|
---|
Category:Drawing
MONTHYEARML20259A2102020-09-14014 September 2020 Updated Final Safety Analysis Report, Chapters 3 Through 5, Figures ML20259A2112020-09-14014 September 2020 Updated Final Safety Analysis Report, Chapter 11, Figures ML20259A2082020-09-14014 September 2020 Updated Final Safety Analysis Report, Chapter 1, Figures ML20259A2092020-09-14014 September 2020 Updated Final Safety Analysis Report, Chapter 2, Figures IR 05000247/20160092016-11-21021 November 2016 Davis-Besse Nuclear Power Station, Unit 1, Revision 31 to Updated Final Safety Analysis Report, Drawing E-0058B, Rev 12, Sheet 0015A NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 8, Electrical Systems, Figures2016-09-19019 September 2016 Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 8, Electrical Systems, Figures ML16280A1682016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 4, Reactor Coolant System, Drawings NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 7, Instrumentation and Control, Drawings2016-09-19019 September 2016 Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 7, Instrumentation and Control, Drawings NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 7, Instrumentation and Control, Figures2016-09-19019 September 2016 Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 7, Instrumentation and Control, Figures NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 6, Engineered Safety Features, Drawings2016-09-19019 September 2016 Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 6, Engineered Safety Features, Drawings NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 6, Engineered Safety Features, Figures2016-09-19019 September 2016 Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 6, Engineered Safety Features, Figures NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 5, Containment Systems, Drawing2016-09-19019 September 2016 Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 5, Containment Systems, Drawing NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 5, Containment Systems, Figures2016-09-19019 September 2016 Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 5, Containment Systems, Figures NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 4, Reactor Coolant System, Drawings2016-09-19019 September 2016 Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 4, Reactor Coolant System, Drawings NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 4, Reactor Coolant System, Figures2016-09-19019 September 2016 Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 4, Reactor Coolant System, Figures NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 4, Reactor Coolant System2016-09-19019 September 2016 Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 4, Reactor Coolant System NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 3, Reactor, Figures2016-09-19019 September 2016 Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 3, Reactor, Figures NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 1, Introduction and Summary, Figures2016-09-19019 September 2016 Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 1, Introduction and Summary, Figures ML16280A1892016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 5, Containment Systems, Drawing ML16280A1942016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 7, Instrumentation and Control, Figures ML16280A1922016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 6, Engineered Safety Features, Drawings ML16280A1952016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 7, Instrumentation and Control, Drawings ML16280A1882016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 5, Containment Systems, Figures ML16280A1912016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 6, Engineered Safety Features, Figures ML16280A1972016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 8, Electrical Systems, Figures ML16280A1652016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 3, Reactor, Figures ML16280A1672016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 4, Reactor Coolant System, Figures ML16280A1602016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 1, Introduction and Summary, Figures ML16280A1662016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 4, Reactor Coolant System NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report, (Ufsar), Revision 25, Chapter 9, Drawings2014-09-17017 September 2014 Indian Point, Unit 2, Updated Final Safety Analysis Report, (Ufsar), Revision 25, Chapter 9, Drawings NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report,(Ufsar), Revision 25, Chapter 10, Figures2014-09-17017 September 2014 Indian Point, Unit 2, Updated Final Safety Analysis Report,(Ufsar), Revision 25, Chapter 10, Figures NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report,(Ufsar), Revision 25, Chapter 10, Drawings2014-09-17017 September 2014 Indian Point, Unit 2, Updated Final Safety Analysis Report,(Ufsar), Revision 25, Chapter 10, Drawings NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report,(Ufsar), Revision 25, Chapter 11, Figures2014-09-17017 September 2014 Indian Point, Unit 2, Updated Final Safety Analysis Report,(Ufsar), Revision 25, Chapter 11, Figures NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report,(Ufsar), Revision 