Rev 10 to Technical Requirements Manual (Trm), for Ginna Station
ML17265A626
Person / Time
Site: Ginna Constellation icon.png
Issue date: 04/18/1999
From:
ROCHESTER GAS & ELECTRIC CORP.
To:
References
PROC-990418, NUDOCS 9904270207
Download: ML17265A626 (14)


Text

CATEGORY 1 REGULA INFORMATION DISTRIBUTIO YSTEM (RIDS)

ACCESSION NBR:9904270207 DOC.DATE: 99/04/18 NOTARIZED: NO DOCKET ¹ FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH. NAME AUTHOR AFFILIATION

  • Rochester Gas S Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION Isiig/~s

SUBJECT:

Rev 10 to "Technical Requirements Manual (TRM)," for Ginna Station.

DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: OR Submittal: General Distribution T NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72). 05000244 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL LPD1-1 LA LPD1-1 PD VISSING,G.

INTERNAL NRR/DE/EMCB NRR/DE/EMEB NRR/DSSA/SPLB NRR/DSSA/SRXB NRR/SPSB JUNG,I NUDOCS-ABSTRACT OGC/HDS3 EXTERNAL: NOAC NRC PDR D

L.iIIJLih0.JIIl IIL~I.I JL<L4 N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR ENCL 12

, DISR261'HESTER GAS Ec ELECTRIC C ORATION DOCUMENT CONTROL Document Transmittal Transmittal: 9904077N 055 To: DOCUMENT CONTROL DESK Date: 04/17/1999 US NRC Holder: 1217 ATT: ALLEN JOHNSON PROJECT DOCTORATE 1-1 WASHINGTON DC 20555 LISTED BELOW ARE NEW OR REVISED CONTROLLED DOCUMENTS. REVIEW THE ATTACHED INSTRUCTION LETTER (IF APPLICABLE), AND UPDATE YOUR CONTROLLED DOCUMENT IN ACCORDANCE WITH IP-DOC-1.

Doc Id Doc Title Rev Rev Date Qty TRM TECHNICAL REQUIREMENTS MANUAL FOR 010 -04/18/1999 1 GINNA STATION "i'COGS Receipt Acknowledgement and Action Taken:

Signature Date Return to: Rochester Gas & Electric Corporation Ginna Station - Records Management 1503 Lake Road Ontario, New York 14519 9'F04270207 990418 PDR ADQCK 05000244 P PDR

E Jl

Rochester Gas and Electric Corporation Inter-Office Correspondence April 16, 1999

Subject:

Core Operating Limits Report (COLR) Cycle 28 Revision 1 and Technical Requirements Manual (TRM) Revision 10 TQ: Distribution Attached is Revision 1 of the Ginna Station Core Operating Limits Report for Cycle 28 and the associated pages for Revision 10 of the Technical Requirements Manual.

Revision 1 of the COLR Cycle 28 is due to changes in the required shutdown margin as the result of a new steam line break analysis. Revision 10 of the TRM is due to the combining of the S07 and S08 halon systems and typos.

Cycle 28 Revision 1 of the COLR and Revision 10 of the TRM are considered effective April 18, 1999. Instructions for the necessary changes to the ITS for your controlled copy of the COLR and TRM are as follows:

Volume Section Remove Insert III COLR COLR Cycle 28r0 COLR Cycle 28rl III TRM Cover Page Cover Page III .

TRM LEP-i LEP-i III TRM Chapter 3.3 TRM 3.3-10 TRM 3.3-10 III TRM Chapter 3.7 TRM 3.7-11 TRM 3.7-11 III TRM Chapter 3.7 TRM 3.7-13 TRM 3.7-13 III TRM Chapter 3.8 TRM 3.8-3 TRM 3.8-3 III TRM Chapter 3.7 TRM 3.9-5 TRM 3.9-5 Please contact Tom Harding (extension 3384) if you have any questions.

Thomas L. Harding

0 GINNA STATION TRM Revis on 9 TECHNICAL REQUI EMENTS MANUAL

{TyRMI R sponsible Hanag' g- 27-'f'7 Effective Date Controlled Copy Ho. i@7

List of Effective Pages (TRM)

Pa e Rev. Page Rev. Page Rev. Page Rev.

