CP-200800348, Transmittal of Inservice Inspection Program Plan, Revision 3, (ASME Code Section XI 1998 Edition, 1999 and 2000 Addenda, Interval Start Date August 3, 2004, Second Interval)

From kanterella
Revision as of 14:50, 12 July 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Transmittal of Inservice Inspection Program Plan, Revision 3, (ASME Code Section XI 1998 Edition, 1999 and 2000 Addenda, Interval Start Date August 3, 2004, Second Interval)
ML080720369
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 03/06/2008
From: Blevins M, Madden F
Luminant Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
CP-200800348, TXX-08046
Download: ML080720369 (254)


Text

Luminant Mike Blevins Executive Vice President& Chief Nuclear Officer Mike.Blevins

@ Luminant.com Luminant Power P O Box 1002 6322 North FM 56 Glen Rose, TX 76043 T 254 897 5209 C 817 559 9085 F 254 897 6652 CP-200800348 Log # TXX-08046 Ref. # 10 CFR 50.55a(g)March 6, 2008 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)DOCKET NO. 50-446 TRANSMITTAL OF UNIT 2 INSERVICE INSPECTION PROGRAM PLAN, REVISION 3 (UNIT 2: ASME CODE SECTION XI 1998 EDITION, 1999 AND 2000 ADDENDA, INTERVAL START DATE AUGUST 3, 2004, SECOND INTERVAL)

Dear Sir or Madam:

Enclosed is one copy of Revision 3 to the Unit 2 Inservice Inspection (ISI) Program Plan for updating your manual. The attached Plan Revision 3 replaces the Plan Revision 2 in its entirety.

This transmittal does not contain a request for relief from ASME Code requirements.

If you have any questions or need- additional information regarding this matter, please feel free to contact Jack Hicks at (254) 897-6725.Sincerely, Luminant Generation Company LLC Mike Blevins By: z?3 2.)u Fred W. Madden Director, Oversight

& Regulatory Affairs A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway Comanche Peak Diablo Canyon Palo Verde South Texas Project Wolf Creek K I.(c-U. S. Nuclear Regulatory Commission TXX-08046 Page 2 03/06/2008 Enclosure Unit 2 Second Interval ASME Section XI Inservice Inspection Program Plan Revision 3 c -E. E. Collins, Region IV clo B. K. Singal, NRR Resident Inspectors, Comanche Peak clo A. P. Jones, Chief Inspector, TDLR ENCLOSURE to TXX-08046 99 TXU LUMINANT COMANCHE PEAK NUCLEAR POWER PLANT (CPNPP)6322 NORTH FM 56 GLEN ROSE, TEXAS 76043 UNIT 2 -SECOND INTERVAL ASME SECTION XI INSERVICE INSPECTION PROGRAM PLAN REVISION 3- EFFECTIVE DATE: FEBRUARY 28, 2008 COMMERCIAL OPERATION:

AUGUST 3, 1993 SECOND INTERVAL START DATE: AUGUST 3, 2004 Prepared By:

ISI Engineer Reviewed By: ---sic, , Technical Reviewer Approved By: -' i" 2.2/2 Shaw Site.Director, Engineering and Technical Services Approved By: $/ / z"7-.J-- :-- -Luminant Engineering Manager COMANCHE PEAK NUCLEAR POWER PLANT UNIT NO. 2 -SECOND INTERVAL ASME SECTION XI INSERVICE INSPECTION PROGRAM PLAN TABLE OF CONTENTS 1.0 Introduction 1.1 General Plant Description 1.2 Purpose 1.3 Responsibility 1.4 Scope 1.5 Acronyms 1.6 Exemptions 1.7 Weld Reference System 1.8 Relief Requests 1.9 Records of Retention 1.10 Authorized Inspection Agency 2.0 Examination Boundaries 2.1 ASME Code Boundaries 2.2 ISI Isometric Drawings 2.3 ISI Examination Boundary Drawings 3.0 Non-Destructive Examination Methods 3.1 Visual Examination (TWA-2210) 3.2 Surface Examination (IWA-2200) 3.3 Volumetric Examination (IWA-2230) 4.0 Examination Tables 4.1 Class 1 NDE 4.2 Class 2 NDE 4.3 Component Supports 4.4 Eddy Current 5.0 Pressure Testing 5.1 Purpose 5.2 Pressure Test Description 5.3 Pressure Test Requirements 6.0 Program Changes 4.0, 4.1, 4.2, 4.3 plus examination itemsheets (204 pages)Appendix A Relief Requests Appendix B VT-2 System Pressure Test Listing Appendix C Applicable Code Cases Appendix D Ultrasonic Calibration Blocks Appendix E List of ISI Sketches Appendix F Record of Revision Page 2 of 18 COMANCHE PEAK NUCLEAR POWER PLANT UNIT NO. 2 -SECOND INTERVAL ASME SECTION XI INSERVICE INSPECTION PROGRAM PLAN 1.0- INTRODUCTION 1.1 GENERAL PLANT DESCRIPTION The Comanche Peak Nuclear Power Plant (CPNPP) is a two unit plant containing pressurized water reactors, each with an electrical output of approximately 1150 MWe. CPSES was constructed to the ASME Boiler and Pressure Vessel Code,Section III, 1974 Edition, including Summer 1974 Addenda for piping and Winter 1974 Addenda for component supports.1.2 PURPOSE The purpose of this plan is to provide details pertaining to performance of the Inservice Inspection (ISI) at CPNPP, Unit 2 (including common and Unit 1 systems required to support Unit 2 operations).

This plan demonstrates compliance with the Code of Federal Regulations, 10CFR50.55a, and CPNPP Technical Specifications (TS) 5.5.9. This plan meets the requirements of the 1998 Edition of the ASME Boiler and Pressure Vessel Code, including 1999 and 2000 Addenda of Section XI, and Code Cases as identified in Appendix C of this plan (hereafter referred to as the Code).1.3 RESPONSIBILITY Luminant (Owner)/ Designated Agent is responsible for preparation and maintenance of this ten year ISI Program Plan, including any required reference drawings and boundary drawings.

The owner prepares each Outage Plan, which defines the scope of the examinations, determines the extent of any of the examinations, and defines the method of each exam. After each outage, this Plan is updated by the Owner/Designated Agent to reflect the completed examinations, and a summary report is prepared and submitted to the Regulatory and Enforcement Authorities.

The Owner/Designated Agent is responsible for any associated craft labor required for the examinations, including access provisions, insulation removal; weld preparation, and other aspects. The Owner/Designated Agent is responsible for the evaluation of the ISI examination records, including indication evaluations and associated corrective actions.A contractor working under the guidance of the Owner/Designated Agent, in most cases, performs the examinations.

The contractor submits procedures and personnel certifications for performance of the examinations to the Owner/Designated Agent for review and approval.

A contractor ISI Program Manager and a suitable number of examination teams, supplied with the required NDE equipment, are provided to complete the scheduled examinations for the outage. The contractor conducts the examinations, reviews the data, and makes suitable recommendations to the Owner/Designated Agent.Page 3 of 18 COMANCHE PEAK NUCLEAR POWER PLANT UNIT NO. 2 -SECOND INTERVAL ASME SECTION XI INSERVICE INSPECTION PROGRAM PLAN 1.4 SCOPE ISI, as used in this plan, is the program of planned examinations of welds, components and their supports, which is implemented during the service life of a commercial nuclear power plant. This plan addresses those examinations to be performed on ASME Class 1, 2 and 3 systems, and components as stipulated in the Code. ISI examinations will be performed in accordance with the schedule of Inspection Program B of the Code.A risk-informed inspection (RI-ISI) program for selected ASME Code Class 1 and 2 piping welds(category welds B-F, B-J, C-F-1, and C-F-2) has been developed, submitted, and accepted by the NRC as an alternative to the requirements of Section XI of the ASME Code for Inservice Inspection.

Relief Request A-I is authorized for the second 10-year interval of Unit 2 and is reflected in the Plan in Appendix A..The examination of containment as stipulated in Subsections IWE and IWL of the Code are not within the ,scope of this plan.1.5 ACRONYMS ANSI ASME CPNPP UFSAR ISI PSI PDI NDE RI-ISI RR EVT American National Standards Institute American Society of Mechanical Engineers.

Comanche Peak Nuclear Power Plant Updated Final Safety Analysis Report Inservice Inspection Pre-Service Inspection Performance Demonstration Initiative Non-destructive Examination Risk Informed ISI Relief Request Enhanced Visual Examination 1.6 EXEMPTIONS 1.6.1 Code Class 1 The following Code Class 1 components (or parts of components) are exempted from the volumetric and surface examination requirements of 1WB-2500 of the Code by IWB-1220;(a) components that are connected to the reactor coolant system and part of the reactor coolant pressure boundary, and that are of such a size and Page 4 of 18 COMANCHE PEAK NUCLEAR POWER PLANT UNIT NO. 2 -SECOND INTERVAL ASME SECTION XI INSERVICE INSPECTION PROGRAM PLAN shape so that upon postulated rupture the resulting flow of coolant from the reactor coolant system under normal plant operating conditions is within the capacity of makeup systems which are operable from on-site emergency power. The emergency core cooling -systems are excluded from the calculation of makeup capacity.(b) (1) Piping of NPS 1 and smaller and their supports, except for steam generator tubing.(2) Components, their supports and their connections in piping of NPS 1 and smaller.(c) Reactor vessel head connections and associated piping, and their supports, NPS 2 and smaller, made inaccessible by control rod drive penetrations.(d) Welds or portions of welds that are inaccessible due to being encased in concrete, buried underground, located inside apenetration, or encapsulated, by guard pipe.1.6.2 Code Class 2 The following Code Class 2 components or parts of components are exempted from the volumetric and surface examination requirements of Subsection IWC-2500 of the Code by Subsection IWC-1220.1.6.2.1 Components within Residual Heat Removal (RHR), Emergency Core Cooling (ECC), and Containment Heat Removal (CHR) Systems or Portions of Systems: (a) For systems, except high pressure safety injection systems in pressurized water reactor plants: (1) Piping NPS 4 and smaller (2) Vessels, pumps, and valves and their connections in piping NPS 4 and smaller (b) For high pressure safety injection systems in pressurized water reactor plants: (1) Piping NPS 11/2 and smaller.(2) Vessels, pumps, and valves and their connections in piping NPS 1 1/2 and smaller.Page 5 of 18 COMANCHE PEAK NUCLEAR POWER PLANT UNIT NO. 2- SECOND INTERVAL ASME SECTION XI INSERVICE INSPECTION PROGRAM PLAN (c) Vessels, piping, pumps, and valves, other components, and component connections of any size in statically pressurized, passive (i.e., no pumps) safety injection systems of pressurized water reactor plants.(d) Piping and other components of any size beyond the last shutoff yalve in open ended portions of systems that do not contain water during normal plant operating conditions.

1.6.2.2 Components within systems or portions of systems other than RHR, ECC, and CHR Systems: (a) For systems, except auxiliary feedwater systems pressurized water reactor plants: (1) Piping NPS 4 and smaller (2) Vessels, pumps, and valves and their connections in piping NPS 4 and smaller (b) For auxiliary feedwater systems in pressurized reactor plants: (1) Piping NPS 1 1/2 and smaller (2) Vessels, pumps, and valves and their connections in piping NPS 1 1/2 and smaller.(c) Vessels, piping, pumps, valves, other components, component connections of any size in systems or of systems that operate (when the system function is required) at a pressure equal to or less than 275 psig at a temperature equal to or less than 200'F (93°C).(d) Piping and other components of any size beyond last shutoff valve 'in open ended portions of systems do not contain water during normal plant operating conditions.

1.6.2.3 Inaccessible Welds Welds or portions of welds that are inaccessible due to being encased in concrete, buried underground, located inside a penetration, or encapsulated by guard pipe.1.6.3 The following components or parts of components are exempted from the VT-1 visual examination requirements of IWD-2500 of the Code by IWD-1220: (a) Piping NPS 4 and smaller.(b) Vessels, pumps, and valves and their connections in piping NPS 4 and smaller.Page 6 of 18 COMANCHE PEAK NUCLEAR POWER PLANT UNIT NO. 2- SECOND INTERVAL ASME SECTION XI INSER VICE INSPECTION PROGRAM PLAN (c) Components that operate at a pressure of 275 psig or less and at a temperature of 200'F (93 0 C) or less in systems (or portions of systems) whose function is not required in support of reactor residual heat removal, containment heat removal, and emergency core cooling.(d) Welds or portions of welds that are inaccessible due to being encased in concrete, buried underground, located inside a penetration, or encapsulated by guard pipe.1.7 WELD REFERENCE SYSTEM Weld areas subject to surface or volumetric examination shall be identifiable through a reference system as specified by Subsection IWA-2600 and Appendix III of the Code. This system shall consist of a combination of physical markings and written direction provided in this plan and in site implementing procedures.

Welds within the boundaries of the ISI program are uniquely identified on isometric drawings, which provide weld numbers and locations.

In those cases where the physical configuration Will not provide positive weld location, dimensional information can be obtained from construction isometric drawings or piping fabrication drawings to allow for such positive identification.

Welds which were inadvertently not marked or whose marks have been removed shall be marked at the time inservice inspection is performed.

The method of marking these indications on the pipe will be delineated in the implementing procedures.

1.8 RELIEF REQUESTS Where a particular examination requirement of the Code is determined to be impractical, a request for relief from the requirement shall be submitted pursuant to the requirement of lOCFR5O.55a (a)(3).Each request for relief should contain the following information, as a minimum: (a) System/Component for which relief is requested;(b) Code requirement;(c) Code requirement from which relief is requested;(d) Proposed alternative;(e) Basis of alternative for providing acceptable level of quality and safety;and, (f) Duration of proposed alternative.

Page 7 of 18 COMANCHE PEAK NUCLEAR POWER PLANT UNIT NO. 2 -SECOND INTERVAL ASME SECTION XI INSERVICE INSPECTION PROGRAM PLAN 1.9 RECORDS OF RETENTION Records and documentation of information and examination results, which provide the basis for evaluation and facilitate the comparison of examination results from previous and subsequent examinations, shall be maintained as permanent plant records at CPNPP in accordance with Article IWA-6000 of the Code. As a minimum, this documentation shall include the applicable records described in Subsection IWA-6340.1.10 AUTHORIZED INSPECTION AGENCY In accordance with Subsection lWA-1400, paragraph (f), of the Code, Owner/Designated Agent has maintained a contract with an Authorized Inspection Agency. (AIA) for an Authorized Nuclear Inservice Inspector (ANII)to provide inspection services as described in Subsection IWA-21 10 of the Code. The ANII is afforded the opportunity to verify examinations and review the plan, examination procedures, examination records, certification records, and other associated documents.

2.0 EXAMINATION BOUNDARIES 2.1 ASME CODE BOUNDARIES ASME Code classification and system boundaries of the piping and other components subject to examination have been identified as required by Subsection TWA-1400(a) of the Code. Section 3.2 of the CPNPP UFSAR defines the various safety classes of piping and components in accordance with Regulatory Guide 1.26 and ANSI Standard N18.2. The plant piping schematic drawings (flow diagrams) show these class interfaces and the ISI examination boundary drawings were developed from these flow diagrams.2.2 ISI ISOMETRIC DRAWINGS ISI isometric drawings have been developed to identify the ISI examination areas' for examinations required by ASME Section XI tables IWB-2500, IWC-2500, and IWF-2500 (class 1 and 2 only). These drawings are maintained current by CPNPP. Revisions to these ISI isometric drawings are prepared and approved in accordance with site implementing procedures.

Plant piping drawings (BRP, BRHL, GHH), individual pipe support drawings and vendor drawings for vessels, pumps, and valves are specifically used to identify examination areas for examinations as required by ASME Section XI tables IWD-2500 and IWF-2500 (Code class 3) and also provide references for class 1 and 2 examinations.

Page 8 of 18 COMANCHE PEAK NUCLEAR POWER PLANT UNIT NO. 2 -SECOND INTERVAL ASME SECTION XI INSERVICE INSPECTION PROGRAM PLAN 2.3 ISI EXAMINATION BOUNDARY DRAWINGS The following ISI examination boundary drawings, which are part of the ISI Program and are found in revision 0 of the Program Plan, delineate the bounds within which the ISI examination requirements of the Code are applied. The plant systems included in theexamination boundary are listed below: AF -Auxiliary Feedwater CC -Component Cooling Water CH -Chilled Water System CS -Chemical and Volume Control CT -Containment Spray DD -Demineralized

&S Reactor Make-up Water DO -Diesel Oil FW -Feedwater MS -Main Steam RC -Reactor Coolant RH -Residual Heat Removal SI -Safety Injection SW -Service Water Flow diagrams for each :system are marked up from the boundary drawings and become part of the VT-2 system pressure test packages.3.0 NON-DESTRUCTIVE EXAMINATION (NDE) METHODS The method of examination for each weld, component, or support is specified in the examination tables found in subsection 4.1, 4.2, and 4.3 of this plan. These methods, as described below, are in accordance with Article IWA-2000 of the Code.Page 9 of 18 COMANCHE PEAK NUCLEAR POWER PLANT UNIT NO. 2 -SECOND INTERVAL ASME SECTION XI INSERVICE INSPECTION PROGRAM PLAN 3.1 VISUAL EXAMINATION (IWA-2210) 3.1.1 VT-1 (IWA-2211)

VT-I examinations are conducted to detect discontinuities and imperfections on the surfaces of components, including such conditions as cracks, wear, corrosion, or erosion.3.1.2 VT-2 (IWA-2212)

,(a) VT-2 examinations are conducted to detect evidence of leakage from pressure retaining components, with or without leakage collection systems, as required during the conduct of system pressure test.(b) VT-2 examinations shall be conducted in accordance with IWA-5000.

For direct examination, the Table IWA-2210-1 maximum examination distance shall apply to the distance from the eye to the surfaces being examined.3.1.3 VT-3 (IWA-2213)

VT-3 examinations are conducted to determine the general mechanical and structural condition of components and their supports by verifying parameters such as clearances, settings, and physical displacement; and to detect discontinuities and imperfections, such as loss of integrity at bolted or welded connections, loose or missing parts, debris, corrosion, wear, or erosion. VT-3 includes examinations for conditions that could affect operability or functional adequacy of snubbers and constant load and spring type supports.3.2 SURFACE EXAMINATION (IWA-2220)(a) A surface examination indicates the presence of surface discontinuities.