25, Chapter 9, Figures2014-09-17017 September 2014 Indian Point, Unit 2, Updated Final Safety Analysis Report,(Ufsar), Revision 25, Chapter 9, Figures NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report, (Ufsar), Revision 25, Chapter 8, Drawings2014-09-17017 September 2014 Indian Point, Unit 2, Updated Final Safety Analysis Report, (Ufsar), Revision 25, Chapter 8, Drawings NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report, (Ufsar), Revision 25, Chapter 8 - Figures2014-09-17017 September 2014 Indian Point, Unit 2, Updated Final Safety Analysis Report, (Ufsar), Revision 25, Chapter 8 - Figures ML14287A3432014-09-17017 September 2014 Updated Final Safety Analysis Report, (Ufsar), Revision 25, Chapter 8, Drawings ML14287A3562014-09-17017 September 2014 Updated Final Safety Analysis Report,(Ufsar), Revision 25, Chapter 11, Figures ML14287A3512014-09-17017 September 2014 Updated Final Safety Analysis Report,(Ufsar), Revision 25, Chapter 10, Drawings ML14287A3502014-09-17017 September 2014 Updated Final Safety Analysis Report,(Ufsar), Revision 25, Chapter 10, Figures ML14287A3482014-09-17017 September 2014 Updated Final Safety Analysis Report, (Ufsar), Revision 25, Chapter 9, Drawings ML14287A3472014-09-17017 September 2014 Updated Final Safety Analysis Report,(Ufsar), Revision 25, Chapter 9, Figures ML14287A3422014-09-17017 September 2014 Updated Final Safety Analysis Report, (Ufsar), Revision 25, Chapter 8 - Figures ML11236A2262010-10-0606 October 2010 Partially Released Updated Final Safety Analysis Report for Indian Point Unit 2. (Redacted Information: Figures 5.1-2, 5.1-3, 5.1-4, 5.1-5, 5.1-6 & 5.1-7 Are All Plant Drawings). Table of Contents - Chapter 7, Page 18 of 108 ML11236A2272010-10-0606 October 2010 Partially Released Updated Final Safety Analysis Report for Indian Point Unit 2. (Redacted Information: Figures 5.1-2, 5.1-3, 5.1-4, 5.1-5, 5.1-6 & 5.1-7 Are All Plant Drawings). Chapter 7, Page 19 of 108 - Chapter 14 Figure 14.3-129 ML1012603792010-05-0606 May 2010 Drawing No. A205454, Revision 4, Containment Building Restraint & Support Design, Line 351. ML1000402912010-01-0404 January 2010 Chemical and Volume Control System - Sheet 1, Figure 9.2-1 ML11083A0542009-03-0606 March 2009 Lr Hearing - Slides from ACRS Subcommittee Meeting on March 4, 2009 NL-08-074, Amendment 4 to License Renewal Application (LRA) Letter Dated April 30, 2008 from Entergy Nuclear Northeast (NL-08-074)2008-04-30030 April 2008 Amendment 4 to License Renewal Application (LRA) Letter Dated April 30, 2008 from Entergy Nuclear Northeast (NL-08-074) ML0904008952008-02-29029 February 2008 No. 3 Nuclear Power Plant - Electrical Distribution & Transmission System Diagram 2020-09-14
[Table view] Category:E-Mail
MONTHYEARML24036A0162024-02-0101 February 2024 NRC Email - Acknowledge and Accept the Indian Point Energy Center Request to Be Removed from NRC Headquarters Operation Officer (Hoo) Morning Authentication Code Calls ML23341A2002023-12-0707 December 2023 Email - Indian Point Energy Center Generating Units 1, 2, and 3 – Implementation Notice of Amendment No. 67, 300 and 276 to Independent Spent Fuel Storage Installation Only Emergency Plan (Ioep) ML23332A0802023-11-0808 November 2023 – Email from State of New York on the Revised License Amendment for Indian Point Energy Center ISFSI Only Emergency Plan ML23331A9542023-11-0808 November 2023 Email - State of New York Comments on the Revised License Amendment for Indian Point Unit 2 and 3 Technical Specification Changes Reflecting Permanent Removal of Spent Fuel ML23325A1632023-11-0808 November 2023 – State of New York Comments on the Revised License Amendment for Indian Point Unit 2 and 3 Technical Specification Changes Reflecting Permanent Removal of Spent Fuel ML23144A3382023-05-25025 May 2023 Dawn Giambalvo of Jersey City, New Jersey Email Against Treated Water Release from Indian Point Site ML23144A3422023-05-25025 May 2023 Peter Duda of Pearl River, New York Email Against Treated Water Release from Indian Point Site ML23144A3452023-05-25025 May 2023 Adam Kahn of Monsey, New York Email Against Treated Water Release from Indian Point Site ML23144A3502023-05-25025 May 2023 Dan Kwilecki of Montebello, New York Email Against Treated Water Release from Indian Point Site ML23144A3392023-05-25025 May 2023 David Morris of New City, New York Email Against Treated Water Release from Indian Point Site ML23144A3442023-05-25025 May 2023 Peggy Kurtz of Rockland County, New York Email Against Treated Water Release from Indian Point Site ML23136B1622023-05-15015 May 2023 – Town of North Salem, County of Westchester, New York Board Resolution Letter Regarding Treated Water Release from Indian Point Site ML23109A0632023-04-17017 April 2023 Email Acceptance Review for IP2 and IP3 Amended Facility License and Technical Specification to Reflect Permanent Removal of Spent Fuel from Spent Fuel Pits ML23055A1112023-02-23023 February 2023 Alyse Peterson Email- NYSERDA No Comments on Indian Point Unit 2 - Regarding Holtec License Amendment Request to Revise Permanently Defueled Technical Specifications and Staffing Requirements with Spent Fuel Transfer to ISFSI (Dockets 50-24 ML23049A0032023-02-14014 February 2023 – NRC Acceptance Email to Holtec for License Amendment Request for Approval of New