ML19275A144
ML19275A144 | |
Person / Time | |
---|---|
Site: | Sequoyah, Brunswick |
Issue date: | 08/27/1979 |
From: | Banks H CAROLINA POWER & LIGHT CO. |
To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
Shared Package | |
ML19275A145 | List: |
References | |
GD-79-2015, NUDOCS 7908310449 | |
Download: ML19275A144 (1) | |
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217M4461999-10-20020 October 1999
[Table view]Forwards Rev 8 to Sequoyah Nuclear Plant Physical Security/ Contingency Plan, IAW 10CFR50.54(p).Encl Withheld,Per 10CFR73.21 BSEP-99-0170, Forwards Proprietery Notification of Change in Operator Status.Individual Name,Docket Number,License Number & Effective Date of Expiration,Encl.Proprietary Info Withheld, Per 10CFR2.790(a)(6)1999-10-19019 October 1999 Forwards Proprietery Notification of Change in Operator Status.Individual Name,Docket Number,License Number & Effective Date of Expiration,Encl.Proprietary Info Withheld, Per 10CFR2.790(a)(6) 05000327/LER-1999-002, Forwards LER 99-002-00 Re Start of Units 1 & 2 EDGs as Result of Cable Being Damaged During Installation of Thermo- Lag for Kaowool Upgrade Project1999-10-15015 October 1999 Forwards LER 99-002-00 Re Start of Units 1 & 2 EDGs as Result of Cable Being Damaged During Installation of Thermo- Lag for Kaowool Upgrade Project ML20217J4151999-10-15015 October 1999 Forwards Request for Addl Info Re Util 990624 Application for Amend of TSs That Would Revise TS for Weighing of Ice Condenser Ice Baskets BSEP-99-0161, Submits Response to NRC RAI Re Relief Request VRR-03.VRR-03 Requested Relief from full-stroke Open Exercise Requirements for Supply Check Valves to air-operated Valves 1(2)-RNA-V313,1(2)-RNA-V314,1(2)-RNA-V350 & 1(2)-RNA-V3511999-10-13013 October 1999 Submits Response to NRC RAI Re Relief Request VRR-03.VRR-03 Requested Relief from full-stroke Open Exercise Requirements for Supply Check Valves to air-operated Valves 1(2)-RNA-V313,1(2)-RNA-V314,1(2)-RNA-V350 & 1(2)-RNA-V351 ML20217G1191999-10-0808 October 1999 Informs That on 990930,NRC Staff Completed mid-cycle PPR of Brunswick NPP & Did Not Identify Any Areas Where Performance Warranted More than Core Insp Program.Nrc Plan to Conduct Only Core Insps at Facility Over Next Five Months ML20217G1141999-10-0707 October 1999 Responds to from P Salas,Providing Response to NRC Risk Determination Associated with 990630 Flooding Event at Sequoyah Facility.Meeting to Discuss Risk Determination Issues Scheduled for 991021 in Atlanta,Ga ML20217B2981999-10-0606 October 1999 Discusses Closeout of GL 92-01,rev 1,suppl 1, Reactor Vessel Integrity, for Sequoyah Nuclear Plant,Units 1 & 2. NRC Also Hereby Solicits Any Written Comments That TVA May Have on Current Rvid Data by 991101 ML20217C6931999-10-0606 October 1999 Forwards Insp Repts 50-324/99-06 & 50-325/99-06 on 990801- 0911 at Brunswick Reactor Facility.No Violations Were Identified ML20217B8431999-10-0505 October 1999 Requests NRC Review & Approval of ASME Code Relief Requests That Were Identified in Plant Second 10-yr ISI Interval for Both Units.Encl 3 Provides Util Procedure for Calculation of ASME Code Coverage for Section XI Nondestructive Exams BSEP-99-0114, Forwards Supplemental Biological Assessment Submitted by CP&L Providing Updated Data for 1998 & 1999. Pictures of Intake Canal at Diversion Structure During High Tide Conditions Also Encl1999-10-0404 October 1999 Forwards Supplemental Biological Assessment Submitted by CP&L Providing Updated Data for 1998 & 1999. Pictures of Intake Canal at Diversion Structure During High Tide Conditions Also Encl BSEP-99-0157, Submits Annual Rept Summarizing Effect of Changes & Errors in Accepted loss-of-coolant Accident ECCS Evaluation Models Applicable to Bsep,Units 1 & 2 IAW 10CFR50.46(a)(3)(ii)1999-10-0404 October 1999 Submits Annual Rept Summarizing Effect of Changes & Errors in Accepted loss-of-coolant Accident ECCS Evaluation Models Applicable to Bsep,Units 1 & 2 IAW 10CFR50.46(a)(3)(ii) IR 05000327/19990041999-10-0101 October 1999 Ack Receipt of Providing Comments on Insp Repts 50-327/99-04 & 50-328/99-04.NRC Considered Comments for Apparent Violation Involving 10CFR50.59 Issue ML20212J5981999-10-0101 October 1999 Forwards SE Accepting Request for Relief from ASME Boiler & Pressure Vessel Code,Section Xi,Requirements for Certain Inservice Insp at Plnat,Unit 1 ML20217C7101999-10-0101 October 1999 Forwards Response to NRC 990910 RAI Re Sequoyah Nuclear Plant,Units 1 & 2 URI 50-327/98-04-02 & 50-328/98-04-02 Re Ice Weight Representative Sample ML20212M1081999-09-29029 September 1999 Confirms Intent to Meet with Utils on 991025 in Atlanta,Ga to Discuss Pilot Plants,Shearon Harris & Sequoyah Any Observations & Lessons Learned & Recommendations Re Implementation of Pilot Program ML20217A9451999-09-27027 September 1999 Forwards Insp Repts 50-327/99-05 & 50-328/99-05 on 990718- 0828.One Violation Identified & Being Treated as Non-Cited Violation ML20216J9351999-09-27027 September 1999 Responds to NRC Re Violations Noted in Insp Repts 50-327/99-04 & 50-328/99-04.Corrective Actions:Risk Determination Evaluation Was Performed & Licensee Concluded That Event Is in Green Regulatory Response Band ML20212F4501999-09-23023 September 1999 Forwards Amends 246 & 237 to Licenses DPR-77 & DPR-79, Respectively & Ser.Amends Approve Request to Revise TSs to Allow Use