Similar Documents at Ginna |
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML17250B3041999-10-20020 October 1999 Forwards Changes to Tech Specs Bases for Re Ginna Nuclear Power Plant.Change Bars Indicate Those Revs Which Have Been Incorporated IR 05000244/19990081999-10-14014 October 1999 Forwards Insp Rept 50-244/99-08 on 990809-0919.Severity Level IV Violation of NRC Requirements Occurred & Being Treated as non-cited Violation Consistent with App C of Enforcement Policy ML17265A7651999-10-0808 October 1999 Forwards Fifteen Relief Requests That Will Be Utilized for Ginna NPP Fourth Interval ISI Program That Will Start on Jan 1,2000.Attachment 1 Includes Summaries & Detailed Description of Each Relief Request ML17265A7631999-10-0505 October 1999 Requests Approval for Use of Relief Request Number 43 to Address Volumetric Examination Limitations (Less than 90%) Associated with a & B RHR Heat Exchanger Outlet Nozzle to Shell Welds.Approval Is Requested by Dec 31,2000 ML17265A7641999-10-0505 October 1999 Requests Approval for Use of Relief Request Number 42 to Address Volumetric Examinations Limitations (Less than 90%) Associated with Eight Class 1 Identified Welds or Areas of Reactor Pressure Vessel ML20212J3561999-09-30030 September 1999 Forwards Four Copies of Re Ginna NPP Training & Qualification Plan for Security Officers, Rev 7,dtd 990930. Synopsis of Changes,Encl.Encl Withheld Per 10CFR73.21 ML20212J3801999-09-30030 September 1999 Forwards Four Copies of Rev to Re Ginna NPP Security Plan.Rev Changes Contingency Weapons Available to Response Force to Those Most Effective in Current Defensive Strategy.Encl Withheld Per 10CFR73.21 IR 05000244/19990051999-09-24024 September 1999 Forwards More Detailed Response Re Main Steam Check Valve Performance Questions Arising from NRC Insp Rept 50-244/99-05 Following Completion of Independent Assessment Being Performed by Duke Engineering & Svcs ML17265A7571999-09-24024 September 1999 Forwards More Detailed Response Re Main Steam Check Valve Performance Questions Arising from NRC Insp Rept 50-244/99-05 Following Completion of Independent Assessment Being Performed by Duke Engineering & Svcs IR 05000244/19992011999-09-24024 September 1999 Forwards Insp Rept 50-244/99-201 (Operational Safeguards Response Evaluation) on 990621-24.No Violations Noted. Primary Purpose of Osre to Assess Licensee Ability to Respond to External Threat.Insp Rept Withheld ML17265A7461999-08-31031 August 1999 Submits Response to NRC Administrative Ltr 95-03,rev 2, Availability of Reactor Vessel Integrity Database,Version, Dtd 990726 ML17265A7401999-08-26026 August 1999 Requests Approval for Use of Relief Request Number 35 Re Use of ASME Section XI Code,1995 Edition,1996 Addenda.Code Will Be Used to Develop Plant Fourth 10-year Interval ISI Program on Class 1,2 & 3 Components ML17265A7411999-08-26026 August 1999 Forwards LER 99-004-01 Re Plant Being Outside Design Basis Due to Containment Recirculation Fan Moisture Separator Vanes Being Incorrectly Installed.Part 21 Notification of 990512 Is Being Rescinded ML17265A7451999-08-23023 August 1999 Forwards fitness-for-duty Performance Data Rept for Six Months Ending 990630,per 10CFR26.71(d) ML17250B3021999-08-23023 August 1999 Informs That Util & NRC Had Conference Call on 990816 to Review Approach in Responding to Questions,As Result of Questions Re Main Steam Check Valve Performance Included in Insp Rept 50-244/99-05,dtd 990806 ML17265A7271999-07-30030 July 1999 Forwards 10CFR21 Interim Rept Per Reporting of Defects & Noncompliance,Section 21 (a) (2).Interim Rept Prepared Because Evaluation Cannot Be Completed within 60 Days from Discovery of Deviation or Failure to Comply ML17265A7151999-07-23023 July 1999 Forwards LER 99-007-01 Re Personnel Error Which Caused Two Channels to Be in Tripped Condition,Resulting in Reactor Trip.Further Investigation of Event Identified Addl Corrective Actions ML17265A7061999-07-22022 July 1999 Forwards LER 98-003-02,re Actuations of CR Emergency Air Treatment Sys.All Creats Actuations,Including Those Originally Believed to Be Valid Actuations,Were,In Fact Invalid Actuations ML17265A7191999-07-21021 July 1999 Forwards Ginna Station ISI Rept for Refueling Outage Conducted in 1999 ML17265A7141999-07-21021 July 1999 Withdraws Relief Request 35 for Plant Inservice Insp Program Section XI Requirements,Submitted on 980806.Licensee Plans to Resubmit Relief Request,Which Includes Addl Level of Detail,In Near Future ML17265A7041999-07-16016 July 1999 Submits Info Re Specific Licensing Actions Which May Be Expected to Generate Complex Reviews,In Response to Administrative Ltr 99-02,dtd 990603 ML17265A6911999-06-30030 June 1999 Responds to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants.Gl 98-01 Requested Response on Status of Facility Y2K Readiness by 990701.Readiness Disclosure Attached ML17265A6871999-06-22022 June 1999 Forwards Response to RAI Made During 990225 Telcon Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves. Calculation Encl. Encl ML17265A6841999-06-21021 June 1999 Informs That Util Wishes to Amend Extend of Alternate Exams Provided for Relief Request Re ISI Program ASME Section XI Require Exams for First 10-Yr Interval for Containment ML17265A6741999-06-15015 June 1999 Submits Annual ECCS Rept IAW 