Revised Monthly Operating Rept for Aug 1978
ML19210D129
Person / Time
Site: North Anna Dominion icon.png
Issue date: 11/05/1979
From: Wil Madison
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML19210D121 List:
References
NUDOCS 7911200564
Download: ML19210D129 (2)


Text

..%.VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH Auoust YEAR 1978 (Revised 11-05-79)

SUBMITTED:

ND[A .<&~SUPERINTENDENT - OPERATIONS APPROVED:.W'/..MANAGER'1120056f

..b OPERATING DATA REPORT QOO 50-338 y \.)DOCKET NO.

DATE ll b74 C051PLETED BY W. R. Madison TELEPHONE (701)B21-5151 OPER.\ TING STATUS North Anna Notes , 1. Unit Name:

, August 1978 (Revised)2. Reporting Period:

3.. Licensed Thermal Power (51Wt):

2775-4. Nameplate Rating (GrosiMWe):

947'907 5. Design E!cetrical Rating (Net MWe):

928 6. Maximum Depenable Capacity (Gross MWe):

090 7. S'aximum Dependable Capacity (Net MWe):

8. If Changes Occur in Capacity Ratings (Items Number 3 Thruugh 7) Since Last Report. Give Reasons:

N/A N/A 9. Power Level To which Restricted,If Any (Net MWe):

10. Reasons For Restriction.s. If Any:

N/A-..This Month Yr to-Date Cumulative

11. Hours in Reporting Period 744 2,088 2.088 2 12. Numb r Of Hours Reactor Was Critical 744 2,036 2,036 0 22.4 22.4 13. Reactor Reserve Shutdown Ifours
14. Ifours Generator On-Line 744 2,027.8 2,027_.8 0 0 0 15. Unit Reserve Shutdown Hours
16. Gross The mal Energy Generated (MWH) l,959,033 5.19L815 5.192.8185
17. Grou Electrical Energy Generated (MWH) 620,088_ _ .1.661.403 1.661.401_IS. Net Electrical Energy Generated (MWH) 581,045 1,552,923 1.552.923 100.0 97.1 97.1 19. Unit Service Factor
20. Unit Availability Fac:or 100.0 97.1 92,1___87.0 82.8 8 t.3_21. Unit Capacity Factor (Using MDC Net)
22. Unit Capacity Factor (Using DER Net) 86.1 82.0 82.0 0.0 0.5 0.5 23. Unit Forced Outage Rat,'24. Shutdowns Scheduled Oser Next 6 Months (Type. Date.and Duration of Each):

Scheduled, Sept. 22-29, 1978, Snubber Inspection & Misc. Maint.

25. If Shut Down At End Of Report Period, Estimated Date of Startup:

N/A 26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIA L CRITICALITY INI TIA L ELECTRICITY COMMERCIAL OPERATION

' " " " 1367 297