mnps,Unit 1 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217P5391999-10-25025 October 1999 Rev 0,Change 1 to Millstone Unit 1 Northeast Utils QA Program ML20217C8721999-10-0606 October 1999 Rev 21,change 3 to MP-02-OST-BAP01, Nuqap Topical Rept, App F & G Only B17896, Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 1.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 1.With B17894, Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 2.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 2.With B17898, Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 3.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 3.With ML20216J4341999-09-24024 September 1999 Mnps Unit 3 ISI Summary Rept,Cycle 6 ML20211N8401999-09-0202 September 1999 Rev 21,change 1 to Northeast Utils QA TR, Including Changes Incorporated Into Rev 20,changes 9 & 10 B17878, Monthly Operating Rept for Aug 1999 for Mnps,Unit 1.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Mnps,Unit 1.With B17874, Monthly Operating Rept for Aug 1999 for Millstone Nuclear Power Station,Unit 3.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Millstone Nuclear Power Station,Unit 3.With ML20216F5141999-08-31031 August 1999 Rept on Status of Public Petitions Under 10CFR2.206 B17879, Monthly Operating Rept for Aug 1999 for Millstone Nuclear Power Station,Unit 2.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Millstone Nuclear Power Station,Unit 2.With ML20211G9631999-08-30030 August 1999 SER Accepting Licensee Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves ML20211A6561999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 2 B17858, Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 3.With1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 3.With B17856, Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 1.With1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 1.With ML20210J0311999-07-21021 July 1999 Rev 20,Change 10 to QAP 1.0, Organization ML20210E5931999-07-19019 July 1999 Revised Page 16 of 21,to App F of Northeast Util QA Program Plan ML20210C5911999-07-15015 July 1999 Revised Rev 20,change 10 to Northeast Util QA Program TR, Replacing Summary of Changes ML20210A0411999-07-15015 July 1999 Rev 20,change 10 to Northeast Util QA Program Tr B17814, Special Rept:On 990612 B Train EDG Failed to Restart within 5 Minutes Following Completion of 18 Month 24 H Endurance Run Required by TS 4.8.1.1.2.g.7.Caused by Procedural inadequacy.Re-performed Hot Restart Via Manual Start1999-07-12012 July 1999 Special Rept:On 990612 B Train EDG Failed to Restart within 5 Minutes Following Completion of 18 Month 24 H Endurance Run Required by TS 4.8.1.1.2.g.7.Caused by Procedural inadequacy.Re-performed Hot Restart Via Manual Start ML20209D1881999-07-0101 July 1999 Rev 20,change 9 to Northeast Util QA Program Tr ML20196J2191999-06-30030 June 1999 SER Concluding That Licensee USI A-46 Implementation Program,In General,Met Purpose & Intent of Criteria in GIP-2 & Staff Sser 2 for Resolution of USI A-46 ML20211A6751999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Millstone Nuclear Power Station,Unit 2,providing Revised Average Daily Unit Power Level & Operating Data Rept ML20196A8451999-06-30030 June 1999 Post Shutdown Decommissioning Activities Rept ML20209J0541999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Millstone Unit 2 B17830, Monthly Operating Rept for June 1999 for Millstone Nuclear Power Station,Unit 3.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Millstone Nuclear Power Station,Unit 3.With ML20196K1791999-06-30030 June 1999 Addendum 6 to Millstone Unit 2 Annual Rept, ML20196J1821999-06-30030 June 1999 Rev 21,Change 0 to Northeast Utilities QAP (Nuqap) Tr B17833, Monthly Operating Rept for June 1999 for Millstone Power Station,Unit 1.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Millstone Power Station,Unit 1.With ML20195H1011999-06-11011 June 1999 Rev 20,change 8 to Northeast Utilities QAP (Nuqap) TR ML20207G6411999-06-0303 June 1999 Safety Evaluation Supporting Amends 105,235 & 171 to Licenses DPR-21,DPR-65 & NPF-49,respectively ML20211A6631999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Millstone Nuclear Power Station,Unit 2,providing Revised Average Daily Unit Power Level,Operating Data Rept & Unit Shutdowns & Power Reductions B17808, Monthly Operating Rept for May 1999 for Millstone Nuclear Power Station,Unit 3.