ISFSI-Only Emergency Plan and Associated EAL Scheme ML22313A1682022-11-0909 November 2022 NRC Response to Updates to the Proposed Amended IP2 Master Trust ML22308A0912022-11-0303 November 2022 Email Acknowledgement for IP2 and IP3 Amended Facility License and Technical Specification to Reflect Permanent Removal of Spent Fuel from Spent Fuel Pits ML22276A1642022-09-29029 September 2022 New York State Revised Draft EA Response E-Mail ML22271A8492022-09-28028 September 2022 E-Mail Transmitting Revised Indian Point Exemption Draft EA ML22269A3452022-09-22022 September 2022 Email Objection to Holtec IP2 Master Decommissioning Trust Agreement for Indian Point Nuclear Generating Facility Unit 1 and 2, EPID L-2022-LLA-0072 ML22259A1992022-09-0202 September 2022 Acceptance for License Amendment Request to Modify Staffing Requirements Following SFP Transfer to Dry Storage ML22265A0142022-08-31031 August 2022 Email Acknowledgement for Amended and Restated Holtec IP3 Master Decommissioning Trust Agreement for Indian Point Nuclear Generating Facility Unit 3 ML22242A2592022-08-19019 August 2022 E-mail from K. Sturzebecher, NRC, to B. Noval, HDI, Acknowledgement for Amended and Restated Holtec IP2 Master Decommissioning Trust Agreement for Indian Point Nuclear Generating Facility Unit 1 and 2 ML22228A1332022-08-0909 August 2022 Acknowledgement for License Amendment Request to Modify Staffing Requirements Following SFP Transfer to Dry Storage ML22215A0432022-08-0101 August 2022 E-Mail Transmitting NYS NSA Exemption Comments & Draft EA Review Completion ML22208A0292022-07-19019 July 2022 E-Mail Transmitting Indian Point Exemption Draft EA ML22168A0072022-06-16016 June 2022 Acceptance Review for License Amendment Request to Revise License Condition to Eliminate Cyber Security Plan Requirements ML22112A0102022-04-21021 April 2022 Acceptance Review: Request for Exemption from 10 CFR 50.54(w)(1) Concerning Indian Point Energy Center Onsite Property Damage Insurance ML22112A0122022-04-21021 April 2022 Acceptance Review: Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance for Indian Point Energy Center ML22103A2432022-04-13013 April 2022 E-mail - Request for Additional Information - License Amendment Request to Revise Emergency Plan and Emergency Action Level Scheme for Permanently Defueled Condition for Indian Point Energy Center ML22104A0342022-04-13013 April 2022 E-mail from Z. Cruz, NRC to J. Fleming, Holtec - Request for Additional Information Related to Request for Exemption from Portions of 10 CFR 50.47 and Part 50 Appendix E for Indian Point Energy Center ML22038A2572022-02-0707 February 2022 E-mail from Z. Cruz, NRC, to J. Fleming, HDI - Acceptance Review: License Amendment Request to Revise Emergency Plan and Emergency Action Level Scheme to Address Permanently Defueled Condition for Indian Point Energy Center ML22035A1862022-02-0404 February 2022 E-mail to J. Fleming, Holtec, from Z. Cruz Perez, NRC - Acceptance Review: Exemption Requests from Portions of 10 CFR 50.47 and 10 CFR Part 50, Appendix E, Section IV for Indian Point Energy Center ML22028A1032022-01-28028 January 2022 E-mail Dated 1/28/2022, Transmittal of Draft Safety Evaluation for Proposed License Amendment Revision to Licensing Basis to Incorporate the Installation and Use of of New Auxiliary Lifting Device ML22038A1592022-01-24024 January 2022 NRR E-mail Capture - (External_Sender) 2021 IPEC Annual Sturgeon Impingement Report ML22006A0442022-01-0505 January 2022 Email from Z Cruz to J Fleming Request for Additional Information - HDI Indian Point Post-Shutdown Decommissioning Activities Report ML21337A2952021-12-0303 December 2021 Subsequent Request for Additional Information License Amendment Request to Revise Licensing Basis for New Auxiliary Lifting Device (E-mail Dated 12/3/2021) ML21335A3692021-12-0101 December 2021 Acceptance Review: Indian Point Energy Center - Exemption Request from 10 CFR Part 20 App G Section Iii.E ML21266A2972021-08-18018 August 2021 8/18/2021 E-mail from H. Specter to R. Guzman Public Comments to NRC, Indian Point Post-Shutdown Decommissioning Activities Report Public Meeting on July 29, 2021 ML21225A5012021-08-0909 August 2021 Email from NRC to the Shinnecock Indian Nation Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21224A3032021-08-0909 August 2021 Email from NRC to the Mashantucket Pequot Tribe of Connecticut Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21225A6142021-08-0909 August 2021 Email from NRC to the Tuscarora Nation Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21225A5682021-08-0909 August 2021 Email from NRC to the Stockbridge-Munsee Community Band of Mohican Indians Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21225A4252021-08-0909 August 2021 Email from NRC to the Oneida Nation of Wisconsin Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21225A3142021-08-0606 August 2021 Email from NRC to the Oneida Indian Nation Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21225A4402021-08-0606 August 2021 Email from NRC to the Onondaga Nation of Wisconsin Announcing the IPEC PSDAR Meeting on August 18, 2021 ML21225A5352021-08-0606 August 2021 Email from NRC to the Tonawanda Band of Seneca Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21225A5462021-08-0606 August 2021 Email from NRC to the St. Regis Mohawk Tribe Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21266A2942021-07-25025 July 2021 E-mail from Paul Blanch to NRC (N. Sheehan, D. Screnci) Public Comments to NRC, Indian Point Post-Shutdown Decommissioning Activities Report Public Meeting, July 29, 2021 ML21197A2002021-07-16016 July 2021 (E-mail 7/16/2021) NRC Staff Assessment and RAI Closeout HDI Fleet Decommissioning Quality Assurance Program and Indian Point Energy Center Quality Assurance Program Manual 2024-02-01