It may be conducted by a magnetic particle, a liquid penetrant, or an eddy current method.(b) Any linear indication that exceeds the allowable linear surface flaw standards shall be recorded.3.2.1 Magnetic Particle Examination (IWA-2221)

The magnetic particle (MT) examination shall be conducted in accordance with Article 7 of Section V of the ASME Boiler and Pressure Vessel Code. MT of coated materials shall be conducted in accordance with Article 7 , Appendix I if Section V.Page 10 of 18 COMANCHE PEAK NUCLEAR POWER PLANT UNIT NO. 2 -SECOND INTERVAL ASME SECTION XI INSERVICE INSPECTION PROGRAM PLAN 3.2.2 Liquid Penetrant Examination (IWA-2222)

The liquid penetrant (PT) examination shall be conducted in accordance with Article 6 of Section V of the ASME Boiler and Pressure Vessel Code.3.2.3 Eddy Current Examination (IWA-2223)

Eddy current (EC) examination for detection of surface flaws shall be conducted in accordance with Appendix IV of the Code.3.3 VOLUMETRIC EXAMINATION (IWA-2230)

A volumetric examination indicates the presence of discontinuities throughout the volume of material.3.3.1 Radiographic Examination (RT) (IWA-223 1)This volumetric examination is conducted to detect discontinuities using penetrating radiation with appropriate image-recording devices. This examination shall be conducted in accordance with Article 2 of Section V of the ASME Boiler and Pressure Vessel Code.3.3.2 Ultrasonic Examination (UT) (IWA-2232)

This volumetric examination is conducted to detect discontinuities using appropriate ultrasonic instrumentation in accordance with Appendix I of Section XI of the ASME Code.3.3.3 Eddy Current Examination (EC) (IWA-2233)

This volumetric examination is conducted to detect discontinuities in heat exchanger tubing using electromagnetic principles in accordance with the provisions of Section V of the ASME Code, Article 8, Appendix II. For Inspection Program for Steam Generator Tubing refer to ASME Section XI Subsection IWB-2413 and paragraph 4.4 below.Page 1 of 18 COMANCHE PEAK NUCLEAR POWER PLANT UNIT NO. 2 -SECOND INTERVAL ASME SECTION XI INSERVICE INSPECTION PROGRAM PLAN 4.0 EXAMINATION TABLES CPNPP ASME Section XI Inservice Inspection Plan tables 4.1 through 4.3 have been developed and contain the following information:

a) System Names (identified in Section 2.3of the Plan)b) Summary Number -A computer data base assigned sequencing number.c) Line Number of Component Number -Example: 6-SI-2-089-2501R-1 or TCX-RCPCRV-01.

d) Weld Number or Pipe Support Number -Example: TCX-I-1 100-8 or CC-2-105-012-E33K.

e) ASME Sec. XI Category and Item Number -Described in ASME Sec.XI Examination Tables (IWX-2500-1).

f) NDE Method -Identifies the examination method(s) as described in section 3 of this plan.g) Plan Status -Identifies the inspection interval, period and outage h) Year -Example: 83, the year that PSI was performed.

i) Instructions

-Notes applicable to specific inspection requirements.

j) Calibration Block -Example: TBX-18.k) Notes -Applicable to the results of specific outages preceded by the outage year, "84" refers to the baseline outage.4.1 CLASS 1 NDE This subsection describes the examination areas and NDE methods for the Class 1 pressure retaining components and associated component integral welded attachments as specified in Article IWB of the Code.For pressure testing, refer to Section 5 below.Class 1 valve bodies exceeding 4" NPS have been grouped according to size, constructional design, manufacturing method, and function in accordance with Table IWB-2500-1, Category B-M-2, and Note 3 of the Code. These groups are delineated below. One valve from each group has been selected for examination as denoted by the asterisk "*" These examinations are only required to be performed if the component is disassembled for maintenance, repair or other testing Group 1 -6" Forged Pressurizer Relief Valves 2-8010A (reference TCX- 1-4501 for location)2-801 OB 2-801 OC Page 12 of 18 COMANCHE PEAK NUCLEAR POWER PLANT UNIT NO. 2 -SECOND INTERVAL ASME SECTION XI INSERVICE INSPECTION PROGRAM PLAN Group 2 -12" Forged Gate Valves Isolating the RC System from the RHR System 2-8701A 2-8701B 2-8702A 2-8702B.(reference TCX- 1-4101 for location)Group 3 10" Forged Check Valves Isolating the RC System from the SI System 2-8948A 2-8948B 2-8948C 2-8948D 2-8956A 2-8956B 2-8956C 2-8956D (reference TCX-1-4402 for location)Group 4 -6" Forged Check Valves Isolating the RC System from the SI System 2-8818A 2-8818B 2-8818C 2-8818D 2-8949A 2-8949B 2-8949C 2-8949D 2-8841A 2-8841B (reference TCX- 1-4403 for location)4.2 CLASS 2 NDE This subsection describes the examination areas and NDE methods for the Class 2 pressure retaining components and associated component integral welded attachments as specified in Article IWC of the Code. For pressure testing, see Section 5.Class 2 valve body welds have been grouped according to design, size, function and service in a system in accordance with Table IWC-2500-1, Category C-G, Note 1 of the Code. These groups are delineated below. One valve from each group has been selected for examination as denoted by the asterisk "*" Page 13 of 18 COMANCHE PEAK NUCLEAR POWER PLANT UNIT NO. 2 -SECOND INTERVAL ASME SECTION XI INSERVICE INSPECTION PROGRAM PLAN Group 1 -8" Forged Gate Valves, MS Safety Isolation 2MS-026 2MS-063 2MS-098 2MS-134!ý J: I (reference TCX-2-2300 for location)Group 2 -18" Forged Gate Valves, Main Feedwater Isolation 2FW-071 2FW-077 (reference TCX-2-2202 for location)2FW-083 2FW-089 Group 3 -6" Forged Check Valves, Feedwater 2FW-191 2FW- 192 2FW-193 2FW- 194 2FW-195 2FW-196 2FW-197 2FW-198 2FW-199 2FW-200 2FW-201 2FW-202* (reference TCX-2-2204 for location)Group 4 -6" Forged Gate Valves, Auxiliary Feedwater Isolation 2FW-203 2FW-204* (reference .TCX-2-2403 for location)2FW-205 2FW-2o6 12" Forged Gate Valves, Containment Spray Isolation Group 5 -2CT-0026 2CT-0028 2CT-0078 2CT-0084* (reference TCX-2-2578 for location)Page 14 of 18 COMANCHE PEAK NUCLEAR POWER PLANT UNIT NO. 2 -SECOND INTERVAL ASME SECTION XI INSERVICE INSPECTION PROGRAM PLAN Group 6 -12" Forged Gate Valve, Safety Injection 2SI-0048 * (reference TCX-2-2582 for location)4.3 COMPONENT SUPPORTS This subsection describes the examination areas and requirements for the Class 1, 2 and 3 component supports and Class 3 Integral Welded Attachments as specified in Article IWF and IWD of the Code, respectively.

For pressure testing of Class 3 components, see Section 5.In lieu of the requirements of Technical Specifications relating to snubbers, specifically those ISI requirements (e.g., plans, schedules, reports, inspector involvement, and Code Data Reports) of ASME Section XI, snubbers shall be demonstrated operable bly performance of the augmented inservice inspection program as described in the ASME OM Code, Subsection ISTD.4.4 EDDY CURRENT Eddy Current testing (ET) of the steam generator tubes, shall be governed by Plant Technical Specifications; results of the examination shall be evaluated against acceptance criteria contained in TS 5.5.9. The steam generator tubes are examination category B-Q, Item No. 16.20, per ASME Section XI. The. need for reporting requirements; the corrective action including expanded examination samples shall also be governed by the Technical Specifications.

Other examination parameters shall be in accordance with ASME Section XI. These measures will provide compliance with the inspection requirements of Reg.Guide 1.83.Procedure NDE 7.10, "Steam Generator Tube Selection and Examination" lists the tubes repaired by steam generator number and the type of plugs installed.

The information in this table is cumulative and is updated after each refueling outage.The following License Amendment Request (LAR) numbers have been taken for Eddy Current testing: 98-006 Revision to SG tube plugging criteria Page 15 of 18 COMANCHE PEAK NUCLEAR POWER PLANT UNIT NO. 2 -SECOND INTERVAL ASME SECTION XI INSERVICE INSPECTION PROGRAM PLAN 5.0 PRESSURE TESTING 5.1 PURPOSE This section of the ISI Plan identifies pressure test requirements for ASME Code Class 1, 2, and 3 pressure retaining piping and components at CPNPP Unit 2 as defined in Subsection IWA-5000 of the Code.This section defines pressure test boundaries, establishes test frequencies, required tests and test pressures and temperature as required by the Code.The system pressure test for repair/replacement activities shall be in accordance with Subsection IWA-5120 of the Code.5.2 PRESSURE TEST DESCRIPTION Pressure retaining components within each system boundary is subjected to the following applicable system pressure tests as referenced in the ASME Section XI, Table IWA-5210-1, under which conditions a VT-2 visual examination is performed in accordance with IWA-5240 to detect leakage.5.2.1 IWA-5211(a):

A system leakage test is conducted while the system is in operation, during a system operability test, or while system is at rest conditions using an external pressurization source;5.2.2 IWA-521 1(b): A system hydrostatic test conducted during a plant shutdown at an elevated test pressure as specified in IWB-5230, IWC-5230, or IWD-5222; and 5.2.3 TWA-5211(c):

A system pneumatic test conducted in lieu of either of the above system pressure tests for Class 2 or 3 components as permitted by IWC-5000 or IWD-5000, the requirements for system leakage and hydrostatic tests are applicable to pneumatic tests.5.3 PRESSURE TEST REQUIREMENTS A system pressure test and accompanying VT -2 examination shall be performed in accordance with Articles IWA-5000, IWB-5000, IWC-5000 and IWD-5000 and the related tables, Tables IWA-5210-1, 1WB, IWC and IWD-2500-1 of the Code. The plant systems identified in the ISI boundary are found in Section 2.3.A VT-2 system pressure test listing, identified in Appendix B, breaks up the system into smaller VT-2 packages and work orders and are scheduled and completed on a period basis. This list tracks the scheduled and completed VT-2 examinations during a period and supports the completed OAR-1 Report.Page 16 of 18 COMANCHE PEAK NUCLEAR POWER PLANT UNIT NO. 2 -SECOND INTERVAL ASME SECTION XI INSERVICE INSPECTION PROGRAM PLAN Insulated Bolted Connections:

IWA-5242 states that borated systems controlling reactivity shall have insulation removed from pressure retaining bolted connections during VT -2 visual exams.In lieu of performing this examination at plant start-up and after removing/reinstalling the insulation at these bolted connections, an alternate examination was done using approved Code Case N-533-1. This alternate examination allowed for removing the insulation and conducting the bolted joint exams for class 1 systems during refueling.

VT -3 certified personnel having the required VT-2 certifications then perform the exams of the bolted connections looking for evidence of leakage per the list of components provided in Preventative Maintenance (PM) work orders(legacy PM 344682).6.0 PROGRAM CHANGES Class 1 NDE, Class 2 NDE, and component support exams that are substituted for other exams are identified in the following table per the requirements of IWA-2420(b)(5).

Based on the limitations of the ISI data base program, exams that are no longer conducted do not appear on the Class 1 NDE, Class 2 NDE, and component support tables. The table, on the next page, clearly identifies the specific exams affected rather than reviewing the history of changes made per each specific revision of the Program Plan.Page 17 of 18 COMANCHE PEAK NUCLEAR POWER PLANT UNIT NO. 2 -SECOND INTERVAL ASME SECTION XI INSERVICE INSPECTION PROGRAM PLAN Weld/Conip Number TCX-1-4506-15 TCX-1-4101-4 TCX-2-2581-6 Code Cat.B-J R1.11 B-J R1 none C-F-1 RI none Replacement Weld/Comp TCX- 1-4506-17 TCX- 1-4401-4 TCX-2-2581-7 Code Cat B-J RI.ll B-J R1 none C-F-1 RI none Outage Justification 2RF07 Replaced because of interference between the weld and a clamp for a vertical pipe support. Removal of the clamp would have required temporarily supporting the line in a high radiation area. Selected another weld on the same line segment, having the same risk category and ranking.2RF07 Replaced because of interference between the weld and a clamp for a pipe support. Clamp could not be easily removed or loosened.Selected another weld having the same risk category and ranking.2RF07 Replaced because the weld is located too close to a penetration seal, which interferes with the exam and the seal is not easily removable.

Selected another weld which has the same risk category and ranking.Page 18 of 18 1/16/2008 REVISION:

3 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION

SUMMARY

FOR THE SECOND INTERVAL SECTION XI

SUMMARY

PAGE: 1 CATEGORY B-A B-B B-D B-G-1 B-G-2 B-K B-L-1 B-L-2 B-M-2 B-N-I B-N-2 B-N-3 B-O C-A C-B C-C C-D NUMBER OF COMPONENTS

.....................

24 8 36 181 68 10 1 1 25 1 1 1 28 19 8 97 1 COMPONENTS REQUIRED 24 8 36 165 19 8 1 1 4 3 1 1 4.19 FIRST PERIOD SECOND PERIOD..... ..... .... ..... ..... .... ..... .... -- -------a .........-(SCHEDULED

/ COMPLETED

/ PERCENTAGE OF REQUIREMENT)

THIRD PERIOD 1 2 i0 0 4 2 0 0 1 1 0 0 0 4 2 25 1 1 2 10 0 4 2 0 0 1 1 0 0 0 4 2 25 1 4%25%27%0%21%25%0%0%25%33%0%0%0%21%25%26%100%3 4 6 0 6 4 0 0 3 1 0 0 0 10 2 39 0 0 16%0 75%0 44%0 0%0 53%0 75%0 0%0 0%0 100%0 66%0 0%0 0%0 0%0 73%0 50%0 67%0 100%20 2 20 165 9 2 1 1 0 1 1 1 4 5 4 31 0 100%100%100%100%100%100%.100%100%100%100%100%100%.100%100%100%100%100%8 95 1 C-G D-A F-A (1)F-A (2)F-A (3)F-A (NPS)27 141 289 572 861 143 3199 5388 6 140 85 252 168 102 144 1295 2 2 33%41 41 29%2 0 66%51 0 65%2 0 100%48 0 100%18 61 54 32 18 61 54 32 21%24%32%31%27 103 66 44 0 0 0 0 53%65%66%75%40 88 48 26 0 0 0 0 100%100%100%100%R-A 39 39 27%300------300------23---.

300 300 23%.57 0 67% 48 0 100%42B 0 56% 567 0 100%TOTALS NOTE: (1)(2)(3)(NPS)Item FI.10; CLASS 1 PIPING SUPPORTS Item F1.20; CLASS 2 PIPING SUPPORTS Item F1.30; CLASS 3 PIPING SUPPORTS Item FI.40; SUPPORTS OTHER THAN PIPING SUPPORTS (CLASS 1, 2, 3 AND MC)4.0 PAGE 1 of 3 4.0 EXAMINATION TABLES CPSES ASME Section XI Inservice Inspection Plan tables 4.1 through 4.3 have been developed and contain the following information:

a) System Name.b) Summary Number -A computer data base assigned sequencing number.c). Line Number of Component Number- Example: 6-SI-1-089-2501R-1 or TCX-RCPCRV-01.

d) Weld Number or Pipe Support Number -Example: TCX-I-1100-8 or CC-I-105-012-E33K.

e) ASME Sec. XI Category and Item Number -Described in ASME Sec. XI Examination Tables (IWX-2500-1).

NDE Method -Identifies the examination method(s) as described in section 3 of this plan.g) Plan Status -Identifies the inspection interval, period and outage h) Year -Example: 83, the year that PSI was performed., i) Instructions

-Notes applicable to specific inspection requirements.

j) Calibration Block -Example: TBX-1 8.k) Notes -Applicable to the results of specific outages.preceded by the outage year, "84" refers to the baseline outage.4.0 Page 2 of 3 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLA.SSI COMPONENTS INSPECTION INTERVAL_

PLAN STATUS I FIRST SECOND ASME I PERIOD PERIOD PRESERVICE YEAR PTEIRD I PERIOD I (A)

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION BLOCK*SEC. XI CATGY ITEM NOlI NDE I--------

OUTAGE ----------

INSTRUCTIONS METH I 1 2 1 2 3 1 2 1 -CALIBRATION (C)(D)(G)(B)(E) (F)(H)(I)(3)(K)4.0 Page 3 of 3 4.1 CLASS 1 NDE This subsection describes the examination areas and NDE methods, for the Class I pressure retaining components and associated component integral welded attachments as specified in Article IWB of the Code.For pressure testing, refer to Section 5 below.Class I valve bodies exceeding 4" NPS have been grouped according to size, constructional design, manufacturing method, and function in accordance with Table IW3B-2500-1, Category B-M-2, and Note 3 of the Code. These groups are delineated below.One valve from each group has been selected for examination as denoted by the asterisk "*" These examinations are only required to be performed if the component is disassembled for maintenance, repair or other testing.Group 1 -6" Forged Pressurizer Relief Valves 2-8010A (reference TCX- 1-4501 for location)2-8010B 2-801 OC Group 2 -12" Forged Gate Valves Isolating the RC System from the RHR System 2-8701A (reference TCX- 1 -4101 for location)2-8701B 2-8702A 2-8702B Group 3 -10" Forged Check Valves Isolating the RC System from the SI System 2-8948A 2-8948B 2-8948C 2-8948D 2-8956A 2-8956B 2-8956C 2-8956D (reference TCX-1 -4402 for location)4.1 Page 1 of 2 Group 4 -6"' Forged Check Valves Isolating the RC System from the SI System 2-8818A 2-8818B 2-881 8C 2-8818D 2-8949A 2-8949B 2-8949C 2-8949D 2-8841A 2-8841B (reference TCX-1-4403 for location)4.1 Page 2Tf 2 DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS PAGE:.INSPECTION INTERVAL PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD ASME SEC. XI CATGY NDE ITEM NO METH

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION 1 2 OUTAGE 1 2 3 1 2 PRESERVICE YEAR INSTRUCTIONS I **CALIBRATION BLOCK**REACTOR COOLANT TCX-RCPCRV-01 000100 TCX-1-1100-1 RV FLANGE TO SHELL WELD R157 830RB B-A B1.30 UT 83 TDLR VERIFICATION BOUNDARY.2' ----X -**PDI-01**

000200 TCX-1-1100-2 B-A RV UPPER TO INTERMEDIATE SHELL B1.11 WELD UT 83 TDLR VERIFICATION BOUNDARY.2---X -**PDI-01**

000300 TCX-1-1100-3 B-A RV INTERMEDIATE TO LOWER SHELL B1.11 WELD UT 83 TDLR VERIFICATION BOUNDARY.2 ----X -**PDI-01**

000400 TCX-1-1100-4 B-A RV LOWER SHELL TO BOTTOM HEAD B1.11 WELD UT 83 TDLR VERIFICATION BOUNDARY.2 -X -**PDI-01**

000500 TCX-1-1100-5 B-A UT 82 TDLR VERIFICATION BOUNDARY.RV LOWER HEAD CIRCUMFERENTIAL B1.21 WELD 2 -X -**PDI-01**

000600 TCX-1-1100-6 B-A RV UPPER SHELL LONGITUDINAL B1.12 WELD UT 83 TDLR VERIFICATION BOUNDARY.2---X**PDI-01**

000700 TCX-1-1100-7 B-A.RVUPPERSHELL LONGITUDINAL B1.12 WELD UT 83 TDLR VERIFICATION BOUNDARY.2 -x**PDI-01**

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS PAGE: 2 INSPECTION INTERVAL ASME SEC. XI CATGY NDE ITEM NO METH PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD---OUTAGE-------------

12 1 2 3 1 2 PRESERVICE YEAR INSTRUCTIONS I **CALIBRATION BLOCK**

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION REACTOR COOLANT TCX-RCPCRV-01 000a00 TCX-1-1100-8 RV UPPER SHELL LONGITUDINAL WELD B-A B1.12 UT 83 TDLR VERIFICATION BOUNDARY.2 ---X**PDI-01**

000900 TCX-1-1100-9 RV INTERMEDIATE SHELL LONGITUDINAL WELD B-A B1.12 UT 83 TDLR VERIFICATION BOUNDARY.2 ----X**PDI-01**

001000 TCX-1-1100-10 RV INTERMEDIATE SHELL LONGITUDINAL WELD B-A B1.12 UT 83 TDLR VERIFICATION BOUNDARY.2 -X. -**PDI-01**

001100 TCX-1-1100-11 RV INTERMEDIATE SHELL LONGITUDINAL WELD B-A B1.12 UT 83 TDLR VERIFICATION BOUNDARY.2 ----X**PDI-01**

001200 TCX-1-1100-12 RV LOWER SHELL LONGITUDINAL WELD B-A B1.12 UT 83 TDLR VERIFICATION BOUNDARY.---X**PDI-01**

001300 TCX-1-1100-13 RV LOWER SHELL LONGITUDINAL WELD B-A B1. 12 UT 83 TDLR VERIFICATION BOUNDARY.2 -X -**PDI-01**

001400 TCX-1-1100-14 RV LOWER SHELL LONGITUDINAL WELD B-A B1.12 UT 83 TDLR VERIFICATION BOUNDARY.2 -X -**PDI-01**

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS PAGE: 3 INSPECTION INTERVAL

SUMMARY

NUMBER EXAMINATION AREA IDENTIFICATION ASME SEC. XI CATGY NDE ITEM NO METH PLAN STATUS FIRST SECOND THIRD PERIOD- PERIOD PERIOD S-OUTAGE-------------

1 2 1 2 3 1 2-----------.-.---------.-.--------

PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**REACTOR COOLANT TCX-RCPCRV-01 001500 TCX-1-1100-15 B-A UT 83 TDLR VERIFICATION BOUNDARY.RV BOTTOM HEAD MERIDIONAL WELD B1.22 2 X -**PDI-01**

001600 TCX-1-1100-16 B-A RV BOTTOM HEAD MERIDIONAL WELD B1.22 UT 83 TDLR VERIFICATION BOUNDARY.2 X -**PDI-01**

001700 TCX-1-1100-17 B-A RV BOTTOM HEAD MERIDIONAL WELD B1.22 UT 83 TDLR VERIFICATION BOUNDARY.2 -X**PDI-01**

001800 TCX-1-1100-18 B-A RV BOTTOM HEAD MERIDIONAL WELD B1.22 UT 83 TDLR VERIFICATION BOUNDARY.2 X**PDI-01**

001850 TCX-1-1100-LUGS CORE SUPPORT LUGS (6)*B-N-2 BI3 .60 VT- 3 83 TDLR VERIFICATION BOUNDARY.2 -X -001900 TCX-1-1100A-19 RV OUTLET NOZZLE TO VESSEL WELD R157 830RB B-D UT B3.90 83 TDLR VERIFICATION BOUNDARY.2 -X**RV-7, PDI-01**001910 TCX-1-1100A-19IR B-D UT RV OUTLET NOZZLE INNER RADIUS B3.100 EVT 2 R157 830RB 83 TDLR VERIFICATION BOUNDARY.

