MONTHYEARIR 05000335/20240032024-11-0707 November 2024 Integrated Inspection Report 05000335/2024003 and 05000389/2024003 ML24291A2862024-11-0101 November 2024 – Relief Request: Proposed Alternative in Accordance with 10 CFR 50.55a(Z)(1), Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years L-2024-176, Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2024-10-30030 October 2024 Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums L-2024-167, Correction to St. Lucie L-2024-132, 2024 Population Update Analysis2024-10-22022 October 2024 Correction to St. Lucie L-2024-132, 2024 Population Update Analysis IR 05000335/20250102024-10-21021 October 2024 Notification of St. Lucie Plant Units 1 & 2 Comprehensive Engineering Team Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000335/2025010 and 05000389/2025010 ML24227A9702024-10-18018 October 2024 Letter to Kenneth Mack Dir, License and Reg Compliance, NextEra Energy, Inc Response to Request Re Engagement Re Sub License Renewal Environmental Review - St Lucie Nuclear Plant 1 and 2 L-2024-085, Refueling Outage SL1-32 Low Pressure Turbine Rotor Inspection Results2024-10-15015 October 2024 Refueling Outage SL1-32 Low Pressure Turbine Rotor Inspection Results L-2024-169, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes2024-10-15015 October 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes L-2024-165, Report of 10 CFR 50.59 Plant Changes, Tests and Experiments Made2024-10-14014 October 2024 Report of 10 CFR 50.59 Plant Changes, Tests and Experiments Made L-2024-118, Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1)2024-10-0808 October 2024 Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1) ML24255A3092024-09-30030 September 2024 SLRA - Revised SE Letter L-2024-155, Subsequent License Renewal Application, Third Annual Update2024-09-27027 September 2024 Subsequent License Renewal Application, Third Annual Update L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes 05000335/LER-2024-001, Unplanned Reactor Scram2024-09-25025 September 2024 Unplanned Reactor Scram IR 05000335/20240112024-09-18018 September 2024 Biennial Problem Identification and Resolution Inspection Report 05000335/2024011 and 05000389/2024011 L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-138, License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles2024-09-11011 September 2024 License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles L-2024-148, Submittal of Offsite Dose Calculation Manual (Odcm), Revision 552024-09-0909 September 2024 Submittal of Offsite Dose Calculation Manual (Odcm), Revision 55 ML24228A2962024-09-0606 September 2024 NRC to NMFS, Designation of FPL as the Non-Federal Representative for St. Lucie IR 05000335/20240052024-08-22022 August 2024 Updated Inspection Plan for St. Lucie, Units 1 & 2 - Report 05000335/2024005 and 05000389/2024005 L-2024-140, Cycle 28 Core Operating Limits Report2024-08-14014 August 2024 Cycle 28 Core Operating Limits Report L-2024-133, Snubber Program Plan Submittal2024-08-14014 August 2024 Snubber Program Plan Submittal L-2024-132, 2024 Population Update Analysis2024-08-13013 August 2024 2024 Population Update Analysis IR 05000335/20240022024-08-13013 August 2024 Integrated Inspection Report 05000335-2024002 and 05000389-2024002 L-2024-129, Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval2024-08-0707 August 2024 Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review 05000389/LER-2024-003, Unplanned Reactor Scram2024-08-0505 August 2024 Unplanned Reactor Scram L-2024-121, Subsequent License Renewal Commitment 30 Revision2024-07-30030 July 2024 Subsequent License Renewal Commitment 