[Table view] Category:Status Report
MONTHYEARML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status L-24-007, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI)2024-03-29029 March 2024 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI) L-22-022, And Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations - Holtec.2022-03-25025 March 2022 And Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations - Holtec. L-21-134, And Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Independent Spent Fuel Storage Installations2021-12-17017 December 2021 And Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Independent Spent Fuel Storage Installations ML21084A7892021-03-25025 March 2021 Entergy Nuclear Operations, Inc. Status of Funding for Managing Irradiated Fuel for Year Ending December 31, 2020 - 10 CFR 50.82(a)(8)(vii) CNRO-2019-00006, Stations - Status of Funding for Managing Irradiated Fuel for Year Ending December 31, 2018 - 10 CFR 50.82(a)(8)(vii) - Entergy Nuclear Operations, Inc2019-03-28028 March 2019 Stations - Status of Funding for Managing Irradiated Fuel for Year Ending December 31, 2018 - 10 CFR 50.82(a)(8)(vii) - Entergy Nuclear Operations, Inc CNRO-2019-00005, Stations - Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v) - Entergy Nuclear Operations, Inc2019-03-28028 March 2019 Stations - Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v) - Entergy Nuclear Operations, Inc ML18088B2462018-03-29029 March 2018 Status of Funding for Managing Irradiated Fuel for Year Ending December 31, 2017, Per 10 CFR 50.82(a)(8)(vii) CNRO-2017-00009, Entergy Nuclear Operations, Inc. - Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v)2017-03-31031 March 2017 Entergy Nuclear Operations, Inc. - Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v) ENOC-17-00006, Status of Funding for Managing Irradiated Fuel for Year Ending December 31, 2016 - 10 CFR 50.82(a)(8)(vii)2017-03-30030 March 2017 Status of Funding for Managing Irradiated Fuel for Year Ending December 31, 2016 - 10 CFR 50.82(a)(8)(vii) NL-16-024, Center'S Sixth Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2016-02-29029 February 2016 Center'S Sixth Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events NL-15-111, Implementation of Order EA-12-051 Modifying Licenses with Regard to Requirements for to Reliable Spent Fuel Pool Instrumentation2015-08-28028 August 2015 Implementation of Order EA-12-051 Modifying Licenses with Regard to Requirements for to Reliable Spent Fuel Pool Instrumentation NL-15-112, Fifth Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2015-08-28028 August 2015 Fifth Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events NL-15-026, Fourth Six-Month Status Report for the Implementation of Order EA-12-051 Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation2015-02-27027 February 2015 Fourth Six-Month Status Report for the Implementation of Order EA-12-051 Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation NL-14-059, Status of Planned Resolutions of the Unapproved III.G.2 Operator Manual Actions2014-04-29029 April 2014 Status of Planned Resolutions of the Unapproved III.G.2 Operator Manual Actions ENOC-14-00009, Decommissioning Funding Status Report Per 10 CFR Section 50.75(f)(1) and 10 CFR 50.82(a)(8)(v) - Entergy Nuclear Operations, Inc2014-03-28028 March 2014 Decommissioning Funding Status Report Per 10 CFR Section 50.75(f)(1) and 10 CFR 50.82(a)(8)(v) - Entergy Nuclear Operations, Inc NL-14-031, Center'S Second Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2014-02-27027 February 2014 Center'S Second Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events NL-14-029, Second Six-Month Status Report for the Implementation of Order EA-12-051, Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation2014-02-27027 February 2014 Second Six-Month Status Report for the Implementation of Order EA-12-051, Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation NL-13-109, First Six-Month Status Report for the Implementation of Order EA-12-051 Modifying Licenses with Regard to Requirements for to Reliable Spent Fuel Pool Instrumentation2013-08-27027 August 2013 First Six-Month Status Report for the Implementation of Order EA-12-051 Modifying Licenses with Regard to Requirements for to Reliable Spent Fuel Pool Instrumentation NL-13-110, First Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2013-08-27027 August 2013 First Six-Month Status Report for the Implementation of Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events NL-13-072, Status of Planned Resolutions of the Unapproved III.G.2 Operator Manual Actions2013-05-0202 May 2013 Status of Planned Resolutions of the Unapproved III.G.2 Operator Manual Actions ENOC-13-00007, Decommissioning Funding Status Report Per 10 CFR Section 50.75(f)(1) and 10 CFR 