The acceptance review is an early stage (see Property:Project stage) when the NRC takes the initial request and states that enough information exists to perform the full review.

List

 Issue dateSiteTitleProject stageProjectEstimated NRC review hours
ML24306A1421 November 2024Point BeachNRR E-mail Capture - Point Beach Nuclear Plant, Units 1 and 2 - Acceptance of License Amendment Request to Adopt Alternative Seismic Method for 50.69 Categorization of SSCsAcceptance ReviewEPID:L-2024-LLA-0140
ML24304B05630 October 2024MonticelloAcceptance of LAR to Revise TS to Adopt TSTF-554, Revise Reactor Coolant Leakage RequirementsAcceptance ReviewEPID:L-2024-LLA-0135
ML24304A89230 October 2024FarleyAcceptance Review - Farley Units 1 and 2 - RG 1.183 Table 3 Footnote 11 Exception UFSAR Change LARAcceptance ReviewEPID:L-2024-LLA-0136
ML24296A06322 October 2024Wolf CreekNRR E-mail Capture - Acceptance Review Wolf Creek License Amendment and Exemption Requests for a risk-informed Resolution to GSI-191Acceptance ReviewEPID:L-2024-LLA-0125
ML24297A60422 October 2024FarleyAcceptance Review - License Amendment Request to Revise TS SR 3.4.14.3 and Correct Admin OversightAcceptance ReviewEPID:L-2024-LLA-0119
ML24292A02818 October 2024Comanche PeakNRR E-mail Capture - Acceptance Review Comanche Peak Adoption of TSTF-51, TSTF-471, and TSTF-571Acceptance ReviewEPID:L-2024-LLA-0123
ML24292A03118 October 202407109341Acceptance Letter for the Review of the Model No. Brr PackageAcceptance ReviewEPID:L-2023-LLA-0090
ML24291A10716 October 2024ColumbiaNRR E-mail Capture - LIC-109 Acceptance Review - Columbia Generating Station - Application to Revise TS to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements - EPID L-2024-LLA-0132Acceptance ReviewEPID:L-2024-LLA-0132
ML24289A14415 October 2024Grand Gulf
River Bend
NRR E-mail Capture - Acceptance Review - Entergy (Grand Gulf Nuclear Station and River Bend Station) - CNRO2024-00017 - Adopt TSTF-592 - CLIIP (L-2024-LLA-0133)Acceptance ReviewEPID:L-2024-LLA-0133
ML24284A19710 October 2024Oyster CreekCover Letter Oyster Creek, License Termination Plan Acceptance ReviewAcceptance Review
ML24282A7048 October 2024Byron
Braidwood
NRR E-mail Capture - Acceptance Reviews of Relief Requests Associated with the Fifth Inservice Inspection Interval at Byron and Braidwood StationsAcceptance Review
ML24274A2377 October 2024Limerick– Supplemental Information Needed for Acceptance of Requested Licensing Action Regarding Primary Containment Leakage Technical SpecificationsAcceptance ReviewEPID:L-2024-LLA-0115
ML24281A1597 October 2024Saint LucieAcceptance Review for FPL LAR - St. Lucie Unit 2 - Fuel Methodology Changes in Support of Transition to 24- Month Fuel CyclesAcceptance ReviewEPID:L-2024-LLA-0124
ML24281A1464 October 2024KemmererKemmerer Unit 1: Acceptance Review of Us Sfr Owner, Llc’S (Uso), Exemption Request Associated with Construction of the Natriumtm Energy IslandAcceptance ReviewEPID:L-2024-LLE-0027
ML24269A2083 October 202407003103Federal Register Notice for Acceptance of Louisiana Energy Services LLC License Amendment Request Raise Enrichment Limit to Less than 10 Weight Percent for Leu+ Production SystemsAcceptance Review
ML24276A1132 October 2024FarleyAcceptance Review - License Amendment Request to Revise TS SR 3.4.14.3 and Correct Administrative OversightAcceptance ReviewEPID:L-2024-LLA-0119
