Final As-Administered Administrative Jpms for Davis-Besse Initial Examination - May 2004
ML041820340
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 05/03/2004
From: House J
FirstEnergy Nuclear Operating Co
To:
Office of Nuclear Reactor Regulation
References
-RFPFR, 50-346/04-301
Download: ML041820340 (66)


Text

Page 1 of 6 Appendix C Job Performance Measure Form ES-C-1 Worksheet

Facility: Davis-Besse ________ _ Task No: _115-036-01-0100_________

Task Title: Calculate a Shutdown Margin with 2 Stuck Rods______________________________

K/A

Reference:

001-A4.11 3.5/4.1 Job Performance Measure No: _RO A_

Examinee: __ NRC Examiner: ___________________

Facility Evaluator: ______________ Date: ___________________________

Method of testing:

Simulated Performance _______________ Actual Performance ____X

______ Classroom ________________ Simulator ______X_________ Plant ___________

READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions: The Plant is in Mode 3 following a Reactor trip. Two control rods failed to insert on the Reactor trip. The START program is NOT available. The plant is at 100 EFPD, Boron Concentration is 2390 ppmB, Tave is 532ºF, Transient Poison Worth is -0.27% K/K, Reactivity worth of Anomaly is -0.13% K/K, Boron Correction Factor is 0.96.

Task Standard: Calculate Shutdown Margin with 2 stuck control rods

Required Materials: Calculator General

References:

DB-NE-06202, Reactivity Balance Calculations, DB-NE-06201, Reactor Operators Curve Book, and Core Operating Limits Report

Initiating Cue: The Unit Supervisor directs you to perform a Shutdown Margin Calculation in accordance with DB-NE-06202, Reactivity Balance Calculations.

Time Critical Task: No Validation Time: 29 Minutes Page 2 of 6 Initiating Cue The Plant is in Mode 3 following a Reactor trip. Two control rods failed to insert on the Reactor trip. The START program is NOT available. Burnup: 100 EFPD Boron Concentration: 2390 ppmB Tave: 532ºF. Transient Poison Worth: -0.27% K/K Reactivity worth of Anomaly: -0.13% K/K Boron Correction Factor: 0.96.

The Unit Supervisor directs you to perform a Shutdown Margin Calculation in accordance with DB-NE-06202, Reactivity Balance Calculations.

Page 3 of 6 PERFORMANCE INFORMATION (Denote critical steps with a check mark)

___________________________________________________________________________

1. Performance Step: Determine minimum boron to ensure 1% K/K SDM. ____ Standard: From figure 6C, determine value of 2320 to 2340 ppmB and enter on Attachment 10.

Comment: Actual value should be 2325 pmmB.

____________________________________________________________________________

2. Performance Step: Determine value of corrected boron concentration.

____

Standard: Divide the RCS boron concentration (2325 ppmB) by the Boron Correction Factor (.96) to obtain a value of 2416 to 2438 ppmB.

Comment: Actual value should be 2325 ppmB divided by 0.96 for a final value of 2422 ppmB.

____________________________________________________________________________

3. Performance Step: Enter the value of Reactivity Worth Anomaly.

____ Standard: Enter a value of -0.13 %K/K, from the initial conditions.

Comment: None

____________________________________________________________________________

4. Performance Step: Determine corrected RCS boron concentration.

____ Standard: Multiply the RCS boron of 2390 ppmB by the Boron Correction Factor of 0.96 for a final value of 2294.4 ppmB.

Comment: None

____________________________________________________________________________

5. Performance Step: Determine Differential Boron Worth

____ Standard: From Figure 5A determine a value of -0.00612 to -0.00616 %K/K/ppmB using the corrected RCS boron concentration of 2294.4 ppmB and enter on Attachment 10.

Comment: Actual value of -.00614 %K/K/ppmB.

____________________________________________________________________________

Page 4 of 6

____________________________________________________________________________

6. Performance Step: Determine the corrected Anomaly Worth

____ Standard: Divide the Reactivity Worth Anomaly (-0.13 %K/K) by the Differential Boron Worth (-0.00612 to -0.00616 %K/K/ppmB) to obtain a value of 21.1 to 21.3 Comment: Actual value of 21.17

____________________________________________________________________________

7. Performance Step: Determine Transient Poison Boron Equivalent

____

Standard: Multiply Transient Poison Worth (-0.27) and Transient Poison Conversion Factor (85) then divide by the Boron Correction Factor (.96) to obtain a value of 23.9. Enter on Attachment 10. Comment: None

____________________________________________________________________________

8. Performance Step: Determine minimum boron concentration to ensure 1% Shutdown Valve.

____ Standard: Calculate minimum boron for 1% SDV on Attachment 10 to obtain a value of 2274 to 2285 ppmB.

Comment: Actual value of 2377 ppmB.

____________________________________________________________________________

Terminating Cues: This JPM is complete.

Page 5 of 6 VERIFICATION OF COMPLETION Job Performance Measure No. ____RO A

______ Examinee's Name:

Examiner's Name:

Date performed:

Facility Evaluator:

Number of attempts:

Time to complete:

Question Documentation:

Question:____________________________________________________________________

____________________________________________________________________________

____________________________________________________________________________

Response:___________________________________________________________________

____________________________________________________________________________

____________________________________________________________________________

____________________________________________________________________________

Result: SAT or UNSAT

Examiner's signature and date: _______________________________ __________

Page 6 of 6 JPM RO A Simulator Instructions If performed on the simulator, this JPM can setup at any IC

Page 1 of 8 Appendix C Job Performance Measure Form ES-C-1 Worksheet

Facility: Davis-Besse ________ _ Task No: _119-004-03-0400_________

Task Title: Control of Locked Valves During Post-Maintenance Testing______________________

K/A

Reference:

GEN 2.2.12 3.0/3.4 Job Performance Measure No: _RO C Examinee: __ NRC Examiner: ___________________

Facility Evaluator: ______________ Date: ___________________________

Method of testing:

Simulated Performance ______X________ Actual Performance __________

Classroom ________________ Simulator _______X_________ Plant __________

READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions: Maintenance has completed a packing adjustment on valve DH2736, DH Aux. Spray Throttle Valve, to stop a packing leak per Order 200001155.

Task Standard: Stroke and time DH2736 and make the appropriate locked valve log entries.

Required Materials: Pump and Valve Basis Document, Stop watch and Locked Valve Log

General

References:

DB-PF-03272, Post Maintenance Valve Test, DB-OP-00008, Operation and Control of Locked Valves Initiating Cue: The Unit Supervisor directs you to perform post maintenance valve testing of DH2736 in accordance with DB-PF-03272, Post Maintenance Valve Test beginning with section 3.2. DB-PF-03272 section 3.1 is complete The Shift Manager has given his permission to stroke DH2736, DH Aux. Spray Throttle Valve. An equipment operator is standing by in the Auxiliary Building. The Locked Valve Log is in the Control Room. The Shift Manager has completed the first 8 columns in the Locked Valve Log.

Time Critical Task: No Validation Time: 25 Minutes Page 2 of 8 Initiating Cues Maintenance has completed a packing adjustment on valve DH2736, DH Aux. Spray Throttle Valve, to stop a packing leak per Order 200001155.