10CFR50.46(a)(3)(ii) Requirements.No Changes Have Been Made to Large Break LOCA PCT & Small Break LOCA PCT ML17265A6751999-06-11011 June 1999 Responds to NRC RAI Re Licensee GL 96-05 Program.Encl Info Verifies That Util Is Implementing Provisions of JOG Program on MOV Periodic Verification ML17309A6551999-06-0707 June 1999 Responds to NRC 990310 RAI Re Verification of Seismic Adequacy of Mechanical & Electrical Equipment ML17265A6671999-06-0101 June 1999 Requests Approval of Ginna QA Program for Radioactive Matl Packages,Form 311,approval Number 0019.Ginna QA Program for Station Operation, Was Most Recently Submitted to NRC by Ltr Dtd 981221 & Supplemented on 990301 ML17265A6641999-05-25025 May 1999 Forwards Addl Info on Use of GIP Method a for Re Ginna Nuclear Power Plant.Copy of Re Ginna Station USI A-46 Outlier Resolution Table as Requested ML17265A6611999-05-24024 May 1999 Forwards LER 99-007-00 Re Personnel Error Which Caused Two Channels to Be in Tripped Condition,Resulting in Rt.Util Is Planning to Submit Suppl to LER by 990730 ML20206U0921999-05-13013 May 1999 Forwards Four Copies of Rev R to Gnpp Security Plan,Per Provisions of 10CFR50.54(p).Rev Clarifies Armed Response Team Assignments & Does Not Degrade Physical Security Effectiveness.Rev Withheld,Per 10CFR73.21 ML17265A6461999-05-12012 May 1999 Forwards 1998 Annual Radioactive Effluent Release Rept & 1998 Annual Radiological Environ Operating Rept, for Re Ginna NPP ML17265A6411999-05-12012 May 1999 Forwards LER 99-004-00 IAW 10CFR50.73 & 10CFR21.Further Assessment Will Be Provided in Suppl to LER by 990630 ML20206E7221999-04-29029 April 1999 Forwards Four Copies of Rev Q to Re Ginna Nuclear Power Plant Security Plan,Per 10CFR50.54(p).Changes Do Not Degrade Physical Security Effectiveness.Encl Withheld,Per 10CFR73.21 ML20206H6911999-04-22022 April 1999 Forwards Info Requested During Informal Telcon on 980408 Concerning Upcoming Osre at Ginna Station.Info Requested Listed.Without Encls ML17265A6271999-04-19019 April 1999 Forwards Rev 0 & Rev 1 to Colr,Cycle 28 for Re Ginna NPP, Per TS 5.6.5 ML17309A6501999-04-14014 April 1999 Forwards Revised Ginna Station EOPs & Procedures Index ML17265A6121999-03-29029 March 1999 Forwards Rept on Status of Decommissioning Funding for Re Ginna Npp,For Which Rg&E Is Sole Owner,Per 10CFR50.75. Data Presented Herein,Current as of 981231 ML17265A6041999-03-24024 March 1999 Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(ii)(B) & 10CFR21.Addl Analyses Are Being Performed to Support Future Cycle Operation & Supplemental LER Is Scheduled to Be Submitted by 990618 ML17265A5671999-03-0101 March 1999 Forwards Application for Amend to License DPR-18,to Revise TSs Battery Cell Parameters Limit for Specific Gravity (SR 3.8.6.3 & SR 3.8.6.6).Supporting Tss,Encl ML17265A5641999-03-0101 March 1999 Forwards Response to NRC 990217 RAI Concerning Changes to QA Program for Re Ginna Station Operation.Rg&E Is Modifying Changes Requested in 981221 Submittal.Modified QA Program,Encl ML17265A5551999-02-25025 February 1999 Informs That Util Is in Process of Revising fitness-for-duty Program,Developed in Accordance with 10CFR26.Util Will Continue to Use Dept of Health & Human Svcs Certified Test Facility for Majority of Tests During Yr ML17265A5561999-02-22022 February 1999 Forwards FFD Performance Data Rept for Six Months Ending 981231,per 10CFR26.71(d) ML17265A5451999-02-12012 February 1999 Forwards Simulator Four Year Certification Rept,Per 10CFR55.45(b)(5)(ii) ML17309A6491999-02-12012 February 1999 Forwards Ginna Station EOPs ML17265A5431999-02-0909 February 1999 Supplements 980806 Relief Request with Attached Table.Util Third 10-Yr ISI of Reactor Vessel Being Performed During 1999 Refueling Outage,Beginning on 990301 ML17265A5361999-02-0202 February 1999 Forwards Response to NRC 981203 RAI Re Resolution of Unresolved Safety Issue USI A-46.Util Does Not Agree with NRCs Interpretation.Detailed Bases,Encl ML17311A0691999-01-25025 January 1999 Forwards Revs to Ginna Station Emergency Plan Implementing Procedures (Epips).Previous Rev Had Incorrect Effective Date ML17311A0671999-01-14014 January 1999 Forwards Revised Emergency Operating Procedures for Re Ginna NPP ML17265A5131999-01-12012 January 1999 Forwards Revised Cover Page for Ginna Station Technical Requirements Manual (Trm), Rev 7,correcting Error in Effective Date 1999-09-30
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML17250B3041999-10-20020 October 1999 Forwards Changes to Tech Specs Bases for Re Ginna Nuclear Power Plant.Change Bars Indicate Those Revs Which Have Been Incorporated ML17265A7651999-10-0808 October 1999 Forwards Fifteen Relief Requests That Will Be Utilized for Ginna NPP Fourth Interval ISI Program That Will Start on Jan 1,2000.Attachment 1 Includes Summaries & Detailed Description of Each Relief Request ML17265A7631999-10-0505 October 1999 Requests Approval for Use of Relief Request Number 43 to Address Volumetric Examination Limitations (Less than 90%) Associated with a & B RHR Heat Exchanger Outlet Nozzle to Shell Welds.Approval Is Requested by Dec 31,2000 ML17265A7641999-10-0505 October 1999 Requests Approval for Use of Relief Request Number 42 to Address Volumetric Examinations Limitations (Less than 90%) Associated with Eight Class 1 Identified Welds or Areas of Reactor