TOC Section 3.3 Section 3.7 (con'd) (con'd)

TRM 3.3-13 TRH 3.7-10 6 TRH 3.3-14 TRH 3.7-11 1 Section 1.0 TRH 3.3-15 TRH 3.7-12 4

.TRH 3.3-16 TRN 3.7-13 1 TRM 1.0-1 TRN 3.7-14 1 Section 3.4 TRH 3.7-15 4 Section 2.0 TRH 3. 7-16 1 TRH 3.4-1 TRH 3. 7-17 6 TRH 2.0-1 6 TRH 3.4-2 TRH 3.7-18 1 TRH 3.4-3 TRH 3.7-19 1 Section 3.0 TRH 3.4-4 0 TRH 3.7-20 6 TRH 3.4-5 0 TRH 3.7-21 6 TRH 3.0-1 TRH 3.4-6 0 TRH 3.7-22 6 TRH 3.4-7 0 TRH 3.7-23 1 Section 3.1 -TRH 3.4-8 3 TRH 3.7-24 1 TRH 3.4-9 3 TRM 3.7-25 8 TRH 3.1-1 TRH 3.4-10 '3 TRH 3.7-26 8 TRM 3.1-2 TRH 3.4-11 TRM 3.1-3 TRN 3.4-12 Section 3.8 TRH 3.1-4 TRH 3.4-13 TRH 3.1-5 TRH 3.4-14 TRM 3.8-1 TRH 3.1-6 TRH 3.8-2 TRM 3.1-7 Section 3.5 TRH 3.8-3 Section 3.2 TRN 3.5-1 Section 3.9 TRH 3.2-1 Section 3.6 TRM 3.9-1 TRH 3.9-2 Section 3.3 TRM 3.6-1 TRM 3.9-3 TRM 3.9-4 TRM 3.3-1 Section 3.7 TRN 3.9-5 TRH 3.3-2 TRN 3.9-6 TRN 3.3-3 TRH 3.7-1 1 TRM 3.9-7 TRH 3.3-4 TRH 3.7-2 1 TRH 3.3-5 TRH 3.7-3 6 Section 4.0 TRH 3.3-6 TRH 3.7-4 TRH 3.3-7 TRH 3.7-5 1 TRM 4.0-1 TRH 3.3-8 TRH 3.7-6 1 TRH 3.3-9 TRH 3.7-7 3 Section 5.0 TRM.3. 3-10 TRH 3.7-8 TRH 3.3-11 TRH 3.7-9 1 TRH 5.0-1 TRM 3.3-12 TRN 5.0-2 Ginna Station TRH LEP-i Revision 8

Fire D ction Instrumentation TR 3.3.4 Table TR 3.3.4-1 (page 1 of 2)

Fire Detection Instrumentation REQUIRED HEAT REQUIRED SNOKE LOCATION FIRE ZONE DETECTORS DETECTORS

1. Containment Filter 3(+)A)(c)
a. Post Accident Charcoal A Z09, Z10 H/A

(+)(0)(c)

b. Post Accident Charcoal Filter 8 Z11, Z12 3 N/A
c. Auxiliary Filter Charcoal Bank A Z06 I (b)(c) N/A 1(0) (c)
d. Auxiliary Filter Charcoal Bank 8 Z07 H/A
e. Cable Trays - Basement Elevation ZOB 1&i(<) H/A
f. Cable Trays - Intermediate Elevation Z15 2(a)(b)(d) N/A
g. Cable Trays - Operating Floor Z16 I (I) (d) H/A
h. Reactor Coolant Pump (RCP) A - Intermediate Z13 I(b)(d) H/A Floor RCP 8 - Intermediate Floor Z14 H/A Area Detection - Operating Floor Z16 H/A 7( ~ )(h)
2. Control Building
a. Control Room - Area and Cabinet Z19 17"
b. Control Room/Turbine Building Wall S29 4( ~ ) H/A 3(+)
c. Air Handling Room S06 N/A
d. Relay Room ZIB, SOB 3(i) IG(>)

Ceiling 3(+)

e. Computer (HUX) Room S07 H/A
f. Battery Rooms A and 8 pyrotronics H/A 3( ~ )

area 2 zone 4

3. Diesel Generators (OGs)
a. OG Room A S12 N/A
b. DG Vault A Z20 N/A
c. OG Room 8 S13 H/A
d. OG Vault 8 Z21 H/A continued)

(a) There is one additional detector at each zone which is not required to be OPERABLE per this TR.