50.82(a)(8)(v) - Entergy Nuclear Operations, Inc2013-03-29029 March 2013 Decommissioning Funding Status Report Per 10 CFR Section 50.75(f)(1) and 10 CFR 50.82(a)(8)(v) - Entergy Nuclear Operations, Inc ENOC-13-00011, Status of Funding for Managing Irradiated Fuel for Year Ending December 31, 2012 - 10 CFR 50.82(a)(8)(vii)2013-03-29029 March 2013 Status of Funding for Managing Irradiated Fuel for Year Ending December 31, 2012 - 10 CFR 50.82(a)(8)(vii) ML12137A1362012-05-29029 May 2012 Decommissioning Funding Status Report ML12137A1052012-05-29029 May 2012 Decommissioning Funding Status Report ML12137A0902012-05-29029 May 2012 Decommissioning Funding Status Report ML12122A0712012-05-14014 May 2012 Enclosure 1: April 2012 Report on the Status of Public Petitions Under Title 10 of the Code of Federal Regulations, Section 2.206 ENOC-11-00005, Status of Decommissioning Funding for Plants Operated by Entergy Nuclear Operations, Inc., for Year Ending December 31, 2010 - 10 CFR 50.75(f)(1)2011-03-31031 March 2011 Status of Decommissioning Funding for Plants Operated by Entergy Nuclear Operations, Inc., for Year Ending December 31, 2010 - 10 CFR 50.75(f)(1) ML1029403622010-11-12012 November 2010 October 2010 10 CFR 2.206 Monthly Status Report: Enclosures ENOC-10-00010, Entergy Nuclear Operations, Inc. - Status of Decommissioning Funding for Year Ending December 31, 20092010-03-31031 March 2010 Entergy Nuclear Operations, Inc. - Status of Decommissioning Funding for Year Ending December 31, 2009 ML1100404362009-09-16016 September 2009 Plant Issue Tracking Application; Plant Status Daily - Oconee Information for 09/16/2009 ML0830800812008-11-20020 November 2008 October 2008 Report on the Status of Public Petitions Under Title 10 of the Code of Federal Regulations (10 CFR) Section 2.206- Enclosures ML0905708302008-11-0505 November 2008 Entergy Center Status Report NL-08-131, Siren Project Status Update2008-08-12012 August 2008 Siren Project Status Update NL-08-121, Siren Project Milestone Schedule - Status Update, Letter Dated 07/25/082008-07-25025 July 2008 Siren Project Milestone Schedule - Status Update, Letter Dated 07/25/08 ENOC-08-00028, J.A. FitzPatrick, Palisades, and Big Rock Point, Decommissioning Fund Status Report2008-05-0808 May 2008 J.A. FitzPatrick, Palisades, and Big Rock Point, Decommissioning Fund Status Report ML0729506172007-09-13013 September 2007 E-mail from K. Mcmullin, Entergy to J. Boska, NRR Et Al on IPEC Status Report, September 13, 2007 ML0729705242007-08-0707 August 2007 E-mail from K. Mcmullin of Entergy to Various, Regarding IPEC Status Report for Aug 7 2007 ML0729705222007-08-0606 August 2007 E-mail from K. Mcmullin of Entergy to Various, Regarding IPEC Status Report for Aug 6 2007 ML0729705042007-07-31031 July 2007 E-mail from K. Mcmullin of Entergy to Various, Regarding IPEC Status Report for July 31 2007 ML0729704422007-07-27027 July 2007 E-mail from K. Mcmullin of Entergy to Various, Regarding IPEC Status Report for July 27, 2007 ML0729704332007-07-26026 July 2007 E-mail from K. Mcmullin of Entergy to Various, Regarding IPEC Status Report for July 26 ML0729703852007-07-18018 July 2007 E-mail from K. Mcmullin of Entergy to Various, Regarding IPEC Status Report for July 18 2007 ML0729506092007-06-11011 June 2007 E-mail from K. Mcmullin of Entergy to Various, Regarding IPEC Status Report for June 11, 2007 ML0729506082007-06-0707 June 2007 E-mail from K. Mcmullin of Entergy to Various, Regarding IPEC Status Report for June 7, 2007 ML0729506032007-06-0505 June 2007 E-mail from K. Mcmullin of Entergy to Various, Regarding Indian Point Energy Center Status Report, June 5, 2007 ML0729506002007-06-0101 June 2007 E-mail from K. Mcmullin of Entergy to Various, Regarding IPEC Status Report for June 1, 2007 ML0729505982007-05-31031 May 2007 E-mail from K. Mcmullin of Entergy to Various, Regarding IPEC Status Report for May 31, 2007 ML0729505922007-05-30030 May 2007 E-mail from K. Mcmullin of Entergy to Various, Regarding IPEC Status Report for May 30, 2007 ML0729505912007-05-29029 May 2007 E-mail from K. Mcmullin of Entergy to Various, Regarding IPEC Status Report for May 29, 2007 2024-09-18
[Table view] |
Text
From: "McMullin, Kathleen M" <KMcMull@entergy.com>
To: 0-05 Baranski, James" <james.baranski@semo.state.ny.us>,"
Eddy, Paul" <paulIeddy@dps. state. ny. us>, "Greeley, Dan" <greeleyd@co.rockland.ny.us>, " Gross, Steve - Orange PIO" <sgross@co.orange.ny.us>, " Sutton, Tony" <awsl @westchestergov.com>,
<AStiebeling@pcbes.org>, "Albanese, Raymond" <rlal @westchestergov.com>, "Alfredo Vidal"
<avidal@thevidalgroup.com>, <awsl @weschestergov.com>, "B. Gore" <bgore@urbanomics.com>,
<bakerna@co.rockland.ny.us>, "Barry, Terrence" <TBarry@entergy.com>, "Benjamin, Liz"
<BenjamiL@co.rockland.ny.us>, <ken.bergmann @semo.state.ny.us>, "Bernie McGar
<mcgarry@ senate.state.ny.us>, <jeanbordewich @schumer.senate.gov>,
<jpbl @nrc.gov>, "Bowman, Greg "<gbowm90@entery.c beh@nrc.gov>,
<JBridges@troopers.state.ny.us>, "Chief Tubbs--
--- ,, P. "Chris Schwarz"
<cschwar@entergy.com>, <ewc@nrc.gov>, "Comiotes, Jim" <JComiot@entergy.com>, "Conroy, Patric W" <PConroy@entergy.com>, <lindac@yorktownny.org>, "Cox, Mark R" <mcox90@entergy.com>,
<Gcrawford@urbanomics.com>, "Curran, Nick" <Nick.curran @mail.house.gov>, "Dacimo, Fred R."