Pressure Vessel ML20212J3561999-09-30030 September 1999 Forwards Four Copies of Re Ginna NPP Training & Qualification Plan for Security Officers, Rev 7,dtd 990930. Synopsis of Changes,Encl.Encl Withheld Per 10CFR73.21 ML20212J3801999-09-30030 September 1999 Forwards Four Copies of Rev to Re Ginna NPP Security Plan.Rev Changes Contingency Weapons Available to Response Force to Those Most Effective in Current Defensive Strategy.Encl Withheld Per 10CFR73.21 IR 05000244/19990051999-09-24024 September 1999 Forwards More Detailed Response Re Main Steam Check Valve Performance Questions Arising from NRC Insp Rept 50-244/99-05 Following Completion of Independent Assessment Being Performed by Duke Engineering & Svcs ML17265A7571999-09-24024 September 1999 Forwards More Detailed Response Re Main Steam Check Valve Performance Questions Arising from NRC Insp Rept 50-244/99-05 Following Completion of Independent Assessment Being Performed by Duke Engineering & Svcs ML17265A7461999-08-31031 August 1999 Submits Response to NRC Administrative Ltr 95-03,rev 2, Availability of Reactor Vessel Integrity Database,Version, Dtd 990726 ML17265A7401999-08-26026 August 1999 Requests Approval for Use of Relief Request Number 35 Re Use of ASME Section XI Code,1995 Edition,1996 Addenda.Code Will Be Used to Develop Plant Fourth 10-year Interval ISI Program on Class 1,2 & 3 Components ML17265A7411999-08-26026 August 1999 Forwards LER 99-004-01 Re Plant Being Outside Design Basis Due to Containment Recirculation Fan Moisture Separator Vanes Being Incorrectly Installed.Part 21 Notification of 990512 Is Being Rescinded ML17250B3021999-08-23023 August 1999 Informs That Util & NRC Had Conference Call on 990816 to Review Approach in Responding to Questions,As Result of Questions Re Main Steam Check Valve Performance Included in Insp Rept 50-244/99-05,dtd 990806 ML17265A7451999-08-23023 August 1999 Forwards fitness-for-duty Performance Data Rept for Six Months Ending 990630,per 10CFR26.71(d) ML17265A7271999-07-30030 July 1999 Forwards 10CFR21 Interim Rept Per Reporting of Defects & Noncompliance,Section 21 (a) (2).Interim Rept Prepared Because Evaluation Cannot Be Completed within 60 Days from Discovery of Deviation or Failure to Comply ML17265A7151999-07-23023 July 1999 Forwards LER 99-007-01 Re Personnel Error Which Caused Two Channels to Be in Tripped Condition,Resulting in Reactor Trip.Further Investigation of Event Identified Addl Corrective Actions ML17265A7061999-07-22022 July 1999 Forwards LER 98-003-02,re Actuations of CR Emergency Air Treatment Sys.All Creats Actuations,Including Those Originally Believed to Be Valid Actuations,Were,In Fact Invalid Actuations ML17265A7191999-07-21021 July 1999 Forwards Ginna Station ISI Rept for Refueling Outage Conducted in 1999 ML17265A7141999-07-21021 July 1999 Withdraws Relief Request 35 for Plant Inservice Insp Program Section XI Requirements,Submitted on 980806.Licensee Plans to Resubmit Relief Request,Which Includes Addl Level of Detail,In Near Future ML17265A7041999-07-16016 July 1999 Submits Info Re Specific Licensing Actions Which May Be Expected to Generate Complex Reviews,In Response to Administrative Ltr 99-02,dtd 990603 ML17265A6911999-06-30030 June 1999 Responds to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants.Gl 98-01 Requested Response on Status of Facility Y2K Readiness by 990701.Readiness Disclosure Attached ML17265A6871999-06-22022 June 1999 Forwards Response to RAI Made During 990225 Telcon Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves. Calculation Encl. Encl ML17265A6841999-06-21021 June 1999 Informs That Util Wishes to Amend Extend of Alternate Exams Provided for Relief Request Re ISI Program ASME Section XI Require Exams for First 10-Yr Interval for Containment ML17265A6741999-06-15015 June 1999 Submits Annual ECCS Rept IAW 10CFR50.46(a)(3)(ii) Requirements.No Changes Have Been Made to Large Break LOCA PCT & Small Break LOCA PCT ML17265A6751999-06-11011 June 1999 Responds to NRC RAI Re Licensee GL 96-05 Program.Encl Info Verifies That Util Is Implementing Provisions of JOG Program on MOV Periodic Verification ML17309A6551999-06-0707 June 1999 Responds to NRC 990310 RAI Re Verification of Seismic Adequacy of Mechanical & Electrical Equipment ML17265A6671999-06-0101 June 1999 Requests Approval of Ginna QA Program for Radioactive Matl Packages,Form 311,approval Number 0019.Ginna QA Program for Station Operation, Was Most Recently Submitted to NRC by Ltr Dtd 981221 & Supplemented on 990301 ML17265A6641999-05-25025 May 1999 Forwards Addl Info on Use of GIP Method a for Re Ginna Nuclear Power Plant.Copy of Re Ginna Station USI A-46 Outlier Resolution Table as Requested ML17265A6611999-05-24024 May 1999 Forwards LER 99-007-00 Re Personnel Error Which Caused Two Channels to Be in Tripped Condition,Resulting in Rt.Util Is Planning to Submit Suppl to LER by 990730 ML20206U0921999-05-13013 May 1999 Forwards Four Copies of Rev R to Gnpp Security Plan,Per Provisions of 10CFR50.54(p).Rev Clarifies Armed Response Team Assignments & Does Not Degrade Physical Security Effectiveness.Rev Withheld,Per 10CFR73.21 ML17265A6461999-05-12012 May 1999 Forwards 1998 Annual Radioactive Effluent Release Rept & 1998 Annual Radiological Environ Operating Rept, for Re Ginna NPP ML17265A6411999-05-12012 May 1999 