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Millstone Nuclear Power Station,Unit 3.With ML20211B7351999-05-31031 May 1999 Cycle 7 Colr B17804, Monthly Operating Rept for May 1999 for Mnps,Unit 2.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Mnps,Unit 2.With B17807, Monthly Operating Rept for May 1999 for Mnps,Unit 1.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Mnps,Unit 1.With ML20209J0661999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Millstone Unit 2 ML20206M4631999-05-11011 May 1999 Safety Evaluation Supporting Alternative Proposed by Licensee to Perform Ultrasonic Exam on Inner Surface of Nozzle to safe-end Weld ML20206J8351999-05-0707 May 1999 Rev 20,Change 7 to QAP-1.0, Northeast Utls QA Program (Nuqap) Tr ML20206G6221999-05-0404 May 1999 SER Accepting Util Request to Apply leak-before-break Status to Pressurizer Surge Line Piping for Millstone Nuclear Power Station,Unit 2 B17782, Monthly Operating Rept for Apr 1999 for Millstone Nuclear Power Station,Unit 1.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Millstone Nuclear Power Station,Unit 1.With ML20205R3531999-04-30030 April 1999 Addendum 4 to Annual Rept, B17775, Monthly Operating Rept for Apr 1999 for Millstone Nuclear Power Station Unit 3.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Millstone Nuclear Power Station Unit 3.With ML20205K6141999-04-30030 April 1999 Non-proprietary Version of Rev 2 to Holtec Rept HI-971843, Licensing Rept for Reclassification of Discharge in Millstone Unit 3 Spent Fuel Pool ML20206E2971999-04-30030 April 1999 Rev 1 to Millstone Nuclear Power Station,Unit 2 COLR - Cycle 13 B17777, Monthly Operating Rept for Apr 1999 for Millstone Unit 2. with1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Millstone Unit 2. with ML20205Q5891999-04-0909 April 1999 Rev 20,change 6 to QAP-1.0,Northeast Utils QA Program TR ML20205R8751999-04-0909 April 1999 Provides Commission with Staff Assessment of Issues Related to Restart of Millstone Unit 2 & Staff Recommendations Re Restart Authorization for Millstone Unit 2 ML20206T3991999-03-31031 March 1999 First Quarter 1999 Performance Rept, Dtd May 1999 B17747, Monthly Operating Rept for Mar 1999 for Millstone Nuclear Power Station,Unit 1.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Millstone Nuclear Power Station,Unit 1.With 1999-09-30
[Table view] |
Text
(~\ .
i -
"* P ' .
l l
OPERATING DATA REPORT DOCKETNO. 50-336 DATE November T), 1980.
CO.\lPLETED BY - G.H. Howj,ett 1ELEPHONE (203)447-_1791X364 .
OPERATING STA TUS
- 1. Unit Name: Millstone 2
- 2. Reporting Period: _0ctober 1980 ~
Notes
- Items 21 & 22 cumulative are computed
- 3. Licensed Thermal Power (>!Wil: _2700 using a weighted average.
- 4. Nameplate Rating (Gross SIWel: 909
- 5. Design Electrical Rating (Net afwe): 870
- 6. Staximum Dependable Capacity (Gross 31We): 895
- 7. Staximum Dependable Capacity (Net StWe): R64
- 8. If Changes None Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report
- 9. Power Lese! To Which Restricted. If Any (Net 31We): None
- 10. Reasons For Restrictions. If Any: --done This .\lonth Yr.-to.Date Cumulative
- 11. Hours In Reporting Period 745 7.320 _ 42,528
- 12. Number Of Hours Reactor Was Critical 429.5 _ 4,706.2 42,/db.3
- 13. Reactor Reserve Shutdown Hours 4.5 4.5
- 14. Ilours Generator On.Line 2,076.9 301.2 4,404 M 28,305
- 15. Unit Reserve Shutdown Hours 132.8
- 16. Gross Thermal Energy Generated O!WH) 132.8 460.2 659.001
- 17. Gross Electrical Energy Cenerated OtWH) 215.600,_ ,, - 11,679,277 3,829,672 __ __69,377,905
- 18. Net Electrical Energy Generated OlhH) 200.139 22,414,317 ]
3,668.534 21.448,792
- 19. Unit Senice Factor 40.4
- 20. Unit Availability Factor 61.3_ 66.6 58.3 63.I
- 21. Unit Capacity Factor (Using if f>C Net t 67.7 31.1 56.0
- 22. Unit Capacity Factor (Using DER Net) 30_9 _
- 23. Unit Forced Outage Rare '
57.6
- 24. Shutdowns None Scheduled Over Next 6.\lonths IType. Date,and Duration of Each1:
- 25. If Shut Down At End Of Report Period. Estimated Date of N/AStartup:
- 26. Units in Test Status (Prior to Commercial Operationi: _
Forecast .chies ed INITIA L CRITICA LITY N/A N/A INITIA L ELECTRICITY __N/A N/A COSI\lERCI A L OPERA TION
_N/A N/A (9/ m 8011210 'f C C .