<FDacimo@entergy.com>, "David Brand' I& ...... .. "David Greene"
<dgreene@urbanomics.com>, "David Weinraub" <DWeinraubrbrrIavbly.com>, "DeGasperis, Edward M" <ede1asp@entergy.com>, "DiRocco, Anthony J" <ADirocc@entergy.com>,
<Donald.Maurer@ semo.state.ny.us>, "Dowling, Adele" <amd2@westchestergov.com>,
<Barney.Drew@lafarge-na.com>, "Fay, Deborah" <DFayl @entergy.com>, "Feathers" <jdf@fcwc-law.com>, <Andrew.Feeney@ semo.state.ny.us>, <peter.feroe @mail.house.gov>,
<galefs @assembly.state.ny.us>, "Geri Shapiro" .- .. f ,l
<Emily.Gibbons@mail.house.gov>, "Giguere, Kathleen M" <KGiguer@entergy.com>, "Gottlieb, Laurence"
<LGottli@entergy.com>, "Greene, Dominick" <dgreene @co.orange.ny.us>,
<gac7@westchestergov.com>, "Grosjean, Alain G" <AGrosje@entergy.com>, <grtroes@nppd.com>,
<Frank.Guiao@ lafarge-na.com>, "Harry Giannoulis" <harry@theparksidegroup.com>, "Hinrichs, Gary H"
<ghinric @entergy.com>, "Hipschman, Thomas" <thips90 @entergy.com>, "lnzirillo, Frank"
<finziri@entergy.com>, "Ira Promisel" <ipromise@troopers.state.ny.us>, "Jack Spath"
<jps @nyserda.org>, <dejl @ nrc.gov>, <jefft @townofcortlandt.com>, "Jensen, Chris"
<jensenc@co.rockland.ny.us>, "JES" <JES1 @westchestergov.com>, "Jim Cunningham"
<jim-cunningham @ nyc.bm.com>, "Jim Wright" <wright @senate.state.ny.us>, "John Cordo" <JLC @fcwc-law.com>, "Jones, T. R." <tjones2@entergy.com>, "Kansler, Michael R" <MKansle@entergy.com>,
"Kathleen Wood" <kathleen.wood @chamber.state.ny.us>, <Pat.keegan @mail.house.gov>, "Kerns, Matthew T" <MKerns@entergy.com>, <MKopy@troopers.state.ny.us>, <kevin.kraus@semo.state.ny.us>,
"L. Leach' 111- "LAROSA, PAUL" <PLAROSA@entergy.com>,
<leibell @senate.state.ny.us>, eonete" <Pete.Leon@ mail.house.gov>, <DCL@nrc.gov>, "Longo, Nick" <longon@co.rockland.ny.us>, "Mark Serrano" <serrano@proactivecom.com>, "Martin Brennan"
<MartinBrennan @schumer.senate.gov>, "Marvin Randolph" <mrandolph @ urbanomics.com>, "Mayer, Donald M" <DMayerl @entergy.com>, "McCann, John (ENNE Licensing Director)"
<jmccan 1@ entergy.com>, "McCannell, Chris" <Chris.mccannell @mail.house.gov>, "McConaghy, Ryan"
<ryan McConaghy@schumer.senate.gov>, "McGillicuddy, Maura" <MMcGilI@,e >-"McKay, Mike" <mike.mckay@mail.house.gov>, "McMahon, Bob - Putman County",
"McMullin, Kathleen M" <KMcMull@entergy.com>, <millera@assembly.stat .ny.us>,
<MillerC@co.rockland.ny.us>, "Mitchell, Frank J" <FMitche@entergy.com>, "Neil Sheehan"
<nas@.nrc.gov>, <rand @schildasset.com>, <jdn @nrc.gov>, <Joseph.o'brien @mail.house.gov>,
<boliveira@amnucins.com>, <doneill@bghc-law.com>, "Pat Brown" <PBrown@bmwlobby.com>, "Paul Steidler" <paul@ effectivecom m.org>, "Paul Tonko <onko@assembly.state.ny.us>, "Paulson, Adam"
<adam.paulson @mail.house.gov>,[ P alp 0 nyserda.org>, "Phillips, Frank M."
<fphilli@entergy.com>, <pjk3@westchestergov.com>, "Poquette, Thomas" <thomas.poquette@lafarge-na.com>, "PRICE, ERNEST JR" <EPRICE2@entergy.com>,
Date: 09/28/2006 5:41:25 PM
Subject:
IPEC status report for September 28 Please note a copy of the monitoring well map is attached.
Information in this record was deleted of Information in accordance with the Freedom Act, exemptions *' "
FOIA- --e'o
tcLdU . I !MIl I - 117 L..?. O LdU ILUPI L I 'Ji U P 1.tI V I I LU I (.J r cyI
ý CýYý: I-]
Indian Point Energy Center Status Report September 28, 2006 Operational Status Indian Point Unit 2 is currently operating at 100% power and has been on line for 65 days. Indian Point 3 is operating at 100% and has been on line for 69 days.