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS PAGE: 4 INSPECTION INTERVAL __PLAN STATUS_FIRST SECOND THIRD'ASME PERIOD, PERIOD PERIOD SEC. XI NDE ------------

--OE---------------

CATGY NDE T 0 U T A G E ITEM NO METH 1 2 1 2 3 1 2.............--------.-.-- ------. .-- --------.........-PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**

SUMMARY

NUMBER EXAMINATION AREA IDENTIFICATION REACTOR COOLANT TCX-RCPCRV-01 002000 TCX-1-1100A-20 B-D UT RV INLET NOZZLE TO VESSEL WELD B3.90 83 TDLR VERIFICATION BOUNDARY.2 ----X -**RV-7 ,PDI-01**002010 TCX-1-1100A-20IR I B-D UT RV INLET NOZZLE INNER RADIUS B3.100 EVT 2 -83 TDLR VERIFICATION BOUNDARY.---X -002100 TCX-1-1100A-21 B-D RV INLET NOZZLE TO VESSEL WELD B3.90 UT 83 TDLR VERIFICATION BOUNDARY.2 -X -**RV-7 ,PDI-01**002110 TCX-1-1100A-21IR B-D UT RV INLET NOZZLE INNER RADIUS B3.100 EVT 2 -83 TDLR VERIFICATION BOUNDARY.X 002200 TCX-1-1100A-22 RV OUTLET NOZZLE TO VESSEL WELD R157 830RB B-D B3.90 UT 83 TDLR VERIFICATION BOUNDARY.2 X -**RV-7 PDI-01**002210 TCX-1-II00A-22IR B-D UT RV OUTLET NOZZLE INNER RADIUS B3.100 EVT 2 -R157 830RB 83 TDLR VERIFICATION BOUNDARY.X 002300 TCX-1-1100A-23 RV OUTLET NOZZLE TO VESSEL WELD R157 830RB B-D B3 .90 UT 83 TDLR VERIFICATION BOUNDARY.X**RV-7 PDI-01**

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS PAGE: 5 INSPECTION INTERVAL_I FIRS ASME SEC. XI CATGY NDE ITEM NO METH

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION PERI 1 2 PLAN STATUS T SECOND THIRD OD PERIOD PERIOD--OUTAGE-------------

1 2 3 1 2----.-.---------.-.--------

PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK t REACTOR COOLANT TCX-RCPCRV-01 002310 TCX-1-1100A-23IR B-D UT RV OUTLET NOZZLE INNER RADIUS B3.100 EVT 2 R157 830RB 83 TDLR VERIFICATION BOUNDARY.---X 002400 TCX-1-1100A-24 B-D RV INLET NOZZLE TO VESSEL WELD 33.90 UT 83 TDLR VERIFICATION BOUNDARY.2 -X -**RV-7 ,PDI-01**002410 TCX-1-1100A-24IR 13-D UT RV INLET NOZZLE INNER RADIUS B3.100 EVT 2 83 TDLR VERIFICATION BOUNDARY.--X -**RV-I**002500 TCX-1-1100A-25 13-D RV INLET NOZZLE TO VESSEL WELD B3.90 UT 83 TDLR VERIFICATION BOUNDARY.----**RV-7 ,PDI-01**002510 TCX-1-1100A-25IR RV INLET NOZZLE INNER RADIUS 002600 TCX-1-1100A-26 RV OUTLET NOZZLE TO VESSEL WELD R157 830RB B-D UT B3.100 EVT 2 83 TDLR VERIFICATION BOUNDARY.---B-D UT B3.90 83 TDLR VERIFICATION BOUNDARY.2 X**RV-7 ,PDI-01**002610 TCX-1-1100A-26IR B-D UT RV OUTLET NOZZLE INNER RADIUS B3.100 EVT 2 -R157 830RB 83 TDLR VERIFICATION BOUNDARY.x -

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS PAGE: 6 INSPECTION INTERVAL ASME SEC. XI CATGY NDE ITEM NO METH I I J I I-----__-_ -PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD--OUTAGE-------------

1 2 1 2 3 1 2 PRESERVICE YEAR INSTRUCTIONS I **CALIBRATIOr

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION N BLOCK**REACTOR COOLANT TCX-RCPCRV-01 002700 TCX-1-1100A-LIG RV FLANGE LIGAMENTS (1/54)R157R830RB B-G-1 B6. 40 UT 83 TDLR VERIFICATION BOUNDARY.2 -X *-**RV-3**002800 TCX-I-1200-INT RV INTERNALS (ACCESS DURING REFUELING)

R157 832RB 002805 TCX-1-1200-CSS RV CORE SUPPORT STUCT-NO ACCESS @ REFUEL B-N-I VT-3 BI3 .10 B-N-3 VT-3 BI3 .70 82 TDLR VERIFICATION BOUNDARY.2 -C X -X -82 TDLR VERIFICATION BOUNDARY.2 ---X -003100 TCX-l-1300-1 B-A RV CLOSURE HEAD TO FLANGE WELD B1.40 RI57R832RB UT MT 83 TDLR VERIFICATION BOUNDARY 2 C**TBX-29**

003200 TCX-i-1300-2 B-A RV CLOSURE HEAD RING TO DISC BI.21 WELD R157R832RB UT 83 TDLR VERIFICATION BOUNDARY.2 X**TBX-29**

003300 TCX-I-1300-3 RV CLOSURE HEAD MERIDIONAL WELD RI57R832RB 003400 TCX-I-1300-4 RV CLOSURE HEAD MERIDIONAL WELD B-A B1.22 UT 83 TDLR VERIFICATION BOUNDARY.2 -**TBX-29**

B-A B1.22 UT 83 TDLR VERIFICATION BOUNDARY.2 ----X**TBX-29**

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS PAGE: 7 INSPECTION INTERVAL PLAN STATUS _______ PRESERVICE YEAR I FIRST SECOND THIRD I ASME SEC. XI CATGY ITEM NO PERIOD----------

NDE METH 1 2 PERIOD PERIOD

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION OUTAGE--------

1 2 3 -1 2 INSTRUCTIONS

    • CALIBRATION BLOCK**REACTOR COOLANT TCX-RCPCRV-01 003500 TCX-1-1300-5 RV CLOSURE HEAD MERIDIONAL WELD B-A B1.22 UT 83 TDLR VERIFICATION BOUNDARY.2 -X -**TBX-29**

003600 TCX-1-1300-G RV CLOSURE HEAD MERIDIONAL WELD B-A B1.22 UT 83 TDLR VERIFICATION BOUNDARY.2 -X --**TBX- 29**003700 TCX-1-1300-CB75 CONOSEAL BOLTING R157 860RB B-G-2 B7.80 VT-i 84 TDLR VERIFICATION BOUNDARY.2 ----X -003800 TCX-1-1300-CB76 CONOSEAL BOLTING R157 860RB B-G-2 B7.80 VT-1 84 TDLR VERIFICATION BOUNDARY.2 ----X -003900 TCX-1-1300-CB77 CONOSEAL BOLTING R157 860RB B-G-2 B7.80 VT- i 84 TDLR VERIFICATION BOUNDARY.2 004000 TCX-1-1300-CB78 CONOSEAL BOLTING R157 860RB B-G-2 B7.80 VT- 1 84 TDLR VERIFICATION BOUNDARY.2 X 005150 TCX-1-1300A-CRD75 CONTROL ROD DRIVE R155 86ORB B-0 B14 .10 PT 83 TDLR VERIFICATION BOUNDARY.---X DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS PAGE: 8 INSPECTION INTERVAL __PLAN STATUS FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION SEC. XI CATGY ITEM NO I -----------


NDE I METH 1 1 2 PRESERVICE YEAR INSTRUCTIONS I **CALIBRATION BLOCK**OUTAGE -1 2 3 1 2 REACTOR COOLANT TCX-RCPCRV-01 005200 TCX-1-1300A-CRD76 CONTROL ROD DRIVE B-O B14 .10 PT 83 TDLR VERIFICATION BOUNDARY.2-X -005250 TCX-1-1300A-CRD77 CONTROL ROD DRIVE B-0 B14. 10 PT 83 TDLR VERIFICATION BOUNDARY.2 -005300 TCX-1-1300A-CR1D78 CONTROL ROD DRIVE B-0 B14. 10 PT 83 TDLR VERIFICATION BOUNDARY.2 ----X -005400 TCX-1-1400-1 RV STUD R160 905RB B-G-1 UT B6. 30 82 TDLR VERIFICATION BOUNDARY.2 -X -**TBX-52**

005420 TCX-1-1400-2 RV STUD RI60 905RB B-G-1 UT B6.30 82 TDLR VERIFICATION BOUNDARY.-X**TBX-52**

005440 TCX-1-1400-3 RV STUD RI60 90SRB B-G-i B6.30 UT 82 TDLR VERIFICATION BOUNDARY.2-X**TBX-52**

005460 TCX-1-1400-4 RV STUD RI60 905RB 9-G-1 UT B6.30 82 TDLR VERIFICATION BOUNDARY.X**TBX-52**

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS PAGE: INSPECTION INTERVAL ASME SEC. XI CATGY NDE ITEM NO METH PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD-OUTAGE- -------- -----------

20 U TA G 2E 1 2 1 2 3 1 2-----------.-.---------.-.--------

PRESERVICE YEAR INSTRUCTIONS w*CALIBRATION BLOCK**

SUMMARY

NUMBER EXAMINATION AREA IDENTIFICATION REACTOR COOLANT TCX-RCPCRV-01 005480 TCX-1-1400-5 RV STUD R160 905RB B-G-1 B6. 30 UT 82 TDLR VERIFICATION BOUNDARY.2---X**TBX-52**

005500 TCX-1-1400-6 RV STUD RI60 905RB B-G-1 B6. 30 UT 82 TDLR VERIFICATION BOUNDARY.2 -X -005520 TCX-1-1400-7 RV STUD RI60 905RB B-G-1 B6.30 UT 82 TDLR VERIFICATION BOUNDARY.2 -X -**TBX-52**

005540 TCX-1-1400-8 RV STUD R160 905RB B-G-1 B6. 30 UT 82 TDLR VERIFICATION BOUNDARY.2 -----X -**TBX-52**

005560 TCX-1-1400-9 RV STUD RI60 905RB B-G-1 UT B6.30 82 TDLR VERIFICATION BOUNDARY.x**TBX-52**

005580 TCX-1-1400-10 RV STUD RI60 905RB B-G-1 UT B6. 30 82 TDLR VERIFICATION BOUNDARY.2 -x -**TBX-52**

005600 TCX-1-1400-11 RV STUD RI60 905RB B-G-1 UT BG. 30 82 TDLR VERIFICATION BOUNDARY.x**TBX-52**

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS PAGE: 10 INSPECTION INTERVAL FIRST PERIOD PLAN STA SECOND PERIOD ASME SEC. XI CATGY NDE ITEM NO METH TUS THIRD PERIOD G-- -----------

PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION 1 2-U T A 1 2 3 1 2 REACTOR COOLANT TCX-RCPCRV-01 005620 TCX-1-1400-12 RV STUD, RI60 905RB B-G-1 B36.30 UT 82 TDLR VERIFICATION BOUNDARY.2 ----X -**TBX-52**

005640 TCX-1-1400-13 RV STUD RI60 905RB B-G-1 B6.30 UT 82 TDLR VERIFICATION BOUNDARY.2 ---.X -**TBX-52**

005660 TCX-1-1400-14 RV STUD R160 905RB B-G-1 B6.30 UT 82 TDLR VERIFICATION BOUNDARY.---X -**TBX-52**

005680 TCX-1-1400-15 RV STUD R160 905RB B-G-1 B6.30 UT.82 TDLR VERIFICATION BOUNDARY.2 --X -**TBX-52**

005700 TCX-1-1400-16 RV STUD RI60 905RB K B-G-1 B6. 30 UT 82 TDLR VERIFICATION BOUNDARY.2 -X -**TBX-52**

005720 TCX-1-1400-17 RV STUD R160 905RB B-G-1 BE6.30 UT 82 TDLR VERIFICATION BOUNDARY.2 -X**TBX-52**

005740 TCX-1-1400-18 RV STUD R160 905RB B-G-1 UT B6.30 82 TDLR VERIFICATION BOUNDARY.X**TBX-52**

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS PAGE: 11 INSPECTION INTERVAL_ASME SEC. XI CATGY NDE ITEM NO METH PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION

--. .-----------------.1 2 OUTAGE- --1 2 3 1 2 RF.ACTOp COOLANT TCX-RCPCRV-01 005760 TCX-1-1400-19 RV STUD R160 905RB B-G-1 B6.30 UT 82 TDLR VERIFICATION BOUNDARY.2 ----X -**TBX-52**

005780 TCX-1-1400-20 RV STUD RIGO 905RB B-G-1 UT B6.30 82 TDLR VERIFICATION BOUNDARY.2 ----X -**TBX-52**

005800 TCX-1-1400-21 RV STUD R160 905RB B-G-1 B6 .30 UT 82 TDLR VERIFICATION BOUNDARY.X -**TBX-52**

005820 TCX-1-1400-22 RV STUD RI60 905RB B-G-1 B6,30 UT 82 TDLR VERIFICATION BOUNDARY.2 -X**TBX-52**

005840 TCX-1-1400-23 RV STUD R160 905RB B-C-1 UT B6 .30 82 TDLR VERIFICATION BOUNDARY.2 X**TBX-52**

005860 TCX-1-1400-24 RV STUD Ri60 905RB B-G-1 B6.30 UT 82 TDLR VERIFICATION BOUNDARY.2 -X**TBX-52**

005880 TCX-1-1400-25 RV STUD R160 905RB B-G-1 B6 .30 UT.82 TDLR VERIFICATION BOUNDARY.2---X -**TBX-52**

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS PAGE: 12 INSPECTION INTERVAL ASME SEC. XI CATGY NDE ITEM NO METH FIRST PERIOD 1 2 PLAN STATUS---SECOND THIRD PERIOD PERIOD PRESERVICE YEAR

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION


.-.---------------

OUTAGE ----1 2 3 1 2--I INSTRUCTIONS

    • CALIBRATION BLOCK**PKAC'TDN CDDT.ANT TCY-NCPCPV-01 REACTOR COOLANT TCX-RCPCRV-01 005900 TCX-1-1400-26 RV STUD R160 905RB B-G-1 B6.30 UT 82 TDLRVERIFICATION BOUNDARY.2-X -**TBX-52**

005920 TCX-1-1400-27 RV STUD Ri60 905RB B-G-1 B6.30 UT 82 TDLR VERIFICATION BOUNDARY.2 ----X -**TBX-52**

005940 TCX-I-1400-28 RV STUD RI60 905RB B-G-1 B6.30 UT 82 TDLR VERIFICATION BOUNDARY.2 X -**TBX-52**

005960 TCX-1-1400-29 RV STUD Ri60 905RB B-G-1 B6.30 UT 82 TDLR VERIFICATION BOUNDARY.2 ---X**TBX-52**

005980 TCX-1-1400-30 RV STUD Ri60 905RB B-G-1 UT B6.30 82 TDLR VERIFICATION BOUNDARY.X -**TBX-52**

006000 TCX-1-1400-31 RV STUD RI60 905RB B-G-1 UT B6.30 82 TDLR VERIFICATION BOUNDARY.X -**TBX-52**

000020 TCX-i-1400-32 RV STUD R160 905RB B-G-1 UT B5.30 82 TDLR VERIFICATION BOUNDARY.2 -X -**TBX-52**

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS PAGE: 13 INSPECTION INTERVAL ASME.SEC. XI CATGY NDE ITEM NO METH I PLAN STATUS* FIRST SECOND PERIOD PERIOD THIRD PERIOD-1i PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION 2-OUTAGE ----1 2 3 1 2-----REACTOR COOLANT TCX-RCPCRV-01 006040 TCX-1-1400-33 RV STUD R160 905RB B-G-1 B6.30 UT 82 TDLR VERIFICATION BOUNDARY.2 -X-**TBX-52**

006060 TCX-1-1400-34 RV STUD R160 905RB B-G-1 B6.30 UT 82 TDLR VERIFICATION BOUNDARY.2 ----X**TBX-52**

006080 TCX-1-1400-35 RV STUD RIGO 905RB B-G-1 B6.30 UT 82 TDLR VERIFICATION BOUNDARY.2 ---X -**TBX-52**

006100 TCX-1-1400-36 RV STUD R160 905RB B-G-1 B6.30 UT 82 TDLR VERIFICATION BOUNDARY.2 ---X -**TBX-52**

006120 TCX-1-1400-37 RV STUD B-G-1 B6.30 UT 82 TDLR VERIFICATION BOUNDARY.2 -X**SAP 102924**006140 TCX-1-1400-38 RV STUD B-G-1 B6.30 UT 82 TDLR VERIFICATION BOUNDARY X**SAP 102924**006160 TCX-1-1400-39 RV STUD B-G-1 UT B6 .30 82 TDLR VERIFICATION BOUNDARY.2--X -**SAP 102924**

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL __PLAN STATUS I FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI -

SUMMARY

EXAMINATION AREA CATGY NDE j ----------

O U T A G E-------NUMBER IDENTIFICATION ITEM NO METH 1 2 1 2 3 1 2 REACTOR COOLANT TCX-RCPCRV-01 006180 TCX-1-1400-40 B-G-1 UT RV STUD B6.30 2 -X 006200 TCX-1-1400-41 RV STUD 006220 TCX-1-1400-42 RV STUD B-G-1 UT B6 .30---X -B-G-1 UT B6.30 PAGE: 14 PRESERVICE YEAR INSTRUCTIONS I **CALIBRATION BLOCK**82 TDLR VERIFICATION BOUNDARY.**SAP 102924*t 82 TDLR VERIFICATION BOUNDARY.**SAP 102924**82 TDLR VERIFICATION BOUNDARY.**SAP 102924**82 TDLR VERIFICATION BOUNDARY.**SAP 102924**82 TDLR VERIFICATION BOUNDARY.**SAP 102924**82 TDLR VERIFICATION BOUNDARY.**SAP 102924**82 TDLR VERIFICATION BOUNDARY.**SAP 102924**2 ----X ----X -006240 TCX-1-1400-43 RV STUD 006260 TCX-1-1400-44 RV STUD.B-G-1 UT B6.30 B-G-1 UT B6.30 2 -X -006280 TCX-1-1400-45 RV STUD 006300 TCX-1-1400-46 RV STUD B-G-1 UT B6 .30--X -B-G-1 UT B6 .30 DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS I FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI I

SUMMARY

EXAMINATION AREA CATGY NDE -----------

O U T A G E -.-.-------

NUMBER IDENTIFICATION ITEM NO METH 1 2 1 2 3 1 2 REACTOR COOLANT TCX-RCPCRV-01 006320 TCX-1-1400-47 B-G-1 UT RV STUD B6.30 2 -X -PAGE: 15 PRESERVICE YEAR I INSTRUCTIONS I **CALIBRATION BLOCK**006340 TCX-1-1400-48 RV STUD B-G-1 UT B6.30 2 ---X---x -006360 TCX-1-1400-49 RV STUD B-G-1 UT B6.30 006380 TCX-1-140 0-50 RV STUD B-G-1 UT B6.30 2 ----X 82 TDLR VERIFICATION BOUNDARY.**SAP 102924**82 TDLR VERIFICATION BOUNDARY.**SAP 102924**82 TDLR VERIFICATION BOUNDARY.**SAP 102924**82 TDLR VERIFICATION BOUNDARY.**SAP 102924**82 TDLR VERIFICATION BOUNDARY.**SAP 102924**82 TDLR VERIFICATION BOUNDARY.**SAP 102924**82 TDLR VERIFICATION BOUNDARY.**SAP 102924**006400 TCX-1-1400-51 RV STUD B-G-1 UT B6 .30 2 ----X 006420 TCX-1-1400-52 RV STUD 006440 TCX-1-1400-53 RV STUD B-G-1 UT B6.30 2 ---x B-G-1 UT B6.30 x -

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS PAGE: 16 INSPECTION INTERVAL ASME SEC. XI_ _ _ PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD-PRESERVICE YEAR INSTRUCTIONS I **CALIBRATION BLOCK**

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION CATGY NDE -----------

O U T A ITEM NO'METH I1 2 1 2 3 1 2 REACTOR COOLANT TCX-RCPCRV-01 006460 TCX-1-1400-54 RV STUD B-G-1 B6.30 UT 82 TDLR VERIFICATION BOUNDARY.--X -**SAP 102924**006600 TCX-1-1400-1 RV NUT RIGO 905RB B-G-1 B 06.10 VT- i 82" TDLR VERIFICATION BOUNDARY.2---X -006620 TCX-1-1400-2 RV NUT R160 905RB 006640 TCX-1-1400-3 RV NUT R160 905RB B-G-1 B6. 10 VT- i 82 TDLR VERIFICATION BOUNDARY.2 ----X -B-G-1 VT-i B6.10 82 TDLR VERIFICATION BOUNDARY.2 ----X-006660 TCX-1-1400-4 RV NUT R160 905RB B-G-1 B6. 10 VT- i 82 TDLR VERIFICATION BOUNDARY.---X 006680 TCX-1-1400-5 RV NUT RI60 905RB B-G-1 B6.10 VT-1 02 TDLR VERIFICATION BOUNDARY.2 -X 006700 TCX-1-1400-6 RV NUT R160 905RB B-G-1 B6 .10 VT- 1 V2 TDLR VERIFICATION BOUNDARY.2 -

DATEt 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS PAGE 17 INSPECTION INTERVAL_F ASME P SEC. XI CATGY NDE -ITEM NO METH 1 2 PLAN STATUS IRST SECOND THIRD ERIOD PERIOD PERIOD---- OUTAGE--------------