30 Revision L-2024-123, Submittal of In-Service Inspection Program Owners Activity Report (OAR-1)2024-07-29029 July 2024 Submittal of In-Service Inspection Program Owners Activity Report (OAR-1) L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24184B2822024-07-16016 July 2024 – Request to Use a Later Code Edition and Addenda of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan 05000389/LER-2024-002-01, Safety Injection Tank Vent Through Wall Leakage2024-07-11011 July 2024 Safety Injection Tank Vent Through Wall Leakage L-2024-110, Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake2024-07-10010 July 2024 Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-109, Schedule for Subsequent License Renewal Environmental Review2024-07-0303 July 2024 Schedule for Subsequent License Renewal Environmental Review ML24172A1562024-06-27027 June 2024 Relief Request - PSL2-I5-RR-01 Proposed Alternative to Amse Code XI Code Examination Requirements - System Leakage Test of Reactor Pressure Vessel Bottom Head and Class 1 and 2 Piping in Covered Trenches L-2024-104, Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 102024-06-26026 June 2024 Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 L-2024-097, Technical Specification Special Report2024-06-20020 June 2024 Technical Specification Special Report L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter L-2024-090, Revised Steam Generator Tube Inspection Reports2024-06-0404 June 2024 Revised Steam Generator Tube Inspection Reports IR 05000335/20244012024-06-0303 June 2024 Security Baseline Inspection Report 05000335/2024401 and 05000389/2024401 ML24135A0642024-05-17017 May 2024 Correction Letter - Amendment Nos. 253 and 208 Regarding Conversion to Improved Standard Technical Specifications L-2024-075, Notification of Improved Standard Technical Specifications (ITS) Implementation2024-05-13013 May 2024 Notification of Improved Standard Technical Specifications (ITS) Implementation IR 05000335/20240012024-05-10010 May 2024 Integrated Inspection Report 05000335/2024001 and 05000389/2024001 ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-053, License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis2024-04-30030 April 2024 License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis L-2024-071, Cycle 27 Core Operating Limits Report2024-04-29029 April 2024 Cycle 27 Core Operating Limits Report L-2024-070, Cycle 32 Core Operating Limits Report2024-04-29029 April 2024 Cycle 32 Core Operating Limits Report 2024-09-09
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan ML24192A2302024-07-10010 July 2024 003 Radiation Safety Baseline Inspection Information Request ML24108A0632024-04-18018 April 2024 – Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML24177A2512024-02-12012 February 2024 Acceptance Review for RR 7-Proposed Alternative - Extension of Inspection Interval for St. Lucie Unit 1 Reactor Pressure Vessel Welds from 10 to 20 Years ML24177A2532024-02-12012 February 2024 Request for Additional Information Relief Request RR 7, Alternative Examination of Reactor Vessel Welds for Florida Power & Light Company, St. Lucie Nuclear Plant, Unit 1 ML23243A9862023-08-31031 August 2023 NRR E-mail Capture - Draft RAIs for EP Staff Augmentation Times LAR (L-2022-LLA-0166) ML23226A0762023-08-14014 August 2023 NRR E-mail Capture - Request for Additional Information - St. Lucie Plant, Units 1 and 2 - Adopt 10 CFR 50.69 (L-2022-LLA-0182) ML23173A1522023-06-22022 June 2023 Request for Additional Information NextEra Fleet Emergency Plan Amendment Request ML23254A4022023-01-24024 January 2023 RP Inspection_2023-001_Document Request ML22311A5582022-11-22022 