The Unit Supervisor directs you to perform post maintenance valve testing of DH2736 in accordance with DB-PF-03272, Post Maintenance Valve Test beginning with section 3.2. DB-PF-03272 section 3.1 is complete The Shift Manager has given his permission to stroke DH2736, DH Aux. Spray Throttle Valve. An equipment operator is standing by in the Auxiliary Building. The Locked Valve Log is in the Control Room.

The Shift Manager has completed the first 8 columns in the Locked Valve Log.

Page 3 of 8 PERFORMANCE INFORMATION (Denote critical steps with a check mark)

____________________________________________________________________________

1. Performance step: Complete section 3.2 of DB-PF-03272

Standard: Check Verify section 3.1 is complete Comment: None

____________________________________________________________________________

2. Performance step: Complete section 3.2 of DB-PF-03272 Standard: Verify a RWP is available Comment: None Cue: (If asked) A special RWP is not required for this test.

____________________________________________________________________________

3. Performance step: Obtain stroke times from the Pump and Valve Basis Document and record on Attachment 2

____

Standard: Enter the maximum close time of 59.70 seconds, the maximum open time of 59.62 seconds, the expected close time range of 33.83 seconds to 45.77 seconds and the expected open time range of 33.78 seconds to 45.71 seconds in step 3.2.3 of DB-PF-03272

Comment: None

____________________________________________________________________________

4. Performance step: Complete section 3.2 of DB-PF-03272

Standard: Obtain Shift Manager's permission to perform the test Comment: None Cue: (If asked) the Shift Manager has given permission to stroke test DH 2736

____________________________________________________________________________

5. Performance step: Record test equipment data Standard: Record the M&TE number for the stopwatch and the calibration due date

Comment: None Cue: (If asked) A special DB-OP-00016 lineup is NOT required

____________________________________________________________________________

Page 4 of 8

____________________________________________________________________________

6. Performance step: Verity the Equipment Operator is at DH 2736 Standard: Communicate via GAI-TRONICS or radio

Comment: None Cue: An Equipment Operator is standing by to verify local valve position

____________________________________________________________________________

7. Performance step: Stoke DH 2736 open and record time

____ Standard: Depress and hold the OPEN pushbutton and stroke time using the stopwatch. Record the stroke time.

Comment: DH 2736 is a throttle valve, which requires the OPEN pushbutton to be depressed while the valve is stroking DH 2736 will stroke faster than the expected time.

____________________________________________________________________________

8. Performance step: Contact the Equipment Operator to check local indication

Standard: Communicate via GAI-TRONICS or radio Comment: None Cue: The Equipment Operator reports local valve position indicates DH 2736 is open

____________________________________________________________________________

9. Performance step: Complete the "Position To" column in the Locked Valve Log

____ Standard: Enter "Open" Comment: The Locked Valve Log may be updated after the stoke test is complete

____________________________________________________________________________

10. Performance step: Complete the "Position By" column in the Locked Valve Log

____ Standard: Enter initials Comment: The Locked Valve Log may be updated after the stoke test is complete

____________________________________________________________________________

Page 5 of 8

____________________________________________________________________________

11. Performance step: Stoke DH 2736 closed and record time

____ Standard: Depress and hold the CLOSED pushbutton and stroke time using the stopwatch.

Record the stroke time.

Comment: None

____________________________________________________________________________

12. Performance step: Contact the Equipment Operator to check local indication Standard: Communicate via GAI-TRONICS or radio Comment: None Cue: The Equipment Operator reports local valve position indicates DH 2736 is closed

____________________________________________________________________________

13. Performance step: Complete the "Restored By" column in the Locked Valve Log

____ Standard: Enter initials Comment: The Locked Valve Log may be updated after the stoke test is complete

____________________________________________________________________________

14. Performance step: Recognize the stroke times are not within the expected times Standard: Compare valve stroke times to the expected range of stroke times

Comment: None

____________________________________________________________________________

15. Performance step: Restoke DH 2736 and record times

____ Standard: Recognize the test requires the valve to be stroke timed a second time Comment: None

Cue: DH 2736 has been stroked open and closed a second time. The stroke times are the same as recorded in step 4.2.2

____________________________________________________________________________

Page 6 of 8

____________________________________________________________________________

16. Performance step: Inform the Unit Supervisor or Shift Manager the stroke times are not with in the expected range

____

Standard: Communicate to a shift SRO the need to write a Condition Report and perform an Operability Justification Comment: None Cue: The Shift Manager will write the Condition Report and document the Operability Justification

____________________________________________________________________________

17. Performance step: Complete acceptance criteria

____

Standard: Sign off steps 5.2 and 5.3 Comment: None

____________________________________________________________________________

Terminating Cue: This JPM is complete Page 7 of 8 VERIFICATION OF COMPLETION Job Performance Measure No. ____RO C

______ Examinee's Name:

Examiner's Name:

Date performed:

Facility Evaluator:

Number of attempts:

Time to complete:

Question Documentation:

Question:____________________________________________________________________

____________________________________________________________________________

____________________________________________________________________________

Response:___________________________________________________________________

____________________________________________________________________________

____________________________________________________________________________

____________________________________________________________________________

Result: SAT or UNSAT

Examiner's signature and date: _______________________________ __________

Page 8 of 8 JPM RO C Simulator Instructions Setup the simulator to any Mode 1, 2, or 3 IC at NOP and NOT.

Page 1 of 7 Appendix C Job Performance Measure Form ES-C-1 Worksheet

Facility: Davis-Besse ________ _ Task No: _071-001-02-0100_________

Task Title: Containment Pressure Reduction Release___________________________________

K/A

Reference:

GEN 2.3.11 2.7/3.2 Job Performance Measure No: _RO D Examinee: __ NRC Examiner: ___________________

Facility Evaluator: ______________ Date: ___________________________

Method of testing:

Simulated Performance _______________ Actual Performance __________

Classroom ________________ Simulator ________________ Plant __________

READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions: A plant heatup is in progress. Containment to annulus differential pressure has risen to 20 inches H 2O. A release permit has been prepared and approved.

Task Standard: Initiate a pressure release of Containment and stop the Containment release when the Main Station Exhaust Fans are found not running.

Required Materials: None General

References:

DB-OP-03012, Radioactive Gaseous Batch Release Initiating Cue: The Unit Supervisor directs you to perform a Containment pressure reduction release beginning with step 4.6.8 of DB-OP-03012, Radioactive Gaseous Batch Release. An Equipment Operator is standing by in the Auxiliary Building with a working copy of the release procedure to take actions at your direction.

Time Critical Task: No Validation Time: 15 Minutes

Page 2 of 7 Initiating Cues A plant heatup is in progress. Containment to annulus differential pressure has risen to 20 inches H 2 O. A release permit has been prepared and approved.

The Unit Supervisor directs you to perform a Containment pressure reduction release beginning with step 4.6.8 of DB-OP-03012, Radioactive Gaseous Batch Release. An Equipment Operator is standing by in the Auxiliary Building with a working copy of the release procedure to take actions at your direction.