1 2 3 1 2 PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION PPAOTOB CONlANT TCX-RCPCPV-01 REACTOR COOLANT TCX-RCPCPV-ni 006720 TCX-1-1400-7 RV NUT R160 905RB B-G-1 B6. 10 VT- 1 82 TDLR VERIFICATION BOUNDARY.2 --x 006740 TCX-1-1400-8 RV NUT R160 905RB B-G-1 VT-I B6.10 82 TDLR VERIFICATION BOUNDARY.---X -006760 TCX-I-1400-9 RV NUT R160 905RB 006780 TCX-1-1400-10 RV NUT R160 905RB B-G-1 B6, 10 VT-1 82, TDLR VERIFICATION BOUNDARY.2 -X -B-G-1 VT-I B6.10 82 TDLR VERIFICATION BOUNDARY.2 -----X -006800 TCX-1-1400-11 RV NUT R160 905RB B-G-1 B6 .10 VT-1 82 TDLR VERIFICATION BOUNDARY.2 x -006820 TCX-1-1400-12 RV NUT Ri6O 905RB B-G-1 B6. 10 VT -1 82 TDLR VERIFICATION BOUNDARY.2 x 006840 TCX-1-1400-13 RV NUT Ri60 905RB B-G-1 VT-I B6.10 82 TDLR VERIFICATION BOUNDARY.x DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS PAGE: 18 INSPECTION INTERVAL __PLAN STATUS FIRST SECOND ASME I PERIOD PERIOD THIRD PERIOD

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION SEC. XI CATGY NDE ITEM NO METH ii OUTAGE -1 2 3 1 PRESERVICE YEAR INSTRUCTIONS

-*CALIBRATION BLOCK**2 2 REACTOR COOLANT TCX-RCPCRV-01 006860 TCX-1-1400-14 RV NUT R160 905RB B-G-1 B6 .10 VT- I 82 TDLR VERIFICATION BOUNDARY.2 --X-006880 TCX-1-1400-15 RV NUT R160 905RB B-G-1 B6. 10 VT-1 82 TDLR VERIFICATION BOUNDARY.2---x -006900 TCX-1-1400-16 RV NUT R16O 905RB B-G-1 B6. 10 VT- 1 82 TDLR VERIFICATION BOUNDARY.2 -x -006920 TCX-1-1400-17 RV NUT RI60 905RB B-G-1 B6. 10 VT-1 82 TDLR VERIFICATION BOUNDARY.2 -X 006940 TCX-1-1400-18 RV NUT RI60 905RB B-G-1 B6. 10 VT-1 82 TDLR VERIFICATION BOUNDARY.2 006960 TCX-1-1400-19 RV NUT RIGO 905RB B-G-1 VT-I B6.10 82 TDLR VERIFICATION BOUNDARY.x 006980 TCX-1-1400-20 RV NUT R160 905RB B-G-1 B6. 10 VT-1 82 TDLR VERIFICATION BOUNDARY.2 -x DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS PAGE: 19 INSPECTION INTERVAL_ASME SEC. XI I CATGY NDE ITEM NO METH I PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD--- --- ---------PRESERVICE YEAR I INSTRUCTIONS

    • CALIBRATION 1 2

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION 1 2 1 2 3 1 2 BLOCK-REACTOR COOLANT TCX-RCPCRV-01 007000 TCX-1-1400-21 RV NUT RI60 905RB B-G-1 B6 .10 VT-i 82 TDLR VERIFICATION BOUNDARY.2- X -007020 TCX-1-1400-22 RV NUT R160 90SRB B-G-1 B6. 10 VT-i 82 TDLR VERIFICATION BOUNDARY.2 ----X 007040 TCX-1-1400-23 RV NUT R160 905RB B-G-1 B6. 10 VT-1 82 TDLR VERIFICATION BOUNDARY.2 -X -007060 TCX-1-1400-24 RV NUT R160 905RB B-G-1 B6. 10 VT-1 82 TDLR VERIFICATION BOUNDARY.2 -X -007080 TCX-1-1400-25 RV NUT R160 905RB B-G-1 B6 .10 VT-i 82 TDLR VERIFICATION BOUNDARY.2 -007100 TCX-1-1400-26 RV NUT R160 905RB B-G-1 VT-I B6. 10 82 TDLR VERIFICATION BOUNDARY.007120 TCX-1-1400-27 RV NUT RI60 905RB B-G-1 B6. 10 VT-i 82 TDLR VERIFICATION BOUNDARY.2 X DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS PAGE: 20 INSPECTION INTERVAL ASME SEC. XI CATGY NDE ITEM NO METH PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD I----------

OUTAGE--------------

1 2 1 2 3 1 2 PRESERVICE YEAR INSTRUCTIONS I **CALIBRATION BLOCK**

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION REACTOR COOLANT TCX-RCPCRV-01 007140 TCX-I-1400-28 RV NUT R160 905RB B-G-1 B6.10 VT-1 82 TDLR VERIFICATION BOUNDARY.2 ---x -007160 TCX-I-1400-29 RV NUT R160 905RB B-G-1 B6. 10 VT-i 82 TDLR VERIFICATION BOUNDARY.2 ---X -007180 TCX-1-1400-30 RV NUT R160 905RB B-G-1 B6. 10 VT-1 82 TDLR VERIFICATION BOUNDARY.2 -X -007200 TCX-1-1400-31 RV NUT R160 905RB B-G-1 VT-I B6. 10 82 TDLR VERIFICATION BOUNDARY.X -VT-1 007220 TCX-1-1400-32 RV NUT R160 905RB B-G-1 B6. 10 82 TDLR VERIFICATION BOUNDARY.2 x -007240 TCX-I-1400-33 RV NUT RI60 905RB B-G-1 VT-i B6.10 82 TDLR VERIFICATION BOUNDARY.2 007260 TCX-1-1400-34 RV NUT R160 905RB B-G-1 VT-I B6. 10 82 TDLR VERIFICATION BOUNDARY 2 -X -

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS PAGE: 21 INSPECTION INTERVAL ASME SEC. XI CATGY NDE ITEM NO METH------------.-.-----.-.-

PLAN STATUS I FIRST SECOND I PERIOD PERIOD_ -PRESERVICE YEAR THIRD PERIOD---------

SUMMARY

NUMBER EXAMINATION AREA IDENTIFICATION

-~OUTAGE-1 2 1.2 3 1 2-----------.-.---------.-.-

INSTRUCTIONS

    • CALIBRATION BLOCK**PrnrmflP r'nfl.ANT TC'Y-RCPCPV-fl1 RECO COLN TCX-RCPCR...........

007280 TCX-I-1400-35 RV NUT R160 905RB B-G-1 B6.10 VT-1 82 TDLR VERIFICATION BOUNDARY.2 X -007300 TCX-1-1400-36 RV NUT RI60 905RB B-G-1 B6. 10 VT-1 82 TDLR VERIFICATION BOUNDARY.2--X 007320 TCX-1-1400-37 RV NUT B-G-1 B6.10 VT- I 82 TDLR VERIFICATION BOUNDARY.2 ---x -007340 TCX-1-1400-38 RV NUT B-G-1 B6 .10 VT-i 82 TDLR VERIFICATION BOUNDARY.2 -I X -007360 TCX-1-1400-39 RV NUT B-G-1 VT-I B6 .10 82 TDLR VERIFICATION BOUNDARY.---X -007380 TCX-I-1400-40 RV NUT B-G-1 VT-I B6.10 82 TDLR VERIFICATION BOUNDARY.X -007400 TCX-I-1400-41 RV NUT B-G-1 B6 .10 VT- 1 82 TDLR VERIFICATION BOUNDARY.2 -X, DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS PAGE: 22 INSPECTION INTERVAL i PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD ASME SEC. XI CATGY NDE ITEM NO METH

SUMMARY

NUMBER EXAMINATION AREA IDENTIFICATION I --I -Ii 2 1 U TAG E-.3 1 2 PRESERVICE YEAR INSTRUCTIONS

-*CALIBRATION BLOCK**---I REACTOR COOLANT TCX-RCPCRV-01 007420 TCX-I-1400-42 RV NUT B-G-1 B6. 10 VT -1 82 TDLR VERIFICATION BOUNDARY.2 -X 007440 TCX-I-1400-431 RV NUT B-G-1 B6. 10 VT -1 82 TDLR VERIFICATION BOUNDARY.---~X 007460 TCX-I-1400-44 RV NUT B-G-1 B6.10 VT- 1 82 TDLR VERIFICATION BOUNDARY.2 -007480 TCX-1-1400-45 RV NUT B-G-1 VT-I B6.10 82 TDLR VERIFICATION BOUNDARY.2 --, -X -007500 TCX-I-1400-46 RV NUT B-G-1 VT-I B6 .10 82 TDLR VERIFICATION.

BOUNDARY.2 X 007520 TCX-I-1400-47 RV NUT 007540 TCX-1-1400-48 RV NUT B-G-1 VT-I B6'. 10-B-G-1 VT-I BG. 10 82 TDLR VERIFICATION BOUNDARY.X 82 TDLR VERIFICATION BOUNDARY.X DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS PAGE: 23 INSPECTION INTERVAL_I FIRST PLAN STATUS SECOND THIRD PERIOD PERIOD

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION


.-.---------------

ASME SEC. XI CATGY NDE ITEM NO METH PERIOD PRESERVICE YEAR INSTRUCTIONS I **CALIBRATION BLOCK**I I 12 U T A G 1 2 1 2 3-----------..--------

E1 1 2 REACTOR COOLANT TCX-RCPCRV-01 007560 TCX-1-1400-49 RV NUT B-G-1 B6. 10 VT- 1 82 TDLR VERIFICATION BOUNDARY.X -007580 TCX-I-1400-50 RV NUT B-G-1 BG .10 VT-1 82 TDLR VERIFICATION BOUNDARY.2 ----X -007600 TCX-I-1400-51 RV NUT B-G-1 B6 .10 VT-1 82 TDLR VERIFICATION BOUNDARY.2 -X -007620 TCX-i-1400-52 RV NUT B-G-1 B6 .10 VT-I 82 TDLR VERIFICATION BOUNDARY.2---X -007640 TCX-1-1400-53 RV NUT B-G-1 VT-I B6. 10 82 TDLR VERIFICATION BOUNDARY.2--X -007660 TCX-i-1400-54 RV NUT B-G-1 VT-1 B6 .10 82 TDLR VERIFICATION BOUNDARY.2 -007800 TCX-I-1400-1 RV WASHER Ri60 90SRB B-G-1 VT-I B6.50 82 TDLR VERIFICATION BOUNDARY.

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS PAGE: 24 INSPECTION IN ASME SEC. XI CATGY ITEM NO TERVAL _ _ PLAN STATUS FIRST SECOND PERIOD PERIOD ND ----------


OT G NDE T 0 U T A G E METH 1. 2 1 2 3 THIRD PERIOD 1 2 PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION REACTOR COOLANT TCX-RCPCRV-01 007820 TCX-1-1400-2 RV WASHER R160 905RB B-G-i iVT-1 B6.50 82 TDLR VERIFICATION BOUNDARY 2 -X 007840 TCX-1-1400-3 RV WASHER R160 905RB B-G-1 B6 .50 VT-1 82 TDLR VERIFICATION BOUNDARY.2'---X 007860 TCX-1-1400-4 RV WASHER R160 905RB B-G-1 B6.50 VT-1 82 TDLR VERIFICATION BOUNDARY.2 ----X 007880 TCX-1-1400-5 RV WASHER R160 905RB B-G-1 VT-I B6.50 82 TDLR VERIFICATION BOUNDARY.X 007900 TCX-1-1400-6 RV WASHER RI60 905RB B-G-1 B6 .50 VT -1 82 TDLR VERIFICATION BOUNDARY.2 -X 007920 TCX-I-1400-7 RV WASHER Ri60 905RB B-G-1 B6 .50 VT-I 82 TDLR VERIFICATION BOUNDARY.2 X -007940 TCX-I-1400-8 RV WASHER RI60 905RB B-G-1 VT-I B6 .50 82 TDLR VERIFICATION-BOUNDARY.

X DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS PAGE: 25 INSPECTION INTERVAL_FIRST ASME PERIOD SEC. XI --CATGY NDE -ITEM NO METH 1 2 PLAN ST SECON PERIO 0 U TA 1 2 3 ATUS D THIRD D PERIOD G---- -----------

G 1E 1 2 PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION REACTOR COOLANT TCX-RCPCRV-01 007960 TCX-1-1400-9 RV WASHER R160 905RB B-G-1 B6.50 VT-1 82 TDLR VERIFICATION BOUNDARY.2- -----X 007980 TCX-1-1400-10 RV WASHER R160 905RB B-G-1 B6.5.0 VT- i 82 TDLR VERIFICATION BOUNDARY.2 -X -008000 TCX-1-1400-11 RV WASHER R160 905RB B-G-1 B6.50 VT-i 82 TDLR VERIFICATION BOUNDARY.2 -X 008020 TCX-1-1400-12 RV WASHER RIGO 905RB B-G-1 B6.50 VT-1 82 TDLR VERIFICATION BOUNDARY.2 X -008040 TCX-1-1400-13 RV WASHER R160 905RB B-G-1 VT-I B6.50 82 TDLR VERIFICATION BOUNDARY.--X 008060 TCX-1-1400-14 RV WASHER R160 905RB B-G-.1 B6 .50 VT -1 82 TDLR VERIFICATION BOUNDARY.2-008080 TCX-1-1400-15 RV WASHER R160 905RB B-G-1 B6. 50 VT-I 82 TDLR VERIFICATION BOUNDARY 2--X DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS PAGE: 26 INSPECTION INTERVAL PLAN FIRST SE: PERIOD PE]

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC. XI CATGY NOE ITEM NO METH Ii STATUS COND THIRD RIOD PERIOD A-G--- -----------

E PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**-0 U'2 1 2 3 1 2 REACTOR COOLANT TCX-RCPCRV-01 008100 TCX-1-1400-16 RV WASHER R160 905RB B-G-1 B6.50 VT- 1 82 TDLR VERIFICATION BOUNDARY.2 x -008120 TCX-1-1400-17 RV WASHER RI60 905RB B-G-1 B6 .50 VT_-I 82 TDLR VERIFICATION BOUNDARY.2 x -008140 TCX-1-1400-18 RV WASHER R160 905RB B-G-1 B6 .50 VT- I 82 TDLR VERIFICATION BOUNDARY.2 ----x 008160 TCX-1-1400-19 RV WASHER R160 905RB B-G-1 B6.50 VT- i 82 TDLR VERIFICATION BOUNDARY.2 -x -008180 TCX-1-1400-20 RV WASHER RI60 905RB 008200 TCX-1-1400-21 RV WASHER B-G-1 VT-I B6E.50 82 TDLR VERIFICATION BOUNDARY.2 -x -B-G-1 VT-I B6.50 82 TDLR VERIFICATION BOUNDARY.---x -008220 TCX-1-1400-22 RV WASHER R160 905RB B-G-1 VT-i B6.50 82 TDLR VERIFICATION BOUNDARY.2 -x -

)DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS PAGE: 27 INSPECTION INTERVAL_ASME PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD PRESERVICE YEAR SEC. XI CATCY ITEM NO-----------



I

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION NDE L --------OUTAGE---METH 1 2 1 2 3 1 2----. -.- .- -----------.-------.- --.----I INSTRUCTIONS

    • CALIBRATION BLOCK**nrArmnD CNNfT.ANT TCX-RCPCPV-Di REACTOR COOLANT TCX-RCPCRV-01 008240 TCX-1-1400-23 RV WASHER R160 905RB 008260 TCX-1-1400-24 RV WASHER R160 905RB 008280 TCX-I-1400-25 RV WASHER Ri60 905RB B-G-1 B6 .50 VT- 1 82 TDLR VERIFICATION BOUNDARY.2 ----X B-G-1 VT-I B6 .50 B-G-1 VT-I B6 .50 82 TDLR VERIFICATION BOUNDARY.---X 82 TDLR VERIFICATION BOUNDARY.X 008300 TCX-I-1400-26.

RV WASHER RiG0 905RB B-G-1 B6.50 VT- i 82 TDLR VERIFICATION BOUNDARY.2 -X 008320 TCX-1-1400-27 RV WASHER RIGO 905RB B-G-1 B6 .50 VT-1 82 TDLR VERIFICATION BOUNDARY.2 -X 008340 TCX-I-1400-28 RV WASHER R160 905RB B-G-1 VT-I B6 .50 82 TDLR VERIFICATION BOUNDARY.---X-008360 TCX-i-1400-29 RV WASHER R160 905RB B-G-1 B6 .50 VT-1 82 TDLR VERIFICATION BOUNDARY.2 -X -

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS PAGE: 28 INSPECTION INTERVAL_I F: ASME P1 SEC. XI CATGY NDE "--ITEM NO METH 1 2 PLAN STATUS IRST SECOND THIRD ERIOD PERIOD PERIOD------ ----U-TA-G--------------

10 U TAG E 1 2 3 1 2 PRESERVICE YEAR I INSTRUCTIONS I **CALIBRATION BLOCK**

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION RFACTC) rrnTAMT REACTOR COOLANT TCX-RCPCPV-ni 008380 TCX-1-1400-30 RV WASHER RI60 905RB B-G-1 B6.50 VT-i 82 TDLR VERIFICATION BOUNDARY.2 ---X -008400 TCX-1-1400-31 RV WASHER R160 905RB B-G-1 B6.50 VT- 1 82 TDLR VERIFICATION BOUNDARY.2 ----X -008420 TCX-1-1400-32 RV WASHER R160 905RB B-G-1 B6.50 VT-1 82 TDLR VERIFICATION BOUNDARY.2 ----X -008440 TCX-1-1400-33 RV WASHER R160 905RB B-G-1 BE6.50 VT-1 82 TDLR VERIFICATION BOUNDARY.2 X -008460 TCX-1-1400-34 RV WASHER R160 905RB B-G-1 B6 .56 VT- I 82 TDLR VERIFICATION BOUNDARY.2--, -X -008480 TCX-1-1400-35 RV WASHER R160 905RB B-G-1 VT-i B6.50 82 TDLR VERIFICATION BOUNDARY.2, x 008500 TCX-1-1400-36 RV WASHER R160 905RB B-G-I VT-i B6.50 82 TDLR VERIFICATION BOUNDARY.x -

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS PAGE: 29 INSPECTION INTERVAL __PLAN STATUS_ _FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI SCATG NDE- ------------


OU AG---------------

CATGY NDE T H U T A G E ITEM NO METH i1 2 1 2 3 1 2 PRESERVICE YEAR INSTRUCTIONS i **CALIBRATION BLOCK**

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION REACTOR COOLANT TCX-RCPCRV-01 008520 TCX-1-1400-37 RV WASHER B-G-1 B6. 50 VT-I 82 TDLR VERIFICATION BOUNDARY.---X 008540 TCX-I-1400-38 RV WASHER B-G-1 B6. so VT-I 82 TDLR VERIFICATION BOUNDARY.2 -X -008560 TCX-i-ý400-39 RV WASHER 008580 TCX-I-1400-40 RV WASHER 008600 TCX-1-1400-41 RV WASHER B-G-1 VT-i B6. 50 B-G-1 VT-I B6. 50 B-G-1 VT-I B6. 50 82 TDLR VERIFICATION BOUNDARY.---X -82 TDLR VERIFICATION BOUNDARY.X 82 TDLR VERIFICATION BOUNDARY.X -008620 TCX-I-1400-42 RV WASHER B-G-1 B6. 50 VT- 1 82 TDLR VERIFICATION BOUNDARY.2 X 008640 TCX-I-1400-43 RV WASHER B-G-1 B6 .50 VT--82 TDLR VERIFICATION BOUNDARY.2- X -

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS PAGE: 30 INSPECTION INTERVAL_I F: ASME P SEC. XI CATGY NDE ITEM NO METH 1 2 IRST ERIOD PLAN STATUS SECOND THIRD PERIOD PERIOD OUTAGE-------------

1 2 3 1 2 PRESERVICE YEAR I INSTRUCTIONS I **CALIBRATION BLOCK**

SUMMARY

EXAMINATION'AREA NUMBER IDENTIFICATION REACTOR COOLANT TCX-RCPCRV-01 008660 TCX-I-1400-44 RV WASHER B-G-1 B6. 50 VT-i 82 TDLR VERIFICATION BOUNDARY.2 -008680 TCX-i-1400-45 RV WASHER B-G-1 B6.50 VT- i 82 TDLR VERIFICATION BOUNDARY.2 X 008700 TCX-1-1400-46 RV WASHER B-G-1 B6.50 VT-i 82 TDLR VERIFICATION BOUNDARY.2 ----X -008720 TCX-1-1400-47 RV WASHER B-G-1 26.50 VT-1 82 TDLR VERIFICATION BOUNDARY.2 008740 TCX-I-1400-48 RV WASHER B-G-1 B6.50 VT- 1 82 TDLR VERIFICATION BOUNDARY, X 008760 TCX-i-1400-49 RV WASHER B-G-1 VT-I B6.50 82 TDLR VERIFICATION BOUNDARY.008780 TCX-I-1400-50 RV WASHER B-G-1 B6 .50 VT-i 82 TDLR VERIFICATION BOUNDARY.2- -- --X -

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS PAGE: 31 INSPECTION INTERVAL_ASME SEC. XI CATGY NDE ITEM NO METH PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD OUTAGE ---------------

1 2 1 2 3 1 2................................