Forwards LER 99-004-00 IAW 10CFR50.73 & 10CFR21.Further Assessment Will Be Provided in Suppl to LER by 990630 ML20206E7221999-04-29029 April 1999 Forwards Four Copies of Rev Q to Re Ginna Nuclear Power Plant Security Plan,Per 10CFR50.54(p).Changes Do Not Degrade Physical Security Effectiveness.Encl Withheld,Per 10CFR73.21 ML20206H6911999-04-22022 April 1999 Forwards Info Requested During Informal Telcon on 980408 Concerning Upcoming Osre at Ginna Station.Info Requested Listed.Without Encls ML17265A6271999-04-19019 April 1999 Forwards Rev 0 & Rev 1 to Colr,Cycle 28 for Re Ginna NPP, Per TS 5.6.5 ML17309A6501999-04-14014 April 1999 Forwards Revised Ginna Station EOPs & Procedures Index ML17265A6121999-03-29029 March 1999 Forwards Rept on Status of Decommissioning Funding for Re Ginna Npp,For Which Rg&E Is Sole Owner,Per 10CFR50.75. Data Presented Herein,Current as of 981231 ML17265A6041999-03-24024 March 1999 Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(ii)(B) & 10CFR21.Addl Analyses Are Being Performed to Support Future Cycle Operation & Supplemental LER Is Scheduled to Be Submitted by 990618 ML17265A5641999-03-0101 March 1999 Forwards Response to NRC 990217 RAI Concerning Changes to QA Program for Re Ginna Station Operation.Rg&E Is Modifying Changes Requested in 981221 Submittal.Modified QA Program,Encl ML17265A5671999-03-0101 March 1999 Forwards Application for Amend to License DPR-18,to Revise TSs Battery Cell Parameters Limit for Specific Gravity (SR 3.8.6.3 & SR 3.8.6.6).Supporting Tss,Encl ML17265A5551999-02-25025 February 1999 Informs That Util Is in Process of Revising fitness-for-duty Program,Developed in Accordance with 10CFR26.Util Will Continue to Use Dept of Health & Human Svcs Certified Test Facility for Majority of Tests During Yr ML17265A5561999-02-22022 February 1999 Forwards FFD Performance Data Rept for Six Months Ending 981231,per 10CFR26.71(d) ML17265A5451999-02-12012 February 1999 Forwards Simulator Four Year Certification Rept,Per 10CFR55.45(b)(5)(ii) ML17309A6491999-02-12012 February 1999 Forwards Ginna Station EOPs ML17265A5431999-02-0909 February 1999 Supplements 980806 Relief Request with Attached Table.Util Third 10-Yr ISI of Reactor Vessel Being Performed During 1999 Refueling Outage,Beginning on 990301 ML17265A5361999-02-0202 February 1999 Forwards Response to NRC 981203 RAI Re Resolution of Unresolved Safety Issue USI A-46.Util Does Not Agree with NRCs Interpretation.Detailed Bases,Encl ML17311A0691999-01-25025 January 1999 Forwards Revs to Ginna Station Emergency Plan Implementing Procedures (Epips).Previous Rev Had Incorrect Effective Date ML17311A0671999-01-14014 January 1999 Forwards Revised Emergency Operating Procedures for Re Ginna NPP ML17265A5131999-01-12012 January 1999 Forwards Revised Cover Page for Ginna Station Technical Requirements Manual (Trm), Rev 7,correcting Error in Effective Date ML17265A5111999-01-11011 January 1999 Requests Relief Per 10CFR50.55a(a)(3)(ii) from Certain Requirements of Section XI of ASME Bp&V Code for ISI Program.Relief Requests 37,38 & 39 Encl ML17265A5101999-01-11011 January 1999 Requests Relief Per to 10CFR50.55a(a)(3)(ii) from Certain Requirements of Section XI of ASME B&PV Code for ISI Program.Relief Request 40 Encl 1999-09-30
[Table view] Category:UTILITY TO NRC
MONTHYEARML20059L4481990-09-18018 September 1990 Forwards Responses to Rer 900709-13 Team Visit Findings, Per .Responses Withheld (Ref 10CFR73.21) ML17309A4491990-09-13013 September 1990 Forwards Slides Presented by Facility & Westinghouse to NRC in 900724 Meeting.Encl Withheld ML17262A1331990-09-11011 September 1990 Responds to Violations & Several Unresolved Items Noted in SSFI Rept 50-244/89-81.Update of Appropriate Unresolved Items Encl.Specific Actions Re All NRC Unresolved Items Being Tracked to Completion ML17261B1511990-08-29029 August 1990 Forwards Semiannual Radioactive Effluent Release Rept Jan- June 1990 & Rev 3 to Process Control Program for Ginna Station, Per Tech Specs 6.9.1.4 & 6.16,respectively ML17261B1481990-08-28028 August 1990 Lists Understanding of Issues Util Planning to Address Re Containment Integrity,Per 900718 Telcon.Any Concerns or Action Items Different from Listed Submittal Should Be Provided to Util Prior to NRC 900905 & 06 Visit to Plant IR 05000244/19880261990-08-20020 August 1990 Submits Update on Util Plans to Provide Appropriate Ventilation to Intermediate Bldg Clean Side,Per Violation Noted in Insp Rept 50-244/88-26.Extensive Program to Manually Close All External Openings Implemented ML17261B1501990-08-20020 August 1990 Submits Update on Util Plans to Provide Appropriate Ventilation to Intermediate Bldg Clean Side,Per Violation Noted in Insp Rept 50-244/88-26.Extensive Program to Manually Close All External Openings Implemented ML17261B1371990-08-17017 August 1990 Forwards Rev 0 to, Inservice Insp Rept for Third Interval (1990-1999),First Period,First Outage (1990) at Re Ginna Nuclear Power Plant. ML17309A4481990-08-16016 August 1990 Responds to NRC 900717 Ltr Re Violations Noted in Insp Rept 50-244/90-80.Corrective Actions:Westinghouse Drawing E-2508 Approved & Issued to Central Records ML17261B1351990-08-15015 August 1990 Provides Info & Assessment on Integrity of Connection of Containment Bldg to Foundation,Per 900808 Telcon.Util Believes That