ML24281A0072 October 2024SequoyahNRR E-mail Capture - Acceptance Review Results for the Sequoyah License Amendment Request to Modify the FHA Analysis, Tech Spec TS 3.9.4 and Tech Spec 3.3.6 (L-2024-LLA-0117)Acceptance ReviewEPID:L-2024-LLA-0117
ML24276A14923 September 2024HoltecAcceptance Review of Request for Amendment No. 19 to Certificate of Compliance No. 1014 for the HI-STORM 100 Multipurpose Canister Storage SystemAcceptance ReviewCAC:001028
EPID:L-2023-LLA-0148
ML24263A08319 September 2024Wolf CreekNRR E-mail Capture - Acceptance Review Wolf Creek Revision to Technical Specification to Adopt TSTF-569-A, Revision 2, Revision of Response Time Testing DefinitionsAcceptance ReviewEPID:L-2024-LLA-0109
ML24262A13018 September 2024Comanche PeakNRR E-mail Capture - Acceptance Review Comanche Peak Multiple Relief Requests for Unit 2 Third Inservice Inspection Interval Due to Impracticality (EPID L-2024-LLR-0053 Through -0058)Acceptance ReviewEPID:L-2024-LLR-0053
EPID:L-2024-LLR-0058
ML24248A25916 September 202407007029Acceptance Letter to Defense Threat Reduction Agency for a License Amendment Re Change of Radiation Safety OfficerAcceptance ReviewEPID:L-2024-NFA-0003
ML24254A20810 September 2024Quad CitiesNRR E-mail Capture - Quad Cities, Unit Nos. 1 and 2 - Alternative to RV-08, Rev 1, SRV Testing Interval - Acceptance of Requested Licensing Action Re Relief Request Associated with Safety Relief Valve Testing IntervalAcceptance ReviewEPID:L-2024-LLR-0060
ML24247A1369 September 202407105797Certificate of Compliance No. 5797 Rev. 24 Acceptance LetterAcceptance ReviewEPID:L-2023-LLA-0156
ML24247A0816 September 202407109403Application for the Model No. Volunteer Package - Acceptance LetterAcceptance ReviewEPID:L-2023-NEW-0007
ML24250A0506 September 2024Diablo CanyonNRR E-mail Capture - Acceptance Review Diablo Canyon Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test FrequenciesAcceptance ReviewEPID:L-2024-LLA-0106
ML24250A0256 September 2024Wolf CreekNRR E-mail Capture - Acceptance Review Wolf Creek Revision to Technical Specification 3.2.1, Heat Flux Hot Channel Factor (Fq(Z)) (Fq Methodology)Acceptance ReviewEPID:L-2024-LLA-0105
ML24248A2634 September 2024Palo VerdeAcceptance Review of Palo Verde Nuclear Generating Station, Units 1, 2, and 3, Relief Request (RR) No. 71: Re?Submittal of RR?30Acceptance Review
ML24248A2424 September 2024Saint LucieAcceptance Review for St. Lucie, Unit 2 - Relief Request (RR) 14: Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program IntervalAcceptance ReviewEPID:L-2024-LLR-0052
ML24248A0823 September 2024Turkey PointNRR E-mail Capture - Acceptance Review for Turkey Point Alternative Request VR-02 for Certain Motor-Operated Isolation Valves (L-2024-LLR-0059)Acceptance ReviewEPID:L-2024-LLR-0059
ML24242A2583 September 202407109382Amendment Request for Certificate of Compliance No. 9382 for the Model No. Tn Eagle - Acceptance for ReviewAcceptance ReviewEPID:L-2024-LLA-0028
ML24240A20927 August 2024Hope CreekNRR E-mail Capture - Acceptance Review - Hope Creek - Relief Request VR-04, SSW Rupture Disc ReplacementAcceptance ReviewEPID:L-2024-LLR-0049
ML24220A02122 August 2024University of UtahUniversity of Utah - Supplemental Information Needed for Acceptance of the Application for an Exemption Request Re Requalification and License Activities ExemptionAcceptance ReviewEPID:L-2024-NLE-0003
ML24234A29721 August 2024OconeeAugust 21, 2024 - Oconee Nuclear Station, Units 1, 2, and 3 - Acceptance of Requested Licensing Action License Amendment Request to Revise Technical Specification 3.7.7Acceptance ReviewEPID:L-2024-LLA-0103