PRESERVICE YEAR

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION INSTRUCTIONS

    • CALIBRATION BLOCK*-nttmnn rAnfl.ANT TCX-PCPCPV-fl1 REACTOR COOLANT TCX-RCPCRV-01 008800 TCX-1-1400-51 RV WASHER B-G-1 VT-I B6.50 82 TDLR VERIFICATION BOUNDARY.2---X -008820 TCX-1-1400-52 RV WASHER B-G-1 B6.50 VT-I 82 TDLR VERIFICATION BOUNDARY.X.008840 TCX-1-1400-53 RV WASHER B6.50 VT-1 82 TDLR VERIFICATION BOUNDARY.2- ----X -008860 TCX-1-1400-54 RV WASHER B-G-1 B6 .50 VT-1 82 TDLR VERIFICATION BOUNDARY.2 ----X REACTOR COOLANT TCX-RCPCPR-01 009000 TCX-1-2100-1 PRESSURIZER LOWER HEAD TO SHELL WELD R161A832R2 009100 TCX-1-2100-5 PRESSURIZER UPPER HEAD TO SHELL WELD RIl6A90SRB B-B B2. 11 UT 79 TDLR VERIFICATION BOUNDARY.**TBX-1**B-B UT B2.11 79 TDLR VERIFICATION BOUNDARY.2 -C**TBX- 1**009200 TCX-1-2100-6 B-B PRESSURIZER LONG. WELD (IFT B2.12 ADJ. WELD 1)RI61A832R0 UT 79 TDLR VERIFICATION BOUNDARY.2-X ----**TBX-1**

K DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS PAGE: 32 INSPECTION INTERVAL ASME SEC. XI CATGY NDE ITEM NO METH i i PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD PRESERVICE YEAR

SUMMARY

NUMBER EXAMINATION AREA IDENTIFICATION I 2 i 2--- -OUTAGE 1 2-I INSTRUCTIONS

    • CALIBRATION BLOCK**REACTOR COOLANT TCX-RCPCPR-01 009300 TCX-1-2100-9 B-B PRESSURIZER LONG. WELD (1FT B2.12 ADJ. WELD 5)R161A905RB 009400 TCX-1-2100-10 B-K PRESSURIZER SUPPORT SKIRT WELD B10.10 R161A832RB UT 79 TDLR VERIFICATION BOUNDARY.2 -C**TBX-1**MT 82 TDLR VERIFICATION BOUNDARY.2 -X ----009500 TCX-1-2100-11 B-D PRESSURIZER SURGE NOZZLE TO B3.110 VESSEL WELD R161A832RB UT 79 TDLR VERIFICATION BOUNDARY.2 -X ----**TBX-1**009550 TCX-1-2100-11IR B-D UT NA TDLR VERIFICATION BOUNDARY.PRESSURIZER.,SURGE NOZZLE INNER B3.120 RADIUS R161A832RB 009600 TCX-1-2100-12 B-D PRESSURIZER SPRAY NOZZLE TO B3.110 VESSEL WELD R161A905RB 2 X -.-**TBX-58**

UT 79 TDLR VERIFICATION BOUNDARY.2 -C**TBX-1**009650 TCX-1-2100-12IR B-D UT NA TDLR VERIFICATION BOUNDARY.PRESSURIZER SPRAY NOZZLE INNER B3.120 RADIUS R161A905RB 009700 TCX-1-2100-13 B-D PRESSURIZER SAFETY NOZZLE TO B3.110 VESSEL WELD Rl6lA905RB 2 -c**TBX-55**

UT 79 TDLR VERIFICATION BOUNDARY.2 -C**TBX-I**

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS PAGE: 33 INSPECTION INTERVAL __PLAN STATUS FIRST SECOND THIRD ASME j PERIOD PERIOD PERIOD SEC. XI --CATGY NDE -----------

O U T A G E-------ITEM NO METH 1 2 1 2 3 1 2 PRESERVICE YEAR INSTRUCTIONS I **CALIBRATION BLOCK**

SUMMARY

NUMBER EXAMINATION AREA IDENTIFICATION REACTOR COOLANT TCX-RCPCPR-01 009750 TCX-1-2100-13IR PRESSURIZER SAFETY NOZZLE INNER RADIUS RI61A905RB 009800 TCX-1-2100-14 PRESSURIZER RELIEF NOZZLE TO VESSEL WELD RI61A905RB 009850 TCX-1-2100-14IR PRESSURIZER RELIEF NOZZLE INNER RADIUS Ri61A905RB 009900 TCX-1-2100-15 PRESSURIZER SAFETY NOZZLE TO VESSEL WELD RI61A905RB 009950 TCX-1-2100-15IR PRESSURIZER SAFETY NOZZLE INNER RADIUS RI61A905RB B-D UT B3.120 EVT 2 -C NA TDLR VERIFICATION BOUNDARY.REFER TO R.G. 1.147 (N-619)**TBX-59**

B-D B3. 110 UT 79 TDLR VERIFICATION BOUNDARY.2 -C**TX- 1**B-D UT B3.120 EVT 2 -C NA TDLR VERIFICATION BOUNDARY.REFER TO R.G. 1.147 (N-619)**TBX-59**

B-D B3. 110 UT 79 TDLR VERIFICATION BOUNDARY.2 -C**TBX-1**B-D UT B3.120 EVT 79 TDLR VERIFICATION BOUNDARY.REFER TO R.G. 1.147 (N-619)2 -C**TBX-59**

010000 TCX-1-2100-16 B-D PRESSURIZER SAFETY NOZZLE TO B3.110 VESSEL WELD RIG1A905RB UT 79 TDLR VERIFICATION BOUNDARY.2 -C**TBX-1**.010050 TCX-1-2100-16IR PRESSURIZER SAFETY NOZZLE INNER RADIUS R161A905RB B-D UT B3.120 EVT 2 -C 79 TDLR VERIFICATION BOUNDARY.REFER TO R.G. 1.147 (N-619)**TBX-59**

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS PAGE: 34 INSPECTION INTERVAL_ASME SEC. XI CATGY NDE ITEM NO METH FIRST PERIOD PLAN, STATUS SECOND PERIOD

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION 1 2-'O U TAG 1 2 3_PRESERVICE YEAR THIRD PERIOD j INSTRUCTIONS 1 2 **CALIBRATIOI E N BLOCK**REACTOR COOLANT TCX-RCPCPR-01 010100 TCX-1-2100-B1-16 PRESSURIZER MANWAY BOLTING (B1/BI6)RIG1A905RB REACTOR COOLANT TCX-RCPCSG-01 B-G-2 VT-I B7.20 84 TDLR VERIFICATION BOUNDARY.2 -C 010200 TCX-1-3100-1-I B-B SG1 CHANNEL HEAD TO TUBESHEET B2.40 WELD A23 UT 82 TDLR VERIFICATION BOUNDARY.2 -X --**TBX-28**

010300 TCX-1-3100-1A SG1 INLET NOZZLE INNER RADIUS A23 B-D UT EVT 2 -NA TDLR VERIFICATION BOUNDARY.REFER TO R.G. 1.147 (N-619)--X**SG-IR**010400 TCX-I-3100-1B B-D UT SGI OUTLET NOZZLE INNER RADIUS EVT A23 NA TDLR VERIFICATION BOUNDARY.REFER TO R.G. 1.147 (N-619)2 -X --**SG-IR**010500 TCX-i-3100-iB1-iG SGl HOTLEG MANWAY BOLTING (I-BI/l-BI6)

A23 010600 TCX-1-3100-1B17-32 SGI COLDLEG MANWAY BOLTING (1-B17/i-B32)

A23 REACTOR COOLANT TCX-RCPCSG-02 B-G-2 VT-I B7.30 84 TDLR VERIFICATION BOUNDARY.2--X B-G-2 B7.30 VT- 1 84 TDLR VERIFICATION BOUNDARY.2-X 010700 TCX-1-3100-2-1 B-B UT SG2 CHANNEL HEAD TO TUBESHEET B2.40 WELD 82 TDLR VERIFICATION BOUNDARY.X X .1r' L, *r DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS PAGE: 35 INSPECTION INTERVAL_ASME SEC. XI CATGY NDE ITEM NO METH PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**

SUMMARY

NUMBER EXAMINATION AREA IDENTIFICATION 1 2-----------


I 0 U T AýG E 1 2 3 1 2---I REACTOR COOLANT TCX-RCPCSG-02 010800 TCX-1-3100-2A SG2 INLET NOZZLE INNER RADIUS R1551812RB B-D UT EVT 2 NA TDLR VERIFICATION BOUNDARY.REFER TO R.G. 1.147 (N-619)X**SGIR**010900 TCX-1-3100-2B B-D UT SG2 OUTLET NOZZLE INNER RADIUS EVT RI551812RB NA TDLR VERIFICATION BOUNDARY.REFER TO R.G. 1.147 (N-619)2 x ----**SGIR**011000 TCX-1-3100-2B1-16 SG2 HOTLEG MANWAY BOLTING (2-BI/2-B16)

R5SI1812RB 011100 TCX-1-3100-2B17-32 SG2 COLDLEG MANWAY BOLTING (2-BI7/2-B32)

R1551812RB REACTOR COOLANT TCX-RCPCSG-03 B-G-2 B7.30 B-G-2 B7 .30 VT-1 84 TDLR VERIFICATION BOUNDARY.2 -x --VT-i 84 TDLR VERIFICATION BOUNDARY.2 X -011200 TCX-1-3100-3-1 B-B SG3 CHANNEL HEAD TO TUBESHEET B2.40 WELD R154K827RB UT 82 TDLR VERIFICATION BOUNDARY.2 --X**TBX-28**

011300 TCX-1-3100-3A SG3 INLET NOZZLE INNER RADIUS R154K827RB B-D UT EVT 2 -NA TDLR VERIFICATION BOUNDARY.REFER TO R.G. 1.147 (N-619)-X**SG-IR**011400 TCX-1-3100-3B B-D UT SG3 OUTLET NOZZLE INNER RADIUS EVT RI54K827RB NA TDLR VERIFICATION BOUNDARY.REFER TO R.G. 1.147 (N-619)2 --X**SG-IR**

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS PAGE: 36 INSPECTION INTERVAL_ASME SEC. XI CATGY NDE ITEM NO METH PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD---OUTAGE-------------

1 21 2 3 1 2 PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION REACTOR COOLANT TCX-RCPCSG-03 011500 TCX-I-3100-3B1-iS SG3 HOTLEG MANWAY BOLTING (3 -B1/3 -BI6)RI54KB27RB 011600 TCX-1-3100-3B17-32 SG3 COLDLEG MANWAY BOLTING (3-BI7/3-B32)

RI54K827RB REACTOR COOLANT TCX-RCPCSG-04 B-G-2 B7.30 VT-I 84 TDLR VERIFICATION BOUNDARY.2 ---X B-G-2 B7 .30 VT-1 84 TDLR VERIFICATION BOUNDARY.2 X 011700 TCX-I-3100-4-1 B-B SG4 CHANNEL HEAD TO TUBESHEET B2.40 WELD A29 UT 82 TDLR VERIFICATION BOUNDARY.2 --X**TBX-28**

011800 TCX-I-3100-4A SG4 INLET NOZZLE INNER RADIUS A29 B-D UT EVT NA TDLR VERIFICATION BOUNDARY.REFER TO R.G. 1.147 (N-619)2 X**SG-IR**011900 TCX-I-3100-4B B-D UT SG4 OUTLET NOZZLE INNER RADIUS EVT A29 NA TDLR VERIFICATION BOUNDARY.REFER TO R.G. 1.147 (N-619)2 -X**SG-IR**012000 TCX-1-3100-4B1-16 SG4 HOTLEG MANWAY BOLTING (4-BI/4-B16)

A29 012100 TCX-I-3100-4BI7-32 SG4 COLDLEG MANWAY BOLTING (4-B17/4-B32)

A29 B-G-2 VT-I B7 .30 84 TDLR VERIFICATION BOUNDARY.X B-G-2 VT-I B7 .30 84 TDLR VERIFICATION BOUNDARY.X DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS PAGE: 37 INSPECTION INTERVAL_ASME SEC. XI CATGY NDE ITEM NO'METH PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD---OUTAGE-------------

1 2 1 2 3 1 2 PRESERVICE YEAR INSTRUCTIONS I **CALIBRATION BLOCK-t

SUMMARY

NUMBER EXAMINATION AREA IDENTIFICATION REACTOR COOLANT 29-RC-2-001-WEST-1 012200 TCX-1-4100-1 RPV NOZZLE TO SAFE END R157 827RB R-A R1.20 UT 92 TDLR VERIFICATION BOUNDARY.B-F WELD.2 ----X**TBX-57,RV-6**

012300 TCX-1-4100-2 SAFE END TO PIPE R157 827RB R-A RI. 20 UT 92 TDLR VERIFICATION BOUNDARY.B-J WELD.2 ----**TBX-57,RV-6**

012500 TCX-1-4100-4 REDUCING ELBOW TO SG NOZZLE R1541827RB R-A Ri. 20 UT 92 TDLR VERIFICATION BOUNDARY.B-F WELD.2 --X**TBX-57**

REACTOR COOLANT 31-RC-2-002-WEST-1 012600 TCX-1-4100-5 SG NOZZLE TO ELBOW RI541829RB.

R-A R1. 20 UT 92 TDLR VERIFICATION BOUNDARY.B-F WELD.X**TBX-57**

REACTOR COOLANT 27.5-RC-2-003-WEST-1 013400 TCX-1-4100-13 ELBOW TO SAFE END R157 827RB R-A UT R1.20 TDLR VERIFICATION BOUNDARY.B-J WELD.2 -**TBX-57,RV-6*

t 013500 TCX-1-4100-14 SAFE END TO RV NOZZLE R1541827RB R-A R1. 20 UT 92 TDLR VERIFICATION BOUNDARY.B-F WELD.2 -X -**TBX-57,RV-6**

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS PAGE: 38 INSPECTION INTERVAL ASME SEC. XI CATGY NDE ITEM NO METH FIRST PERIOD-1 2 PLAN STATUS SECOND THIRD PERIOD PERIOD OUTAGE-------------

1 2 3 1 2 PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION REACTOR COOLANT 12-RC-2-007-2501R-1 014400 TCX-1-4101-2 PIPE TO ELBOW RI541823RB R-A Ri. 11 UT 92 B-J WELD 2 C -**TBX-12**

014500 TCX-1-4101-3 ELBOW TO PIPE R1541822RB R-A Ri. 11 UT 92 B-J WELD 2 C 014800 TCX-1-4101-6 ELBOW TO PIPE R1541817RB R-A Ri. 11 UT**TBX-12**

B-J WELD**TBX-12**

2 C BEH.ITITThT.

HEAT DEMOVAT. 19-RIA-9-Ofl1

-2010-1 RESIDUAL HEAT REMOVAL 12-RH-2-001-250!R-1 015300 TCX-I-4101-11 PIPE TO ELBOW R154AB17RB R-A UT R1. 20 2 C -B-J WELD.**TBX-12**

REACTOR COOLANT IO-PC-2-021-2501R-1 015900 TCX-I-4102-4 ELBOW TO PIPE R1541831RB R-A RI. 20 UT B-J WELD 2 -C**TBX-9, PDI-03"*016000 TCX-I-4102-5 PIPE TO PIPE RI54183iRB R-A R1.20 UT 92 B-J WELD 2 -C DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS PAGE: 39 INSPECTION INTERVAL ASME SEC. XI CATGY NDE ITEM NO METH FIRST PERIOD 1 2 PLAN STATUS SECOND PERIOD THIRD PERIOD PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**

SUMMARY

NUMBER EXAMINATION AREA IDENTIFICATION OUTAGE-------------

1 2 3 1 2 1fl-PC'-9-fl91-9Rfl1P-1 vvhCTnD COOLANT 10-RC-2-021-250IR-1 016100 TCX-1-4102-6 PIPE TO ELBOW R1541831RB R-A UT RI. 20 92 B-J WELD.2 -C**TBX-9**020200 020900.021000 REACTOR COOLANT 3-RC-2-019-2501R-1 TCX-1-4105-6 R-A PIPE TO VALVE RI.11 R1541828RB REACTOR COOLANT 1.5-RC-2-020-2501R-1 TCX-1-4107-4 R-A PIPE TO ELBOW RI.11 RI541828RB TCX-1-4107-5 R-A ELBOW TO PIPE RI.11 R1541828RB REACTOR COOLANT 2-RC-2-015-2501R-1 UT PT 2 C -92 B-J WELD.**PDI-03**

PT 92 B-J WELD.2 C -PT 92 B-J WELD.2 C 024200 TCX-1-4109-4 PIPE TO ELBOW R1541813RB R-A Ri. 11 PT 92 B-J WELD.2 X 024300 TCX-1-4109-5 ELBOW TO PIPE R1541813RB R-A Ri. 11 PT 92 B-J WELD.2 ---X DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS PAGE: 40 INSPECTION INTERVAL __PLAN STATUS FIRST SECOND TH ASME PERIOD PERIOD PE SEC. XI CATGY N ITEM NO M----------

PRESERVICE YEAR IRD RIOD-INSTRUCTIONS I **CALIBRATIOI

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION


.-.---------------

IDE 1 -OUTAGE IETH 1 1 2 1 2 3 1 2---.-.-.---------.--.--------.--.-

N BLOCK-*CHEMICAL AND VOLUME CONTROL 1.5-CS-2-248-2501R-I 027550 TCX-I-4110-FLG 1 FLANGE BOLTING R1541830RB B-G-2 B7.50 VT-i 92 2 C REACTOR COOLANT 29-RC-2-023-WEST-I 027600 TCX-i-4200-1 RPV NOZZLE TO SAFE END R157 827RB R-A UT R1.20 92 TDLR VERIFICATION BOUNDARY.B-F WELD.**TBX-57,RV-6**

027700 TCX-I-4200-2 SAFE END TO PIPE R157 827RB R-A UT Ri. 20 92 TDLR VERIFICATION BOUNDARY.B-J WELD.2 ----X -**TBX-57,RV-6**

027900 TCX-i-4200-4 REDUCING ELBOW TO SG NOZZLE R155J827RB R-A RI. 20 UT 92 TDLR VERIFICATION BOUNDARY.B-F WELD.2 X**TBX-57**

REACTOR COOLANT 31-RC-2-024-WEST-I"UT 028000 TCX-I-4200-5 SG NOZZLE TO ELBOW R155JB29RB R-A Ri. 20 92 TDLR VERIFICATION BOUNDARY.B-F WELD.2 --x --**TBX-57**

028300 TCX-I-4200-8 ELBOW TO PIPE R154J817RB R-A UT Ri. 20 TDLR VERIFICATION BOUNDARY.B-J WELD.2 --**TBX-57**

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS PAGE: 41 INSPECTION INTERVAL_ASME SEC. XI PLAN STATUS FIRST SECOND PERIOD PERIOD PRESERVICE YEAR THIRD I

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION


.-.---------------

CATGY NDE ITEM NO METH 1 2---OUTAGE PERIOD 1 2 INSTRUCTIONS

    • CALIBRATION BLOCK**REACTOR COOLANT 27.5-RC-2-025-WEST-1 028800 TCX-1-4200-13 ELBOW TO SAFE END R157 827RB R-A R1. 20 UT TDLR VERIFICATION BOUNDARY.RB-J WELD.2 -----*"TBX-57,RV-6**

028900 TCX-1-4200-14 SAFE END TO RV NOZZLE R154J827RB R-A RI. 20 UT 92 TDLR VERIFICATION BOUNDARY.B-F WELD.2 -X**TBX-57,RV-6**

REACTOR COOLANT 10-RC-2-037-2501R-1 029800 TCX-1-4201-4 ELBOW TO PIPE RI54J831RB R-A RI.20 UT B-J WELD.2 -X**TBX-9, PDI-03**029900 TCX-1-4201-5 PIPE TO ELBOW RI54J831RB R-A Ri. 20 UT B-J WELD.2 -X*t TBX-9, PDI-03**030000 TCX-I-4201-6 ELBOW TO PIPE RI54J831RB R-A Ri. 20 UT B-J WELD.2 -x**TBX-9, PDI-03**REACTOR COOLANT G-RC-2-029-2501R-I 034300 TCX-I-4203-11 PIPE TO ELBOW RI54J831RB R-A Ri. 20 UT 92 B-J WELD.2 X**TBX-5**

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS PAGE: 42 INSPECTION INTERVAL_ASME SEC. XI CATGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD THIRD PERIOD 1 2 PRESERVICE YEAR INSTRUCTIONS

    • CALIBPATION BLOCK**

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION 1-OUTAGE 2 1 2 3 REACTOR COOLANT 29-RC-2-040-WEST-1 040900 TCX-I-4300-1 RPV NOZZLE TO SAFE END R157 827RB R-A Ri. 20 UT 92 TDLR VERIFICATION BOUNDARY.B-F WELD.2 ---X -**TBX-57,RV-6**

041000 TCX-1-4300-2 SAFE END TO PIPE R157 827RB R-A UT Ri. 20 92 TDLR VERIFICATION BOUNDARY.B-J WELD.2 ----X -**TBX-57,RV-6**

REACTOR COOLANT 31-RC-2-041-WEST-1 041600 TCX-1-4300-8 ELBOW TO PIPE R154KB17RB R-A RI. 20 UT X -92 TDLR VERIFICATION BOUNDARY.B-J WELD.**TBX-57**