Page 3 of 7 PERFORMANCE INFORMATION (Denote critical steps with a check mark)

____________________________________________________________________________

1. Performance step: Place computer point P318 on trend

____ Standard: Use the plant process computer to trend CTMT PRESS DIFF TO ANNULUS Comment: Exceptable to trend on the computer CRT or on the analog trend pens

Cue: P318 reads 20 inches. (If asked) The Unit Supervisor requests a 60-second trend

____________________________________________________________________________

2. Performance step: Request the Shift Manager approval of the release

____

Standard: Communicate with the Shift Manager Comment: Role play as the Shift Manager to sign and date Item 4.l on Attachment 1 of DB-OP-03012

____________________________________________________________________________

3. Performance step: Verify less than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> since containment was sampled Standard: Determine difference is less than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> between containment sample time in Item 4.e of Attachment 1 and current time

Comment: None

____________________________________________________________________________

4. Performance step: Open CV5037, H2 Purge System Ctmt Isolation

____ Standard: Press OPEN on HIS5037 Comment: Role play to provide the Independent Verification for opening CV 5037

____________________________________________________________________________

5. Performance step: Open CV5038, H2 Purge System Ctmt Isolation

____ Standard: Press OPEN on HIS5038

Comment: Role play to provide the Independent Verification for opening CV 5038

____________________________________________________________________________

Page 4 of 7

____________________________________________________________________________

6. Performance step: Direct the Equipment Operator to open the containment release skid discharge gate, to start the skid fan and to maintain flow rate at approximately 1400 on the M&TE anemometer readout.

____ Standard: Communicate via the GAI-TRONICS or radio Comment: May direct the Equipment Operator to perform steps 4.6.13, 4.6.14 and 4.6.15.

Cue: The Equipment Operator reports steps 4.6.13, 4.6.14 and 4.6.15 are complete. Step 4.6.13 has been independently verified. Skid flow rate is 1400 on the local anemometer.

____________________________________________________________________________

7. Performance step: Make a Unit Log entry Standard: Record start time, release permit number and containment to annulus differential pressure in the Unit Log Comment: None Cue: The secondary side Reactor Operator has made Unit Log entry for release start time, release permit number and containment to annulus differential pressure

____________________________________________________________________________

8. Performance step: Update the release permit

Standard: Record start date and time and containment to annulus P in Item 6 of Attachment 1 Comment: After the release is started an Equipment Operator will contact the Control Room to report that the Main Station Exhaust Fans are not running Cue: This is the Zone 3 Equipment Operator. I am in Fan Alley. Neither one of the Main Station Exhaust Fans are running.

____________________________________________________________________________

9. Performance step: Recognize the release should be stopped

____ Standard: Communicate to the Equipment Operator the need to stop the Containment Pressure Release Skid Fan Comment: None Cue: The Containment Pressure Release Skid Fan has been stopped.

____________________________________________________________________________

Page 5 of 7

____________________________________________________________________________

10. Performance step: Close CV5037, H2 Purge System Ctmt Isolation

____ Standard: Press CLOSE on HIS5037

Comment: None

____________________________________________________________________________

11. Performance step: Close CV5038, H2 Purge System Ctmt Isolation

____ Standard: Press CLOSE on HIS5038 Comment: None

____________________________________________________________________________

12. Performance step: Notify the Shift Manager the release has been stopped Standard: Communicate with the Shift Manager Comment: None

Cue: The Shift Manager acknowledges the Containment Pressure Reduction Release has been stopped.

____________________________________________________________________________

Terminating Cue: This JPM is complete

Page 6 of 7 VERIFICATION OF COMPLETION Job Performance Measure No. _RO D

_______ Examinee's Name:

Examiner's Name:

Date performed:

Facility Evaluator:

Number of attempts:

Time to complete:

Question Documentation:

Question:____________________________________________________________________

____________________________________________________________________________

____________________________________________________________________________

Response:___________________________________________________________________

____________________________________________________________________________

____________________________________________________________________________

____________________________________________________________________________

Result: SAT or UNSAT

Examiner's signature and date: _______________________________ __________

Page 7 of 7 JPM RO D Simulator Instructions Setup the simulator in a Mode 3, NOP, NOT IC.

Raise Containment pressure to 20 inches.

Fail Computer Point P318 to 20 inches.

Page 1 of 7 Appendix C Job Performance Measure Form ES-C-1 Worksheet

Facility: Davis-Besse ________ _ Task No: _000-080-05-0100_________

Task Title: Offsite Dose Assessment Using a Nomogram________________________________

K/A

Reference:

GEN 2.4.39 3.3/3.1 Job Performance Measure No: _RO E Examinee: __ NRC Examiner: ___________________

Facility Evaluator: ______________ Date: ___________________________

Method of testing:

Simulated Performance _______________ Actual Performance _____X

____ Classroom ________________ Simulator ________X_______ Plant __________

READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions: The reactor has been tripped due to an unisolable steam leak on Steam Generator 2. Steam Generator 2 is at 0 psig. SFRCS has actuated and both Auxiliary Feedwater Pumps Turbines (AFPT) are running. After Steam Generator 2 depressurized, a tube leak developed in Steam Generator 1. An RCS cooldown to 500 ºF is in progress using Atmospheric Vent Valve 1(AVV). The Safety Parameter Display System (SPDS) terminals are not available. Lower T is +1.0 ºF. Wind speed is 8 MPH. RE 609 is reading 4 X 10 5 CPM. Task Standard: Using a nomogram, determine the off-site TEDE dose levels at the site boundary, the two mile, the five mile and the ten mile limits.

Required Materials: Straightedge or ruler, calculator General

References:

RA-EP-02240, Offsite Dose Assessment, and Offsite Dose Assessment Nomogram Initiating Cue: The Shift Manager directs you to calculate a projected offsite Total Effective Dose Equivalent (TEDE) rate using the offsite dose assessment nomogram in accordance with RA-EP-02240, Offsite Dose Assessment.

Time Critical Task: No Validation Time: 13 Minutes Page 2 of 7 Initiating Cues The reactor has been tripped due to an unisolable steam leak on Steam Generator 2. Steam Generator 2 is at 0 psig. SFRCS has actuated and both Auxiliary Feedwater Pumps Turbines (AFPT) are running. After Steam Generator 2 depressurized, a tube leak developed in Steam Generator 1.

An RCS cooldown to 500 ºF is in progress using Atmospheric Vent Valve 1(AVV). The Safety Parameter Display System (SPDS) terminals are not available. Lower T is +1.0 ºF Wind speed is 8 MPH RE 609 is reading 4 X 10 5 CPM The Shift Manager directs you to calculate a projected offsite Total Effective Dose Equivalent (TEDE) rate using the offsite dose assessment nomogram in accordance with RA-EP-02240, Offsite Dose Assessment.