November 2022 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request for Cep ML22325A0692022-11-18018 November 2022 RAI Set 4 ML22270A1482022-09-26026 September 2022 SLRA Second Round RAI Letter 2 - Class 1 Fatigue (Final) ML22217A0032022-08-0404 August 2022 SLRA Second Round RAI Letter 1) ML22217A0022022-08-0404 August 2022 Email from Brian Harris (NRC) to Robert Coffey (FPL) - St. Lucie SLRA Second Round RAI Letter 1) ML22193A0872022-07-11011 July 2022 Letter RAI Set 3 (Final) ML22133A0032022-05-12012 May 2022 SLRA RAIs Set 1 ML22101A2322022-05-0202 May 2022 Summary of the Environmental Remote Audit Related to the Review of the Subsequent License Renewal Application Enclosure RCIs and RAIs ML22094A1672022-04-0101 April 2022 2022 St. Lucie POV Inspection Information Request ML22075A1212022-03-16016 March 2022 Stl Problem Identification and Resolution (Pi&R) Information Request Final Report ML21350A4262021-12-21021 December 2021 Supplemental Information Needed for Acceptance of Licensing Amendment Request Concerning Technical Specification Conversion to NUREG-1432, Revision 5 ML21119A3142021-04-28028 April 2021 Requests for Additional Information Regarding License Amendment Requests to Apply Risk Informed Completion Times (RICT) for the 120-Volt AC (EPID L-2020-LLA-0283) (Email) ML21063A3192021-03-0404 March 2021 Request for Additional Information Regarding Relief Request RR 15 - Extension of RPV Welds from 10 to 20 Years ML20092G3442020-04-0101 April 2020 RAIs for LAR to Revise Technical Specifications 6.8.4.o, Reactor Coolant Pump Flywheel Inspection Program ML20094G2022020-03-30030 March 2020 Request for Additional Information Regarding License Amendment Request to Adopt EAL Schemes Pursuant to NEI 99-01 (L-2019-LLA-0210) ML19225D3152019-08-13013 August 2019 NRR E-mail Capture - St. Lucie Plant, Unit No. 2, Request for Additional Information Regarding License Amendment Request to Relocate the MOV Thermal Overload Bypass Devices (L-2019-LLA-0106) ML19218A2742019-08-0606 August 2019 Notification of Inspection and Request for Information ML19193A1982019-07-12012 July 2019 Emailed St. Lucie Heat Sink RFI ML19192A1372019-07-11011 July 2019 NRR E-mail Capture - Request for Additional Information - St. Lucie Plant, Unit No. 2, Fall 2018 Refueling Outage Steam Generator Tube Inspection Report ML19192A1352019-06-25025 June 2019 NRR E-mail Capture - Draft Request for Additional Information - St. Lucie Plant, Unit No. 2, Fall 2018 Refueling Outage Steam Generator Tube Inspection Report ML19151A8312019-05-31031 May 2019 NRR E-mail Capture - St. Lucie Plant, Unit Nos. 1 and 2, Request for Additional Information Regarding Emergency Diesel Generator Surveillance Requirement Amendment Request ML19151A5092019-05-21021 May 2019 NRR E-mail Capture - Draft Request for Additional Information - St. Lucie Plant, Unit Nos. 1 and 2 Emergency Diesel Generator Surveillance Requirement Amendment Request ML19109A1392019-04-18018 April 2019 NRR E-mail Capture - St. Lucie Plant, Unit No. 2, Request for Additional Information Regarding the License Amendment Request Pertaining to the Iodine Removal System ML19053A2242019-02-0101 February 2019 NRR E-mail Capture - St. Lucie Plant Unit No. 1 - Draft Request for Additional Information Related to Relief Request 6 Regarding the Refueling Water Tank Bottom Liner ML18296A2052018-10-22022 October 2018 NRR E-mail Capture - St. Lucie Plant, Unit No. 2, Request for Additional Information Regarding License Amendment Request to Reduce the Number of Control Element Assemblies (EPID L-2018-0181) L-2018-018, St. Lucie Plant, Unit No. 2, Request for Additional Information Regarding