, , .l
' AVER ACE DAILY UNIT POWER LEVEL -
b DOCKET NO. __50-335
. UNIT Millstone 2 DATE November 6, 1980
.B1PLETED BY G.H. Howlett TELEPHONE (203)447-1791X364 SiONE October 1980 DAY AVERAGE DAILY POWER LEVEL DAY- AVERAGE DAILY POWER LEVEL
~ _- (NtWe-Net) - (5fWe-Net) 3 O (-4) ,7 'O (-27) 2 0 (-4) is 0 (-27) 3 0 (-4) 39 58 4 0- (-4) ,o 289 5 0 '(-4) ,3 404 6 0 (-5) ,, 428
- 7. 0 (-4) ,
~3 735 8
0 (-5) 826 24 9 -0 (-4) ,5 826 to 0 (-5) -791
- 0 (-14) 27 827
- 12 0 (-26) 840
's 13 0 (-27) 29 853 14 0 (-27) 3a 852 15 0 (-28) 3, 852
. 16 0 (-28)
INSTRUCTIONS On :hn format.!!st' the nerage da0y unit power leselin S!We Net for each day in the repuriin; month Compuie to the f.earcil whole megaw.*t. -
(9/77)
BN' r -ra i % +wy- 3 -
l e .
50-336 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKETNO.
UNIT NAME Millstone 2 DATE November 12. 1980 REPORTMONTH 0ctober 1980 COMPLETED BY G - 11 linwlett TELEPHONE (?n'tidd7 1741 Y'464 "i -
e c. .2 e*
! 3 =g
~
Licensee 5% g. Cause & Correceive No
- Date E. S5 -5 j x Event Action to 4 yj g Report
- f,3 nU gU3 C- 2 i Di y g p,cvent Recurrence d
13 800816 S 442.5 C 1 Cycle 4 Refuel Outage 14 8010 S 1.3 B 4 Power was manually reduced to approx-imately 8% at which time a Turbine-overspeed trip test was conducted with the reactor remaining at power, Summary: Cycle 4 refuel outage concluded with the reactor being brought critical on the 13th. Low Power Physics te:ng was conducted through the 18th with the unit being brought on line on the 19th.
, 100% power operations was achieved on the 29th. Power Ascension testing is still ongoing at the end,0f this reporting period.
k i
Dockit No. 50-336 Dato novemoer it, 1960 Page 1 of 3 Unit Name Mi11stnnn ? -
Completed By n n_ innw19et .-
Telephone (203)447-1791X364 CORRECTIVE MAINTENANCE
SUMMARY
FOR SAFETY RELATED EQUIPMENT Report Month September 1980 DATE SYSTEM COMPONENT MAINTENANCE ACTION 9/2/80 . Main Steam Main Steam Safety Valves Removed off site for overhaul setup and testing.
9/3/80 Main Steam Steam Driven Aux, feed Pump H-21, Overhauled valve.
Trip Valve 9/3/00 Diesel Generator 130, Emergency Diesel Generator Annual overhaul 9/4/80 Main Steam Main Steam Isolation Valve Changed out air operated valve actuators.
2-MS-64A 9/5/80 High Pressure Safety HPSI Pump P-41C Realigned pump to notor per vendor recommendations.