Page 3 of 7 PERFORMANCE INFORMATION (Denote critical steps with a check mark)

____________________________________________________________________________

1. Performance step: Determine the release pathway

Standard: Determine the release pathway is from both AFPT exhausts and from AVV 1 Comment: The flow rates for both AFPTs and AVV 1 can be added together or the TEDE rates for each of the flow paths can be added together

____________________________________________________________________________

2. Performance step: Locates the procedural guidance Standard: Identifies Attachment 2 of RA-EP-02240, Offsite Dose Assessment, as correct procedural guidance

Comment: None

____________________________________________________________________________

3. Performance step: Obtain a Nomogram

Standard: Obtain a Nomogram Comment: None

____________________________________________________________________________

4. Performance step: Record name, date and time on nomogram Standard: Write the information on the nomogram Comment: None

____________________________________________________________________________

5. Performance step: Plot the radiation monitor reading

____

Standard: From initial conditions, plot RE 609 reading of 4 X 10 5 CPM on scale B Comment: None

____________________________________________________________________________

6. Performance step: Plot the flow rate

____ Standard: Mark a flow rate of 5 to 6 KCFM on scale A Comment: Actual value is 5.06 KCFM. 0.33 KCFM for each AFPT and 4.4 KCFM for the AVV.

____________________________________________________________________________

Page 4 of 7

____________________________________________________________________________

7. Performance step: Plot the release rate

____ Standard: Draw a line from scale B to scale A to obtain a release rate of 10 to 20 Curries/sec

Comment: Actual release rate value is 12 Curries/sec

____________________________________________________________________________

8. Performance step: Plot the lower T ____ Standard: From initial conditions, plot lower T of +1.0 ºF on scale 1.

Comment: Lower T of +1.0 ºF is equivalent to a stability class E

____________________________________________________________________________

9. Performance step: Plot the wind speed

____ Standard: From initial conditions, plot a wind speed of 8 MPH on scale 2

Comment: None

____________________________________________________________________________

10. Performance step: Plot the X/Q value

____ Standard: Draw a line from scale 1 to scale 2 to obtain a X/Q value of 4 X 10

-5 to 6 X 10

-5 sec/m 3 on scale 3 Comment: Actual X/Q value is 5 X 10

-5 ____________________________________________________________________________

11. Performance step: Plot the TEDE value at the site boundary

____

Standard: Draw a line from scale C to scale 3 to obtain a TEDE value of 0.4 to 1 rem/hr and plot on scale 4 Comment: Actual TEDE rate at the site boundary is 0.8 rem/hr

____________________________________________________________________________

Page 5 of 7

____________________________________________________________________________

12. Performance step: Determine the TEDE rate at 2 miles

____ Standard: Divide the site boundary TEDE rate by 5 to obtain a TEDE rate at 2 miles of 0.08 rem/hr to 0.2 rem/hr and record on the nomogram Comment: Actual TEDE rate at 2 miles is 0.16 rem/hr

____________________________________________________________________________

13. Performance step: Determine the TEDE rate at 5 miles

____ Standard: Divide the site boundary TEDE rate by 15 to obtain a TEDE rate at 5 miles of 0.027 rem/hr to 0.067 rem/hr and record on the nomogram Comment: Actual TEDE rate at 5 miles is 0.053 rem/hr

____________________________________________________________________________

14. Performance step: Determine the TEDE rate at 10 miles

____

Standard: Divide the site boundary TEDE rate by 40 to obtain a TEDE rate at 10 miles of 0.01 rem/hr to 0.025 rem/hr and record on the nomogram Comment: Actual TEDE rate at 10 miles is 0.02 rem/hr

____________________________________________________________________________

Terminating Cue: This JPM is complete.

Page 6 of 7 VERIFICATION OF COMPLETION Job Performance Measure No. _RO E

______ Examinee's Name:

Examiner's Name:

Date performed:

Facility Evaluator:

Number of attempts:

Time to complete:

Question Documentation:

Question:____________________________________________________________________

____________________________________________________________________________

____________________________________________________________________________

Response:___________________________________________________________________

____________________________________________________________________________

____________________________________________________________________________

____________________________________________________________________________

Result: SAT or UNSAT

Examiner's signature and date: _______________________________ __________

Page 7 of 7 JPM RO E Simulator Instructions Setup the simulator to any IC Page 1 of 8 Appendix C Job Performance Measure Form ES-C-1 Worksheet

Facility: Davis-Besse ________ _ Task No: _336-005-03-0300_________

Task Title: _Notification to the Federal Aviation Administration for Cooling Tower Aviation__ Light Failure ___________________________________________________________________

K/A

Reference:

GEN 2.1.17 3.5/3.6 Job Performance Measure No: SRO A_

Examinee: __ NRC Examiner: ___________________

Facility Evaluator: ______________ Date: ___________________________

Method of testing:

Simulated Performance ______X________ Actual Performance __________

Classroom ________________ Simulator _______X________ Plant __________

READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions: The plant is at 100% power. You are the Shift Manager.

Task Standard: Notify the Federal Aviation Administration of a problem with the Cooling Tower Aviation Lighting Required Materials: None General

References:

DB-OP-00002, Operations Section Event/Incident Notifications and Actions, EO-02, Cooling Tower and Microwave Tower Aviation Lighting Malfunctions Initiating Cue: The security supervisor reports that two of the red beacons on top of the Cooling Tower are not flashing.

Time Critical Task: No Validation Time: 8 Minutes

Page 2 of 8 Initiating Cue The plant is at 100% power. You are the Shift Manager.

The security supervisor reports that two of the red beacons on top of the Cooling Tower are not flashing.

Page 3 of 8 PERFORMANCE INFORMATION (Denote critical steps with a check mark)

____________________________________________________________________________

1. Performance step: Locate guidance for notifying the Federal Aviation Administration

Standard: Use Operations Directive EO-02, Cooling Tower and Microwave Tower Aviation Lighting Malfunctions Comment: May go to DB-OP-00002 first but guidance is contained in EO-02

____________________________________________________________________________

2. Performance step: Notify Electrical Maintenance and/or Electrical Systems Engineering

____

Standard: Communicate via the GAI-TRONICS or telephone Comment: May contact the Work Week Manager Cue: Need to contact the vendor. Trouble shooting and repairing the Cooling Tower lights will take approximately 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />

____________________________________________________________________________

3. Performance step: Notify the Federal Aviation Administration

____ Standard: Communicate using the telephone Comment: Dial 9-1-800-992-7433, #, *, 9, 9 OR 9-1-216-265-8070 Cue: (If the candidate does not dial 9) The number you have requested can not be completed as dialed. Please check the number and dial again. Cue: Answer as the Federal Aviation Administration

____________________________________________________________________________

4. Performance step: Notify the Federal Aviation Administration

____ Standard: Provide name

Comment: Ask for the required information if not provided by the candidate Cue: Role-play as the Federal Aviation Administration

____________________________________________________________________________

Page 4 of 8

____________________________________________________________________________

5. Performance step: Notify the Federal Aviation Administration

____ Standard: Provide reason for call - Davis-Besse Unit 1 Hyperbolic Cooling Tower Aviation Lighting problem Comment: Ask for the required information if not provided by the candidate Cue: Role-play as the Federal Aviation Administration

____________________________________________________________________________

6. Performance step: Notify the Federal Aviation Administration

____

Standard: Provide exact lighting problem -Two of the eight red beacons are not flashing Comment: Ask for the required information if not provided by the candidate Cue: Role-play as the Federal Aviation Administration

____________________________________________________________________________

7. Performance step: Notify the Federal Aviation Administration

____

Standard: Provide time of occurrence Comment: Ask for the required information if not provided by the candidate

