ML16308A251

From kanterella
Revision as of 15:01, 10 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Annual Financial Reports 2015
ML16308A251
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 10/28/2016
From: Weber T
Arizona Public Service Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
Shared Package
ML16308A257 List:
References
102-07370-TNW/TMJ
Download: ML16308A251 (1)


Text

10 CFR 50.71(b) 10 CFR 72.SO(b)

(laps Palo Verde Nuclear Generating Station PO Box 52034 102-07370-TNW/TMJ Phoenix, Arizona 85072-2034 October 28, 2016 Mail Station 7636 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3 and Independent Spent Fuel Storage Installation Docket Nos. STN 50-528/529/530 and 72-44 Submittal of Annual Financial Reports 2015 Pursuant to 10 CFR 50. 71(b) and 10 CFR 72.BO(b ), enclosed please find the 2015 Annual Financial Reports for two Participants who jointly own PVNGS and do not file a Form 10-Q with the Securities and Exchange Commission or a Form 1 with the Federal Energy Regulatory Commission. These Participants are Southern California Public Power Authority and Los Angeles Department of Water and Power. The Salt River Project is also a Participant who jointly owns PVNGS and does not file a Form 10-Q with the Securities and Exchange Commission or a Form 1 with the Federal Energy Regulatory Commission. The 2015 Annual Financial Report for the Salt River Project was provided by Arizona Public Service Company (APS) letter number 102-07160, dated December 9, 4015 [Agencywide Documents Access and Management System (ADAMS) Accession Number ML15356A124].

The remaining Participants who jointly own PVNGS file a Form 10-Q with the Securities and Exchange Commission or a Form 1 with the Federal Energy Regulatory Commission and therefore do not have to file an Annual Financial Report in accordance with 10 CFR 50.71(b) or 10 CFR 72.SO(b). These Participants are El Paso Electric Company, Arizona Public Service Company, Southern California Edison Company and Public Service Company of New Mexico.

No commitments are being made to the NRC by this letter.

Should you need further information regarding this submittal, please contact Michael D.

Dilorenzo, Regulatory Affairs Section Leader, at (623) 393-3495.

~l/,W{jdf. *-

Thomas N. Weber Department Leader, Regulatory Affairs TNW/TMJ/akf

Enclosure:

PVNGS 2015 Annual Financial Reports Southern California Public Power Authority and Los Angele~ Department of Water and Power cc: K. M. Kennedy NRC Region IV Regional Administrator M. M. Watford NRC NRR Project Manager C. A. Peabody NRC Acting Senior Resident Inspector for PVNGS A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway

  • Diablo Canyon
  • Palo Verde
  • Wolf Creek