License Amendment Request to Reduce the Number of Control Element Assemblies (EPID L-2018-0181)2018-10-22022 October 2018 St. Lucie Plant, Unit No. 2, Request for Additional Information Regarding License Amendment Request to Reduce the Number of Control Element Assemblies (EPID L-2018-0181) ML18197A4112018-08-0101 August 2018 Supplemental Information Needed for Acceptance of Requested Licensing Action License Amendment Request to Reduce the Number of Control Element Assemblies ML18019A0712018-01-18018 January 2018 NRR E-mail Capture - Request for Additional Information - St. Lucie Inop AFW Steam Supply LAR (L-2017-LLA-0296) ML17331B1532017-11-27027 November 2017 NRR E-mail Capture - Request for Additional Information - St. Lucie IST Relief Request #5 - PR-01 (L-2017-LLR-0113) ML17277A3692017-10-0404 October 2017 NRR E-mail Capture - Request for Additional Information - St. Lucie Rict LAR - MF5372/MF5373 ML17152A1842017-06-0101 June 2017 Request for Additional Information - RPS Rate of Change and LCO Change LAR (CACs MF9119 9120) ML16356A1432016-12-20020 December 2016 Notification of Inspection and Request for Information ML16326A0092016-11-18018 November 2016 NRR E-mail Capture - Request for Additional Information Re. Nextera/Fpl LAR to Adopt TSTF-545 - CACs MF8203, MF8204, MF8208, and MF8209 ML16308A3232016-11-0303 November 2016 NRR E-mail Capture - Request for Additional Information - St. Lucie EDG Day Tank LAR - MF8006 ML16292A8212016-10-14014 October 2016 Emergency Preparedness Inspection and Request for Information ML17003A0452016-10-11011 October 2016 NRR E-mail Capture - (External_Sender) FW: St. Lucie Response to RAI on SL2-22 SG Tube Inspection Report (MF7604) ML16244A2602016-08-26026 August 2016 Notification of Inspection and Request for Information ML16155A3502016-06-0303 June 2016 Notification of Inspection and Request for Information ML16089A0052016-03-28028 March 2016 NRR E-mail Capture - Request for Additional Information - St. Lucie Srxb Mtc Surv - MF7269 & MF7270 ML16077A1062016-03-17017 March 2016 NRR E-mail Capture - Request for Additional Information - St Lucie Vacuum Gothic LAR - MF6980/MF6981 ML16068A2612016-03-0808 March 2016 NRR E-mail Capture - Request for Additional Information - St Lucie TSTF-422 - MF6683/MF6684 2024-07-12
[Table view] |
Text
August 1, 2007Florida Power and Light CompanyATTN:Mr. J. A. Stall, Senior Vice PresidentNuclear and Chief Nuclear OfficerP. O. Box 14000 Juno Beach, FL 33408-0420
SUBJECT:
ST. LUCIE NUCLEAR POWER PLANT - NOTIFICATION OF INSPECTION ANDREQUEST FOR INFORMATION
Dear Mr. Stall:
During the period of October 22-26, 2007, and November 13-16, 2007, the NRC will conductbaseline radiation safety inspection activities at the St Lucie Nuclear Station. The inspection will focus on the Occupational Radiation Safety Inspection cornerstone using NRC Inspection Procedure (IP) Numbers 71121.01, 71121.02, and 71122.02; and will include the Radiation Safety sections of IP 71151. The inspectors also will complete a review of radiation protection activities associated with groundwater monitoring activities as outlined in IP 71122.01. Experience has shown that this inspection is resource intensive both for the NRC inspectorsand your staff. In order to minimize the impact to your on-site resources and to conduct a productive inspection, we have enclosed a request for documents needed for this inspection. It is important that all of these documents are up to date and complete, in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection. The lead inspector has scheduled a three day pre-inspection visit with your staff for the September 04-06, 2007 period. The requested material will be reviewed and collected at that time.We have discussed the schedule for these inspection activities with your staff and understandthat our regulatory contact for this inspection will be Mr. Don. Cecchett of your organization. If there are any questions about this inspection or the material requested, please contact the lead inspector, George B. Kuzo at (404) 562-4658. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter andits enclosure will be available electronically for public inspection in the NRC Public Document FP&L2Room or from the Publicly Available Records (PARS) component of NRC's document system(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).Sincerely,/RA/Brian Bonser , ChiefPlant Support Branch 1 Division of Reactor SafetyDockets Nos. 50-335, 389, License Nos. DPR-67 and NPF-16
Enclosure:
Public Radiation Protection Inspection Document Request FP&L3cc w/encl:William E. Webster Vice President, Nuclear Operations South Region Florida Power & Light Company Electronic Mail DistributionGordon L. JohnstonSite Vice President St. Lucie Nuclear Plant Florida Power & Light Company Electronic Mail DistributionChristopher R. CostanzoPlant General Manager St. Lucie Nuclear Plant Electronic Mail DistributionBill ParksOperations Manager St. Lucie Nuclear Plant Electronic Mail DistributionTerry L. PattersonLicensing Manager St. Lucie Nuclear Plant Electronic Mail DistributionRajiv S. KundalkarVice President - Nuclear Technical Services Florida Power & Light Company Electronic Mail DistributionDon E. GrissetteVice President, Nuclear Training and Performance Improvement Florida Power & Light Company Electronic Mail DistributionSeth B. DustonTraining Manager St. Lucie Ocean Drive Florida Power & Light Company Electronic Mail DistributionM. S. Ross, Managing AttorneyFlorida Power & Light Company Electronic Mail DistributionMarjan Mashhadi, Senior AttorneyFlorida Power & Light Company Electronic Mail DistributionWilliam A. PassettiBureau of Radiation Control Department of Health Electronic Mail DistributionCraig Fugate, DirectorDivision of Emergency Preparedness Department of Community Affairs Electronic Mail DistributionJ. KammelRadiological Emergency Planning Administrator Department of Public Safety Electronic Mail DistributionDouglas AndersonCounty Administrator St. Lucie County 2300 Virginia Avenue Ft. Pierce, FL 34982
_________________________OFFICERII:DRSRII:DRPRII:DRSSIGNATURE/RA//RA M. Ernstes for/NAMEGBKuzoSNinhDATE7/31/07August 2, 2007August 2, 2007August 2, 2007August 2, 2007August 2, 2007 E-MAIL COPY? YESNO YESNO YESNO YESNO YESNO YESNO YESNO EnclosureOCCUPATIONAL RADIATION PROTECTION INSPECTION DOCUMENT REQUEST SITE: Plant St. Lucie Nuclear Station (PSL) Rpt. 05000335,389/2007005PRE-INSPECTION VISIT:September 04-06, 2007 INSPECTION DATES: October 22-26, 2007, and November 13-16, 2007NRC INSPECTORS:George B. Kuzo, GBK1@NRC.GOV (404) 562-4658Jose Diaz, JXD2@NRC.GOV (404) 562-4736IDENTIFIED LICENSEE CONTACTS: Radiation Controls - Mark Moore (Radiation ProtectionManager) 772 467-7785/Alan Day (X7436), Stan Wisla, Outage Projects (X7301); ALARA -Keith Mourning (X7310); Remote Monitoring/Instrumentation - Barry Robertson (7269);
Effluents/ Process Monitors - Al Locke (7049); Dosimetry - Maroa, Quinnett, (X7666); andLicensing/Compliance - Don Cecchett (7155)Inspection Procedures:IP 71121.01Access Control To Radiologically Significant AreasIP 71121.02 ALARA (OS)