Cue: Role-play as the Federal Aviation Administration

____________________________________________________________________________

8. Performance step: Notify the Federal Aviation Administration

____

Standard: Provide estimated return to service date of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Comment: Ask for the required information if not provided by the candidate

Cue: Role-play as the Federal Aviation Administration

____________________________________________________________________________

Page 5 of 8

____________________________________________________________________________

9. Performance step: Notify the Federal Aviation Administration

____ Standard: Provide latitude and longitude of the cooling tower - 41

°35'57"/83°05'28" Comment: Ask for the required information if not provided by the candidate Cue: Role-play as the Federal Aviation Administration

____________________________________________________________________________

10. Performance step: Notify the Federal Aviation Administration

____ Standard: Provide the height of the cooling tower -493'AGL/1077AMSL Comment: AGL - Above Ground Level, AMSL - Above Mean Sea Level Ask for the required information if not provided by the candidate

Cue: Role-play as the Federal Aviation Administration

____________________________________________________________________________

11. Performance step: Notify the Federal Aviation Administration

____ Standard: Provide location of the nearest airport -Port Clinton, 10 miles WNW Comment: Davis-Besse cooling tower does not have an FCC registration number

Cue: Ask if the cooling tower has an FCC registration number.

____________________________________________________________________________

12. Performance step: Notify the Federal Aviation Administration

Standard: Request a NOTAM number Comment: NOTAM - Notice to AirMen Cue: Provide the NOTAM number of 04-AGL-00129

____________________________________________________________________________

Page 6 of 8

____________________________________________________________________________

13. Performance step: Log Federal Aviation Administration notification in the Unit Log Standard: Make Unit Log entry with the following details: Time of occurrence Details of problem Time FAA was notified Time Electrical Maintenance/Plant Engineering was notified NOTAM number

Comment: Unit Log may be available if JPM is performed on the simulator Cue: Ask what information will be recorded in the Unit Log

____________________________________________________________________________

Terminating Cue: This JPM is complete.

Page 7 of 8 VERIFICATION OF COMPLETION Job Performance Measure No. _SRO A

_______ Examinee's Name:

Examiner's Name:

Date performed:

Facility Evaluator:

Number of attempts:

Time to complete:

Question Documentation:

Question:____________________________________________________________________

____________________________________________________________________________

____________________________________________________________________________

Response:___________________________________________________________________

____________________________________________________________________________

____________________________________________________________________________

____________________________________________________________________________

Result: SAT or UNSAT

Page 8 of 8 JPM SRO A Simulator Instructions If performed on the simulator, this JPM can setup at any IC Page 1 of 7 Appendix C Job Performance Measure Form ES-C-1 Worksheet

Facility: Davis-Besse ________ _ Task No: _333-011-01-0300_________

Task Title: Review and Correct a Shutdown Margin Calculation____________________________

K/A

Reference:

GEN 2.1.12 2.9/4.0 Job Performance Measure No: _SRO B Examinee: __ NRC Examiner: ___________________

Facility Evaluator: ______________ Date: ___________________________

Method of testing:

Simulated Performance _______________ Actual Performance ____X

______ Classroom ________________ Simulator ______X_________ Plant _____

______ READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions: The plant is in Mode 3 following a reactor trip. The START program is not available. The following conditions exist: The plant is at 100 EFPD, RCS Boron Concentration is 1600 ppmB, Tave is 532

°F, APSRs are 28.5% withdrawn, there is one known stuck rod, Reactivity worth due to transient poisons is -.27% K/K, the correction factor for boron 10 depletion is 0.99, the Reactivity Anomaly is .13% K/K.

Task Standard: Recognize Shutdown Margin is NOT adequate and apply the appropriate Technical Specifications

Required Materials: Calculator General

References:

DB-NE-06202, Reactivity Balance Calculations, DB-NE-06201, Reactor Operator Curve Book Initiating Cue: The Shift Manager has directed you to check the calculation for a shutdown margin per DB-NE-06202, Reactivity Balance Calculations, and DB-NE-06201, Reactor Operator Curve Book, Attachment 4.

Time Critical Task: No Validation Time: 22 minutes Page 2 of 7 Initiating Cue The plant is in Mode 3 following a reactor trip. The START program is not available. The following conditions exist: The plant is at 100 EFPD RCS Boron Concentration is 1600 ppmB Tave is 532

°F APSRs are 28.5% withdrawn There is one known stuck rod. Reactivity worth due to transient poisons is -.27% K/K The correction factor for boron 10 depletion is 0.99 The Reactivity Anomaly is .13% K/K The Shift Manager has directed you to check the calculation for a shutdown margin per DB-NE-06202, Reactivity Balance Calculations, and DB-NE-06201, Reactor Operator Curve Book, Attachment 4.

Page 3 of 7 PERFORMANCE INFORMATION (Denote critical steps with a check mark)

____________________________________________________________________________

1. Performance step: Verify reactivity worth of the fuel.

Standard: From Figure 2, verify a value of 13.5% K/K to 13.6% K/K and enter this value on Attachment 4.

Comment: Actual value is 13.55% K/K ____________________________________________________________________________

2. Performance step: Verify the corrected boron concentration.

Standard: Verify RCS boron concentration of 1600 ppmB multiplied by the B10 correction factor of 0.99 to obtain a value of 1584ppmB Comment: None

____________________________________________________________________________

3. Performance step: Verify the reactivity worth due to boron Standard: From Figure 3, verify a value of -10.2% K/K to -10.3% K/K. From Figure 4, verify a value of 1.004 to 1.006 for the Fuel Burnup Correction Factor. Multiply to obtain a value of -10.24% K/K to -10.36% K/K Comment: Actual value is -10.25% K/K times 1.005 = -10.3% K/K ____________________________________________________________________________
4. Performance step: Verify reactivity worth due to transient poisons.

Standard: Verify from initial conditions that the reactivity worth due to transient poisons is -.27% K/K. Comment: None

____________________________________________________________________________

5. Performance step: Verify the reactivity worth due to temperature.

Standard: Verify the reactivity worth due to temperature is 0 Comment: T is 0% K/K ____________________________________________________________________________

Page 4 of 7

____________________________________________________________________________

6. Performance step: Recognize the adjusted rod worth for one known stuck rod entered on the calculation sheet is incorrect

____ Standard: From Figure 10, determine rod worth of -4.18% K/K to -4.2% K/K and enter on the calculation sheet.

Comment: Actual value is -4.19% K/K. Value entered on the calculation sheet was -5.12% K/K The candidate may choose to complete the review of the Shutdown Margin before informing the Shift Manager of the error.

Cue: The Shift Manager acknowledges the error and directs you to continue with the calculations and make any necessary corrections.