92 TDLR VERIFICATION BOUNDARY.B-J WELD.041900 REACTOR COOLANT 27.5-RC-2-042-WEST-1 TCX-1-4300-11 R-A RC PUMP DISCHARGE NOZZLE TO R1.20 PIPE RI54K827RB REACTOR COOLANT 2.75-RC-2-042-WEST-1 UT 2 --X -**TBX-S7**

042100 TCX-1-4300-13 ELBOW TO SAFE END R157 827RB R-A UT Ri. 20 TDLR VERIFICATION BOUNDARY.B-J WELD.2 X -**TBX-57,RV-6**

042200 TCX-1-4300-14 SAFE END TO RV NOZZLE R157 827RB R-A Ri. 20 UT 92 TDLR VERIFICATION BOUNDARY.B-F WELD.2---X**TBX-57,RV-6**

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS PAGE: 43 INSPECTION INTERVAL_ASME SEC. XI CATGY NDE ITEM NO METH PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD---OUTAGE-------------

PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION 1 2 1 2 3 1 2 SAFETY INJECTION 10-SI-2-181-250iR-1 043600 TCX-1-4301-9 PIPE TO ELBOW R154K832RB R-A R1. 16 UT 2 -X --B-J WELD.**TBX-9 ,**B-J WELD.**TBX-9 **043700 TCX-1-4301-10 ELBOW TO PIPE R154KS31RB R-A RI. 16 UT 2 --X REACTOR COOLANT 6-RC-2-046-2501R-1 047600 TCX-1-4303-11 PIPE TO ELBOW R154K831RB R-A R1.20 UT 92 B-J WELD.2 -X -**TBX-5**REACTOR COOLANT 3-RC-2-052-2501R-1 048800 TCX-1-4304-4 PIPE TO ELBOW R154KS14RB R-A Ri. 11 UT 92 B-J WELD.2 C**PDI-03**

CHEMICAL AND VOLUME CONTROL 3-RC-2-052-2501R-1 050800 TCX-1-4304-24 PIPE TO VALVE R154K826RB R-A RI.11 UT 92 B-J WELD.2 -X ---REACTOR COOLANT 29-RC-2-058-WEST-1 059200 TCX-1-4400-1 RPV NOZZLE TO SAFE END R157 827RB R-A R1. 20 UT 92 TDLR VERIFICATION BOUNDARY.B-F WELD.2 -X -**TBX-57,RV-6**

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS I PAGE: 44 INSPECTION INTERVAL_ASME I SEC. XI I CATGY NDE ITEM NO METH PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION 1 2 OUTAGE --1 2 3 1 2 REACTOR COOLANT 29-RC-2-058-WEST-1 059300 TCX-1-4400-2 SAFE END TO PIPE R157 827RB R-A R1. 20 UT 92 TDLR VERIFICATION BOUNDARY.B-J WELD 2 -X -**TBX-57,RV-6**

REACTOR COOLANT 27.5-RC-2-060-WEST-1 060400 TCX-1-4400-13 ELBOW TO SAFE END R157 827RB R-A R1.20 UT TDLR VERIFICATION BOUNDARY.B-J WELD.2 ----X**TBX-57,RV-6**

060500 TCX-1-4400-14 SAFE END TO RPV NOZZLE R157 827RB R-A R1. 20 UT 92 TDLR VERIFICATION BOUNDARY.B-F WELD.2 --X -**TBX-57,RV-6**

REACTOR COOLANT 12-RC-2-069-2501R-1 061500 TCX-1-4401-2 PIPE TO ELBOW RI54L823RB R-A Ri. ii UT B-J WELD.2 -C**TBX-12, PDI-03**061700 TCX-1-4401-4 PIPE TO ELBOW RI54L817RB R-A UT RI. 20 2-X B-J WELD. PIPE CLAMP IN THE WAY. REPLACES WELD.TCX-I-4101-4.

REFER TO SECTION 6.0 OF THE PROGRAM PLAN.**TBX-12, PDI-03**061800 TCX-1-4401-5 ELBOW TO PIPE R154L817RB R-A Ri. ii UT B-J WELD.2 -C**TBX-12, PDI-03-*

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS PAGE: 45 INSPECTION INTERVAL PLAN STATU FIRST SECOND PERIOD PERIOD ASME SEC. XI CATGY NDE ITEM NO METH S THIRD PERIOD------------

1 2 PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION 1 2 0 U T A G 1 2 3--U- -A --REACTOR COOLANT 14-RC-2-135-2501R-I 075100 TCX-1-4500-2 PIPE TO PIPE R154L832RB R-A R1. 11 UT 92 TDLR VERIFICATION BOUNDARY.B7J WELD.--X -**TBX-19**

075200 TCX-1-4500-3 PIPE TO PIPE RI54L832RB R-A Ri. 11 UT 92 TDLR VERIFICATION BOUNDARY.B-J WELD.2 --X -**TBX- 19**REACTOR COOLANT 6-RC-2-096-2501R-1 075600 TCX-1-4501-1 R-A UT PRESSURIZER NOZZLE TO SAFE END R1.20 R161E905RB 92 B-F WELD.2 ---X -**DMCB-I1**

B-7 WELD.076400 TCX-1-4501'-9 PIPE TO ELBOW RIGIE905RB R-A Ri. 20 UT 2 -C**TBX-5 , PDI-03**076500 TCX-1-4501-10 ELBOW TO PIPE R161E905RB R-A RI. 20 UT B-J WELD.2 -C**TBX-5 , PDI-03**076600 TCX-I-4501-11 PIPE TO VALVE (FLANGED)RI61E905RB R-A R1. ii UT 92 B-J WELD.2 -C**TBX-5**REACTOR COOLANT 6-RC-2-108-2501R-I 078900 TCX-1-4504-1 R-A PRESSURIZER NOZZLE TO SAFE END R1.20 RI6iE905RB UT-X 92 TDLR VERIFICATION BOUNDARY.B-F WELD.I. m PMa6 -I t DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS PAGE: 46 INSPECTION INTERVAL_ASME SEC. XI CATGY NDE ITEM NO METH---------.-.-----.-.--

PLAN STATUS FIRST SECOND PERIOD PERIOD OUTAGE -1 2 1 2 3 1-----------.-.---------.-

THIRD PERIOD 2 PRESERVICE YEAR INSTRUCTIONS

    • CALIBPATION BLOCK**

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION


..---------------

083500 083700 083900 084600 084700 REACTOR COOLANT 4-RC-2-087-2501R-1 TCX-1-4505-19 R-A PIPE TO PIPE RI.11 RI60B913RB REACTOR COOLANT 4-RC-2-018-2501R-i>

TCX-1-4505-21 R-A PIPE TO PIPE Ri.20 R161D883RB REACTOR COOLANT 6-RC-2-163-2501R-1 TCX-1-4505-23 R-A PIPE TO PIPE RI.20 RIG1D908RB REACTOR COOLANT 4-RC-2-075-2501R-I TCX-1-4506-7 R-A PIPE TO REDUCER R1.20 RI61D905R5 REACTOR COOLANT 6-RC-2-161-2501R-1 TCX-1-4506-8 R-A REDUCER TO PIPE R1.20 RI61D906RD REACTOR COOLANT 6-RC-2-147-2501R-1 UT B-J WELD.2 ---X**TBX-4 , PDI-03**UT B-J WELD.2 ---X --**TBX-4 , PDI-03**UT B-J WELD.2 ---.X --**TBX-5 , PDI-03**UT B-J WELD.2 -X**TBX-4 , PDI-03**UT B-J WELD.2-X**TBX-5 , PDI-03**085600 TCX-1-4506-17 TEE TO PIPE RI60B913R]

R-A UT Ri. 11--X B-J WELD. REPLACES WELD TCX-1-4506-15.

+d -i .P ?OI-C2 DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS PAGE: 47 INSPECTION INTERVAL_ASME SEC. XI CATGY NDE ITEM NO METH PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD PRESERVICE YEAR'INSTRUCTIONS

    • CALIBRATION BLOCK**

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION

--OUTAGE 1 2 1 2 3-----------.-.---------

1 2 SAFETY INJECTION 3-SI-2-303-250IR-I 090500 TCX-1-4600-4 PIPE TO PIPE R154A823RB R-A RI. 20 UT 2 --x .090600 TCX-1-4600-5 PIPE TO ELBOW RI54A823RB R-A UT RI. 20 2 --X B-J WELD.**PDI-03**

B-J WELD.**PDI-03**

B-J WELD.**PDI-03**

090700 TCX-1-4600-6 ELBOW TO PIPE R154A823RB R-A RI. 20 UT 2 --X SAFETY INJECTION 3-SI-2-033-2501R-1 090900 TCX-1-4600-8 REDUCER TO PIPE Ri54D818RB 091400 TCX-I-4600-13 PIPE TO REDUCER RI54D818RB R-A UT RI.20 X B-J WELD.**PDI-03**

B-J WELD.**PDI-03**

R-A RI. 20 UT X SAFETY INJECTION I SI 2 -I-- I 091600 TCX-I-4600-15 PIPE TO ELBOW RI54D822RB R-A Ri. 20 UT X B-J WELD.**PDI-03**

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS PAGE: 48 INSPECTION INTERVAL_ASME SEC. XI CATGY NDE ITEM NO METH PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD SOUTAGE--------------

1 2 1 2 3 1 2 PRESERVICE YEAR I.INSTRUCTIONS i **CALIBRATION BLOCK**

SUMMARY

NUMBER EXAMINATION AREA IDENTIFICATION SAFETY INJECTION 3-SI-2-339-2501R-I 091700 TCX-I-4600-16 ELBOW TO PIPE RI54D822RB R-A Rli. 20 UT 2 -----X B-J WELD.**PDI-03**

REACTOR COOLANT TCX-RCPCPC-02 092400 TCX-i-5100A-2SB1-12 RC PUMP 2 #1 SEAL BOLTING (2-BI/2-B12) 092900 TCX-i-5100A-2FBI-24 RC PUMP 2 MAIN FLNG BLT (2-BI/2-B24)

B-G-2 VT-I B7.60 B-G-1 UT B6.180 92 TDLR VERIFICATION BOUNDARY.---X -92 TDLR VERIFICATION BOUNDARY.2 ---X**TBX-54**

093000 TCX-I-510OA-2FLG B-G-1 VT-I RC PUMP 2 MAIN FLANGE SURFACE B6.190 2 92 TDLR VERIFICATION BOUNDARY.EXAM TO BE DONE WHEN PUMP IS DISASSEMBLED.

094000 TCX-1-510OC-2CASING RC PUMP 2 CASING -INTERNAL SURFACES 094050 TCX-1-5100C-2-1 RC PUMP 2 CASING WELD B-L-2 VT-3 B312.20 92 TDLR VERIFICATION BOUNDARY.X B-L-1 VT-I B12.10 92 TDLR VERIFICATION BOUNDARY.SEE R.G. 1.147 (N-619)IC RESIDUAL HEAT REMOVAL 12-RH-2-001-2501R-I 094221 TCX-i-4101-8701A-BLT VALVE BODY BOLTING 2-8701A RI54A808RB B-G-2 VT-I B7.70 92 DWG. 8372D46 2 X DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS PAGE: 49 INSPECTION INTERVAL_ASME SEC. XI CATGY NDE ITEM NO METH PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION 1 2 0 U T A G 1 2 3--UTAG--E 2-----1 2 SAFETY INJECTION 10-SI-2-182-2501R-i 094244 TCX-1-4402-8956D-BLT VALVE BODY BOLTING 2-8956D RI54L819RB B-G-2 B7 .70 VT- 1 92 DWG. 8372D14 2 C -SAFETY INJECTION 6-SI-2-092-2501R-1 094245 TCX-1-4403-8818D-BLT VALVE BODY BOLTING 2-8818D B-G-2 B7.70 VT- i 92 DWG. 8372D12 2 ---X REACTOR COOLANT 6-RC-2-096-2501R-l 094249 TCX-1-4501-8010A-BLT VALVE BODY BOLTING 2-8010A R161A905RB B-G-2 B7.70 VT-1 92 DWG. DS-C-66075 2 C -RESIDUAL HEAT REMOVAL 12-RH-2-001-2501R-1 094261 TCX-1-4101-8701A-INT VALVE INTERNAL SURFACES R154A817RB B-M-2 VT-3 B12 .50 2 -X NA DWG. 8372D46. EXAM TO BE CONDUCTED WHEN VALVE IS DISASSEMBLED.

SAFETY INJECTION 10-SI-2-182-2501R-1 094279 TCX-i-4402-8956D-INT VALVE INTERNAL SURFACES B-M-2 VT-3 B12 .50 DWG. 8372D14 2 -X --SAFETY INJECTION 6-SI-2-092-2501R-I 094280 TCX-1-4403-8818D-INT VALVE INTERNAL SURFACES B-M-2 VT-3 B12. 50 2 -NA DWG. 8372D12 DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS I SCHED/COMPL COMPONENTS PAGE: 50 INSPECTION INTERVAL ASME SEC. XI CATGY NDE ITEM NO METH FIRST PERIOD-1i PLAN STATUS SECOND PERIOD PRESERVICE YEAR THIRD PERIOD

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION OUTAGE G E 1 2 3 1 2 INSTRUCTIONS

    • CALIBRATION BLOCK**REACTOR COOLANT 6-RC-2-096-2501R-1 094282 TCX-1-4501-801UA-INT VALVE INTERNAL SURFACES RI61A905RB B-M-2 VT-3 B12 .50 NA DWG. DS-C-66075 2 C -

4.2 CLASS 2 NDE This subsection describes the examination areas and NDE methods for the Class 2 pressure retaining components and associated component integral welded attachments as specified in Article TWC of the Code. For pressure testing, see Section 5.Class 2 valve body welds have been grouped according to design, size, function, and service in a system in accordance with Table TWC-2500-1, Category C-G, Note I of the Code. These groups are delineated below. One valve from each group has been selected for examination as denoted by the asterisk "*".Group 1 -8" Forged Gate Valves, MS Safety Isolation 2MS-026 2MS-063 2MS-098 2MS-134* (reference TCX-2-2300 for location)Group 2 -18" Forged Gate Valves, Main Feedwater Isolation 2FW-071 2FW-077 2FW-083 2FW-089* (reference TCX-2-2202 for location)Group 3 -6" Forged Check Valves, Feedwater 2FW-191 2FW-192 2FW- 193 2FW- 194 2FW- 195 2FW-]196 2FW-197 2FW- 198 2FW-199 2FW-200 2FW-201 2FW-202* (reference TCX-2-2204 for location)4.2 Page 1 of 2 Group 4 -6" Forged Gate Valves, Auxiliary Feedwater Isolation 2FW-203 2FW-204.2FW-205 2FW-206* (reference TCX-2-2403 for location)Group 5 -12" Forged Isolation 2CT-0026 2CT-0028 2CT-0078 2CT-0084 Gate Valves, Containment Spray* (reference TCX-2-2578 for location)Group 6 -12" Forged Gate Valve, Safety Injection 2SI-0048 * (reference TCX-2-2582 for location)4.2 Page 2 of 2 DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS PAGE: 51 INSPECTION INTERVAL_FIRS ASME PERIT SEC. XI -CATGY NDE --ITEM NO METH 1 2 T OD PLAN STATUS_SECOND THIRD PERIOD PERIOD PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION 0 U 1 2 T-G---- -----------

T A G E 1 3 1 2 MAIN STEAM TCX-RCPCSG-03 094300 TCX-2-1100-3-2 SG 3 TUBESHEET TO SHELL WELD R155J832RB C-A C1.30 UT 2 C -094400 TCX-2-1100-3-3 SG 3 LOWER SHELL CIRC. WELD RISSJ832RB C-A Cl. 10 UT 2 C -094500 TCX-2-1100-3-5 C-A SG 3 TRANSITION CONE TO LOWER CI.10 SHELL WELD UT 2 ----X 92 TDLR VERIFICATION BOUNDARY.REFER TO R.G. 1.147 (N-435-1)FOR SURFACE EXAMINATION ALTERNATIVE.

    • TBX-27**

92 TDLR VERIFICATION BOUNDARY.REFER TO R.G. 1.147 (N-435-1)FOR SURFACE EXAMINATION ALTERNATIVE

    • TBX-27**.

92 TDLR VERIFICATION BOUNDARY.REFER TO R.G. 1.147 (N-435-1)FOR SURFACE EXAMINATION ALTERNATIVE.

    • TBX-27**

92 TDLR VERIFICATION BOUNDARY.REFER TO R.G. 1.147 (N-435-1)FOR SURFACE EXAMINATION ALTERNATIVE.

    • TBX-27**

92 TDLR VERIFICATION BOUNDARY.REFER TO R.G. 1.147 (N-435-1)FOR SURFACE EXAMINATION ALTERNATIVE.

    • TBX-27**

92 TDLR VERIFICATION BOUNDARY.094600 TCX-2-1100-3-6 C-A SG 3 UPPER SHELL TO TRANSITION C1.10 CONE WELD UT 2 -X 094700 TCX-2-1100-3-8 SG 3 HEAD TO SHELL WELD C-A UT Cl. 20 2----x 094800 TCX-2-1100-3-9 SG 3 FEEDWATER NOZZLE TO VESSEL WELD R155J832RB C-B UT C2.21 MT 2 C**TBX-27**

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS PAGE: 52 INSPECTION INTERVAL_ASME FIRST PERIOD PLAN STATUS SECOND PERIOD

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION SEC. XI CATGY NDE ITEM NO METH Il --THIRD PERIOD 1 2 S OUTAGE 2 12 3 PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**1 MAIN STEAM TCX-RCPCSG-03 094900 TCX-2-1100-3-91R SG 3 FEEDWATER NOZZLE INNER RADIUS RI55J832RB 095000 TCX-2-1100-3-10 SG 3 AUX FEEDWATER NOZZLE TO VESSEL WELD C-B C2 .22 UT 92 TDLR VERIFICATION BOUNDARY.2 C**TBX-56**

C-B UT C2.21 MT 92 TDLR VERIFICATION BOUNDARY.2 -----X**TBX-27**

095100 TCX-2-1100-3-11 SG 3 MAIN STEAM NOZZLE TO VESSEL WELD C-B UT C2.21 MT 2 92 TDLR VERIFICATION BOUNDARY.----X**TBX-27*t CHEMICAL AND VOLUME CONTROL TCX-CSAHEL-01 095300 TCX-2-1110-1 EXCESS LETDOWN HX HEAD TO FLANGE WELD R154E808RB C-A UT C1.20 2 C 92 TDLR VERIFICATION BOUNDARY.REFER TO R.G. 1.147 (N-435-1)FOR SURFACE EXAMINATION ALTERNATIVE.

    • TBX-8**RESIDUAL HEAT REMOVAL TCX-RHAHRS-01 095600 TCX-2-1120-1-1 RHR HX1 HEAD TO SHELL WELD C-A UT C1.20 2 X 92 REFER TO R.G. 1.147 (N-435-1)FOR SURFACE EXAMINATION ALTERNATIVE.

t*TBX-30D*92 REFER TO R.G. 1.147 (N-435-1)FOR SURFACE EXAMINATION ALTERNATIVE.

    • TBX-30t*

095700 TCX-2-1120-1-2 C-A RHR HX1 SHELL TO FLANGE WELD Cl.10 UT DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS PAGE: 53 INSPECTION INTERVAL FIRST PERIOD ASME SEC. XI CATGY ITEM NO PLAN STATUS SECOND THIRD PERIOD PERIOD OUTAGE---


1 2 3 1 2 PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION NDE -METH 1 2 RESIDUAL HEAT REMOVAL TCX-RHAHRS-01 095800 TCX-2-1120-1-3 C-B RHR HX1 INLET NOZZLE TO SHELL C2.21 WELD UT PT 92 2 -X**TBX-51**

096000 TCX-2-1120-1-4 C-B RHR HX1 OUTLET NOZZLE TO SHELL C2.21 WELD UT PT 2 X**TBX-51**

096200 TCX-2-1120-1-1WS RHR HX1 WELDED SUPPORT 790SB C-C C3 .10 PT 92 X 096300 TCX-2-1120-1-2WS C-C PT RHR HXI WELDED SUPPORT C3.10 790SB CHEMICAL AND VOLUME CONTROL TCX-CSAHLD-01 92 X 096400 TCX-2-1130-1 C-A HORIZONTAL LETDOWN HX HEAD TO C1.20 FLANGE WLD R81 811SB UT 2 -C 92 REFER TO R.G. 1.147 (N-435-1)FOR SURFACE EXAMINATION ALTERNATIVE.

    • TBX-31**

CHEMICAL AND VOLUME CONTROL TCX-TRAHLR-01 096500 TCX-2-1140-1 LETDOWN REHEAT HX HEAD TO SHELL WELD 833SB C-A PT Cl. 20 92 PT IN LIEU OF UT PER CODE CASE N-435-1.

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS PAGE: 54 INSPECTION INTERVAL l I PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD ASME SEC. XI CATGY NDE ITEM NO METH

SUMMARY

NUMBER EXAMINATION AREA IDENTIFICATION I -Ii PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**---- --- -OU AG------ -----------

2 0 U T A G E 12 2 1 2 3 1 2--------.-.---------.-.---------.