IP 71122.01Radioactive Gases and Liquid Effluent Treatment & Monitoring Systems § 02.01(e), § 2.02 (d & e) IP 71122.02, Radioactive Material Processing and Transportation, IP 71151Performance Indicator Verification for Occupational and Public Radiation Safety CornerstonesNote: This is a broad list of the documents the lead NRC inspector will be interested inreviewing and obtaining during the pre-inspection visit. The current version of these documentsis expected unless specified otherwise. Electronic media is preferred, if readily available. (The preferred file format is Word, WordPerfect, or searchable ".pdf" files on CD-ROM. Please provide 3 copies of each CDROM that is submitted.) Information in the "document lists" should contain enough information to be easily understood by someone who has a knowledge of the subject. The lead inspector will discuss specific information needs with the licensee staff and may request additional documents.ACCESS CONTROLS TO RADIOLOGICALLY SIGNIFICANT AREAS [71121.01]
- Provide List/Maps of:
N current Radiation Area (RA) High Radiation Area (HRA), Locked- HRA (LHRA), Very -HRA (VHRA), and airborne radioactivity area locations. Note: only provide general area maps of elevations identifying rooms with HRA/LHRA/VHRA conditions. Detailed maps of specific rooms/areas are not needed 2Enclosure# Provide Procedure/Guidance documents for:
N administrative and physical access controls including posting, labeling, survey frequency, dosimetry, multi-badging, LHRA key control, control of divers, controls for non-fuel highly activated materials stored in Spent Fuel Pool (SPF) areas, direct alarming dosimetry (DAD) use, Radiation Work Permit (RWP) development
- Provide Corrective Action Program (CAP) documents including:
N listing of Condition Reports (CRs) issued/documented since October 2006 for radiation protection program activities including access control/personnel contamination events, and intakes
N Audit and self assessments conducted/issued since October 2006 for radiation protection program activities
- Provide list of scheduled work in HRAs, LHRAs, VHRAs, airborne radioactivity areas tentatively scheduled for the weeks of onsite inspection (10/22-26/07 and - 11/13-16/07)
- Identify list of infrequently performed tasks or tasks potentially involving LHRA/VHRA condition for the upcoming Unit 2 Refueling Outage
- Provide the Following Records/Evaluations N List 10 maximum personnel exposures for Calendar Years (CY) 2006 and Year-to-Date (YTD) 2007
N List of internal dose assessments (with assigned dose) for intakes since October 2006 N List of Personnel Contamination Assessments conducted since October 2006 - general list, not detailsDuring on-site inspection:
- Inspectors will:
N conduct tours and observations of ongoing work activities and worker radiation protection practices
N conduct/observe independent radiation surveys associated with ongoing work activities N evaluate proficiency of Health Physics Technicians and adequacy of job/task coverage N evaluate on-going radiation protection issues including potential intakes, contamination events, etc.
ALARA [7112102]Prior to the Onsite Inspection
- Provide copies of all procedures related to:
N HP/ALARA not listed above (e.g. monitoring for declared pregnant worker, shielding implementat/assessment, etc.).
N HP/CHEM/OPs procedures related to crudburst & cleanup.
N ALARA manual (or equivalent high-level procedure).
N crudburst & cleanup trending point data from previous outage (e.g. dose rates and cobalt concentration). Data should be from the same unit as the current outage.
N source term reduction program guidance, including cobalt reduction initiatives N flood-up and drain-down 3Enclosure# Provide List of N CRs related to ALARA or crudburst since October 2005. Note: Do not duplicate CRs identified for access controls.