of Fully Qualified & Tested Spare Inverter in Place of Any of Eight Required Inverters ML20212F0751999-09-23023 September 1999 Forwards SER Granting Util 981021 Request for Relief from ASME Code,Section XI Requirements from Certain Inservice Insp at Sequoyah Nuclear Power Plant,Units 1 & 2 Pursuant to 10CFR50.55a(a)(3)(ii) BSEP-99-0142, Forwards Proprietary Updated List of Home Addresses for Individuals Licensed to Operate CP&L Bsep,Units 1 & 2. Proprietary Info Withheld,Per 10CFR2.790(a)(6)1999-09-23023 September 1999 Forwards Proprietary Updated List of Home Addresses for Individuals Licensed to Operate CP&L Bsep,Units 1 & 2. Proprietary Info Withheld,Per 10CFR2.790(a)(6) BSEP-99-0158, Provides Proprietary Notification of Change in Operator Status.Individual Name,Docket Number,License & Effective Date of Expiration Provided in Encl to Ltr.Proprietary Info Withheld,Per 10CFR2.790(a)(6)1999-09-21021 September 1999 Provides Proprietary Notification of Change in Operator Status.Individual Name,Docket Number,License & Effective Date of Expiration Provided in Encl to Ltr.Proprietary Info Withheld,Per 10CFR2.790(a)(6) ML20212M1911999-09-21021 September 1999 Discusses Exercise of Enforcement Discretion Re Apparent Violation Noted in Insp Repts 50-327/99-04 & 50-328/99-04 Associated with Implementation of Procedural Changes Which Resulted in Three Containment Penetrations Being Left Open BSEP-99-0153, Forwards Monthly Operating Repts for Brunswick Steam Electric Plant,Units 1 & 2.CP&L Is Submitting Encl Rept of Operating Statistics & SD Experience for Aug 19991999-09-14014 September 1999 Forwards Monthly Operating Repts for Brunswick Steam Electric Plant,Units 1 & 2.CP&L Is Submitting Encl Rept of Operating Statistics & SD Experience for Aug 1999 BSEP-99-0147, Forwards Response to NRC Telcon RAI Re Relief Requests RR-5, 12,13,14,22,23,24 & 25,per Inservice Insp Program for Third 10-yr Interval1999-09-14014 September 1999 Forwards Response to NRC Telcon RAI Re Relief Requests RR-5, 12,13,14,22,23,24 & 25,per Inservice Insp Program for Third 10-yr Interval ML20211Q0311999-09-10010 September 1999 Requests Written Documentation from TVA to Provide Technical Assistance to Region II Re TS Compliance & Ice Condenser Maint Practices at Plant BSEP-99-0151, Notifies NRC That Unit 1 Digtial FW Control Sys Upgrade Was Completed on 990831 During Plant Sd.Action Completes Y2K Remediation Activities for BSEP1999-09-0808 September 1999 Notifies NRC That Unit 1 Digtial FW Control Sys Upgrade Was Completed on 990831 During Plant Sd.Action Completes Y2K Remediation Activities for BSEP ML20216F5441999-09-0707 September 1999 Provides Results of Risk Evaluation of 990630,flooding Event at Sequoyah 1 & 2 Reactor Facilities.Event Was Documented in Insp Rept 50-327/99-04 & 50-328/99-04 & Transmitted in Ltr, BSEP-99-0150, Forwards Proprietary Info Re Positive Drug Test for Operator Licensed on CP&L Bsep,Units 1 & 2,in Response to NRC .Proprietary Info Withheld,Per 10CFR2.790(a)(6)1999-09-0202 September 1999 Forwards Proprietary Info Re Positive Drug Test for Operator Licensed on CP&L Bsep,Units 1 & 2,in Response to NRC .Proprietary Info Withheld,Per 10CFR2.790(a)(6) BSEP-99-0149, Forwards Two Proprietary License Renewal Applications Consisting of NRC Form 398 & NRC Form 396,for Operators Licensed at Plant.Proprietary Encls Withheld1999-09-0202 September 1999 Forwards Two Proprietary License Renewal Applications Consisting of NRC Form 398 & NRC Form 396,for Operators Licensed at Plant.Proprietary Encls Withheld BSEP-99-0112, Forwards Summary of Exam Results for Feedwater Sparger & Nozzle Exams Performed During RFO13.Evaluation of Exam Results Documented in ESR 98-00333, Unit 2 Feedwater Sparger Evaluation Based on B214R1 IVVI Exam Results, Encl1999-09-0101 September 1999 Forwards Summary of Exam Results for Feedwater Sparger & Nozzle Exams Performed During RFO13.Evaluation of Exam Results Documented in ESR 98-00333, Unit 2 Feedwater Sparger Evaluation Based on B214R1 IVVI Exam Results, Encl ML20211N5681999-09-0101 September 1999 Submits Clarification of Two Issues Raised in Insp Repts 50-327/99-04 & 50-328/99-04,dtd 990813,which Was First Insp Rept Issued for Plant Under NRC Power Reactor Oversight Process Pilot Plant Study ML20211G5881999-08-27027 August 1999 Submits Summary of 990820 Management Meeting Re Plant Performance.List of Attendees & Matl Used in Presentation Enclosed ML20211K9001999-08-27027 August 1999 Forwards Insp Repts 50-324/99-05 & 50-325/99-05 on 990620-0731.Two Violations Occurred & Being Treated as NCVs BSEP-99-0146, Forwards Revised EPIPs for Bsep,Units 1 & 2.List of Revised Procedures & Summary of Changes Are Encl1999-08-26026 August 1999 Forwards Revised EPIPs for Bsep,Units 1 & 2.List of Revised Procedures & Summary of Changes Are Encl BSEP-99-0130, Requests Relief from ASME Boiler & Pressure Vessel Code, Section Xi,Iaw 10CFR50.55a(g)(5)(iii) & NRC GL 90-05, Guidance for Performing Temporary Non-Code Repair of ASME Code Class 1,2 & 3 Piping. Regulatory Commitments,Encl1999-08-25025 August 1999 Requests Relief from ASME Boiler & Pressure Vessel Code, Section Xi,Iaw 10CFR50.55a(g)(5)(iii) & NRC GL 90-05, Guidance for Performing Temporary Non-Code Repair of ASME Code Class 1,2 & 3 Piping. Regulatory Commitments,Encl BSEP-99-0148, Forwards Rev 0 to NF-908.03, Brunswick Unit 2,Cycle 14 