Existing Condition Not Safety Concern & No Reason Exists to Suspect Joint Will Not Perform Function ML17261B1361990-08-14014 August 1990 Responds to Commitment Tracking Concerns Noted in Insp Rept 50-244/90-09 & Planned Corrective Actions.Util Confirms Commitments Dates for Implementation of Effective Shelf Life Program & Comprehensive Preventive Maint Program for Parts ML17261B1331990-08-13013 August 1990 Recommits to Performing Enhanced primary-to-secondary Leak Rate Monitoring,Per NRC Bulletin 88-002 ML17261B1261990-07-30030 July 1990 Clarifies Commitment Made in 900316 RO Re Restoring Inoperable Fire Damper I-411-21-P.Util Plans to Design Removable Track Which Will Allow Charcoal Drawer to Be Manipulated.Definitive Schedule Will Be Provided in 60 Days ML20055H9291990-07-23023 July 1990 Forwards Revised Page 6:4 of Plant Security Plan.Page Withheld Per 10CFR73.21 ML17261B1091990-07-20020 July 1990 Advises That Structural Evaluations of Containment Sys Being Performed in Response to Containment Integrity Insp ML17309A4471990-07-17017 July 1990 Forwards Decommissioning Rept, for Plant,Per 10CFR50.33(k) & 50.75(b) ML17261B0881990-07-13013 July 1990 Provides Update to Util 860616 Ltr Re Implementation of NUREG-0737,Item 6.2,Suppl 1, Emergency Response Capability. ML17261B0921990-07-11011 July 1990 Responds to 900709 Request for Addl Info Re Containment Integrity Insp.Util Will Provide Preliminary Results by 900716 Re Where Groundwater Entering Annular Access Area. Meeting Proposed for Wk of 900723 ML20044B0481990-07-10010 July 1990 Discusses Review of Station Blackout Documentation,Per 10CFR50.63.Licensee Will Complete Enhancements to Station Blackout Documentation Identified in Attachment 1 as Indicated & Other Items Will Be Completed within 2 Yrs ML17309A4461990-07-0909 July 1990 Responds to Generic Ltr 90-04 Re Status of Licensee Implementation of Generic Safety Issues Resolved W/ Imposition of Requirements or Corrective Actions ML17261B0931990-07-0909 July 1990 Responds to Generic Ltr 88-14, Instrument Air Supply Sys Problems Affecting Safety-Related Equipment. Util Completed All Actions Requested in Generic Ltr & Will Retain Documentation Verification for Min of 2 Yrs ML17261B0901990-07-0909 July 1990 Advises That Licensee Will Install Containment Isolation Signal Going to Valve AOV 745 by End of 1992 Refueling Outage,Per Util 900608 Ltr Notifying of Condition Outside Design Basis of Plant Under 10CFR50.72 Criterion ML17250B2151990-06-29029 June 1990 Forwards Application for Amend to License DPR-18, Reformatting Auxiliary Electrical Sys Tech Specs & Action Statements for Offsite & Onsite Power Sources Available for Plant Auxiliaries ML17261B0851990-06-28028 June 1990 Forwards LER 89-016-02 Re 891117 Failure of Safety Injection Block/Unblock Switch Which Could Render Both Trains of Safety Injection Sys Inoperable.Also Reported Per Part 21 ML17250B1991990-06-0808 June 1990 Responds to NRC 900509 Ltr Re Violations Noted in Insp Rept 50-244/89-81.Corrective Actions:Improved Battery Load Profile Developed Incorporating Calculational Improvements Contained in Current Industry Std IEEE 485-1983 ML17250B1951990-06-0505 June 1990 Responds to Generic Ltr 89-08, Erosion/Corrosion Induced Pipe Wall Thinning. Util Developed Erosion/Corrosion Program for Single & Two Phase Sys Consistent W/Requirements of NUREG-1344 & NUMARC 870611 Rept ML17250B1851990-06-0101 June 1990 Forwards Application for Amend to License DPR-18,providing Guidance for Action Statements Associated W/Power Distribution Limit Specs ML17261B0691990-06-0101 June 1990 Discusses Testing Frequency for Insp of Incore Neutron Monitoring Sys Thimble Tubes,Per NRC Bulletin 88-009.Thimble Tube Indicating Greatest Wear Recently Repositioned in Effort to Minimize Future Wear ML17250B1811990-05-31031 May 1990 Forwards Addl Info Re Response to Notice of Violation from Insp Rept 50-244/90-04.Info Withheld (Ref 10CFR73.21) ML17250B1801990-05-29029 May 1990 Responds to NRC Bulletin 90-001, Loss of Fill-Oil in Transmitters Mfg by Rosemount. Util Does Not Need to Develop Enhanced Surveillance Program to Monitor Currently Installed Transmitter Based Upon Limited Installed Quantity ML17250B1841990-05-29029 May 1990 Responds to NRC Bulletin 89-002, Stress Corrosion Cracking of High Hardness Type 410 Stainless Steel (SS) Internal Pre-Load Bolting.... Valves Disassembled & 410 SS Studs Removed & Visually & Liquid Penetrant Examined ML17261B0961990-05-29029 May 1990 Responds to NRC 900427 Ltr Re Violations Noted in Insp Rept 50-244/90-07.Corrective Actions:Worker Records Immediately Corrected Indicating That Worker Received No Significant Exposure for Time While Error Occurred ML17250B1721990-05-18018 May 1990 Forwards Rev 1 to Summary Exam Rept for 1990 Steam Generator Eddy Current Insp. Rept Summarizes Observations & Corrective Actions Resulting from Insps Performed During 1990 Outage ML20042G8931990-05-0808 May 1990 Forwards Revised Emergency Operating Procedures,Including Rev 3 to AP-RHR.2,Rev 1 to ES-0.3 & Rev 11 to ES-1.3 ML17261B0611990-04-26026 April 1990 Advises of Changes to 890201 Commitments Made Under Programmed Enhancement Response to Generic Ltr 88-17.Changes Will Not Reduce Capability to Operate Safely in Reduced Inventory Condition or Scope of Programmed Enhancements