096600 CHEMICAL AND VOLUME CONTROL TCX-TRAHLR-01 TCX-2-1140-2 C-A PT LETDOWN REHEAT HX SHELL TO CI.10 FLANGE WELD 833SB CHEMICAL AND VOLUME CONTROL TCX-CSAHRG-01 92 PT IN LIEU OF UT PER CODE CASE N-435-1.2 -X --096700 TCX-2-1150-1 REGENERATIVE WELD R155C833RB 096800 TCX-2-1150-2 REGENERATIVE WELD RI55C833RB 096900 TCX-2-1150-3 REGENERATIVE WELD R155C833RB C-A Cl. 20 UT HX HEAD TO TEE 2 -X C-A C1.20 UT HX HEAD TO TEE 2 X -C-A Cl. 10 UT HX SHELL TO TEE 2 -X 92 REFER TO R.G. 1.147 (N-435-1)FOR SURFACE EXAMINATION ALTERNATIVE.

    • TBX-9**92 REFER TO R.G. 1.147 (N-435-1)FOR SURFACE EXAMINATION ALTERNATIVE.
    • TBX-9**92 REFER TO R.G. 1.147 (N-435-1)FOR SURFACE EXAMINATION ALTERNATIVE.
    • TBX-B**92 REFER TO R.G. 1.147 (N-435-1)FOR SURFACE EXAMINATION ALTERNATIVE.
    • TBX-8**92 REFER TO R.G. 1.147 (N-435-1)FOR SURFACE EXAMINATION ALTERNATIVE.
    • TBX-8**92 REFER TO R.G. 1.147 (N-435-1)FOR SURFACE EXAMINATION ALTERNATIVE.
    • TBX-8**097000 TCX-2-1150-4 REGENERATIVE HX SHELL TO TEE WELD R155C833RB 097100 TCX-2-1150-5 REGENERATIVE HX SHELL TO TUBESHEET WELD Ri55C833RB 097200 TCX-2-.1150-6 REGENERATIVE HX SHELL TO TUBESHEET WELD R155C833RB C-A CI. 10 UT 2 C-A Cl. 30 UT X -C-A Cl. 30 UT.2 -X DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS PAGE: 55 INSPECTION INTERVAL ASME PLAN STATUS FIRST SECOND THIRD PERIOD, PERIOD PERIOD

SUMMARY

NUMBER EXAMINATION AREA IDENTIFICATION SEC. XI -CATGY NDE --ITEM NO METH 1 2-------. -.--. -.- .- --------~I OUTAGE-- -----------

1 2 3 1 2 PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**CONTAINMENT SPRAY CP2-CTAHCS-01 097410 TCX-2-1180-1-1 CT HX1 HEAT TO SHELL WELD C-A UT C1.20 92 2-X**TBX-31**

097420 TCX-2-1180-1-2 C-A CT HX1 SHELL TO FLANGE WELD CI.10 UT 92 2 -X --**TBX-31**

097430 TCX-2-11B0-1-3 CT HX1 INLET NOZZLE TO SHELL WELD C-B UT C2.21 PT 2 -X -92**TBX-15,SSCB-1**

097444 TCX-2-11BO-1-4 C-B CT HX1 OUTLET NOZZLE TO SHELL C2.21 WELD UT PT 92 2 --X ---**TBX-15,SSCB-1**

CONTAINMENT SPRAY TCX-CTAHCS-01 097450 TCX-2-1180-1-1WS CT HX1 WELD SUPPORT 097460 TCX-2-1180-1-2WS CT HXl WELDED SUPPORT C-C'C3 .10 PT 92 2 X -C-C PT C3.10 92-X -FEEDWATER 6-FW-2-095-1303-2 108500 TCX-2-2103-10 PIPE TO PIPE RIO0BS64SB R-A RI. 20 UT C-F-2 WELD.2* ' TL;X -3 ý_) POý -c Z, ' 0 DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS PAGE: 56 INSPECTION INTERVAL PLAN STATUS_FIRST SECOND THIRD ASME SEC. XI CATGY NDE ITEM NO METH PER 1 2 RIOD PERIOD PERI O-PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION 0 U OUTAGE ----1 2 3 1 2 FEEDWATER 6-FW-2-095-41303-2 108600 TCX-2-2103-11 ELBOW TO PIPE R100B864SB R-A R1. 20 UT C-F-2 WELD.2--x --**TBX-35, PDI-02*108700 TCX-2-2103-12 PIPE TO ELBOW RIO0B864SB R-A RI. 20 UT C-F-2 WELD.2 ---X --**TBX-35, PDI-02"*FEEDWATER i6-FW-2-074-1303-2 115400 TCX-2-2201-1 NOZZLE TO REDUCING ELBOW R155I841RB R-A Ri .11 UT NA TDLR VERIFICATION BOUNDARY.C-F-2 WELD.2 X ----**TBX-20**

FEEDWATER 6-FW-2-096-1303-2 124200 TCX-2-2204-24 PIPE TO ELBOW Ri00D864SB R-A Ri. 20 UT C-F-2 WELD.2 --X**TBX-35, PDI-02**124300 TCX-2-2204-25 ELBOW TO PIPE RI0OD864SB R-A Ri.20 UT C-F-2 WELD.-X**TBX-35, PDI-02**124400 TCX-2-2204-26 PIPE TO PIPE RI00D864SB R-A RI. 20 UT C-F-2 WELD.2 -X --**TBX-35, PDI-02**

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS PAGE: 57 INSPECTION INTERVAL_ASME I SEC. XI i CATGY NDE ITEM NO METH PLAN STATUS_FIRST SECOND THIRD PERIOD PERIOD PERIOD -U T A0-- ------------

12 1 23 1 2 PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK-

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION FEEDWATER 6-FW-2-097-1303-2 141000 TCX-2-2303-25 PIPE TO EBLOW Ri0OC864SB R-A Ri. 20 UT 92 TDLR VERIFICATION BOUNDARY.C-F-2 WELD.2-X -**TBX-35, PDI-02"*141100 TCX-2-2303-26 ELBOW TO PIPE R10O0C864SB R-A R1.20 UT C-F-2 WELD.2 --X -**TBX-35, PDI-02**141200 TCX-2-2303-27 PIPE TO PIPE R100C864SB R-A Ri. 20 UT C-F-2 WELD.2 X ---**TBX-35, PDI-02**FEEDWATER 6-FW-2-098-1303-2 156800 TCX-2-2403-23 ELBOW TO PIPE R100AB84SB R-A Ri. 20 UT C-F-2 WELD.2 -C**TBX-35, PDI-02**156900 TCX-2-2403-24 PIPE TO ELBOW RI0OA864SB R-A Ri. 20 UT 92 TDLR VERIFICATION BOUNDARY.C-F-2 WELD.2 -C**TBX-35, PDI-02**r-157000 TCX-2-2403-25 ELBOW TO PIPE RIOOAB64SB R-A UT RI.20 C-F-2 WELD.C**TBX-35, PDI-02**RESIDUAL HEAT REMOVAL 12-RH-2-003-601R-2 158100 TCX-2-2500-2 PIPE TO PIPE R154AB17RB R-A UT RI.20 C-F-I WELD.2 -C Kt rV -, P01; 4-cf DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS PAGE: 58 INSPECTION INTERVAL_ASME SEC. XI CATGY NDE ITEM NO METH PLAN STATUS FIRST SECOND PERIOD PERIOD

SUMMARY

NUMBER EXAMINATION AREA IDENTIFICATION 1 2---- -OUTAGE 1 2 3 PRESERVICE YEAR THIRD PERIOD-INSTRUCTIONS 1 2 **CALIBRATIOI N BLOCK**RESIDUAL HEAT REMOVAL 12-RH-2-003-601R-2 158500 TCX-2-2500-6 PIPE TO ELBOW R77B 817SB R-A RI. 20 UT 2 -C C-F-1 WELD.**TBX-1I**

C-F-i WELD..**TBX-II**

158600 TCX-2-2500-7 ELBOW TO PIPE R77B 816SB R-A UT Ri. 20 2 -C RESIDUAL HEAT REMOVAL 16-RH-2-007-601R-2 160900 TCX-2-2500-30 PIPE TO REDUCING ELBOW R53 775SB R-A RI. 20 UT 2 -C C-F-i WELD.**TBX- 15*SAFETY INJECTION 16-SI-2-076-601R-2 162000 TCX-2-2500-41 PIPE TO ELBOW R65 803SB R-A RI. 20 UT 2 -C RC-F-I WELD.**TBX- 15*RESIDUAL HEAT REMOVAL 12-RH-2-004-601R-2 162800 TCX-2-2501-6 PIPE TO ELBOW R77A 817SB 162900 TCX-2-2501-7.

ELBOW TO PIPE R77A 816SB R-A Ri. 20 UT 2 -C C-F-I WELD.**TBX-II**

C-F-I WELD.**TBX-II**

R-A RI. 20 UT 2 -C DAT13: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS PAGE: 59 INSPECTION INTERVAL PLAN STATUS I FIRST SECOND THIRD ASME I PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION SEC. XI CATGY NDE ITEM NO METH I----------

OUTA 1 2 1 2 3 PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**G E------1 2 RESIDUAL HEAT REMOVAL 16-RH-2-008-G6IR-2 165700 TCX-2-2501-35 PIPE TO REDUCING ELBOW R52 775SB R-A UT RI. 20 2 -C C-F-I WELD.**TBX-15**

SAFETY INJECTION 16-SI-2-075-601R-2 166900 TCX-2-2501-47 PIPE TO PIPE R63 798SB R-A UT Ri. 20 2 -C C-F-I WELD.**TBX-15**

C-F-I WELD.**TBX-15**

167000 TCX-2-2501-48 PIPE TO ELBOW R63 803SB R-A R1. 20 UT 2 -C RESIDUAL HEAT REMOVAL 10-RH-2-015-601R-2 167900 TCX-2-2520-5 ELBOW TO PIPE R67 796SB R-A UT Ri. 20 2 C-F-I WELD.RESIDUAL HEAT REMOVAL 12-RH-2-033-601R-2 169000 TCX-2-2520-18 PIPE TO REDUCING ELBOW R69 797SB R-A .UT RI. 20 2 X C-F-i WELD.**TBX-II,**

RESIDUAL HEAT REMOVAL 8-RH-2-063-601R-2 172200 TCX-2-2520-50 PIPE TO ELBOW R54 780SB R-A RI .20 UT 2 --X C-F-I WELD.**TBX-42,**

DAýTE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS PAGE: 60 INSPECTION INTERVAL_ASME I SEC. XI I CATGY NDE ITEM NO METH PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD--OUTAGE--------------

1 2 1 2 3 1 2-------------.-.---------.-.--------

PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION RESIDUAL HEAT REMOVAL 8-RH-2-003-601R-2 172300 TCX-2-2520-51 ELBOW TO PIPE R54 780SB 172400 TCX-2-2520-52 PIPE TO ELBOW R54 780SB R-A R1.20 UT 2 --X R-A Rl. 20 UT X C-F-1 WELD.**TBX- 42, **C-F-1 WELD.**TBX..42, **C-F-I WELD.**TBX-42, **C-F-I WELD.**TBX-42**

172500 TCX-2-2520-53 ELBOW TO PIPE R54 780SB R-A F1.20 UT 2 ----X 172800 TCX-2-2520-56 PIPE TO ELBOW R54 780SB R-A R1. 20 UT 2 ---X RESIDUAL HEAT REMOVAL 10-RB-2-016-601R-2 173600 TCX-2-2521-4 REDUCING ELBOW TO PIPE R68 797SB R-A R1. 20 UT 2 X C-F-I WELD.C-F-I WELD.173700 TCX-2-2521-5 PIPE TO PIPE R68 797SB R-A R1. 20 UT 2 -X RESIDUAL HEAT REMOVAL 12-RH-2-034-601R-2 175100 TCX-2-2521-19' PIPE TO REDUCING ELBOW R68 797SB R-A RI. 20 UT C-F-1 WELD.X-T..,. ii .

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS PAGE: 61 INSPECTION INTERVAL PLAN STATUS FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI SCAT. MOE- -----------


OU AG--------------

CATGY NDE 12 T A G E ITEM NO METH 1 2 1 2 3 1 2 PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK--

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION RESIDUAL HEAT REMOVAL 8-RH-2-064-601R-2 178200 TCX-2-2521-50 PIPE TO ELBOW R51 781SB 178300 TCX-2-2521-51 ELBOW TO PIPE R51 781SB R-A RI. 20 UT 2 -X ---R-A Ri. 20 UT 2 -X C-F-1 WELD.C-F-I WELD.C-F-1 WELD.C-F-i WELD.178400 TCX-2-2521-52 PIPE TO ELBOW R51 781SB 178500 TCX-2-2521-53 ELBOW TO PIPE R51 781SB R-A Ri. 20 UT 2 -X R-A Ri. 20 UT 2 --X --SAFETY INJECTION 10-SI-2-095-2501R-2 183900 TCX-2-2530-33 PIPE TO ELBOW R77B 812SB R-A R1.20 UT C-F-1 WELD.2 C -**TBX-9, PDI-04**184000 TCX-2-2530-34 ELBOW TO PIPE R77B 813SB R-A R1.20 UT 92 C-F-I WELD.2 C -**TBX-9, PDI-04**184500 TCX-2-2530-39 PIPE TO ELBOW R77B 823SB R-A UT R1.20 92 C-F-I WELD.2 C**TBX-9, PDI-04**

DATE: 01/21/08 COMANCHE PEAK UNIT 2* INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS PAGE: 62 INSPECTION INTERVAL_ASME I SEC. XI CATGY NDE ITEM NO METH I PLAN STA FIRST SECOND PERIOD PERIOD TUS -PRESERVICE YEAR THIRD PERIOD E------- ----------- -ISRCTOS G E *-INSTRUCTIONS B 1 2 **CALIBRATION BLOCK--

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION 1 2 0 U T A 1 2 3 SAFETY INJECTION 10-SI-2-079-601R-2 186100 TCX-2-2531-14 ELBOW TO PIPE R77A 820SB R-A RI. 20 UT C-F-i WELD.2 C -**TBX-10, PDI-03**RESIDUAL HEAT REMOVAL 10-RH-2-025-601R-2 187000 TCX-2-2532-5 ELBOW TO PIPE R62F 789SB R-A RI. 20 UT 2 -X -C-F-I WELD.SAFETY INJECTION 10-SI-2-078-601R-2 188300 TCX-2-2532-18 PIPE TO ELBOW R77B 820SB R-A RI. 20 UT-X C-F-I WELD.**TBX-10**

C-F-I WELD.**TBX-10**

188400 TCX-2-2532-19 ELBOW TO PIPE R77B 820SB R-A Rl .20 UT 2 --X -RESIDUAL HEAT REMOVAL 8-RH-2-027-601R-2 190100 TCX-2-2532-36 PIPE TO ELBOW R62F 797SB R-A Ri. 20 UT 2 --X C-F-i WELD.C-F-I WELD.190200 TCX-2-2532-37 ELBOW TO PIPE R62F 797SB R-A Ri. 20 UT 2-X -

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS PAGE: 63 INSPECTION INTERVAL_ASME I SEC. XI CATGY NOE ITEM NO METH i FIRST PERIOD 1 2 PLAN STATUS SECOND THIRD PERIOD PERIOD I i

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION O U TA 1 2 3 G E 1 2 PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**RESIDUAL HEAT REMOVAL 8-RH-2-027-601R-2 190300 TCX-2-2532-38 PIPE TO ELBOW R62F 797SB R-A UT Rl. 20 2 X C-F-I WELD.SAFETY INJECTION 10-SI-2-083-2501R-2 192200 TCX-2-2534-1 PIPE TO PIPE (PENETRATION)

RI54D821RB R-A Ri. 20 UT 92 C-F-I WELD.2 .- C**TBX-09, PDI-03**192300 TCX-2-2534-2 PIPE TO TEE RI54DB21RB R-A Ri. 20 UT 92 C-F-I WELD.2 -C**TBX-09, PDI-03**SAFETY INJECTION 8-SI-2-088-250IR-2 192900 TCX-2-2534-8 PIPE TO ELBOW RI54D817RB R-A UT RI. 20 92 C-F-I WELD.2 -C -**TBX-18, PDI-03**193000 TCX-2-2534-9 ELBOW TO PIPE RI54D817RB R-A Ri.20 UT 92 C-F-i WELD.2 -C**TBX-18, PDI-03**CONTAINMENT SPRAY 16-CT-2-002-151R-2 197200 TCX-2-2536-8 ELBOW TO PIPE R63 803SB R-A RI.20 UT 2 C-F-I WELD.**TBX-48,**

DATE: .01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS PAGE: 64 INSPECTION INTERVAL PLAN STATUS ASME SEC. XI CATGY NDE ITEM NO METH FIRST SECOND* PERIOD PERIOD-1OUTAGE 1 2' 1 23 THIRD PERIOD 1 2 PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK--

SUMMARY

NUMBER EXAMINATION AREA IDENTIFICATION CONTAINMENT SPRAY 16-CT-2-001-151R-2 1981IQ0 TCX-2-2537-7 ELBOW TO PIPE R6B 803SB R-A Ri. 20 UT 2 -----X C-F-I WELD.**TBX-48,**

SAFETY INJECTION 6-SI-2-038-151R-2 215200 TCX-2-2541-8 ELBOW TO PIPE R62 775SB R-A Ri. 20 UT 2 X 215300 'TCX-2-2541-9 PIPE TO ELBOW R62 786SB R-A RI. 20 UT 2.- -----X C-F-I WELD.C-F-i WELD.C-F-i WELD C-F-I WELD 215400 TCX-2-2541-10 ELBOW TO PIPE R62 786SB R-A RI. 20 UT 2 ----X 215500 TCX-2-2541-11 PIPE TO PIPE R62 786SB R-A RI.20 UT X SAFETY INJECTION 6-SI-2-041-151R-2 216600 TCX-2-2541-22 PIPE TO TEE.-R62F 789SB R-A UT Ri. 20 C-F-I WELD.2 --X DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS PAGE: 65 INSPECTION INTERVAL ASME SEC. XI CATGY NDE ITEM NO METH PLAN STATUS FIRST SECOND THIRI PERIOD PERIOD PERI(---- -TA- ---- --PRESERVICE YEAR)D-INSTRUCTIONS I --CALIBRATION BLOCK**

SUMMARY

NUMBER EXAMINATION AREA IDENTIFICATION 1 2 1 2 3 1 2 SAFETY INJECTION 6-SI-2-041-151R-2 216700 TCX-2-2541-23 TEE TO PIPE R62F 789SB R-A UT Ri. 20 2 -C-F-I WELD.SAFETY INJECTION 6-SI-2-311-i5lR-2 217000 TCX-2-2541-26 PIPE TO ELBOW R62F 789SB R-A Ri. 20 UT"2 -X C-F-I WELD.C-F-I WELD.217100 TCX-2-2541-27 ELBOW TO PIPE R62F 789SB R-A UT RI.20 2 -X SAFETY INJECTTON A-NT-2-070-lqiR-2 221500 TCX-2-2542-9

'ELBOW TO PIPE REQ 775SB 221600 TCX-2-2542-10 PIPE TO FLANGE.REQ 778SB 221700 TCX-2-2542-11 FLANGE TO PIPE REQ 786GSB R-A Ri. 20 UT 2 X --R-A Ri. 20 UT 2 X C-F-I WELD.C-F-i WELD.C-F-I WELD.R-A R1. 20 UT X DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS PAGE: 66 INSPECTION INTERVAL_ASME SEC. XI I CATGY NDE ITEM NO METH I PLAN STATUS FIRST SECOND PERIOD PERIOD

SUMMARY

EXAMINATION AREA NUM1BER IDENTIFICATION 1 .2 0 1 U T A G E 2 3 THIRD PERIOD 12 PRESERVICE YEAR.INSTRUCTIONS

    • CALIBRATION BLOCK**SAFETY INJECTION 6-SI-2-070-151R-2 221800 TCX-2-2542-12 PIPE TO ELBOW R60 786SB 221900 TCX-2-2542-13 ELBOW TO PIPE R60 786SB R-A RI. 20 UT 2 -X -C-F-I WELD.C-F-I WELD.R-A UT RI. 20 2 -X -304000 SAFETY INJECTION 14-SI-2-071-60IR-2 TCX-2-2581-7 R-A ELBOW TO PIPE R1.20 R70 793SB SAFETY INJECTION 14-SI-2-072-601R-2 UT 2 X I 92 C-F-I WELD. REPLACES WELD TCX-2-2581-6.