Neutronics Startup Rept, IAW Section 13.4.2.1 of UFSAR for Brunswick Steam Electric Plant,Units 1 & 21999-08-25025 August 1999 Forwards Rev 0 to NF-908.03, Brunswick Unit 2,Cycle 14 Neutronics Startup Rept, IAW Section 13.4.2.1 of UFSAR for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-99-0141, Forwards Proprietary Info Re Expiration of Operator Licenses SOP-20812-1,OP-20977-1 & OP-21217,per 10CFR50.74(b) Re Notification of Changes in Operator Status.Proprietary Info Withheld,Per 10CFR2.790(a)(6)1999-08-25025 August 1999 Forwards Proprietary Info Re Expiration of Operator Licenses SOP-20812-1,OP-20977-1 & OP-21217,per 10CFR50.74(b) Re Notification of Changes in Operator Status.Proprietary Info Withheld,Per 10CFR2.790(a)(6) ML20211F8891999-08-25025 August 1999 Forwards Sequoyah Nuclear Plant Unit 1 Cycle 9 Refueling Outage, Re Completed SG Activities,Per TSs 4.4.5.5.b & 4.4.5.5.c BSEP-99-0132, Requests Delay in Providing Update on Util Intended Actions Re GL 96-06,until 180 Days After NRC Approval of Generic Technical Basis.List of Regulatory Commitments,Encl1999-08-20020 August 1999 Requests Delay in Providing Update on Util Intended Actions Re GL 96-06,until 180 Days After NRC Approval of Generic Technical Basis.List of Regulatory Commitments,Encl ML20211A1851999-08-16016 August 1999 Forwards Proprietary TR WCAP-15128 & non-proprietary Rept WCAP-15129 for NRC Review.Repts Are Provided in Advance of TS Change That Is Being Prepared to Support Cycle 10 Rfo. Proprietary TR Withheld,Per 10CFR2.790 ML20210V1471999-08-13013 August 1999 Forwards Insp Repts 50-327/99-04 & 50-328/99-04 on 990601- 0717.One Potentially Safety Significant Issue Identified.On 990630,inadequate Performance of Storm Drain Sys Caused Water from Heavy Rainfall to Backup & Flood Turbine Bldg BSEP-99-0134, Forwards Monthly Operating Repts for July 1999 for BSEP, Units 1 & 2.Revised Rept for June 1999 for Unit 2,reflecting Info on 990628 Forced Shutdown of Plant,Encl1999-08-13013 August 1999 Forwards Monthly Operating Repts for July 1999 for BSEP, Units 1 & 2.Revised Rept for June 1999 for Unit 2,reflecting Info on 990628 Forced Shutdown of Plant,Encl ML20211A1921999-08-12012 August 1999 Requests Proprietary TR WCAP-15128, Depth-Based SG Tube Repair Criteria for Axial PWSCC at Dented TSP Intersections, Be Withheld from Public Disclosure Per 10CFR2.790 ML20210P8221999-08-11011 August 1999 Advises That Info Contained in Which Submitted Document,Prepared by Siemens Power Corp,EMF-2168(P) Rev 0, Marked Proprietary,Will Be Withheld from Public Disclosure, Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954 BSEP-99-0128, Forwards Revised Relief Request RR-17,applicable to Remainder of Third 10-year ISI Program for Plant1999-08-11011 August 1999 Forwards Revised Relief Request RR-17,applicable to Remainder of Third 10-year ISI Program for Plant ML20210S9061999-08-11011 August 1999 Informs That GE Document Entitled, Addl Info Regarding 1.09 Cycle Specific SLMCPR for Brunswick Unit 1 Cycle 12, Will Be Withheld from Public Disclosure Pursuant to 10CFR2.790(b)(5) & Section 103(b) of Atomic Energy Act ML20210S9121999-08-11011 August 1999 Informs That Document NEDC-31624P,Suppl 2,Rev 6,entitled, Loss-Of-Coolant Accident Analysis Rept for Brunswick Steam Electric Plant Unit 2,Reload 13,Cycle 14 Will Be Withheld from Public Disclosure Pursuant to 10CFR2.790(b)(5) ML20210P8911999-08-10010 August 1999 Forwards SE Authorizing Relief Requests CIP-01,02,06,07,08, 09,10,11 (with Certain Exceptions) & 12-18,for Second 10-year ISI Interval.Requests CIP-04 & 05 Would Result in Hardship,Relief CIP-03 Not Required & CIP-11 Denied in Part ML20210P9381999-08-10010 August 1999 Forwards SE Accepting Licensee & Suppls & 0517,which Submitted Assessment of Impact on Operation of Unit 1 with Crack Indications of 2.11, 6.36 & 1.74 Inches in Three Separate Jet Pump Risers 1999-09-08 Category:INCOMING CORRESPONDENCE MONTHYEARML20217M4461999-10-20020 October 1999
[Table view]Forwards Rev 8 to Sequoyah Nuclear Plant Physical Security/ Contingency Plan, IAW 10CFR50.54(p).Encl Withheld,Per 10CFR73.21 BSEP-99-0170, Forwards Proprietery Notification of Change in Operator Status.Individual Name,Docket Number,License Number & Effective Date of Expiration,Encl.Proprietary Info Withheld, Per 10CFR2.790(a)(6)1999-10-19019 October 1999 Forwards Proprietery Notification of Change in Operator Status.Individual Name,Docket Number,License Number & Effective Date of Expiration,Encl.Proprietary Info Withheld, Per 10CFR2.790(a)(6) 05000327/LER-1999-002, Forwards LER 99-002-00 Re Start of Units 1 & 2 EDGs as Result of Cable Being Damaged During Installation of Thermo- Lag for Kaowool Upgrade Project1999-10-15015 October 1999 Forwards LER 99-002-00 Re Start of Units 1 & 2 EDGs as Result of Cable Being Damaged During Installation of Thermo- Lag for Kaowool Upgrade Project BSEP-99-0161, Submits Response to NRC RAI Re Relief Request VRR-03.VRR-03 Requested Relief from full-stroke Open Exercise Requirements for Supply Check Valves to air-operated Valves 1(2)-RNA-V313,1(2)-RNA-V314,1(2)-RNA-V350 & 1(2)-RNA-V3511999-10-13013 October 1999 Submits Response to NRC RAI Re Relief Request VRR-03.VRR-03 Requested Relief from full-stroke Open Exercise Requirements for Supply Check Valves to air-operated Valves 1(2)-RNA-V313,1(2)-RNA-V314,1(2)-RNA-V350 & 1(2)-RNA-V351 