MONTHYEARML24100A7672024-04-11011 April 2024 Meeting Slides - Preapplication with Constellation on Planned Fleet Alternative Request to Adopt OMN-2 ML24089A2612024-04-0909 April 2024 Slides - Constellation - Pre-Application Regarding Hooded Masks 4/9/2024 Meeting Slides (L-2024-LLM-0041) ML24029A1742024-01-30030 January 2024 Constellation Pre-Application January 30, 2024, Meeting Slides - Proposed Alternative to Utilize Code Case N-932, Alternative Requirements for Acceptance of Containment Base Metal Corrosion or Erosion ML23317A0712023-11-14014 November 2023 NRC Pre-Submittal Meeting on November 14th, 2023 - TSTF-591 and Selected 50.69 License Condition Updates (EPID L-2023-LLM-0098) (Slides) ML23255A1042023-08-11011 August 2023 Slides - Constellation - Pre-Application EP 9/18/2023 Draft CEG Presubmittal SG Performance Monitoring Plan Meeting Handout NEI 99-01, Slides - Constellation - Pre-Application EP 2/23/2023 Meeting Slides2023-02-21021 February 2023 Slides - Constellation - Pre-Application EP 2/23/2023 Meeting Slides ML22311A5112022-11-0707 November 2022 Pool Swell License - Amendment Request ML21314A4472021-11-10010 November 2021 Slides for Presubmittial Meeting for Proposed Alternative to Adopt ASME Code Case N-921 to Extend the Inservice Inspection Interval ML21194A1582021-07-13013 July 2021 and Lasalle Nuclear Generating Stations 2020 Annual Assessment Meeting Slides ML21162A3322021-06-11011 June 2021 BWR Fleet Relief Request Associated with RPV Instrument Nozzle Repairs ML21141A0102021-05-21021 May 2021 La Salle County Station, Units 1 and 2, May 27, 2021 Pre Submission Public Meeting Slides (EPID-L-2021-LRM-0052) ML20261G7322020-09-16016 September 2020 Pre-Submittal Slides Extend 120-month Isi/Ist Interval Under 50.55a ML20238B8662020-08-25025 August 2020 Hq Online EOC Slides ML20178A4202020-06-30030 June 2020 NEI Slides for June 30, 2020, Public Meeting on COVID-19 Response ML20170B0212020-06-23023 June 2020 NRC Pre-Submittal Meeting Byron Unit 2 One-Time Deferral of Reactor Pressure Vessel Head Penetration Nozzle (Rpvhpn) Inspections ML20163A6552020-06-16016 June 2020 6-16-20 Byron Unit 2 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections ML20169A5592020-06-16016 June 2020 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections (Rev 1) ML18347B3142018-12-19019 December 2018 Bwrvip/Asme Relief Request Discussion December 19, 2018 ML18334A2162018-11-30030 November 2018 Presentation Slides: Exelon BWR MSIV (Boiling-Water Reactor - Main Steam Isolation Valve) Leakage Optimization for NRC Pre-Submittal Meeting of December 6, 2018 ML18319A1272018-11-19019 November 2018 Slides for 11/19/18 Public Meeting - Exelon Fleet LAR for Common Language for TS 5.7 High Radiation Areas ML18054B3592018-02-27027 February 2018 Slide: NRC Pre-Submittal Meeting for Exelon Fleet LAR to Relocate TS Unit Staff Qualification ANSI Requirements to the QATR, February 27, 2018, Profile Info: Submitted by Frank Mascitelli ML17339A1812017-12-0707 December 2017 NRC Hq Pre-Submittal LaSalle CSCS LAR 12-7-2017 Final ML16194A0062016-07-12012 July 2016 Pre-Application Meeting Presentation Regarding LaSalle County Station License Amendment Request for Revision of Suppression Pool Swell Design Analysis ML16077A1562016-03-22022 March 2016 Fleet: Pre-application Teleconference with Exelon to Discuss a Potential License Amendment Request Regarding Operating Training Standards ML16077A3492016-03-17017 March 2016 NRC Briefing Slides for LaSalle Dseis Public Meeting March 22, 2016 ML15062A3642015-03-0303 March 2015 Environmental Scoping Briefing for March 10th Meetings ML15058A6322015-02-27027 February 2015 LSCS Scoping Briefing Prepared 2-27-15 for March 10th Meeting ML13212A3372013-07-31031 July 2013 NRC NEI-01-01 Meeting Presentation on 7/31/13 Digital I&C Meeting NEI 01-01, NRC NEI-01-01 Meeting Presentation on 7/31/13 Digital I&C Meeting2013-07-31031 July 2013 NRC NEI-01-01 Meeting Presentation on 7/31/13 Digital I&C Meeting ML13211A3782013-07-30030 July 2013 7/31/2013 NRC Public Meeting Presentation on NEI 01-01 NEI 01-01, 7/31/2013 NRC Public Meeting Presentation on NEI 01-012013-07-30030 July 2013 7/31/2013 NRC Public Meeting Presentation on NEI 01-01 ML13164A3792013-06-24024 June 2013 Summary of Public Meeting with Exelon Generation