____________________________________________________________________________

7. Performance step: Verify APSR reactivity worth.

Standard: From Figure 11A, verify APSR reactivity worth of -0.11% K/K to -0.12% K/K. Comment: Actual value is -0.115% K/K ____________________________________________________________________________

8. Performance step: Verify Flux Redistribution Penalty (FRP) using Table 1 of DB-OP-06201.

Standard: Verify Flux Redistribution Penalty is 0.35% K/K. Comment: None

____________________________________________________________________________

9. Performance step: Verify reactivity anomaly reactivity worth from initial conditions.

Standard: Verify reactivity anomaly reactivity worth is .13% K/K. Comment: None

____________________________________________________________________________

10. Performance step: Determine the value for shutdown margin.

____ Standard: Determine that shutdown margin is a value between .72% K/K and .97% K/K. Comment: Actual Shutdown Margin is .845% K/K ____________________________________________________________________________

Page 5 of 7

___________________________________________________________________________

11. Performance step: Take actions for Shutdown Margin less than adequate Standard: Communicate revised Shutdown Margin to the Shift Manager Comment: None

Cue: (If asked) The Shift Manager reports another SRO has reviewed the corrections and agrees that Shutdown Margin is less than 1%.

____________________________________________________________________________

12. Performance step: Take actions for Shutdown Margin less than adequate

____

Standard: Recognize the need to enter Technical Specification 3.1.1.1 Comment: May need to ask the candidate what actions are required Candidate may refer to Tech. Specs.

____________________________________________________________________________

13. Performance step: Take actions for Shutdown Margin less than adequate

____ Standard: Recognize the need to immediately initiate RCS boration Comment: May need to ask the candidate what actions are required Candidate may refer to Tech. Specs.

____________________________________________________________________________

Terminating Cues: This JPM is complete.

Page 6 of 7 VERIFICATION OF COMPLETION Job Performance Measure No. ___SRO B

_______ Examinee's Name:

Examiner's Name:

Date performed:

Facility Evaluator:

Number of attempts:

Time to complete:

Question Documentation:

Question:____________________________________________________________________

____________________________________________________________________________

____________________________________________________________________________

Response:___________________________________________________________________

____________________________________________________________________________

____________________________________________________________________________

____________________________________________________________________________

Result: SAT or UNSAT

Examiner's signature and date: _______________________________ __________

Page 7 of 7 JPM SRO B Simulator Instructions If performed on the simulator, this JPM can setup at any IC

Page 1 of 8 Appendix C Job Performance Measure Form ES-C-1 Worksheet

Facility: Davis-Besse ________ _ Task No: _119-004-03-0400_________

Task Title: Control of Locked Valves During Post-Maintenance Testing______________________

K/A

Reference:

GEN 2.2.12 3.0/3.4 Job Performance Measure No: _SRO C Examinee: __ NRC Examiner: ___________________

Facility Evaluator: ______________ Date: ___________________________

Method of testing:

Simulated Performance ______X________ Actual Performance __________

Classroom ________________ Simulator _______X_________ Plant __________

READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions: Maintenance has completed a packing adjustment on valve DH2736, DH Aux. Spray Throttle Valve, to stop a packing leak per Order 200001155.

Task Standard: Stroke and time DH2736 and make the appropriate locked valve log entries.

Required Materials: Pump and Valve Basis Document, Stop watch and Locked Valve Log

General

References:

DB-PF-03272, Post Maintenance Valve Test, DB-OP-00008, Operation and Control of Locked Valves Initiating Cue: The Unit Supervisor directs you to perform post maintenance valve testing of DH2736 in accordance with DB-PF-03272, Post Maintenance Valve Test beginning with section 3.2. DB-PF-03272 section 3.1 is complete The Shift Manager has given his permission to stroke DH2736, DH Aux. Spray Throttle Valve. An equipment operator is standing by in the Auxiliary Building. The Locked Valve Log is in the Control Room. The Shift Manager has completed the first 8 columns in the Locked Valve Log.

Time Critical Task: No Validation Time: 25 Minutes Page 2 of 8 Initiating Cues Maintenance has completed a packing adjustment on valve DH2736, DH Aux. Spray Throttle Valve, to stop a packing leak per Order 200001155.

The Unit Supervisor directs you to perform post maintenance valve testing of DH2736 in accordance with DB-PF-03272, Post Maintenance Valve Test beginning with section 3.2. DB-PF-03272 section 3.1 is complete The Shift Manager has given his permission to stroke DH2736, DH Aux. Spray Throttle Valve. An equipment operator is standing by in the Auxiliary Building. The Locked Valve Log is in the Control Room.

The Shift Manager has completed the first 8 columns in the Locked Valve Log.

Page 3 of 8 PERFORMANCE INFORMATION (Denote critical steps with a check mark)

____________________________________________________________________________

1. Performance step: Complete section 3.2 of DB-PF-03272

Standard: Check Verify section 3.1 is complete Comment: None

____________________________________________________________________________

2. Performance step: Complete section 3.2 of DB-PF-03272 Standard: Verify a RWP is available Comment: None Cue: (If asked) A special RWP is not required for this test.

____________________________________________________________________________

3. Performance step: Obtain stroke times from the Pump and Valve Basis Document and record on Attachment 2

____

Standard: Enter the maximum close time of 59.70 seconds, the maximum open time of 59.62 seconds, the expected close time range of 33.83 seconds to 45.77 seconds and the expected open time range of 33.78 seconds to 45.71 seconds in step 3.2.3 of DB-PF-03272

Comment: None

____________________________________________________________________________

4. Performance step: Complete section 3.2 of DB-PF-03272

Standard: Obtain Shift Manager's permission to perform the test Comment: None Cue: (If asked) the Shift Manager has given permission to stroke test DH 2736

____________________________________________________________________________

5. Performance step: Record test equipment data Standard: Record the M&TE number for the stopwatch and the calibration due date

Comment: None Cue: (If asked) A special DB-OP-00016 lineup is NOT required

____________________________________________________________________________

Page 4 of 8

____________________________________________________________________________

6. Performance step: Verity the Equipment Operator is at DH 2736 Standard: Communicate via GAI-TRONICS or radio

Comment: None Cue: An Equipment Operator is standing by to verify local valve position

____________________________________________________________________________

7. Performance step: Stoke DH 2736 open and record time

____ Standard: Depress and hold the OPEN pushbutton and stroke time using the stopwatch. Record the stroke time.

Comment: DH 2736 is a throttle valve, which requires the OPEN pushbutton to be depressed while the valve is stroking DH 2736 will stroke faster than the expected time.

____________________________________________________________________________

8. Performance step: Contact the Equipment Operator to check local indication

Standard: Communicate via GAI-TRONICS or radio Comment: None Cue: The Equipment Operator reports local valve position indicates DH 2736 is open

____________________________________________________________________________

9. Performance step: Complete the "Position To" column in the Locked Valve Log

____ Standard: Enter "Open" Comment: The Locked Valve Log may be updated after the stoke test is complete

____________________________________________________________________________

10. Performance step: Complete the "Position By" column in the Locked Valve Log

____ Standard: Enter initials Comment: The Locked Valve Log may be updated after the stoke test is complete

____________________________________________________________________________

Page 5 of 8

____________________________________________________________________________

11. Performance step: Stoke DH 2736 closed and record time

____ Standard: Depress and hold the CLOSED pushbutton and stroke time using the stopwatch.

Record the stroke time.