ML24221A07520 August 202407007033Acceptance of Global Laser Enrichment, LLC Exemption to Submit the Environmental Report in Advance of the Safety and Safeguards Analysis ReportAcceptance ReviewEPID:L-2024-LLE-0023
ML24233A24720 August 2024DresdenAcceptance of Requested Licensing Action Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of OperationsAcceptance ReviewEPID:L-2024-LLE-0012
ML24232A00516 August 2024VogtleNRR E-mail Capture - Acceptance Review - LAR and Exemption Request to Remove Tier 1 and Tier 2 Requirements for Vogtle 3 and 4Acceptance Review
ML24229A04316 August 2024SalemNRR E-mail Capture - Acceptance Review - Salem 1 and 2 - Exemption from 10 CFR 50.46 and 10 CFR 50 Appendix K to Allow the Use of Optimized ZIRLO Fuel Rod CladdingAcceptance ReviewEPID:L-2024-LLE-0024
ML24229A04216 August 2024SalemNRR E-mail Capture - Acceptance Review - Salem 1 and 2 - Implement Optimized ZIRLO Fuel Rod CladdingAcceptance ReviewEPID:L-2024-LLA-0100
ML24222A40014 August 2024Technical Specifications Task ForceTSTF-602, Revise the Ventilation Filter Testing Program to Permit Alternate Challenge Agents, Acceptance Review LetterAcceptance ReviewEPID:L-2024-PMP-0011
ML24226A68413 August 2024Point BeachNRR E-mail Capture - Point Beach, Units 1 and 2 - Acceptance of License Amendment Request to Adopt TSTF-577Acceptance ReviewEPID:L-2024-LLA-0104
ML24225A0069 August 2024VogtleNRR E-mail Capture - Acceptance Review - Vogtle 3 and 4 - LAR Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves), Action a and SR 3.7.6.6 (L-2024-LLA-0101)Acceptance ReviewEPID:L-2024-LLA-0101
ML24221A0087 August 2024Davis BesseNRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of License Amendment Request to Remove the Table of Contents from the Technical SpecificationsAcceptance ReviewEPID:L-2024-LLA-0093
ML24218A0652 August 2024Arkansas NuclearNRR E-mail Capture - LIC-109 Acceptance Review - Arkansas Nuclear One, Unit 1 - License Amendment Request - Request for Review and Approval Changes to SAR and to a Confirmatory Order - Pzr Htr Emergency Power Supply - EPID L-2024-LLA-0092Acceptance ReviewEPID:L-2024-LLA-0092
ML24212A22330 July 2024FarleyAcceptance Review - License Amendment Request to Adopt TSTF-500, Rev 2 DC Electrical Rewrite (EPID L-2024-LLA-0091) - EmailAcceptance ReviewEPID:L-2024-LLA-0091
ML24207A18225 July 2024Technical Specifications Task ForceTSTF-601, Extend Shield Building Completion Time After Refueling, Acceptance Review LetterAcceptance ReviewEPID:L-2024-PMP-0007
ML24207A08624 July 2024Mcguire
McGuire
Relief Request Acceptance Review Results - McGuire Units 1 and 2 Alternatives Component Cooling Pumps, RHR PumpsAcceptance Review
ML24215A31524 July 2024Watts BarNRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Adopt TSTF-276-A, Revision 2 TS 3.8.1, AC SourcesAcceptance ReviewEPID:L-2024-LLA-0086
ML24205A06223 July 2024Diablo CanyonNRR E-mail Capture - Acceptance Review - Diablo Canyon Request for Approval to Extend the Alternative for Use of Full Structural Weld OverlayAcceptance ReviewEPID:L-2024-LLR-0043
ML24205A21423 July 2024FarleyAcceptance Review - License Amendment Request to Change TS 3.6.5, Containment Air TemperatureAcceptance ReviewEPID:L-2024-LLA-0098
ML24199A21417 July 2024Point BeachNRR E-mail Capture - Point Beach Nuclear Plant, Units 1 and 2 - Acceptance of License Amendment Request to Modify Containment Average Air Temperature RequirementsAcceptance ReviewEPID:L-2024-LLA-0088