ML17261B0591990-04-17017 April 1990 Advises That No Interlocks Required for RHR motor-operated Valves 701 & 720 Based on Present Arrangement.Listed Failures Would Have to Occur in Order for Potential Overpressurization of RHR Sys to Occur ML17261B0461990-04-12012 April 1990 Responds to Issues Discussed During 900323 Telcon Re Inservice Testing Program Status & Relief Request.Current Test Methodology for Seat Leakage Acceptable Based on Application of Direct Measurement Sys ML17262A1431990-04-12012 April 1990 Responds to NRC 900202 Ltr Re Weaknesses Noted in Insp Rept 50-244/89-80.Corrective Actions:Procedure ES-0.3 Modified to Provide Guidance for Rapid Cooldown & Depressurization W/ & W/O Reactor & Vessel Instrumentation Sys ML17250B1451990-04-0606 April 1990 Discusses Impact of SER Issuance for Inservice Insp & Inservice Testing Programs & Advises That Timing Will Not Affect Util Implementation Plans for Programs,Except as Listed ML17250B1441990-04-0505 April 1990 Responds to NRC 900309 Ltr Re Violations Noted in Insp Rept 50-244/90-02.Corrective Actions:Positive Indicator Will Be Installed for All Check Valves to Enhance Visible Positive Position Verification Ability & to Avoid Confusion ML17261B0401990-03-30030 March 1990 Advises That Final Results of Station Blackout Documentation Review Will Be Submitted to NRC on or About 900501 ML17261B0321990-03-28028 March 1990 Forwards Annual Rept of ECCS Model Revs as Applicable to Facility,Per 10CFR50.46.Mods to Model for Small Break LOCA Do Not Affect Calculated Peak Clad Temp ML17261B0331990-03-28028 March 1990 Forwards Info Re Reactor Vessel Issues,Per 900305 Telcon Concerning Change of License Expiration Date ML17261B0231990-03-26026 March 1990 Responds to NRC 890222 Ltr Re Violations Noted in Insp Rept 50-244/89-17.Corrective Actions:Personnel Verified Safety Injection Block/Unblock Switch in Proper Position & Operator Procedure 0-1.1 Changed as Indicated ML17261B0281990-03-23023 March 1990 Forwards Addl Info Re Proposed Tech Spec Amend Concerning Use of Reconstituted Fuel,Per 900315 Telcon.During Fuel Assembly Reconstitution,Failed Fuel Rods Will Be Placed W/ Filler Rods ML17261B0221990-03-22022 March 1990 Provides Revised Test Schedule for motor-operated Valve Diagnostic Test Program,Per IE Bulletin 85-003.NRC Notification of Changes to Valve Operability Program Required by Generic Ltr 89-10,dtd 890828 ML17261B0411990-03-20020 March 1990 Forwards Summary of Onsite Property Damage Coverage Currently in Force at Plant,Per 10CFR50.54(w)(4) ML17261B0151990-03-19019 March 1990 Responds to Generic Ltr 89-19, Safety Implication of Control Sys in LWR Nuclear Plants (USI A-47). Overfill Protection Provided Through Trip Bistables in Reactor Protection Racks Powered from 120-volt Instrument Buses ML17261B0101990-03-15015 March 1990 Forwards Application for Amend to License DPR-18,allowing Use of Reconstituted Fuel Assemblies ML20012D2831990-03-14014 March 1990 Responds to Issues Discussed During 900307 Telcon W/Util & Eg&G Re Inservice Testing Program Status & Relief Request. Valves 5960A & 5960B Will Be Disassembled to Verify Forward Flow.Relief Requests PR-8 & VR-25 Encl 1990-09-18
[Table view] |
Text
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR: 8805020177 DOC. DATE: 88/04/21 NOTARIZED: NO DOCKET FACIL: 50-244 Robert Emmet Qinna'uclear Plant> Unit ii Rochester G 0500024<
AUTH. NAME AUTHOR AFFILIATION SNOW> B. A. Rochester Gas i~ Electric Corp.
RECIP. NAME RECIPIENT AFFILIATION RUSSELL W. T. Region 1> Qfc o$ the Director
SUBJECT:
Forwards'SALP Rept 50-244/86-99 for June 19'86 Nov 1987.
DISTRIBUTION CODE: IE40D COPIES RECEIVED: LTR ENCL SIZE:
TITLE: Systematic Assessment o% Licensee Performance (SALP) Report NOTES: License Exp d'ate in accordance with 10CFR2i 2. 109(9/19/72). 05000'?44 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PDl-3 LA 1 0 PD1-3 PD 1 1 STAHLEi C 1 INTERNAL: AEOD BAILEY' 0 AEOD/DOA 1 1 AEQD/DSP/TPAB 1- COMMISSION 5 5 DEDRO 1 NRR MQRISSEAUi D 1 1 NRR/DLPQ/HFB 10 1 NRR/DLPG/PEB 11 1 1 NRR/DOEA/EAB 11 1 NRR/DREP /EP0 10 1 1 NRR/DRFP/RPB 10 NRR/DR I S DIR 9A 1 1 NRR/DR IS/BIB 9A 1 NRR/PMAS/ILRB12 1 1-OE *Ni J 1 OQC 15-B-18 1 1 FILE 02 1 RGN1 FILE 01 1 EXTERNAL: H ST LOBBY WARD LPDR NRC PDR NSIC TOTAL NUMBER OF COPIES REQUIRED: LTTR 29 ENCL 27
ROCHESTER GAS AND ELECTRIC CORPORATION ~ 89 EAST AVENUE, ROCHESTER, N.Y. 14649-0001 April 21, 1988 AQUA TCLCV~ORC conc 71G 546 2 700 U.S. Nuclear Regulatory Commission Attn: Mr. William T. Russell Regional Administrator Region I 475 Allendale Road King of Prussia, PA 19406
Dear Mr. Russell:
The enclosure to this letter. provides comments on the NRC Systematic Assessment of Licensee Performance (SALP) report for Ginna Station. Although specific comments are offered on this report, the report is a good and fair assessment of our nuclear operations. RG&E accepts the recommendations made by the SALP Board concerning engineering resources, the interface between the Operations and Engineering Divisions 'and the use of Quality Assurance and Quality Control as a management tool, and will evaluate means to implement the recommendations.
Thank you for the effort put forth to provide RGGE with your assessment of our corporate performance and especially for the opportunity to discuss this report with NRC personnel on March 23.