ML20217B8431999-10-0505 October 1999 Requests NRC Review & Approval of ASME Code Relief Requests That Were Identified in Plant Second 10-yr ISI Interval for Both Units.Encl 3 Provides Util Procedure for Calculation of ASME Code Coverage for Section XI Nondestructive Exams BSEP-99-0157, Submits Annual Rept Summarizing Effect of Changes & Errors in Accepted loss-of-coolant Accident ECCS Evaluation Models Applicable to Bsep,Units 1 & 2 IAW 10CFR50.46(a)(3)(ii)1999-10-0404 October 1999 Submits Annual Rept Summarizing Effect of Changes & Errors in Accepted loss-of-coolant Accident ECCS Evaluation Models Applicable to Bsep,Units 1 & 2 IAW 10CFR50.46(a)(3)(ii) BSEP-99-0114, Forwards Supplemental Biological Assessment Submitted by CP&L Providing Updated Data for 1998 & 1999. Pictures of Intake Canal at Diversion Structure During High Tide Conditions Also Encl1999-10-0404 October 1999 Forwards Supplemental Biological Assessment Submitted by CP&L Providing Updated Data for 1998 & 1999. Pictures of Intake Canal at Diversion Structure During High Tide Conditions Also Encl ML20217C7101999-10-0101 October 1999 Forwards Response to NRC 990910 RAI Re Sequoyah Nuclear Plant,Units 1 & 2 URI 50-327/98-04-02 & 50-328/98-04-02 Re Ice Weight Representative Sample ML20216J9351999-09-27027 September 1999 Responds to NRC Re Violations Noted in Insp Repts 50-327/99-04 & 50-328/99-04.Corrective Actions:Risk Determination Evaluation Was Performed & Licensee Concluded That Event Is in Green Regulatory Response Band BSEP-99-0142, Forwards Proprietary Updated List of Home Addresses for Individuals Licensed to Operate CP&L Bsep,Units 1 & 2. Proprietary Info Withheld,Per 10CFR2.790(a)(6)1999-09-23023 September 1999 Forwards Proprietary Updated List of Home Addresses for Individuals Licensed to Operate CP&L Bsep,Units 1 & 2. Proprietary Info Withheld,Per 10CFR2.790(a)(6) BSEP-99-0158, Provides Proprietary Notification of Change in Operator Status.Individual Name,Docket Number,License & Effective Date of Expiration Provided in Encl to Ltr.Proprietary Info Withheld,Per 10CFR2.790(a)(6)1999-09-21021 September 1999 Provides Proprietary Notification of Change in Operator Status.Individual Name,Docket Number,License & Effective Date of Expiration Provided in Encl to Ltr.Proprietary Info Withheld,Per 10CFR2.790(a)(6) BSEP-99-0147, Forwards Response to NRC Telcon RAI Re Relief Requests RR-5, 12,13,14,22,23,24 & 25,per Inservice Insp Program for Third 10-yr Interval1999-09-14014 September 1999 Forwards Response to NRC Telcon RAI Re Relief Requests RR-5, 12,13,14,22,23,24 & 25,per Inservice Insp Program for Third 10-yr Interval BSEP-99-0153, Forwards Monthly Operating Repts for Brunswick Steam Electric Plant,Units 1 & 2.CP&L Is Submitting Encl Rept of Operating Statistics & SD Experience for Aug 19991999-09-14014 September 1999 Forwards Monthly Operating Repts for Brunswick Steam Electric Plant,Units 1 & 2.CP&L Is Submitting Encl Rept of Operating Statistics & SD Experience for Aug 1999 BSEP-99-0151, Notifies NRC That Unit 1 Digtial FW Control Sys Upgrade Was Completed on 990831 During Plant Sd.Action Completes Y2K Remediation Activities for BSEP1999-09-0808 September 1999 Notifies NRC That Unit 1 Digtial FW Control Sys Upgrade Was Completed on 990831 During Plant Sd.Action Completes Y2K Remediation Activities for BSEP BSEP-99-0150, Forwards Proprietary Info Re Positive Drug Test for Operator Licensed on CP&L Bsep,Units 1 & 2,in Response to NRC .Proprietary Info Withheld,Per 10CFR2.790(a)(6)1999-09-0202 September 1999 Forwards Proprietary Info Re Positive Drug Test for Operator Licensed on CP&L Bsep,Units 1 & 2,in Response to NRC .Proprietary Info Withheld,Per 10CFR2.790(a)(6) BSEP-99-0149, Forwards Two Proprietary License Renewal Applications Consisting of NRC Form 398 & NRC Form 396,for Operators Licensed at Plant.Proprietary Encls Withheld1999-09-0202 September 1999 Forwards Two Proprietary License Renewal Applications Consisting of NRC Form 398 & NRC Form 396,for Operators Licensed at Plant.Proprietary Encls Withheld BSEP-99-0112, Forwards Summary of Exam Results for Feedwater Sparger & Nozzle Exams Performed During RFO13.Evaluation of Exam Results Documented in ESR 98-00333, Unit 2 Feedwater Sparger Evaluation Based on B214R1 IVVI Exam Results, Encl1999-09-0101 September 1999 Forwards Summary of Exam Results for Feedwater Sparger & Nozzle Exams Performed During RFO13.Evaluation of Exam Results Documented in ESR 98-00333, Unit 2 Feedwater Sparger Evaluation Based on B214R1 IVVI Exam Results, Encl ML20211N5681999-09-0101 September 1999 Submits Clarification of Two Issues Raised in Insp Repts 50-327/99-04 & 50-328/99-04,dtd 990813,which Was First Insp Rept Issued for Plant Under NRC Power Reactor Oversight Process Pilot Plant Study BSEP-99-0146, Forwards Revised EPIPs for Bsep,Units 1 & 2.List of Revised Procedures & Summary of Changes Are Encl1999-08-26026 August 1999 Forwards Revised EPIPs for Bsep,Units 1 & 2.List of Revised Procedures & Summary of Changes Are Encl BSEP-99-0130, Requests Relief from ASME Boiler & Pressure Vessel Code, Section Xi,Iaw 10CFR50.55a(g)(5)(iii) & NRC GL 90-05, Guidance for Performing Temporary Non-Code Repair of ASME Code Class 1,2 & 3 Piping. Regulatory Commitments,Encl1999-08-25025 August 1999 Requests Relief from ASME Boiler & Pressure Vessel Code, Section Xi,Iaw 10CFR50.55a(g)(5)(iii) & NRC