N Any self-assessments or audits of ALARA program since October 2005
- Provide details regarding:
N Highest five person-rem exposure tasks for current refueling outage and ALARA planning packages if available
During on-site inspection:
- Inspectors will conduct selected interviews with, but not limited to:
N principle job sponsors regarding specific ALARA initiatives regarding status of tasks N selected department management regarding ALARA initiatives N site upper-management
- Observations may be conducted for, but not limited to, the following activities N any ongoing ALARA committee meetings N implementation of ALARA initiatives, e.g., shielding packages, drain-down sequence
- Record/Data Reviews N review of effectiveness of ALARA initiatives thru field dose rate measurements/review of specific task personnel exposure data
- Followup on CR/Audit/Self-assessment issues selected from the original ALARA CAP list submitted previouslyRADIOLOGICAL EFFLUENT MONITORING [71122.01]Prior to the Onsite Inspection
- Provide Copy of Current ODCM
- Annual Effluent Monitoring Report for Calendar Year (CY) 2006
- Provide Procedures/Guidance/Documentation for :
N onsite/offsite surface/groundwater monitoring activities N action plan developed for groundwater protection initiative N documenting events associated with spills, leaks, or unexpected liquid discharge or other unusual occurrences since October 2006
- Provide Records for:
N list of time periods for which main liquid/gaseous effluent monitors were out-of-service (OOS) and the duration since October 2006. Note: exclude monitors OOS less than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />
N most recent continuous gas and/or liquid release permits and most recent batch liquid and gas permits (4 permits total)
- Provide summary of spill, leak, unexpected liquid discharge data documented subsequent to October 2006 in the site's 10 CFR 50.75(g) files. Note: Only provide summary, 50.75(g) file - details can be reviewed during onsite inspection 4Enclosure# CAP documents including N listing of CRs issued since October 2006 for: - effluent monitoring/processing and equipment
- onsite System Structure and Component liquid leaks or H-3 in ground and/or surface runoff water samples
N audits and self assessments conducted/issued since October 2006 for: - effluent monitoring activities and equipment
- groundwater monitoring/contaminationDuring on-site inspection:
- Records N review and discuss groundwater monitoring activities and results since October 2006 N tour onsite monitoring wells RADIOACTIVE MATERIAL PROCESSING AND TRANSPORTATION [7112202]Prior to the Onsite Inspection
- Provide Copy of Current Process Control Program (PCP)
- Radioactive waste (Radwaste) Information Input Into the Annual Effluent Monitoring Reports for CYs 05& 06
- Procedures/Guidance/Data Related to:
N transportation of radioactive material/radwaste.
N radwaste processing analaysis, resin sluicing, and HIC dewatering.
N Part 61 Sampling and Analyses; N Development/Evaluation of Scaling Factors and Application to Hard to Detect Radionuclides N Procedures for evaluation of RCS/radioactive waste chemistry to verify stability of waste stream radionuclide composition
- Provide the following N list of shipments made since October 2005. Highlight 5 "hottest" shipments.
N list of changes made to solid radwaste processing systems since July 2003.
N list all permanently abandoned radwaste processing equipment or systems.
N most recent 10 CFR Part 61 analyses for all waste streams N any data on indication of failed-fuel since October 2005 N list of CRs issued for shipping or radwaste program activities since October 2005 (titles/summaries)
N any self-assessments/audits of shipping/radwaste processing program since October 2005
- Transport Cask CoC's and associated documents for frequent used transport casks N Copies not required prior to onsite inspection but listing of responsible staff/on-site document location and availability requested.
N Licensee procedures for cask loading and/or closure 5Enclosure During the On-site inspection
- Review/discuss recent PCP/Radwaste processing/ Transportation Program Changes
- Walk-down and Review/Discuss radwaste processing areas and equipment
- Observe Radioactive Waste Processing or Transportation Activities
- Walk-down/Discuss Abandoned Radwaste Processing Equipment
- Review/Discuss 10 CFR Part 61 Data - Scaling Factors: Changes to Waste Streams
- Followup on CR documents selected from the original Radwaste/Transportation CAP document list previously submitted PI VERIFICATION [71151]
- Provide Procedure/Guidance for collection and reporting of PI data.
- Provide Records of:
N CRs related to occupational and public radiation safety PI occurrences issued since October 2006
N Monthly PI reports since October 2006 N DAD Alarm Logs Since October 2006 N List of Out of Service (OOS) Effluent Monitors and Length of Inoperability since October 2006.
- Provide for CY 2006 N final continuous gas and liquid release permits N final batch gas and liquid release permits GENERAL INFORMATION NEEDED
- Organization Charts and Contact Phone Numbers for:
N Radiation Protection N Chemistry N Operations N Maintenance and I&C
- Procedure for issuing CRs and assessing issues for risk significance.
- Updated Final Safety Analysis Report Chapters 11 (Effluents/Radwaste) and 12 Radiation Protection