Company, LLC, Regarding the Proposed Extended Power Uprate License Amendment Request for LaSalle County Station, Units 1 and 2 ML12200A3652012-07-27027 July 2012 County Station UHS Pre-Application Mtg 6-28-12 - Final ML12188A5122012-07-0606 July 2012 IEMA HAB Lessons Learned_rev1 ML12159A2662012-06-11011 June 2012 County Generating Station Pre-Application Meeting Extended Power Uprate: Replacement Steam Dryers. June 11, 2012 ML12130A0442012-06-0707 June 2012 Summary of Public Meeting with Exelon Generation Company, LLC, Regarding Proposed Extended Power Uprate License Amendment Request for LaSalle County Station, Units 1 and 2 ML1209306162012-04-0202 April 2012 Enclosure - 04/04/2012 Exelon Nuclear Meeting Presentation LaSalle Count Station Pre-Application Meeting Extended Power Uprate. ML1209006542012-03-30030 March 2012 Slides for April 4 Public Meeting on LaSalle Extended Power Uprate ML1208701402012-03-27027 March 2012 Licensee Slides for Exelon Fleet Pre-Submittal Public Meeting 4-10-12 Licensed Operator Eligibility Requirements LAR ML1208806542012-03-27027 March 2012 Non-Proprietary Slides for LaSalle Prnm Meeting ML1200303212012-01-19019 January 2012 12/7/2011 - Summary of Public Meeting with Exelon Regarding the Proposed Extended Power Uprate License Amendment Request for LaSalle, Units 1 and 2 ML13014A1002011-09-12012 September 2011 Sprinkler Clogging LaSalle Exelon - Presentation During September 2011 NEI Fire Protection Information Forum ML11201A2132011-07-20020 July 2011 Summary of Public Meeting to Discuss Exelon'S Plans for Implementing an Electronic Document Control System (Edocs) for Use by NRC Inspectors with U.S. Nuclear Regulatory Commission (NRC) Region III Staff ML1100502552011-01-17017 January 2011 December 29, 2010, Summary of Public Conference Call with Exelon Generation Company, LLC, Regarding LaSalle Netco Insert Request ML1100503592010-12-29029 December 2010 NRC Meeting Slides for December 29, 2010, Public Conference Call with Exelon Generation Company Regarding LaSalle Netco Insert Request ML1030704842010-11-19019 November 2010 Summary of Public Meeting with Exelon Generation Company, LLC Regarding LaSalle Netco Insert Request ML1030903782010-11-19019 November 2010 Licensee Handouts for LaSalle Meeting with Exelon to Discuss Netco Inserts ML1032601422010-11-10010 November 2010 Handouts for November 10, 2010 Public Conference Call with Exelon Regarding LaSalle Insert Request ML0929400522009-10-22022 October 2009 Meeting Power Uprate Meeting Slides ML0917502262009-07-0707 July 2009 Summary of Pre-Application Meeting with Exelon Generation Company, License Amendment Request for LaSalle and Limerick Measurement Uncertainty Recapture Power Uprates 2024-04-09
[Table view] |
Text
LaSalle Annual Assessment MeetingReactor Oversight Process -CY 2006Nuclear Regulatory Commission -Region IIISeneca, Illinois April 10, 2007 Purpose of Today's MeetingA public forum for discussion of the licensee's A public forum for discussion of the licensee's performanceperformanceNRC will address the licensee performance issues NRC will address the licensee performance issues identified in the annual assessment letter identified in the annual assessment letterLicensee will be given the opportunity to respond to Licensee will be given the opportunity to respond to the information in the letter and inform the NRC of the information in the letter and inform the NRC of new or existing programs to maintain or improve new or existing programs to maintain or improve their performance their performance Agenda Introduction Review of Reactor Oversight ProcessNational Summary of Plant Performance Discussion of Plant Performance Results Licensee Response and Remarks NRC Closing Remarks BreakNRC available to address public questions Region III OrganizationJames CaldwellRegional AdministratorGeoffrey Grant Deputy Regional AdministratorMark SatoriusDirector, Division of Reactor ProjectsSteven WestDeputy DirectorCynthia Pederson Director, Division of Reactor SafetyAnne BolandDeputy DirectorBruce BurgessBranch ChiefRegional SpecialistsLaSalleResident InspectorsDaniel KimbleFrances RamírezProject EngineerNirodhShahReactor EngineerStuart Sheldon NRC Representatives NRC Representatives Mark Satorius, Director, Division Reactor Projects -(630) 829-9600Steven