Groundwater Investigation Update The Indian Point groundwater investigation is in the phase 2A of installing new monitoring wells to test the groundwater under the site.
- Entergy is installing a series of wells along the riverfront in front of the Unit 1 and Unit 2 turbine buildings. Two of these four wells have been completed; two are under development
- The investigation team will begin amonth-long test from Recovery Well-i, located in the Unit 211 . ....... his test will begin with two weeks of stabiliing the well field and takingo transducer data followed by a 1-day pump test and a 4-day pump test
- Engineers and metallurgy experts are reviewing the video tape of the transfer canal section of the Unit 2 spent fuel pool liner. The preliminary assessments indicate a few areas that will require further inspection to detect possible flaws. A plan is being developed to conduct non-destructive type tests such as eddy current and penetrating dye tests. The fuel transfer canal is located in a high radiation field and contains elevated levels of contamination. Water is drained in the canal section (all but a few feet) except during fuel transfer from the reactor core during refueling.
- The Unit 1 spent fuel pool dimineralizer system has removed about 98% of the Sr-90 activity in the pool. The latest sample results from the down gradient wells (MW-49 and MW-50) have shown a 5-10 fold reduction in Sr-90 levels. Sample results from other down gradient wells are expected within the next 2-3 weeks.
- Radiological Environmental Monitoring Program fish samples obtained from the Hudson River have come back non-detectable for Sr-90.
(ND = <1-19 pCi/kg)
Entergy to Host Open House on Groundwater Investigation Oct. 5 Entergy and the Indian Point Energy Center will host an open house to present information about the ongoing groundwater investigation
lacy WlHIL.I - rIL'U1LUZS IUPUI L 1U1 OUJLUI I)I , Z£0
! ~
activities on Thursday, October 5 between 4 -8 p.m. The open house witl be held at the Training Center onsite.
At open house experts on the groundwater investigation, radiation health effects and high resolution video inspection will be available to explain the program and answer questions.
Due to heighten security on site, we are requesting that visitors pre-register for the event. You can find the pre-registration form on the www.safesecurevital.org <http://www.safesecurevital.org/> web site.
Click on the Groundwater Investigation Open House Registration link.
NRC to Hold Public Meeting on Sirens The Nuclear Regulatory Commission will hold a public meeting on the Alert and Notification System at Indian Point on Friday, October 6. The meeting is scheduled for 1-3:30 p.m. at Crystal Bay in Peekskill, N.Y.
Information on the meeting can be found on the NRC website: www.nrc;.gov
<file://A\w071 Os03\comm\Publications\Daily%2OStatus%20Reports%20 RS-1280
\Daily/20reports%2006\Sept%2006\www.nrc.gov>
Educational Outreach Entergy Nuclear Northeast provides customized outreach education programs for schools, youth groups, and civic organizations. The topics we cover include Emergency Planning, Understanding Radiation, Nuclear Fuel and a general overview of the operations of Indian Point Energy Center. If you would like a brochure or are interested in scheduling a program, contact IPEC Communications at 914-271-7441.
If you have any questions or need clarification of the information provided, please contact Kathy McMullin, manager of communications, Indian Point Energy Center, at 914-271-7132.
CONCEPTUAL SKETCH OF IPEC PHASE 1, PHASE 2, AND PHASE 2A MONITORING WELL LOCATIONS
......
......
.... .... 0..."..... ..
4...... RADIOACPt*'E
- CTMT SPRAY SUMP MW40 MW33 0 0 0 MW35 TRNFRE ~ "- IýTRANSFORMER L.
YARD FEX EýYARD %
MW52O t mwr u-
@
-t
\iemp\uvv1uuuue- i ivir
\Temp~uvvluu... at
....
.V Mail Envelope Properties (451C416E.B93:17 :23443)
Subject:
IPEC status report for September 28 Creation Date 09/28/2006 5:39:57 PM From: "McMullin, Kathleen M" <KMcMull@entergy.com>
Created By: KMcMull @entergy.com Recipients nrc.gov JPB 1 (John Boska) nrc.gov BEH (Brian Holian)
EWC (Eugene Cobey)
DEJ1 (Donald Jackson)
DCL (David Lew)
NAS (Neil Sheehan)
JDN (James Noggle)
DPS (Diane Screnci)
JRWl (John White) nei.org slb-(Skip Bowman) msf (Mary Fertel) asf (Alex Flint) entergy.com amcmull (Andrew McMullin) pmatusz (Patrick Matuszak)
AGRAVE1 (ALLISON LESLEY.GRAVES) ablizar (Andrea J Blizard) rbentle (Robyn M Bentley) bwitt90 (Brian D Wittick)
KTheobo (Kenneth Theobalds) bsulli I (Brian A Sullivan)
JSteets (James F Steets)
MSlobod (Mike Slobodien) rsach90 (Ronald Sachatello) prubin (Paul W Rubin)
APRIDE (ANN L PRIDE)
EPRICE2 (ERNEST JR PRICE) fphilli (Frank M. Phillips)
FMitche (Frank J Mitchell)
MMcGiil (Maura McGillicuddy) jmccanl (John (ENNE Licensing Director) McCann)
DMayerl (Donald M Mayer)
PLAROSA (PAUL LAROSA)
MKerns (Matthew T Kems)
MKansle (Michael R Kansler) tjones2 (T. R. Jones) finziri (Frank Inzirillo) thips90 (Thomas Hipschman) ghinric (Gary H H-inrichs)
AGrosje (Alain G Grosjean)
LGottli (Laurence Gottlieb)
KGiguer (Kathleen M Giguere)
DFayl (Deborah Fay)
ADirocc (Anthony J DiRocco) edegasp (Edward M DeGasperis)
FDacimo (Fred R. Dacimo) mcox90 (Mark R Cox)
PConroy (Patric W Conroy)
JComiot (Jim Comiotes) cschwar (Chris Schwarz) gbowm90 (Greg Bowman)
TBarry (Terrence Barry) twcny.rr.com tgurdziel dps.state.ny.us wmf (William Flynn) paul eddy (Paul ddy) westchestergov.com cat7 rjo4 pjk3 JESI (JES) gac7 amd2 (Adele Dowling) rlal (Raymond Albanese) awsl (Tony utton) giulianipartners.com Thomas.Fitzpatrick (Tom Fitzpartrick) theparksidegroup.com
. -. ..
