Reactor and Senior Reactor Operator Initial Examinations - 0500325-07-301 and 05000324-07-301
ML070320003
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 01/31/2007
From: Haag R
NRC/RGN-II
To: Scarola J
Carolina Power & Light Co
References
50-324/07-301, 50-325/07-301
Download: ML070320003 (4)


See also: IR 05000324/2007301

Text

January 31, 2007Carolina Power and LightATTN:Mr. J. ScarolaVice PresidentBrunswick Steam Electric Plant

P. O. Box 10429

Southport, NC 28461SUBJECT:BRUNSWICK STEAM ELECTRIC PLANT - REACTOR AND SENIORREACTOR OPERATOR INITIAL EXAMINATIONS 05000325/2007301 AND

05000324/2007301Dear Mr. Scarola:

In a telephone conversation on January 30, 2007, between Mr. Lenny Beller, Superintendent -Operations Training, and Mr. Mark A. Bates, Senior Operations Engineer, arrangements were

made for the administration of licensing examinations at Brunswick Nuclear Plant.

Arrangements were made to administer the written examination during the week of July 9, 2007

and the operating test during the weeks of July 16 and 23, 2007. The on-site preparatory week

is scheduled for the week of June 25, 2007.As agreed during the telephone conversation, your staff will prepare the examinations based onthe guidelines in Revision 9, of NUREG-1021, "Operator Licensing Examination Standards for

Power Reactors." The NRC regional office will discuss with your staff any changes that might

be necessary before the examinations are administered.To meet the above schedule, it will be necessary for your staff to furnish the examinationoutlines by April 30, 2007. The written examinations, operating tests, and the supporting

reference materials identified in Attachment 2 of ES-201 will be due by June 1, 2007. Pursuant

to 10 CFR 55.40(b)(3), an authorized representative of the facility licensee shall approve the

outlines, examinations, and tests before they are submitted to the NRC for review and approval.

All materials shall be complete and ready-to-use. Any delay in receiving the required

examination and reference materials, or the submittal of inadequate or incomplete materials,

may cause the examinations to be rescheduled.In order to conduct the requested written examinations and operating tests, it will be necessaryfor your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302,

your staff should retain the original simulator performance data (e.g., system pressures,

temperatures, and levels) generated during the dynamic operating tests until the examination

results are final.Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be ineffect while the written examinations and operating tests are being administered.

CP&L2To permit timely NRC review and evaluation, your staff should submit preliminary reactoroperator and senior reactor operator license applications (Office of Management and Budget

(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),

and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first

examination date. If the applications are not received at least 30 days before the examination

date, a postponement may be necessary. Signed applications certifying that all training has

been completed should be submitted at least 14 days before the first examination date.This letter contains information collections that are subject to the Paperwork Reduction Act of1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of

Management and Budget, approval number Part 55 (3150-0018), which expires on June 30,

2009. The public reporting burden for this collection of information is estimated to average 500

hours per response, including the time for reviewing instructions, gathering and maintaining the

data needed, writing the examinations, and completing and reviewing the collection of

information. Send comments on any aspect of this collection of information, including

suggestions for reducing the burden, to the Information and Records Management Branch (T-6

F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet

electronic mail at BJS1@NRC.GOV; and to the Desk Officer, Office of Information andRegulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget,

Washington, DC 20503.The NRC may not conduct or sponsor, and a person is not required to respond to, a collectionof information unless it displays a currently valid OMB control number.In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will beavailable electronically for public inspection in the NRC Public Document Room or from the

Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS

is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the PublicElectronic Reading Room).Thank you for your cooperation in this matter. Lenny Beller has been advised of the policiesand guidelines referenced in this letter. If you have any questions regarding the NRC's

examination procedures and guidelines, please contact Mark A. Bates at (404) 562-4612,

(Internet E-mail: MAB7@NRC.GOV), or myself at (404) 562-4607, (Internet E-mail:

RCH@NRC.GOV).Sincerely,\\RA\\Robert C. Haag, ChiefOperations Branch

Division of Reactor SafetyDocket Nos. 50-325, 50-324License Nos. DPR-71, DPR-62cc: (See page 3)

CP&L3 cc cont'd:T. P. Cleary, Director

Site Operations

Brunswick Steam Electric Plant

Progress Energy Carolinas, Inc.

Electronic Mail DistributionBenjamin C. WaldrepPlant Manager

Brunswick Steam Electric Plant

Carolina Power & Light Company

Electronic Mail DistributionJames W. Holt, ManagerPerformance Evaluation and

Regulatory Affairs PEB 7

Carolina Power & Light Company

Electronic Mail DistributionEdward T. O'Neil, ManagerTraining

Carolina Power & Light Company

Brunswick Steam Electric Plant

Electronic Mail DistributionRandy C. Ivey, ManagerSupport Services

Carolina Power & Light Company

Brunswick Steam Electric Plant

Electric Mail DistributionGarry D. Miller, ManagerLicense Renewal

Progress Energy

Electronic Mail DistributionAnnette H. Pope, SupervisorLicensing/Regulatory Programs

Carolina Power and Light Company

Electronic Mail DistributionDavid T. ConleyAssociate General Counsel - Legal Dept.

Progress Energy Service Company, LLC

Electronic Mail Distribution

James RossNuclear Energy Institute

Electronic Mail DistributionJohn H. O'Neill, Jr.Shaw, Pittman, Potts & Trowbridge

2300 N. Street, NW

Washington, DC 20037-1128Beverly Hall, Chief, RadiationProtection Section

N. C. Department of Environment

and Natural Resources

Electronic Mail Distribution Peggy ForceAssistant Attorney General

State of North Carolina

Electronic Mail DistributionChairman of the North Carolina Utilities Commission

c/o Sam Watson, Staff Attorney

Electronic Mail DistributionRobert P. GruberExecutive Director

Public Staff NCUC

4326 Mail Service Center

Raleigh, NC 27699-4326Public Service CommissionState of South Carolina

P. O. Box 11649

Columbia, SC 29211David R. SandiferBrunswick County Board of

Commissioners

P. O. Box 249

Bolivia, NC 28422Warren LeeEmergency Management Director

New Hanover County Department of

Emergency Management

P. O. Box 1525

Wilmington, NC 28402-1525Progress Energy Carolinas, Inc. ATTN: Ms. Jackie Gawron (6/2000)

Training Manager

Brunswick Steam Electric Plant

P. O. Box 10429

Southport, NC 28461-0429

CP&L4Distribution:B. Mozafari, NRR C. Evans (Part 72 Only)

L. Slack, RII EICS

RIDSRIDSNRRDIPMLIPB

PUBLICOFFICERII:DRSRII:DRSRII:DRPSIGNATUREMAB7RCHRXM1NAMEMBatesRHaagRMusserDATE01/31/200701/31/200701/31/2007

E-MAIL COPY? YESNO YESNO YESNO YESNO YESNO YESNO YESNO PUBLIC DOCUMENT YESNO OFFICIAL RECORD COPY DOCUMENT NAME: C:\FileNet\ML070320003.wpd