Comment: None

____________________________________________________________________________

12. Performance step: Contact the Equipment Operator to check local indication Standard: Communicate via GAI-TRONICS or radio Comment: None Cue: The Equipment Operator reports local valve position indicates DH 2736 is closed

____________________________________________________________________________

13. Performance step: Complete the "Restored By" column in the Locked Valve Log

____ Standard: Enter initials Comment: The Locked Valve Log may be updated after the stoke test is complete

____________________________________________________________________________

14. Performance step: Recognize the stroke times are not within the expected times Standard: Compare valve stroke times to the expected range of stroke times

Comment: None

____________________________________________________________________________

15. Performance step: Restoke DH 2736 and record times

____ Standard: Recognize the test requires the valve to be stroke timed a second time Comment: None

Cue: DH 2736 has been stroked open and closed a second time. The stroke times are the same as recorded in step 4.2.2

____________________________________________________________________________

Page 6 of 8

____________________________________________________________________________

16. Performance step: Inform the Unit Supervisor or Shift Manager the stroke times are not with in the expected range

____

Standard: Communicate to a shift SRO the need to write a Condition Report and perform an Operability Justification Comment: None Cue: The Shift Manager will write the Condition Report and document the Operability Justification

____________________________________________________________________________

17. Performance step: Complete acceptance criteria

____

Standard: Sign off steps 5.2 and 5.3 Comment: None

____________________________________________________________________________

Terminating Cue: This JPM is complete Page 7 of 8 VERIFICATION OF COMPLETION Job Performance Measure No. ____SRO C

______ Examinee's Name:

Examiner's Name:

Date performed:

Facility Evaluator:

Number of attempts:

Time to complete:

Question Documentation:

Question:____________________________________________________________________

____________________________________________________________________________

____________________________________________________________________________

Response:___________________________________________________________________

____________________________________________________________________________

____________________________________________________________________________

____________________________________________________________________________

Result: SAT or UNSAT

Examiner's signature and date: _______________________________ __________

Page 8 of 8 JPM SRO C Simulator Instructions Setup the simulator to any Mode 1, 2, or 3 IC at NOP and NOT.

Page 1 of 7 Appendix C Job Performance Measure Form ES-C-1 Worksheet

Facility: Davis-Besse ________ _ Task No: _333-008-01-0300_________

Task Title: Review and Approve a Containment Pressure Reduction Release_________________

K/A

Reference:

GEN 2.3.11 2.7/3.2 Job Performance Measure No: _SRO D Examinee: __ NRC Examiner: ___________________

Facility Evaluator: ______________ Date: ___________________________

Method of testing:

Simulated Performance _______________ Actual Performance _____X

_____ Classroom ________________ Simulator _______X________ Plant ______

_____ READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions: A plant heatup is in progress. Containment to annulus differential pressure has risen to 20 inches H 2O. Flow transmitter FT5090, Station Vent Flow, is out of service for channel calibration.

Task Standard: Review and approve a pressure release of Containment.

Required Materials: None General

References:

DB-OP-03012, Radioactive Gaseous Batch Release, Offsite Dose Calculation Manual

Initiating Cue: Chemistry has completed section 4.15 of DB-OP-03012, Radioactive Gaseous Batch Release and returned the release permit to the Shift Manager. The Shift Manager directs you to perform section 4.5 of DB-OP-03012, Radioactive Gaseous Batch Release.

Time Critical Task: No Validation Time: 24 Minutes

Page 2 of 7 Initiating Cues A plant heatup is in progress. Containment to annulus differential pressure has risen to 20 inches H 2 O. Flow transmitter FT5090, Station Vent Flow, is out of service for channel calibration.

Chemistry has completed section 4.15 of DB-OP-03012, Radioactive Gaseous Batch Release and returned the release permit to the Shift Manager. The Shift Manager directs you to perform section 4.5 of DB-OP-03012, Radioactive Gaseous Batch Release.

Page 3 of 7 PERFORMANCE INFORMATION (Denote critical steps with a check mark)

____________________________________________________________________________

1. Performance step: Verify Chemistry has approved the release

Standard: Verify Item 4.h of Attachment 1 is signed and dated Comment: None

____________________________________________________________________________

2. Performance step: Verify the surveillance requirements are current.

Standard: Verify current surveillances by using DB Maintenance Management System or refer to the Unit Log or refer to the report provided by the Work Support Group Comment: If DBMMS or Unit Log is used provide cues. If asked, provide surveillance report.

____________________________________________________________________________

3. Performance step: Verify the surveillance requirements are current.

Standard: Check DB-MI-03413, RMS Channel Calibration for RE 4598AA and RE 4598BA is current Cue: (If asked) DB-MI-03413 for RE4598AA Tech. Spec. late date is 8/26/04. DB-MI-03413 for RE4598BA Tech. Spec. late date is 4/23/05.

____________________________________________________________________________

4. Performance step: Verify the surveillance requirements are current.

Standard: Check DB-MI-03442, Channel Calibration of 32C-ISF 5090, Station Vent Flow, for FT 5090 is current

Comment: May not check FT 5090 since OOS in initial conditions

Cue: (if asked) DB-MI-03442 for FT 5090 Tech. Spec. late date is 2/20/05.

____________________________________________________________________________

5. Performance step: Verify the surveillance requirements are current.

____ Standard: Recognize DB-MI-03444, Channel Calibration of 32C-ISF 5090A, Station Vent Flow, for FT 5090A is NOT current

Comment: May recognize both flow transmitter channels are inoperable.

Cue: (if asked) DB-MI-03444 for FT 5090A Tech. Spec. late date is (yesterday's date).

____________________________________________________________________________

Page 4 of 7

____________________________________________________________________________

6. Performance step: Verify the surveillance requirements are current.

Standard: Check DB-OP-03007, Miscellaneous Instrument Daily Checks is current

Comment: Status of DB-OP-03007 is obtained from the Unit Log

Cue: (if asked) DB-OP-03007 was completed (today's date)

____________________________________________________________________________

7. Performance step: Verify the surveillance requirements are current.

Standard: Check DB-SC-03216, Quarterly Functional Test of RE 4598AA, Station Vent Normal Range Radiation Monitor is current Comment: Cue: (if asked) DB-SC-03216 for RE4598AA Tech. Spec. late date is 6/10/04.

___________________________________________________________________________

8. Performance step: Verify the surveillance requirements are current

Standard: Verify DB-SC-03218, Quarterly Functional Test of RE 4598BA, Station Vent Normal Range Radiation Monitor is current Comment:

Cue: (if asked) DB-SC-03218 for RE4598BA Tech. Spec. late date is 5/7/04

____________________________________________________________________________

9. Performance step: Verify the surveillance requirements are current

Standard: Check DB-SC-03200, Shift Channel Check of the Radiation Monitoring System is current Comment: Status of DB-SC-03200 can be obtained from the Unit Log Cue: (if asked) DB-SC-03200 was completed (today's date)

____________________________________________________________________________

10. Performance step: Verify the surveillance requirements are current Standard: Check DB-CN-03008, Station Vent Releases, Weekly Radiological Monitoring, Sampling and Analysis is current

Comment: Status of DB-CN-03008 can be obtained from the Unit Log Cue: (if asked) DB-CN-03008 was completed (yesterday's date)