Very truly yours, Bruce A. Snow Superintendent Nuclear Production Enclosure xc: Document Control Desk (original)
Ginna Resident Inspector 80421 gg0$ 020i ADDCK 0 ~0002//
PDP PDR 6
ENCLOSURE 1 COMMBFCS ON SYSTEMATIC ASSESSMENT OF LICENSEE PERFORMANCE INSPECTION REPORT 50-244/86-99 R.E. Ginna Nuclear Power Plant Rochester Gas and Electric Corporation Assessment Period June 1. 1986 November 30. 1987
Introduction The reliable and safe operating record of the R.E. Ginna Nuclear Power Plant is a result of the performance of the working level staff at the plant and within the Engineering Division. The successful operation of the plant in meeting the high standards of performance demanded at nuclear power plants is a source of pride for the members of the organization. RG&E also recognizes that there are areas where improvements can be .made and accepts the recommendations of the SALP Board concerning Engineering resources, the interface between the Operations and Engineering Divisions as it affects timely resolution of matters requiring Engineering support, and the use of Quality Assurance and Quality Control as a management tool and as a means to identify, track and resolve quality concerns. The Board's recommendations will be evaluated and. appropriately implemented. within the Company.
Specific comments related to the SALP report are given in the following paragraphs. The intent of the comments is to clarify statements made within the report and to provide additional information to improve the understanding of the RG&E organization and activities.
Plant Operations A major program has been established to review and evaluate
. human performance errors. We anticipate that this INPO-developed Human Performance Evaluation System (HPES) in conjunction with improvements being implemented in many of the station procedures will help reduce personnel errors.
Improvements have been implemented in the temporary modification program to provide better review of, and control over, activities affecting plant configuration. This, in conjunction with resolution of pre-controlled temporary and implementation of periodic internal audits, 'odifications should lead to continuing improvements.
Subsequent inspection reports have acknowledged housekeeping improvements in portions of the plant. This is part of a systematic housekeeping effort throughout the entire plant to improve housekeeping and material conditions.
As noted in the SALP report, LER reports are written by the responsible department at the station. As discussed during the March 23 meeting, this practice will continue as will our efforts to continue to improve the quality of the reports.
Radiological Controls Significant efforts have gone into our ALARA program as evidenced by low annual exposures in spite of significant activities such as split pin replacements and steam generator maintenance. We believe that use of a full-scale steam generator mockup and our extensive steam generator training program have contributed greatly to reduced exposures.
Examples of poor ALARA implementation cited'n the report is rather an example of good ALARA analysis. Tritium exposure occurred to refueling wo'rkers (<40 MPC-hours) because of a modification performed on the purge supply and exhaust valves to meet an NRC commitment. If the modification and refueling work had not been performed concurrently, the outage length would have been extended and the total exposure would have been expected to increase because of increased duration of exposure to support crews. The decision not to use an air mover on the steam generator logistics tent (not a decontamination facility) was made because masks were reauired even if an air mover was in use, and the air movers could be used more effectively to reduce doses in other areas. Since that time we have also purchased more air movers but we will continue to evaluate the most effective use of equipment at any time. The use of mockups and the examples cited above are demonstrations of appropriate decision making in our effort to maintain radiation doses as low as reasonably achievable.
Clarifications are provided here for several examples cited in the report.
o A controlled area incident log is now in effect although it was not at the time of the report.
o An ALARA procedure and checklist for engineering modifications was issued for use in September 1987, before the end of the reporting period.
o A routine air sampling procedure and a procedure for operating the SRM-100 were in place prior to the end of the reporting period.
o A method to highlight procedure changes has been in effect for several years although it has apparently not been reviewed by the NRC.
Maintenance Improvements have been made in the conduct of our maintenance program which address the control of activities and the incidents relating to emergency diesel generator operation and valve maintenance. As noted in the report, a Senior Reactor Operator (SRO) has been assigned to review all maintenance reauests. This will improve our capability to
properly classify and control maintenance work and to identify the significance of maintenance work. The outage planning team has also been enhanced with additional people with operator training. This enhancement will assure that overall plant safety is appropriately considered when scheduling activities.
Other initiatives have also been undertaken in the maintenance area. We have performed a systematic self assessment of maintenance practices including resources, procedures, organizational structure and policies. This, in conjunction with implementation of a maintenance procedure upgrade program, initiation of a Reliability Centered Maintenance Program with EPRI, and the addition of a technical assessment/analysis group in the maintenance organization will provide continued strength in ,the maintenance area.
Surveillance RG&E Management is pleased with surveillance activities and will work to improve the minor weaknesses identified in the report.
Emer enc Pre aredness RG&E Management has been pleased with the demonstrated capability to respond to emergency conditions. Initiatives to further enhance our capabilities are being investigated.
They include use of the simulator during exercises to relieve congestion in the control room and to avoid distraction of the operators while the emergency response team is simulating conditions in the control room different from the true operating conditions. The use of journalism classes is being considered to return challenge to the Joint Emergency News Center by supplementing the news media who now consider exercises routine.
Securit and Safe ards RG&E Management is committed to maintaining an effective security program. RG&E personnel participate with a Regional group of security specialists in an effort to maintain a strong program consistent with industry practices and regulatory requirements. RG&E has sought out and seeks to maintain high level personnel with a broad background in security affairs.
Licensin Activities RGGE will continue to provide strong .support for current licensing issues and for efforts to reduce the backlog of currently open issues. Recent stability in the NRC organization, our commitment to address concerns and issues of the NRC, and more frequent communication by RGGE management with the NRC team will prevent recurrence of the minor weaknesses noted in the report.
Enqineering and Technical Suppoit We acknowledge and agree that lack of technical resources has affected the ability of the Engineering staff to address the backlog of routine engineering work and to be proactive. We appreciate the recognition that our current staff is highly talented, innovative and experienced and is performing high quality engineering. Since the end of the SALP period a modest increase in Engineering staff has been approved and an overall assessment of the Engineering resources needed to support Ginna Station in a more proactive mode is being performed. As staffing increases are identified, we will carefully pursue the pace of these additions such that we maintain close control over the quality of the engineering.