Injection 9/6/80 Safety Injection Loop 1A.S.I. Header Check valve Rebuilt valve.
leak drain, 2-SI-618 9/11/80 Ma i'i Steam #1 Steam Generator Surface Blow Rebuilt valve Stop Valve 2-MS-llA 9/11/80 Main Steam #1 Steam Generator Bottom Blow Rebuilt valve Stop Valve 2-MS-12A 9/12/80 Reactor Coolant R.C.S. Flow transmitter PDT-lllB Replaced and calibrated transmitter 9/13/80 Main Steam #2 Steam Generator Surface Blow Rebuilt valve.
Stop Valve 2-MS-118 9/13/80 Main Steam #2 Steam Generator Bottom Blow Rebuilt valve.
Stop Valve 2-MS-128 O
Docket Ns. 50-336 Date- november 12, 1960 Page 2 of. 3 Unit Name Millstone 2- -
Completed By G.H. Howlett Telephone (703)447-1791X364' CORRECTIVE MAINTENANCE
SUMMARY
FOR SAFETY RELATED EQUIPMENT Report Month September 1980 DATE SYSTEM COMTONENT MAINTENANCE ACTION 9/15/80 Reactor' Coolant RCS flow transmitter PDT-lllA ' Replaced and calibrated transmitter.
9/16/80 Diesel Generator' 120, Emergency Diesel Generator Replaced thrust bearing and re-coated heat exchanger heads.
9/17/80 Reactor Protection Trip circuit breakers 1-10 Rebuilt breakers.
9/17/80 Reactor Protection R.P.S. Ch. "A" Scaling Amplifier Replaced scaling amplifier.
CPC-2-F4.5 Module 9/20/60 Reactor Protection R.P.S. Ch. "A" Comparator Replaced comparator CPC-1-G4.5 Module 9/22/80 Reactor Building CAR Cooler ' A' RBCCW Normal outlet Rebuilt valve operator.
Cooling Water valve 2-RB-28.2 A 9/24/80 Main Steam S/G #1 Blowdown Stop Valve Rebuilt valve.
2-MS-220A i
9/24/80 Main Steam S/G #2 Blowdown Stop Valve Rebuilt valve.
2-MS-2208 9/24/80 Incore Nuclear Incore Instruments (12 total) Replaced failed detectors.
Monitoring Locations; Nil, Ll6, L6, R6, T9, V15, T16, CIS, B15, L4, W6 & X7.
9/26/80 Reactor Coolant Pressurizer Relief valves. Removed, overhauled, set-up and tested installed valves.
DockGt No. 50-336 '
Date November 12, 1980 Pag 2 3 of 3 Unit Nane Millstono ? -
Completed By G.H. Howlett Telephone (203)447-1791X364 CCRRECTIVE MAINTENANCE
SUMMARY
FOR SAFETY RELATED EQUIPMENT Report Month September 1980 DATE SYSTEM COMPONENT MAINTENANCE ACTION 9/27/80 Reactor Coolant Low temperature, overpressure Repaired bistable.
relief control bistable PC-103-1 9/29/80 Reactor Coolant Reactor Coolant Pump P-40C Repaired pump vapor seal.
Auxi.!ary Feed Replaced bearings.
9/30/80 Aux. Feed Pump P-9A
Dockst N3.. 50-336 Date: November 12, 1980 Completed By: G.H. Howlett III Telephone: 203/447-197) X364 REFUELING INFORMATION REQUEST
- 1. Name of facility: Hillstone 2-
- 2. Scheduled date for next refueling shutdown:
Commenced refuel outage November 28, 1981.
- 3. Schedule date for restart following refueling: January 16, 1982
- 4. Will refueling or- resumption of operation thereafter require a technical specification change or other license amendment?
It is not anticipated that cycle 5 operations will require Technical' Specification changes or other License amendments.
- 5. Scheduled date(s) for submitting licensing action and supporting information:
Licensing documentation will be provided a minimum of 90 days prior to start-up of Cycle 5 or as documented in the R.A. Clark letter to W.G. Counsil, dated 10/6/80, authorizing Cycle 4
. operation.
- 6. Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
N/A
- 7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
(a) In Core: 217 (b) 21 6
- 8. The present licensed spent fuel pool storage capacity and the size of any
- increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies
66~
- 9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:
1985, Spent Fuel Pool, full core off load capability is reached.
1987, Core Full, Spent Fuel Pool contains 648 bundles.