West, Deputy Division Director, DRP-(630) 829-9601 Stephen Sands, Project Manager, NRR-(301) 415-3154Daniel Kimble, Senior Resident Inspector-(815) 357-8611Frances Ramírez, Resident Inspector-(815) 357-8611 Bruce Burgess, Branch Chief-(630) 829-9629NirodhShah, Project Engineer-(630) 829-9821 Stuart Sheldon, Reactor Engineer-(630) 829-9727 NRC Performance GoalsSafety: Ensure protection of the public health and safety and the environment Security: Ensure the secure use and management of radioactive materialsOpenness: Ensure openness in our regulatory process Effectiveness: Ensure that NRC actions are effective, efficient, realistic, and timely Management: Ensure excellence in agency management to carry out the NRC'sstrategic objective Reactor Oversight ProcessSafetyCornerstonesBaseline Inspection ResultsSignificance ThresholdAction MatrixSignificance ThresholdPerformance IndicatorResultsRegulatory ResponseStrategicPerformance AreasSafetyCornerstonesBaseline Inspection ResultsSignificance ThresholdAction MatrixSignificance ThresholdPerformance IndicatorResultsRegulatory ResponseStrategicPerformance Areas Examples of Baseline InspectionsEquipment Alignment ~80 hrs/yr Triennial Fire Protection ~200 hrs every 3 yrsOperator Response ~125 hrs/yrEmergency Preparedness ~80 hrs/yrRad Release Controls ~110 hrs every 2 yrsWorker Radiation Protection ~90 hrs/yrCorrective Action Program ~250 hrs every 2 yrsCorrective Action Case Reviews ~60 hrs/yr Significance ThresholdPerformance Indicators Green: Only Baseline Inspection White:May increase NRC oversightYellow:Requires more NRC oversight Red:Requires more NRC oversight Inspection Findings Green:Very Low safety issue White:Low to moderate safety issueYellow:Substantial safety issue Red:High safety issue Action Matrix ConceptLicenseeResponseRegulatoryResponseDegradedCornerstoneMultiple/Rep.DegradedCornerstoneUnacceptablePerformance Increasing Safety Significance Increasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions National Summary of Plant Performance Status at End of CY 2006Licensee Response 70Regulatory Response 24Degraded Cornerstone 6Multiple/Repetitive Degraded Cornerstone3Unacceptable 0Total103 National Summary Performance Indicator Resu lts (at end of CY 2006)Green 1843White 11Yellow 0Red 0 Total Inspection Findings (CY 2006)Green 676White 13Yellow 0Red 0 LaSalle Assessment ResultsJanuary 1 -December 31, 2006Licensee Response Column of Action Matrix with all Green PIs and inspection findings.
Safety Significant Findings or PIsNo greater than green findings or PIs identifiedNo greater than green findings or PIs identifiedRegion III issued EA Region III issued EA
--06 06--022 on March 31, 2006. It 022 on March 31, 2006. It was a SLwas a SL--III NOV for a willful violation of station III NOV for a willful violation of station High High--Radiation Area Technical Specification Radiation Area Technical Specification requirements by Venture pipe fitters during the requirements by Venture pipe fitters during the Unit 2 refuel outage in February 2005. Unit 2 refuel outage in February 2005.
LaSalle Inspection ActivitiesJanuary 1 -December 31, 2006Inspections at LaSalle were performed by the Resident Inspectors and Regional In spectors. The Regional Inspectors included specialists in Security, Emergency Preparedness, Radiation Protection, and EngineeringThere were 6 Green Inspection Findings identified during 2006.There was a Refueling Outa ge on Unit 1 during 2006.Frances Ramírezbecame the Resident Inspector in January 2007 LaSalle Annual Assessment SummaryJanuary 1 -December 31, 2006Exelon operated LaSalle in a manner that preserved public health and safetyAll cornerstone objectives were metNRC plans baseline inspections at LaSalle for the remainder of the assessment period Licensee Response and Remarks Susan Landahl Site Vice PresidentExelon -LaSalle Station Contacting the NRC Report an emergency(301) 816-5100 (call collect) Report a safety concern: (800) 695-7403 Allegation@nrc.gov General information or questionswww.nrc.govSelect "What We Do" for Public Affairs Reference SourcesReactor Oversight Processhttp://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.htmlPublic Electronic Reading Roomhttp://www.nrc.gov/reading-rm.html Public Document Room1-800-397-4209 (Toll Free)