Engineering is pursuing an improvement in the interface with Ginna Station. It should be noted that examples of highly successful interfacing are present elsewhere in the SALP report. The Inservice Inspection Program and the pipe wall thinning investigations noted in the Surveillance section were activities coordinated and carried out by Engineering Division personnel'he control room design review was an Engineering-managed project and enhancements to the control room such as lighting and paint-tape-label- enhancements of the main control board (see SALP report page 10) were Engineering-managed modifications requiring close coordination with control room operators and activities. The first-of-a-kind installation of the micro-processor based rod position indication system and the boric acid piping replacement (SALP page 17) were also Engineering- managed projects. Successful response to the drain line elbow failure (SALP page 19) involved extensive technical support of Engineering design personnel.
We are actively pursuing continued improvement in the engineering interface with Ginna. The Milestone Scheduling System implemented in April 1987 has already resulted. in improved communications and interface and we expect further improvements. A capital priority and ranking system has been in place since October 1986 to develop mutual Operations and Engineering Division agreement on work scope and priority.
Detailed post-outage reviews of key plant modifications are being performed with the objective of improving both the quality of modifications and. the interface. More regular Engineering attendance at MOPAR meetings has been initiated.
Further initiatives will be sought to improve the interface.
Additional clarifications on specific statements made in the report are given below:
o Detailed engineering training has been conducted in the environmental qualification area and the NRC inspection report reflected no violations or concerns in this area.
Use of consultants in establishing our program and in responding to the inspection was'ue to RG&E resource availability, not due to lack of knowledge and training on the part of responsible Engineering personnel.
o Regarding the IEB 79-02 requirements, RG&E has incorporated the requirements of this Bulletin into our Seismic Upgrade Program, a proactive program initiated in 1979 to upgrade safety related piping to current criteria. Anchor bolt factors of safety were calculated for all piping systems in a timely manner except for the Standby Auxiliary Feedwater System and a small portion of the Service Water System. We acknowledge the omission of these systems. The load change characteristics noted in the inspection report involved only four pipe supports out of more than 1700. We have revised our design process to preclude recurrence.
Finally, we are not aware of requests to RG&E to resolve these issues other than the mid 1987 inspection addressed in the SALP report.
o The oversight regarding the station batteries during the EDG modification was corrected during the modification installation, prior to turnover for use of the modification.
Trainincr and uglification Effectiveness The Company has devoted significant resources to our INPO accreditation program with positive results. We agree that use of the plant specific simulator has produced direct benefits to the operator training program. We anticipate that the simulator will be used even more in coming years to assess operational transients and to practice for startups and heatups and cooldowns of the plant. In this way we expect to provide additional support to our already highly qualified operating staff.
As noted in the Operations section, implementation of the HPES is also expected to improve human performance in all areas by evaluating human performance problems to improve our training, procedures and methods.
A systematic approach utilizing the INPO accreditation methodology is being used to develop a comprehensive training program for QC inspectors.
Assurance of Quality The SALP report recommended two actions to be taken by RG&E:
o Assess the plant Operations and corporate Engineering interface and make the necessary changes to ensure timely resolution of those matters requiring Engineering support.
o Improve the use of QA and QC as a management tool and broaden the scope of. the formal identification, tracking and resolution of quality concerns and problems.
Several aspects of the Operations and Engineering interface have been addressed in the Engineering and Technical Support section including Engineering contributions to significant capital improvements, inspection programs, response to NRC and generic concerns, detailed post-outage reviews of plant modifications and Engineering participation at MOPAR meetings. A capital priority ranking syst: em that provides assessment of matters requiring Engineering support with input from plant Operations and Engineering has been in use for more than two years. The Milestone scheduling system has improved communications and the interface between divisions.
Improvements will continue to be sought although timely resolution of matters may be more a matter of corporate resources than a weakness in the interface between the plant and Engineering. We expect that additional resources will be made available in a controlled manner to address technical issues, improve the timeliness of response and assure the quality of engineering is maintained. Assessments of the interface and timeliness of resolution of issues will be made.
Regarding the use of QA and QC as a management tool, several actions are being taken. Responsibility to process CARs, and to perform followup so as to focus on reported quality deficiencies, has been reassigned to the Superintendent. The augmented maintenance organization with a dedicated corrective action coordinator has already reduced the backlog of open items. Monitoring by the QA/QC subcommittee is helping to maintain attention to problems where solutions have stagnated.
Quality Control staffing is being augmented, training is in progress and surveillance guidelines are being established which will permit more effective surveillance of ongoing operator and maintenance activities. A monthly QC surveillance summary report to management is being developed as a mechanism for providing timely focus on qualitv deficiencies, concerns and related trends.
If With .consultant assistance, Quality Assurance has recently begun to augment their audit guidelines and training regarding performance based assessments. Special audits are also being. utilized more frequently to provide department management with an assessment of the status and effectiveness of special projects. Technical expertise is being utilized more extensively on specialty audits such as radiological controls, emergency preparedness, engineering design, environmental qualification and the D.C. fuse upgrade program.
Adjustments were made early in 1987 to direct QC reports of surveillance efforts to the first line supervision as well as their management. More timely attention to rectify identified deficiencies has been apparent.
Post outage reviews of Non Conformance Reports (NCRs) are
.
expected to identify actions that will reduce repeat problems. This review will also identify those NCRs which reported concerns more appropriately handled by a different method.
Methods to optimize the processing of CARs are being evaluated by the Ginna staff to ensure actions are appropriately assigned and assignments routinely monitored.
Other recently-implemented initiatives of the QA/QC organizations to improve the effectiveness as a management tool include:
- a. QC is involved in maintenance planning through their review of maintenance work orders.
- b. Representatives of both groups conduct a two day training session on Quality Assurance principles and policies as part of the Technical Staff training program.
- c. QA/QC supervision initiated ouarterly reviews of various corrective action trends to identify underlying deficiencies and problems. This effort provides suggestions and recommendations to cognizant supervision.
- d. QC is working on a pilot training effort for the Ginna maintenance groups. QC is extracting "need to know" material from the implementing quality procedures which will result in a tailored training syllabus for each maintenance group. When implemented, this will improve the quality program at the worker level.