____________________________________________________________________________

Page 5 of 7

____________________________________________________________________________

11. Performance step: Recognize that both Station Vent flow monitors are inoperable

____ Standard: Circle UNSAT in item 4.i and record Offsite Dose Calculation Manual (ODCM) action statement in item 5.a, Attachment 1 Comment: ODCM action statement for both flow channels inoperable is to estimate flow rate every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Cue: (If asked) Another SRO is making the Operability Tracking Log entries

____________________________________________________________________________

12. Performance step: Request Shift Manager approval for the release Standard: Communication with the Shift Manager

Comment: ____________________________________________________________________________

Terminating Cue: This JPM is complete

Page 6 of 7

VERIFICATION OF COMPLETION Job Performance Measure No. __SRO D

______ Examinee's Name:

Examiner's Name:

Date performed:

Facility Evaluator:

Number of attempts:

Time to complete:

Question Documentation:

Question:____________________________________________________________________

____________________________________________________________________________

____________________________________________________________________________

Response:___________________________________________________________________

____________________________________________________________________________

____________________________________________________________________________

____________________________________________________________________________

Result: SAT or UNSAT

Examiner's signature and date: _______________________________ __________

Page 7 of 7 JPM SRO D Simulator Instructions If the simulator is used, setup the simulator in a Mode 3, NOP, NOT IC.

Raise Containment pressure to 20 inches.

Page 1 of 8 Appendix C Job Performance Measure Form ES-C-1 Worksheet

Facility: Davis-Besse ________ _ Task No: _334-004-05-0300_________

Task Title: Manually Activate the Emergency Response Organization Group Page_____________

K/A

Reference:

GEN 2.4.43 2.8/3.5 Job Performance Measure No: _SRO E Examinee: __ NRC Examiner: ___________________

Facility Evaluator: ______________ Date: ___________________________

Method of testing:

Simulated Performance ______X________ Actual Performance __________

Classroom ________________ Simulator ______X_________ Plant __________

READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions: The plant is in Mode 1. An Alert has been declared due to the loss of both trains of Decay Heat Removal per EAL 3.B.1.

Task Standard: Recognize the Computerized Automatic Notification System (CANS) is not responding. Manually activate the ERO Group Page.

Required Materials: None General

References:

RA-EP-02110, Emergency Notification; Emergency Plan Telephone Directory Initiating Cue: Security is not available to make emergency notifications. The Emergency Director directs you to notify the Emergency Response Organization in accordance with step 6.2 of RA-EP-001700, Alert.

Time Critical Task: No Validation Time: 8 Minutes

Page 2 of 8 Initiating Cues The plant is in Mode 1. An Alert has been declared due to the loss of both trains of Decay Heat Removal per EAL 3.B.1.

Security is not available to make emergency notifications. The Emergency Director directs you to notify the Emergency Response Organization in accordance with in accordance with step 6.2 of RA-EP-001700, Alert.

Page 3 of 8 PERFORMANCE INFORMATION (Denote critical steps with a check mark)

____________________________________________________________________________

1. Performance step: Make notifications to the ERO

Standard: Refer to RA-EP-02110, Emergency Notifications Comment: None

____________________________________________________________________________

2. Performance step: Obtain a scenario activation password Standard: Obtain the Emergency Directors password, if the examinee does not have his/her own password Comment: Password needed to activate CANS. Password is individual's social security number

Cue: (If asked) The password is 123-45-6789

____________________________________________________________________________

3. Performance step: Obtain the Emergency Classification

Standard: Recognize the Emergency Classification is an Alert as provided in the Initial Conditions Comment: None

____________________________________________________________________________

4. Performance step: Obtain the CANS access number Standard: Obtain the CANS access number from the Emergency Plan Telephone Directory

Comment: CANS number is 9-419-249-2412 OR dial extension 2412

Cue: The CANS number is busy. CANS does not answer.

____________________________________________________________________________

5. Performance step: Contact CANS Standard: Dial the CANS phone number Comment: CANS number will be busy Cue: The CANS number is busy. CANS does not answer.

______________________________________________________________________________

Page 4 of 8

____________________________________________________________________________

6. Performance step: Contact CANS Standard: Dial the CANS phone number a second time

Comment: None

Cue: The CANS number is busy. CANS does not answer.

______________________________________________________________________________

7. Performance step: Recognize CANS failure

____

Standard: Route to section 6.3 of RA-EP-02110, Emergency Notification Comment: None

____________________________________________________________________________

8. Performance step: Obtain the Emergency Classification

____ Standard: Recognize the Emergency Classification is an Alert as provided in the Initial Conditions Comment: None

____________________________________________________________________________

9. Performance step: Obtain the ERO Numeric group pager number

____ Standard: Obtain the group pager number from the Emergency Plan Telephone Directory

Comment: Group pager number is 9-1-800-405-4758 Cue: (If the candidate does not dial 9) The number you have requested can not be completed as dialed. Please check the number and dial again.

____________________________________________________________________________

10. Performance step: Contact the pager system

____ Standard: Dial the pager number Comment: None

Cue: Group pager number has been dialed. The pager system asks for the pager number.

____________________________________________________________________________

Page 5 of 8

____________________________________________________________________________

11. Performance step: Enter the pager number

____ Standard: Enter pager number 2533024

Comment: None

Cue: Pager number 2533024 has been entered. The pager system asks for the numeric message followed by the "#" (pound) key

____________________________________________________________________________

12. Performance step: Enter the classification code

____ Standard: Enter 2222

Comment: None Cue: 2222 has been entered

____________________________________________________________________________

13. Performance step: Depress the (#) key

____ Standard: Depress the (#) key

Comment: None Cue: The # key has been depressed

____________________________________________________________________________

14. Performance step: Contact the pager system

____ Standard: Dial the pager number a second time

Comment: None Cue: Group pager number has been dialed. The pager system asks for the pager number.

____________________________________________________________________________

Page 6 of 8

____________________________________________________________________________

15. Performance step: Enter the pager number

____ Standard: Enter pager number 2533024 a second time

Comment: None

Cue: Pager number 2533024 has been entered. The pager system asks for the numeric message followed by the "#" (pound) key

____________________________________________________________________________

16. Performance step: Enter the classification code a second time

____ Standard: Enter 2222

Comment: None Cue: 2222 has been entered

____________________________________________________________________________

17. Performance step: Depress the (#) key a second time

____ Standard: Depress the (#) key

Comment: None Cue: The # key has been depressed

____________________________________________________________________________

18. Performance step: Verify the group page functioned properly Standard: Verify the Control Room pager indicates 2222 Comment: None

Cue: Five minutes have elapsed. The Control Room pager has gone off twice, indicating 2222. ____________________________________________________________________________

Terminating Cue: This JPM is complete

Page 7 of 8 VERIFICATION OF COMPLETION Job Performance Measure No. _SRO E

_______ Examinee's Name:

Examiner's Name:

Date performed:

Facility Evaluator:

Number of attempts:

Time to complete:

Question Documentation:

Question:____________________________________________________________________

____________________________________________________________________________

____________________________________________________________________________

Response:___________________________________________________________________

____________________________________________________________________________

____________________________________________________________________________

____________________________________________________________________________

Result: SAT or UNSAT

Examiner's signature and date: _______________________________ __________

Page 8 of 8 JPM SRO E Simulator Instructions Setup the simulator to any IC