- -...
- I.-- ..- ,ý - - - - , - - , -
tiffany (Tiffany Rasberry) harry (Harry Giannoulis) lafarge-na.com Scott.Statler thomas.poquette (Thomas Poquette)
Frank.Guiao Barney.Drew mail.house.gov Jon.Sheiner (Jon Sheiner) adam.paulson (Adam Paulson)
Joseph.o'brien mike.mckay (Mike McKay)
Chris.mccannell (Chris McCannell)
Pete.Leon (Pete Leon)
Pat.keegan Emily.Gibbons peter.feroe Nick.curran (Nick Curran) optonline.net JimSeirmarco health.state.ny.us asa0l gw.dec.state.ny.us tbrice troopers.state.ny.us MRealmut MKopy ipromise (Ira Promisel)
JBridges townofcortlandt.com lindap jefft nyserda.org alp jps (Jack Spath)
assembly.state.ny.us tonkop (Paul Tonko) millera galefs effectivecomm.org paul (Paul Steidler) bmwlobby.com PBrown (Pat Brown)
DWeinraub (David Weinraub) bghc-law.com doneill amnucins.com boliveira schildasset.com rand co.rockland.ny.us MillerC longon (Nick Longo) jensenc (Chris Jensen)
BenjamiL (Liz Benjamin) bakerna greeleyd (Dan reeley) schumer.senate.gov
- ryanMcConaghy (Ryan McConaghy)
Martin_Brennan (Martin Brennan) jeanbordewich urbanomics.com mrandolph (Marvin Randolph) dgreene (David Greene)
II Y IýuVIV rae-Gcrawford bgore (B. Gore) proactivecom.com serrano (Mark Serrano) senate.state.ny.us leibell wright (Jim Wright) mcgarry (Bernie McGarry) semo.state.ny.us kevin.kraus Andrew.Feeney Donald.Maurer ken.bergmann james.baranski (James aranski) chamber.state.ny.us kathleen.wood (Kathleen Wood) fcwc-law.com JLC (John Cordo) jdf (Feathers) nyc.bm.com jimrcunningham (Jim Cunningham) nppd.com grtroes co.orange.ny.us dgreene (Dominick Greene) sgross (Steve - Orange PIO ross) yorktownny.org lindac
ýieýnp\yvvjyyyyz. i ivit- I'aye o :i raij~ 01 1
\temp\UvvjuUUUŽ~. I ivir weschestergov.com awsl thevidalgroup.com avidal (Alfredo Vidal) pcbes.org AStiebeling Post Office Route nrc.gov nrc.gov nei.org entergy.com twcny.rr.com dps.state.ny.us westchestergov.com giulianipartners.com theparksidegroup.com lafarge-na.com mail.house.gov optonline.net health.state.ny.us gw.dec.state.ny.us troopers. state.ny.us townofcortlandt.com nyserda.org adelphia.net assembly.state.ny.us effectivecomm.org bmwlobby.com bghc-law.com amnucins.com schildasset.com co.rockland.ny.us aol.com schumer.senate.gov urbanomics.com proactivecom.com senate.state.ny.us yahoo.com semo.state.ny.us chamber.state.ny.us
ýýempxuyý)yyyy.z. i ivir ryyw ý j1
\Tempw~vvJuuuuŽ. I ivir r-aye I fcwc-law.com nyc.bm.com nppd.com co.orange.ny.us hotmail.com yorktownny.org valstar.net weschestergov.com thevidalgroup.com pcbes.org Files Size Date & Time MESSAGE 3911 09/28/2006 5:39:57 PM TEXT.htm 49363 MonitoningWells-Galaxy.pdf 101331 Mime.822 201866 Options Expiration Date: None Priority: Standard ReplyRequested: No Return Notification: None Concealed
Subject:
No Security: Standard Junk Mail Handling Evaluation Results Message is eligible for Junk Mail handling This message was not classified as Junk Mail Junk Mail settings when this message was delivered Junk Mail handling disabled by User Junk List is not enabled Junk Mail using personal address books is not enabled Block List is not enabled