GL 90-05, Guidance for Performing Temporary Non-Code Repair of ASME Code Class 1,2 & 3 Piping. Regulatory Commitments,Encl BSEP-99-0148, Forwards Rev 0 to NF-908.03, Brunswick Unit 2,Cycle 14 Neutronics Startup Rept, IAW Section 13.4.2.1 of UFSAR for Brunswick Steam Electric Plant,Units 1 & 21999-08-25025 August 1999 Forwards Rev 0 to NF-908.03, Brunswick Unit 2,Cycle 14 Neutronics Startup Rept, IAW Section 13.4.2.1 of UFSAR for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-99-0141, Forwards Proprietary Info Re Expiration of Operator Licenses SOP-20812-1,OP-20977-1 & OP-21217,per 10CFR50.74(b) Re Notification of Changes in Operator Status.Proprietary Info Withheld,Per 10CFR2.790(a)(6)1999-08-25025 August 1999 Forwards Proprietary Info Re Expiration of Operator Licenses SOP-20812-1,OP-20977-1 & OP-21217,per 10CFR50.74(b) Re Notification of Changes in Operator Status.Proprietary Info Withheld,Per 10CFR2.790(a)(6) ML20211F8891999-08-25025 August 1999 Forwards Sequoyah Nuclear Plant Unit 1 Cycle 9 Refueling Outage, Re Completed SG Activities,Per TSs 4.4.5.5.b & 4.4.5.5.c BSEP-99-0132, Requests Delay in Providing Update on Util Intended Actions Re GL 96-06,until 180 Days After NRC Approval of Generic Technical Basis.List of Regulatory Commitments,Encl1999-08-20020 August 1999 Requests Delay in Providing Update on Util Intended Actions Re GL 96-06,until 180 Days After NRC Approval of Generic Technical Basis.List of Regulatory Commitments,Encl ML20211A1851999-08-16016 August 1999 Forwards Proprietary TR WCAP-15128 & non-proprietary Rept WCAP-15129 for NRC Review.Repts Are Provided in Advance of TS Change That Is Being Prepared to Support Cycle 10 Rfo. Proprietary TR Withheld,Per 10CFR2.790 BSEP-99-0134, Forwards Monthly Operating Repts for July 1999 for BSEP, Units 1 & 2.Revised Rept for June 1999 for Unit 2,reflecting Info on 990628 Forced Shutdown of Plant,Encl1999-08-13013 August 1999 Forwards Monthly Operating Repts for July 1999 for BSEP, Units 1 & 2.Revised Rept for June 1999 for Unit 2,reflecting Info on 990628 Forced Shutdown of Plant,Encl ML20211A1921999-08-12012 August 1999 Requests Proprietary TR WCAP-15128, Depth-Based SG Tube Repair Criteria for Axial PWSCC at Dented TSP Intersections, Be Withheld from Public Disclosure Per 10CFR2.790 BSEP-99-0128, Forwards Revised Relief Request RR-17,applicable to Remainder of Third 10-year ISI Program for Plant1999-08-11011 August 1999 Forwards Revised Relief Request RR-17,applicable to Remainder of Third 10-year ISI Program for Plant BSEP-99-0123, Forwards Rev 54 to Radiological Emergency Response Plan (RERP) & Revised Epips,Including Re 44 to OPEP-02.1,rev 4 to OPEP-02.1.1 & Rev 7 to OPEP-02.6.26.Summary of Changes Provided in Encl 21999-08-0505 August 1999 Forwards Rev 54 to Radiological Emergency Response Plan (RERP) & Revised Epips,Including Re 44 to OPEP-02.1,rev 4 to OPEP-02.1.1 & Rev 7 to OPEP-02.6.26.Summary of Changes Provided in Encl 2 BSEP-99-0110, Forwards Rev 0 to ESR 99-00279, B214R1 RPV Hydrotest Bolted Connection Corrective Action Evaluation, IAW Subparagraph IWB-3144(b) of 1989 Edition of ASME B&PV Code, Section XI1999-08-0505 August 1999 Forwards Rev 0 to ESR 99-00279, B214R1 RPV Hydrotest Bolted Connection Corrective Action Evaluation, IAW Subparagraph IWB-3144(b) of 1989 Edition of ASME B&PV Code, Section XI BSEP-99-0127, Forwards Rev 3 to Physical Security & Safeguards Contingency Plan, for Brunswick Steam Electric Plant,Units 1 & 2.Without Encl1999-08-0505 August 1999 Forwards Rev 3 to Physical Security & Safeguards Contingency Plan, for Brunswick Steam Electric Plant,Units 1 & 2.Without Encl ML20210L4291999-08-0202 August 1999 Forwards Sequoyah Nuclear Plant Unit 2 Cycle 9 12-Month SG Insp Rept & SG-99-07-009, Sequoyah Unit-2 Cycle 10 Voltage-Based Repair Criteria 90-Day Rept. Repts Submitted IAW TS 4.4.5.5.b & TS 4.4.5.5.c ML20210L1611999-07-30030 July 1999 Forwards Request for Relief RV-4 Re ASME Class 1,2 & 3 Prvs, Per First ten-year Inservice Test Time Interval.Review & Approval of RV-4 Is Requested to Support Unit 1 Cycle 10 Refueling Outage,Scheduled to Start 000213 BSEP-99-0124, Forwards Proprietary Medical Status Rept & NRC Form 396 for Individual Holding License SOP-20811-1. Proprietary Encls Withheld1999-07-30030 July 1999 Forwards Proprietary Medical Status Rept & NRC Form 396 for Individual Holding License SOP-20811-1. Proprietary Encls Withheld ML20210G5301999-07-28028 July 1999 Forwards Sequoyah Nuclear Plant Unit 2 ISI Summary Rept That Contains Historical Record of Repairs,Replacement & ISI & Augmented Examinations That Were Performed on ASME Code Class 1 & 2 Components from 971104-990511 BSEP-99-0122, Informs That,Effective 990702,NRC Operator License for Individual Licensed on BSEP Units 1 & 2,expired Because Individual Employment at BSEP Was Terminated.Proprietary Encl Containing Name,Docket & License Number Withheld1999-07-20020 July 1999 Informs That,Effective 990702,NRC Operator License for Individual Licensed on BSEP Units 1 & 2,expired Because Individual Employment at BSEP Was Terminated.Proprietary Encl Containing Name,Docket & License Number Withheld BSEP-99-0121, Submits Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates. Estimates That 14 Submittals Will Be Made During Fy 2000 & Nine Will Be Made During Fy 2001 for Plant1999-07-19019 July 1999 