ML19211A277

From kanterella
Revision as of 01:32, 24 January 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LER 79-110/03L-0
Date released: 08/13/2019 Download: ML19211A277


LER 79-110/03L-0:on 791112,while Testing HPI Pump 1-1 in Mode 5,pump Failed to Start.Caused by Improperly Terminated Lug in Breaker Control Wiring.Lead Properly Terminated & Reinstalled
ML19211A282
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 12/11/1979
From: Naylor R
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19211A282 (2)
Forwards LER 79-110/03L-0
ML19211A276
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 12/11/1979
From: Murray T
TOLEDO EDISON CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19211A276 (1)