(b) This instrument is not required to be OPERABLE during performance of integrated leak rate tests.

(c) Resistance temperature detectors (RTDs) only.

(d) Line type detectors.

Ginna Station TRH 3.3-10 Revision 4

Halon Systems TR 3.7.3 3.7 PLANT SYSTEMS 3.7.3 Halon Systems TR 3.7.3 Halon systems in Table TR 3.7.3-1 shall be OPERABLE.

APPLICABILITY: When equipment in the room is required to achieve or maintain safe shutdown.

ACTIONS

-NOTE Separate Condition entry is allowed for each halon system.

CONDITION REQUIRED ACTION COMPLETION TIME A. Required halon system A.l --------NOTE--------

inoperable. Not required to be performed during emergency conditions that prohibit access to affected room.

Establish a 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> continuous fire watch with backup fire suppression equipment.

AND A.2 Restore affected 14 days penetration to OPERABLE status.

(continued)

Ginna Station TRM 3. 7-11 Revision 1

Halon Systems TR 3.7.3 Table TR 3.7.3-1 (page 1 of I)

Halon Systems LOCATION SYSTEM NUMBER SURVEILLANCE RE(UIRENENTS Computer Room S07 TSR 3.7.3.1 TSR 3.7.3.2 TSR 3.7.3.3 TSR 3.7.3.4 TSR 3.7.3.5

2. Relay Room S08 TSR 3.7.3.1 TSR 3.7.3.2 TSR 3.7.3.3 TSR 3.7.3.4 TSR 3.7.3.5 Ginna Station TRH 3. 7-13 Revision 1

Table TR 3.8.2-1 (page 1 of 1)

Instrument Bus D Supported Functions I Instrument TR Bus 0 3.8.2 Fails to Tripped MOOE OF FUNCTION SUPPORT SYSTEM Condition7 APPLICABILITY LCO 3.9.2, Source Range Audible Count Rate

2. LCO Table 3.3.6-1, Functions 3.a, 3.b and 3.c Yes 1,2,3,4,5,6, and (CREATS Intake Radiation Monitors) Movement of irradiated fuel
3. LCO Table 3.3.1-1, Function 2 (N-44) Yes
4. LCO Table 3.3.1-1, Function 5 (OTDT Channel 4) Yes 1,2
5. LCO Table 3.3.3-2, Functions Sb and 6c (SG A LT-463) Yes 1,2,3
6. LCO Table 3.3.3-2, Functions Sb and 6c (SG 8 LT-471) Yes 1,2,3
7. LCO Table 3.3.3-2, Functions 4d and 4e (SG B FT-475) Yes 1,2,3
8. LCO Table 3.3.3-1, Function 1 (Pzr Pressure PT-449) Yes 1,2,3
9. LCO Table 3.3.3-1, Function 23 (SG A LT-463) Yes 1,2,3 10 'CO Table 3.3.3-1, Function 24 (SG 8 LT-471) Yes 1,2,3
11. TR Table 3.3.1-1, Functions 1 and 2 Yes 1,2,3,4,5,6 (CREATS Toxic Gas Intrunentation)

Ginna Station TRH TRH 3.8-3 Revision 6

~ ~

V"

Full C Offload for Cycle 27 TR 3.9.4

3. 9 REFUELING OPERATIONS 3.9.4 Full Core Offload for Cycle 27 TR 3.9.4 For the removal of all irradiated fuel assemblies from the reactor to the spent fuel pool (SFP), the following shall be met:
a. Two SFP cooling systems shall be OPERABLE, each commensurate with the SFP heat load; and
b. The combination of the following screenhouse bay water temperature (T) .and in-reactor decay time shall be met:

Sceenhouse Bay Water minimum In-Reactor Temperature,'F Decay Time, hrs.

T s 60 132 60 ( T ( 80 280

- -- NOTES

1. The SFP heat load and SFP cooling system capabilities are determined by Nuclear Engineering Services.
2. The combination of screenhouse bay water temperature and minimum in-reactor decay time is cycle/outage specific.

APPLICABILITY: During the complete removal of irradiated fuel assemblies from the reactor to the SFP, and until the reactor has been refueled.

Ginna Station TRH TRM 3.9-5 Revision 8