Submits Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates. Estimates That 14 Submittals Will Be Made During Fy 2000 & Nine Will Be Made During Fy 2001 for Plant BSEP-99-0111, Forwards New Affidavit Supporting Withholding of Proprietay Info Provided by GE Entitled, Addl Info Re 1.09 Cycle Specific SLMCPR for Brunswick Unit 1 Cycle 12 & Included in Util 980223 LAR1999-07-19019 July 1999 Forwards New Affidavit Supporting Withholding of Proprietay Info Provided by GE Entitled, Addl Info Re 1.09 Cycle Specific SLMCPR for Brunswick Unit 1 Cycle 12 & Included in Util 980223 LAR ML20209G1081999-07-13013 July 1999 Forwards Radiological Emergency Response Plan & Revised Epips,Including Rev 4 to OPEP-02.1.1 & Rev 7 to OPEP-02.6.26 ML20210J1091999-07-10010 July 1999 Submits Suggestions & Concerns Re Y2K & Nuclear Power Plants ML20196K0381999-06-30030 June 1999 Provides Written Confirmation of Completed Commitment for Final Implementation of Thermo-Lag 330-1 Fire Barrier Corrective Actions at Snp,Per GL 92-08 BSEP-99-0106, Informs That Units 1 & 2 Odcm,Spec 7.3.10, Gaseous Radwaste Treatment Sys Requires Gaseous Radwaste Treatment Sys to Be in Operation Whenever Main Condenser Air Ejector Sys Is in Operation.Special Rept Encl1999-06-28028 June 1999 Informs That Units 1 & 2 Odcm,Spec 7.3.10, Gaseous Radwaste Treatment Sys Requires Gaseous Radwaste Treatment Sys to Be in Operation Whenever Main Condenser Air Ejector Sys Is in Operation.Special Rept Encl BSEP-99-0103, Submits follow-up Info Re Interlaboratory Comparison Program for 1998 Radiological Environ Operating Rept,Suppl 11999-06-24024 June 1999 Submits follow-up Info Re Interlaboratory Comparison Program for 1998 Radiological Environ Operating Rept,Suppl 1 BSEP-99-0105, Forwards Rev 6 to OPEP-02.6, Severe Weather. Summary of Changes Encl1999-06-23023 June 1999 Forwards Rev 6 to OPEP-02.6, Severe Weather. Summary of Changes Encl BSEP-99-0100, Forwards Rev 0 to Calculation 2B11-0001, Core Shroud B214R1 Structural Evaluation, Which Provides Evaluation of Unit 2 Core Shroud Insp Results1999-06-23023 June 1999 Forwards Rev 0 to Calculation 2B11-0001, Core Shroud B214R1 Structural Evaluation, Which Provides Evaluation of Unit 2 Core Shroud Insp Results ML20196G7881999-06-22022 June 1999 Informs NRC of Changes That Util Incorporated Into TS Bases Sections & Trm.Encl Provides Revised TS Bases Pages & TRM Affected by Listed Revs ML20196G1801999-06-21021 June 1999 Requests Termination of SRO License SOP-20751-1,for Lf Hardin,Effective 990611.Subject Individual Resigned from Position at TVA BSEP-99-0091, Notifies That Operator Licensed on Units 1 & 2,has Been Reassigned to non-licensed Activities & Operator License Considered Expired.Proprietary Info Encl.Proprietary Info Withheld,Per 10CFR2.790(a)(6)1999-06-14014 June 1999 Notifies That Operator Licensed on Units 1 & 2,has Been Reassigned to non-licensed Activities & Operator License Considered Expired.Proprietary Info Encl.Proprietary Info Withheld,Per 10CFR2.790(a)(6) BSEP-99-0090, Provides Notification That Data Point D23C0315 Has Been Restored to Original Configuration During RFO on 9905141999-06-0909 June 1999 Provides Notification That Data Point D23C0315 Has Been Restored to Original Configuration During RFO on 990514 BSEP-99-0092, Informs That,Effective 990513,NRC Operator License for Individual Licensed on BSEP Units 1 & 2,expired.Proprietary Encl Containing Name of Individual,Docket Number,License Mumber & Date of Expiration Encl.Proprietary Encl Withheld1999-06-0808 June 1999 Informs That,Effective 990513,NRC Operator License for Individual Licensed on BSEP Units 1 & 2,expired.Proprietary Encl Containing Name of Individual,Docket Number,License Mumber & Date of Expiration Encl.Proprietary Encl Withheld 1999-09-08 Category:UTILITY TO NRC MONTHYEARML20059K6661990-09-17017 September 1990
[Table view]Forwards Evaluation That Provides Details of Plug Cracks & Justification for Continued Operation Until 1993 ML20064A8161990-09-14014 September 1990 Forwards Info Re Performance of NDE Exam of Feedwater Nozzles & Safe Ends During 1989/1990 Maint/Refueling Outage, Per NUREG-0619,Section 4.4.3.1(2) ML20059L0911990-09-12012 September 1990 Confirms That Fee Electronically Transferred to Dept of Treasury for Payment of NRC Review Fees ML20059H4031990-09-10010 September 1990 Discusses Plant Design Baseline & Verification Program Deficiency D.4.3-3 Noted in Insp Repts 50-327/86-27 & 50-328/86-27.Evaluation Concluded That pre-restart Walkdown Data,Loops 1 & 2 Yielded Adequate Design Input ML20059G2881990-09-0606 September 1990 Forwards Proprietary NEDC-31624P,Rev 2,Class III, Brunswick Steam Electric Plant Units 1 & 2 SAFER/GESTR-LOCA LOCA Loss of Coolant Accident Analysis, for NRC Approval.Rept Withheld ML20059H1831990-08-31031 August 1990 Forwards Nonproprietary PFE-F26NP & Proprietary PFE-F26, Sequoyah Nuclear Plan Unit 1,Cycle 5 Restart Physics Test Summary, Re Testing Following Vantage 5H Fuel Assembly installation.PFE-F26 Withheld (Ref 10CFR2.790(b)(4)) ML20059E2881990-08-31031 August 1990 Forwards Addl Info Re Alternate Testing of Reactor Vessel Head & Internals Lifting Rigs,Per NUREG-0612.Based on Listed Hardships,Util Did Not Choose 150% Load Test Option ML20059E1851990-08-31031 August 1990 Responds to NRC Re Violations Noted in Insp Repts 50-327/90-22 & 50-328/90-22.Corrective Actions:Extensive Mgt Focus Being Applied to Improve Overtime Use Controls ML18033B5031990-08-31031 August 1990 Forwards Financial Info Required to Assure Retrospective Premiums,Per 10CFR140 & 771209 Ltr ML17348B4941990-08-30030 August 1990 Forwards Semiannual 10CFR26 fitness-for-duty Program Data for 900103-0630.Mgt Decision Made to Utilize Alcohol Breath Instruments as Screening Devices for Unscheduled Work Call Outs in Determining fitness-for-duty ML20028G8341990-08-28028 August 1990 Forwards Calculation SCG1S361, Foundation Investigation of ERCW Pumping Station Foundation Cells. BSEP-90-0579, Informs That Util Plans to Replace Pilot Valve Assemblies on Listed Safety Relief Valves Prior to Startup1990-08-24024 August 1990 Informs That Util Plans to Replace Pilot Valve Assemblies on Listed Safety Relief Valves Prior to Startup ML20063Q2471990-08-20020 August 1990 Submits Implementation Schedule for Cable Tray Support Program.Util Proposes Deferral of Portion of Remaining Activities Until After Current Unit 2 Cycle 4 Refueling Outage,Per 900817 Meeting.Tva Presentation Matl Encl ML20056B5181990-08-20020 August 1990 Responds to NRC Re Order Imposing Civil Monetary Penalty & Violations Noted in Insp Repts 50-327/90-01 & 50-328/90-01.Corrective Actions:Organizational Capabilities Reviewed.Payment of Civil Penalty Wired to NRC ML20063Q2461990-08-17017 August 1990 Forwards Cable Test Program Resolution Plan to Resolve Issues Re Pullbys,Jamming & Vertical Supported Cable & TVA- Identified Cable Damage.Tva Commits to Take Actions Prior to Startup to Verify Integrity of safety-related Cables BSEP-90-0564, Forwards Response to Violations Noted in Insp Repts 50-324/90-19 & 50-325/90-19.Corrective Actions:Procedures to Shutdown Reactor Feed Pump Using Manual Control Approved on 900627 & Real Time Training Provided to Operators1990-08-16016 August 1990 Forwards Response to Violations Noted in Insp Repts 50-324/90-19 & 50-325/90-19.Corrective Actions:Procedures to Shutdown Reactor Feed Pump Using Manual Control Approved on 900627 & Real Time Training Provided to Operators BSEP-90-0565, Responds to Violations Noted in Insp Repts 50-324/90-06 & 50-325/90-06.Corrective Actions:Personnel Counseled on Closure of Locked High Radiation Area Doors & Preventive Maint Program Established for Reactor & Turbine Bldg Gates1990-08-16016 August 1990 Responds to Violations Noted in Insp Repts 50-324/90-06 & 50-325/90-06.Corrective Actions:Personnel Counseled on Closure of Locked High Radiation Area Doors & Preventive Maint Program Established for Reactor & Turbine Bldg Gates ML20059A5121990-08-15015 August 1990 Provides Clarification of Implementation of Replacement Items Project at Plant for Previously Procured Warehouse Inventory.Util Committed to 100% Dedication of Commercial Grade,Qa,Level Ii,Previous Procurement Warehouse Spare ML20058N1671990-08-0909 August 1990 Forwards Updated Tech Spec Pages Re 900314 Application for Amends to Licenses DPR-71 & DPR-62.Amends Permit Removal of Rod Sequence Control Sys & Reduces Rod Worth Minimizer Cutoff Setpoint to 10%-rated Thermal Power ML20056A6931990-08-0707 August 1990 Advises of Plans to Complete Remaining Portions of Licensed Operator Requalification Exams During Oct-Dec 1990 BSEP-90-0535, Forwards Monthly Status Rept on Plant Integrated Action Plan.New Target Completion Date for D27 Will Be 9008151990-08-0707 August 1990 Forwards Monthly Status Rept on Plant Integrated Action Plan.New Target Completion Date for D27 Will Be 900815 ML20058N2361990-08-0707 August 1990 Confirms That Requalification Program Evaluation Ref Matl Delivered to Rd Mcwhorter on 900801.Ref Matl Needed to Support NRC Preparation for Administering Licensed Operator Requalification Exams in Sept 1990 ML20058M2321990-08-0707 August 1990 Forwards Rept of 900709 Fishkill,Per Requirements in App B, Environ Tech Spec,Subsections 4.1.1 & 5.4.2.Sudden Water Temp Increase Killed Approximately 150 Fish in Plant Diffuser Pond BSEP-90-0545, Forwards Monthly Operating Rept for Jul 1990 for Brunswick Steam Electric Plant Units 1 & 2 & Corrected Operating Data Rept for June 1990,Unit 21990-08-0303 August 1990 Forwards Monthly Operating Rept for Jul 1990 for Brunswick Steam Electric Plant Units 1 & 2 & Corrected Operating Data Rept for June 1990,Unit 2 ML20063Q0501990-08-0303 August 1990 Forwards Corrections to Plant Updated Fsar,Amend 8,per ML20056A0291990-07-30030 July 1990 Forwards Response to NRC 900206 Request for Addl Info Re Util 870817 License Amend Request,Extending Expiration Dates for OLs ML20056A0611990-07-27027 July 1990 Advises That Util Plans to Perform Next Integrated Leak Rate Test During Next Reload 8 Outage,Currently Scheduled for Sept 1991 ML20058M4471990-07-27027 July 1990 Responds to Unresolved Items Which Remain Open from Insp Repts 50-327/90-18 & 50-328/90-18.TVA in Agreement W/Nrc on Scope of Work Required to Address Concerns W/Exception of Design Basis Accident & Zero Period Accelaration Effects ML20058M0111990-07-27027 July 1990 Forwards Addl Info Re Plant Condition Adverse to Quality Rept Concerning Operability Determination.Probability of Cable Damage During Installation Low.No Programmatic Cable Installation Problems Exist ML20055J3531990-07-27027 July 1990 Forwards Revised Commitment to Resolve EOP Step Deviation Document Review Comments ML20055J0771990-07-26026 July 1990 Requests Termination of Senior Reactor Operator License SOP-20830 for Jh Sullivan Due to Resignation from Util ML20056A1801990-07-25025 July 1990 Forwards Info Re NPDES Permit Noncompliance Reported to Permit Agency for Month of Mar 1990,per 830426 Agreement BSEP-90-0524, Informs of Change to Info in NRC Insp Repts 50-324/90-01 & 50-325/90-01 Paragraph 3.b of Details1990-07-24024 July 1990 Informs of Change to Info in NRC Insp Repts 50-324/90-01 & 50-325/90-01 Paragraph 3.b of Details ML20055G6771990-07-20020 July 1990 Responds to NRC Re Violations Noted in Insp Repts 50-324/90-14 & 50-325/90-14.Corrective Actions:Event Included in Third Quarter Real Time Training for Personnel, Emphasizing Importance of Detection of Plant Deficiencies ML20055G6611990-07-17017 July 1990 Forwards Justification for Continued Operation for safety- Related Cables Installed at Plant,Per 900717 Telcon.No Operability Concern Exists at Plant & No Programmatic Problems Have Been Identified.Summary of Commitments Encl ML20058L7001990-07-16016 July 1990 Forwards Response to SALP Repts 50-327/90-09 & 50-328/90-09 for 890204 - 900305,including Corrective Actions & Improvements Being Implemented ML20055F6151990-07-13013 July 1990 Provides Addl Bases for Util 900320 Proposal to Discontinue Review to Identify Maint Direct Charge molded-case Circuit Breakers Procured Between Aug 1983 & Dec 1984,per NRC Bulletin 88-010.No Significant Assurance Would Be Expected ML20044B2211990-07-12012 July 1990 Forwards Addl Info Clarifying Certain Conclusions & Recommendation in SER Re First 10-yr Interval Inservice Insp Program ML20055F9431990-07-12012 July 1990 Advises That Stated Amount Electronically Transferred to Us Dept of Treasury,Nrc on 900711 for Payment of Operator License Exam Fees for Listed Insp Invoices ML20055D2531990-07-0202 July 1990 Provides Status of Q-list Development at Plant & Revises Completion Date for Effort.Implementation of Q-list Would Cause Unnecessary & Costly Delays in Replanning Maint,Mod, outage-related Activities & Associated Procedure Revs BSEP-90-0459, Suppls Response to Violations Noted in Insp Repts 50-324/90-06 & 50-325/90-06 Re Locked High Radiation Area Boundary.Three Options to Eliminate Design Problems W/Locked High Radiation Boundaries Will Be Submitted by 9008171990-06-29029 June 1990 Suppls Response to Violations Noted in Insp Repts 50-324/90-06 & 50-325/90-06 Re Locked High Radiation Area Boundary.Three Options to Eliminate Design Problems W/Locked High Radiation Boundaries Will Be Submitted by 900817 ML20055D2751990-06-28028 June 1990 Informs That Senior Operator License SOP-20687 for Rj Zuffa No Longer Needed & Should Be Terminated Upon Receipt of Ltr ML20058K3551990-06-28028 June 1990 Responds to NRC Confirmation of Actions Ltr Re Licensed Operator Training Program Review.Curriculum Development Unit of Nuclear Training Section Will Develop Self Assessment Criteria to Increase Effectiveness of Training Program ML20055D7881990-06-27027 June 1990 Forwards Updated Tech Spec Pages to 890329 Application for Amends to Licenses DPR-71 & DPR-62 to Permit Expanded Operating Domain for Facility ML20043H9061990-06-21021 June 1990 Responds to Generic Ltr 90-04, Request for Info on Status of Licensee Implementaion of Generic Safety Issues Resolved W/Imposition or Requirements or Corrective Actions. No Commitments Contained in Submittal ML20043H2281990-06-18018 June 1990 Informs of Issue Recently Identified During Startup of Facility from Cycle 4 Refueling Outage & How Issue Addressed to Support Continued Escalation to 100% Power,Per 900613 & 14 Telcons ML20055C8201990-06-18018 June 1990 Forwards Rev 0 to Rept of 1989/90 Inservice Insp for Brunswick Steam Electric Plant Unit 2, Per ASME Boiler & Pressure Vessel Code,Section Xi,Article IWA 6220(b) ML20055H5501990-06-14014 June 1990 Discusses Confirmation of Concurrence Re Qualification of Fifth Operating Shift.Util Determined That Crew C Will Be Prepared for NRC Testing by 900723 & 24 to Provide Fifth Crew ML20043G4901990-06-14014 June 1990 Forwards Tabs for Apps a & B to Be Inserted Into Util Consolidated Nuclear Power Radiological Emergency Plan ML20043F9301990-06-13013 June 1990 Responds to NRC 900516 Ltr Re Violations Noted in Insp Repts 50-327/90-17 & 50-328/90-17.Corrective Action:Test Director & Supervisor Involved Given Appropriate Level of Disciplinary Action 1990-09-06 |
Text
,
W
'L Carolina Power & Light Company August 27, 1979 FILE: NG-3516 (B) SERIAL: GD-79-2105 Mr. James P. O'Reilly, Director U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, Suite 3100 Atlanta, GA 30303 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NO.1 DOCKET NO. 502325 LICENSE NO. DPR-71 LICENSEE EVENT REPORT 1-79-054
Dear Mr. O'Reilly:
,
In accordance with Section 6.9.1.9.b of the Technical Specifications for Brunswick Steam Electric Plant, Unit 1, the attached Licensee Event Report is submitted. This report fulfills the requirement for a written report within thirty (30) days of a reportable occurrence and is in accordance with the format set forth in NUREG-0161, July,1977.
Yours very truly, Odk z, H. R. Banks Manager Nuclear Generation SBT:j mb*
Attachment cc: Mr. R. A. Hartfield 2033 299 Mr. V. Stello
.
.
790831 < -
90832ow 9 w m mm m a . 2 a .. n,as 411 Fayetteville Street
- P. O. Box 1551
- Raleigh N. C. 27602
~r-w n ,3, y ~, 3 - - - - , --
-, w