REFER TO SECTION 6,0 OF THE ISI PROGRAM PLAN.**TBX-47, PDI-03**305800 TCX-2-2581-25 PIPE TO ELBOW R70 793SB R-A Ri. 20 UT C-F-I WELD.2 -X**TBX-47, PDI-03**AUXILIARY FEEDWATER 4-AF-2-019-1303-2 312929 AF-2-SB-062A-10 ELBOW TO PIPE R100D86iSB R-A Ri. 20 UT 83 C-F-2 WELD.--X**PDI-02**

312937 AF-2-SB-062A-FW9 PIPE TO ELBOW RI0OD861SB R-A *UT RI.20 83 C-F-2 WELD.2 -X**PDI-02**

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS PAGE: 67 INSPECTION INTERVAL ASME SEC. XI CATGY NDE ITEM NO METH PLAN STATUS FIRST SECOND PERIOD PERIOD-~OUTAGE 1 2 1 2 3-----------.-.---------

THIRD PERIOD 1 2 PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**

SUMMARY

NUMBER EXAMINATION AREA IDENTIFICATION AUXILIARY FEEDWATER 4-AF-2-021-2003-2 312947 AF-2-SB-061-6 PIPE TO ELBOW RI0OB854SB R-A Ri. 20 UT 83 C-F-2 WELD.2 ----X**PDI-02**

312948 AF-2-SB-061-7 ELBOW TO PIPE R100BB54SB R-A Ri.20 UT 83 C-F-2 WELD.2---X**PDI-02**

AUXILIARY FEEDWATER 4-AF-2-022-2003-2 312951 AF-2-SB-060-11A PIPE TO ELBOW R100C860SB R-A Ri. 20 UT 83 C-F-2 WELD.2 X ---**PDI-02**

312952 AF-2-SB-060-12 ELBOW TO PIPE R100C860SB R-A Ri. 20 UT 83 C-F-2 WELD.2 X -**PDI-02**

AUXILIARY FEEDWATER 4-AF-2-024-2003-2 312960 AF-2-SB-052-23 PIPE TO ELBOW RI00A854SB R-A Ri.20 UT 83 C-F-2 WELD.2 -C**PDI-02**

312961 AF-2-SB-052-24A ELBOW TO PIPE RIb0A854SB R-A .UT RI.20 83 C-F-2 WELD.2 -C**PDI-02**

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS PAGE: 68 INSPECTION INTERVAL FIRST PERIOD PLAN STATUS SECOND PERIOD ASME SEC. XI CATGY NDE ITEM NO METH

SUMMARY

NUMBER EXAMINATION AREA IDENTIFICATION O----------OUTAGE 1 2 1 2 3-.-.---------.-.-.-.----

--PRESERVICE YEAR THIRD.PERIOD-INSTRUCTIONS 1 2 **CALIBRATION BLOCK**312976 AUXILIARY FEEDWATER 4-AF-2-054-2003-2 AF-2-SB-062A-8 R-A TEE TO PIPE R1.20 RI0OD861SB RESIDUAL HEAT REMOVAL TCX-RHAPRH-01 UT 83 C-F-2 WELD.2 --X**PDI-02**

313000 TCX-2-3100-1WS RHR PUMP 01 WELDED SUPPORT 313100 TCX-2-3100-2WS RHR PUMP 01 WELDED SUPPORT 313200 TCX-2-3100-3WS RHR PUMP 01 WELDED SUPPORT CHEMICAL AND VOLUME CONTROL C-C C3 .10 PT 92 2 -C C-C PT 92 C3. 10 C-C C3. 10 2 -C PT 92 2 -C TCX-CSAPCH-01 313300 TCX-2-3110-1WS CHG PUMP 01 WELDED SUPPORT 313400 TCX-2-3110-2WS CHG PUMP 01 WELDED SUPPORT C-C C3 .10 C-C C3.10 PT 92---x PT 92 X -

DATEý 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS PAGE 69 INSPECTION INTERVAL PL FIRST PERIOD ASME SEC. XI CATGY NDE ITEM NO METH

SUMMARY

NUMBER EXAMINATION AREA IDENTIFICATION 1 0 2 1 AN STATUS _ PRESERVICE YEAR SECOND THIRD PERIOD PERIOD UTA-------


I NSRCOS U T A G E -INSTRUCTIONS 2 3 1 2 1 **CALIBRATIO!

N BLOCK**CHEMICAL AND VOLUME CONTROL TCX-CSAPCH-01 313500 TCX-2-3110-3WS CHG PUMP 01 WELDED SUPPORT 313600 TCX-2-3110-4WS CHG PUMP 01 WELDED SUPPORT C-C PT C3.10 C-C PT C3 .10 92 2 ---X -92 2 X -SAFETY INJECTION TCX-SIAPSI-02 314000 TCX-2-3140-2BI-32 B1 THRU B32 SI PUMP 02 STUDS C-D C4.30 UT 92 EXAMINE IN 2ND INTERVAL SI PUMP, TSN 431907, S/N 51928.2 -C**TBX-53**

FEEDWATER 18-FW-2-035-2003-2 500700 TCX-2-2202-FW077 C-G VALVE BODY WELD 2FW-0077 (ALT C6.20 2-HV-2135)

R100A856SB FEEDWATER 6-FW-2-092-2003-2 MT 2 C -92 TDLR VERIFICATION BOUNDARY.REFER TO R.G.1.147 (N-617).DWG. 75830 501000 TCX-2-2204-FW193 VALVE BODY WELD 2FW-0193 R100C863SB C-G CG .20 MT 92 DWG. 454KAB1-001.

REFER TO R.G.1.147 (N-617).2 -C MAIN STEAM 8-MS-2-223-1303-2 501200 TCX-2-2300-MS098 VALVE BODY WELD 2MS-0098 C-G C6 .20 MT X -92 TDLR VERIFICATION BOUNDARY.DWG. 75730-1. REFER TO R.G.1.147 (N-617)

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS PAGE: 70 INSPECTION INTERVAL ASME SEC. XI CATGY NDE ITEM NO METH PLAN STATUS FIRST SECOND PERIOD PERIOD-~OUTAGE-1 2 1 2 3 1 THIRD PERIOD 2 PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK-

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION FEEDWATER 6-FW-2-094-2003-2 502300 TCX-2-2403-FW203 VALVE BODY WELD 2FW-0203 C-G C6.20 MT 2 --X -502400 CONTAINMENT SPRAY 12-CT-2-006-151R-2 TCX-2-257B-CT028 C-G VALVE BODY WELD 2CT-0028 C6.20 CONTAINMENT SPRAY 12-SI-2-031-151R-2 PT 92 DWG. 435KAB2-002.

REFER TO R.G.1.147 (N-617).92 D0G. 75780. REFER TO R.G.1.147 (N-617).N 92 DWG. 75780-1. REFER TO R.G.1.147 (N-617).2 -X 502600 TCX-2-2582-SI048 VALVE BODY WELD 2SI-0048 C-G C6 .20 PT 2- --

4.3 COMPONENT SUPPORTS This subsection describes the examination areas and requirements for the Class 1, 2 and 3 component supports and Class 3 Integral Welded Attachments as specified in Article IWF and IWD of the Code, respectively.

For pressure testing of Class 3 components, see Section 5.In lieu of the requirements of Technical Specifications relating to snubbers, specifically those ISI requirements (e.g., plans, schedules, reports, inspector involvement, and Code Data Reports) of ASME Section XI, snubbers shall be demonstrated operable by performance of the augmented inservice inspection program as described in the ASME OM Code, Subsection ISTD. '4.3 PageI ofI DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS PAGE: 71 INSPECTION INTERVAL_ASME SEC. XI CATGY NDE I ITEM NO METH I PLAN STATUS FIRST SECOND PERIOD PERIOD-.2OUTAGE 1 2 1 23 THIRD PERIOD 1 2 PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**

SUMMARY

NUMBER EXAMINATION AREA IDENTIFICATION


----- --- -600000 CHEMICAL & VOLUME CONTROL 3-CS-2-080-2501R-1 TCX-1-4105-Hl F-A VT-3 CS-2-080-401-C41S F1.10 2 RI541B29RB CHEMICAL & VOLUME CONTROL 3-CS-2-235-2501R-1 NA SPRING C 600300 TCX-1-4304-H23 F-A VT-3 CS-2-235-467-C41R F1.10 2 -826RB CHEMICAL & VOLUME CONTROL 2-CS-2-105-2501R-1 NA STRUT---X 600400 TCX-1-4207-Hl CS-2-RB-002-704-1 R154B826RB F-A Fl. 10 VT-3 NA STRUT 2 -X CHEMICAL & VOLUME CONTROL 2-CS-2-112-2501R-1 600900 TCX-1-4507-H16 CS-2-RB-021-701-1 818RB F-A Fl .'0 VT- 3 NA SPRING 2 ----X 601200 TCX-1-4507-H13 CS-2-RB-021-704-1 818RB F-A Fl. 10 VT-3 NA STRUT 2 --x CHEMICAL & VOLUME CONTROL 1.5-CS-2-248-2501R-1 603600 TCX-1-4110-H3 CS-2-RB-037A-701-1 R1541827RB F-A Fl.10 VT- 3 NA SNUBBER 2 C DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS PAGE: 72 INSPECTION INTERVAL-FIRST ASME J PERIOD SEC. XI CATGY NDE ITEM NO METH PLAN STATUS SECOND THIRD PERIOD PERIOD OUTAGE---


1 2 3 1 2 PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION 1 2 CHEMICAL & VOLUME CONTROL 1.5-CS-2-248-2501R-1 603700 TCX-1-4110-H4 CS-2-RB-037A-702-1 Rl541828RB F-A F1. 10 VT- 3 NA SNUBBER 2 C -603800 TCX-1-4110-H5 CS-2-RB-037A-703-1 R1541828RB F-A Fl. 10 VT- 3 NA SNUBBER 2 C -603900 TCX-1-4110-H6 CS-2-RB-037A-704-1 R1541831RB F-A F1.10 VT -3 NA SNUBBER 2 C -CHEMICAL & VOLUME CONTROL 2-CS-2-103-2501R-1 60.4100 TCX-1-4110-HI CS-,2-RB-037B-702-1 R1541826RB F-A Fl. 10 VT -3 NA SNUBBER 2 C REACTOR COOLANT 12-RC-2-007-2501R-1 605400 TCX-1-4101-H2 RC-2-007-401-C41R R1541819 RB F-A Fl. 10 VT-3 NA STRUT 2 C 605500 TCX-1-4101-Hl RC-2-007-402-C41K R1541819RB F-A VT-3 Fl. 10 NA SNUBBER 2 C DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS PAGE: 73 INSPECTION INTERVAL_ASME SEC. XI CATGY NDE ITEM NO METH PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION 1 2 OUTAGE-- -----------

1 2 3 1 2-----------.-.---------.

PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**REACTOR COOLANT 3-RC-2-052-2501R-1 608800 TCX-1-4304-H6 RC-2-052-409-C41R RI54KB14RB 608900 TCX-1-4304-H7 RC-2-052-410-C41R RI54K814RB F-A F1.10 VT-3 NA STRUT 2 C -F-A Fl. 10 VT- 3 NA STRUT 2 C -REACTOR COOLANT 4-RC-2-075-2501R-1 610900 TCX-1-4506-H21 RC-2-075-417-C71R 902RB F-A Fl. 10 VT- 3 NA STRUT 2 -X 611000 TCX-l-4506-H20 RC-2-075-420-C71R 8 895RB F-A VT-3 F1.10 NA STRUT 2 X REACTOR COOLANT 4-RC-2-087-2501R-1 612500 TCX-1-4505-H30 RC-2-087-403-C81K 908RB F-A VT-3 Fl.10 NA SNUBBER 2 -612600 TCX-1-4505-H31 RC-2-087-407-C81K 91ORB F-A Fl. 10 VT-3 NA SNUBBER 2 -

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS PAGE: 74 INSPECTION INTERVAL

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC. XI CATOY NDE ITEM NO METH I i l I I PLAN STATUS FIRST SECOND PERIOD PERIOD-~OUTAGE 1 2 1 2 3 PRESERVICE YEAR THIRD PERIOD---------1 2 J I INSTRUCTIONS

  • -CALIBRATION BLOCK**REACTOR COOLANT 4-RC-2-087-2501R-1 612700 TCX-1-4505-H32 RC-2-087-408-C81R 911RB F-A VT-3 Fl. 10 NA STRUT, 2 -REACTOR COOLANT 4-RC-2-088-2501R-1 612800 TCX-1-4506-H29 RC-2-088-.401-C81R 909RB F-A Fl. 10 VT -3 NA STRUT 2 ----X 612900 TCX-1-4506-H33 RC-2-088-403-C81S 913RB F-A Fl. 10 VT- 3 NA SPRING 2----X 613000 TCX-1-4506-H32 RC-2-088-404-C81K 913RB F-A Fl. 10 VT- 3 NA SNUBBER 2-X 613100 TCX-1-4506-H31 RC-2-088-408-CSIK 911RB F-A VT-3 Fl..10 NA SNUBBER.----X 613200 TCX-1-45068H30 RC-2-088-409-C81R 911RB F-A Fl. 10 VT- 3 NA STRUT-X REACTOR COOLANT 3-RC-2-111-2501R-1 613500 TCX-1-4504-HN RC-2-111-402-C81K 907RB F-A Fl. 10 VT- 3 NA SNUBBER X DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS PAGE: 75 INSPECTION INTERVAL ASME SEC. XI CATGY NDE ITEM NO METH_ _ PLAN STATUS _ PRESERVICE YEAR FIRST SECOND THIRD PERIOD PERIOD PERIOD-OUTA--- GE--- ------------------

I ISRCIN 1 -U T A G E 2 -INSTRUCTIONS 1 2 1 2 3 1i 2 **CALIBRATION BLOCK**

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION REACTOR COOLANT 3-RC-2-111-2501R-1 G13600 TCX-I-4504-H2 RC-2-111-403-C81K RI61Eg07RB F-A Fl .10 VT-3 NA SNUBBER-X 613700 TCX-l-4504-N3 RC-2-111-404-C81S RI61E907RB F-A Fl. 10 VT- 3 NA HANGER 2 --X REACTOR COOLANT 14-RC-2-135-2501R-1 613900 TCX-1-4500-HI RC-2-135-402-C41K R154L832RB F-A Fl. 10 VT-3 NA SNUBBER----X 614000 TCX-1-4500-H4 RC-2-135-407-C41S 832RB F-A Fl. 10 VT- 3 NA SPRING 2 --X 614200 TCX-1-4500-H5 RC-2-135-409-C51R 843RB F-A F1. 10 VT- 3 NA STRUT 2 ---X REACTOR COOLANT 3-RC-2-146-250IR-1 614400 TCX-1-4504-H5 RC-2-146-402-C81K R161E907RB F-A VT-3 FI.10 NA SNUBBER 2-X DATE: 01/21/08.COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS PAGE: 76 INSPECTION INTERVAL_ASME SEC. XI I CATGY NDE I ITEM NO METH PLAN STATUS FIRST SECOND PERIOD PERIOD THIRD PERIOD 1 2

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION 1 2 OUTAGE 12 3 PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**REACTOR COOLANT 3-RC-2-146-2501R-1 614500 TCX-1-4504-H6 RC-2-146-403-C81K RI61E907RB F-A F1 10 VT-3 NA SNUBBER 2 -X 614600 TCX-1-4504-H4 RC-2-146-406-CB1K R161E908RB F-A VT-3 Fl. 10 NA SNUBBER 2 X REACTOR COOLANT 6-RC-2-147-2501R-1 614800 TCX-1-4506-H34 RC-2-147-403-C81K RI60B913RB F-A F1.i10 VT -3 NA SNUBBER 2 -X 615000 TCX-1-4506-H2 RC-2-147-406-C81S RIG1A913RB F-A VT-3 Fl. 10 NA SPRING 2 --X --615050 TCX-1-4506-H2 RC-2-147-406-C81S RI61A913RB B-K B10.20 PT 92 WELDED ATTACHMENT 2 -X --615100 TCX-1-4506-H35 RC-2-147-408LC81R RIG6OB9.3RB F-A Fl. 10 VT- 3 NA STRUT 2 REACTOR COOLANT 6-RC-2-161-2501R-1 615200 TCX-1-4506-Hl RC-2-161-402-C81A R1G1E909RB F-A F. 10 VT- 3 NA BOX 2 -X DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS I SCHED/COMPL COMPONENTS PAGE- 77 INSPECTION INTERVAL_ASME I SEC. XI CATGY NDE I ITEM NO METH PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD-OUTAGE-------------

1 2 1 2 3 1 2-----------.-.---------.-.--------

PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION REACTOR COOLANT 6-RC-2-161-2501R-1 615250 TCX-1-4506-H1 RC-2-161-402-C81A R161E909RB B-K PT B10.20 92 WELDED ATTACHMENT 2 --x REACTOR COOLANT 4-RC-2-162-2501R-1 615600 TCX-1-4506-N28 RC-2-162-401-C81R R160B909RB F-A F. 110 VT -3 NA STRUT 2 -X 615700 TCX-1-4506-H27 RC-2-162-402-C81K RI60B909RB F-A Fl. 10 VT- 3 NA SNUBBER 2 -----x 615800 TCX-1-4506-H26 RC-2-162-403-CSIR RI606909RB F-A Fl .10 VT- 3 NA bTRUT X 615900 TCX-1-4506-H25 RC-2-162-404-C81R RI6OB909RB F-A Fl. 10 VT-3 NA STRUT 2---X REACTOR COOLANT 6-RC-2-163-2501R-1 616000 TCX-1-4505-Hl RC-2-163-402-CIA RI61E908RB F-A VT-3 F1.10 NA BOX 2---x DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS PAGE: 78 INSPECTION INTERVAL_ASME SEC. XI CATGY NDE ITEM NO METH V P LAN STATUS FIRST SECOND PERIOD PERIOD THIRD PERIOD 1 2 PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK-

SUMMARY

NUMBER EXAMINATION AREA IDENTIFICATION 1 2-OUTAGE 1 2 3 REACTOR COOLANT 6-RC-2-163-2501R-1 616050 TCX-1-4505-HI RC-2-163-402-C81A R161Eg08RB B-K PT B10.20 92 WELDED ATTACHMENT 2 -X REACTOR COOLANT 4-RC-2-164-2501R-1 616200 TCX-1-4505-H28 RC-2-164-402-C81R R16OBS90RB F-A VT-3 F1.10 NA STRUT 2 --X -REACTOR COOLANT 4-RC-2-162-2501R-1 616300 TCX-1-4505-H27 RC-2-164-403-C81R RI60B908RB F-A Fl. 10 VT- 3 NA STRUT 2 --x ---REACTOR COOLANT 2-RC-2-015-2501R-1 616500 TCXTl-4109-H2 RC-2-RB-027-702-1 R1541813RB 616600 TCX-1-4109-H3 RC-2-RB-027-703-1 R1541813RB F-A VT-3 Fl.10 F-A VT-3 Fl. 10 NA SNUBBER X -NA SPRING X 616700 TCX-1-4109-H4 RC-2-RB-027-704-1 Ri541813RB F-A Fl. 10 VT- 3 NA SNUBBER 2 DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS PAGE: 79 INSPECTION INTERVAL_ASME SEC. XI CATGY NDE ITEM NO METH PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION


..-----------------

1 2-OUTAGE-- -----------

1 2 3 1 2.-..----------..----------

REACTOR COOLANT 2-RC-2-01S-2501R-1 616800 TCX-1-4109-H5 RC-2-RB-027-705-1 R1541813RB 617100 TCX-I-4109-H8 RC-2-RB-027-708-1 RI541813RB F-A Fl. 10 VT- 3 NA SNUBBER 2 -X --F-A VT- 3 Fl. 10 NA SNUBBER 2 -X ----RESIDUAL HEAT REMOVAL 12-RN-2-001-2501R-1 618800 TCX-1-4101-H3 RH-2-001-404-C41S RI541817RB 618900 TCX-1-4101-H9 RH-2-001-405-C41R RI54A817RB F-A Fl. 10 VT- 3 NA SPRING 2 C -F-A VT-3 Fl.10 NA STRUT 2 C 619200 TCX-1-4101-H8 RH-2-001-408-C41K R154A817RB RESIDUAL HEAT REMOVAL 12-RH-F-A Fl. 10 VT- 3 NA SNUBBER 2 C 2-002-2501R-1 619400 TCX-1-4401-H9 RH-2-002-401-C41R 817RB F-A Fl. 10 VT- 3 NA STRUT 2 --X DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS PAGE: 80 INSPECTION INTERVAL ASME SEC. XI CATGY NDE ITEM NO METH ,PLAN STATUS_FIRST SECOND THIRD PERIOD PERIOD PERIOD-OUTAGE.-------------

1 2 1 2 3 1 2 PRESERVICE YEAR INSTRUCTIONS I **CALIBRATION BLOCK**

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION RESIDUAL HEAT REMOVAL 12-RH-2-002-2501R-1 620000 TCX-1-4401-H4 RH-2-002-408-C41R F-A F1. 10 VT -3 NA STRUT 2 --X 817 RB SAFETY INJECTION 3-SI-2-033-2501R-1 620100 TCX-1-4600-H3 SI-2-033-405-C41S R154D818RB F-A Fl. 10 VT- 3 NA SPRING--X --620125 TCX-1-4600-H4 SI-2-033-401-C41R R154D818RB F-A Fl. 10 VT- 3 NA STRUT 2 -X --620150 TCX-1-4600-H5 V-A VT-A NA SNUBBER SI-2-033-403-C41K Fi.10 R154DB18RB SAFETY INJECTION 6-SI-2-089-2501R-1 X 620300 TCX-1-4103-HI SI-2-089-402-C41S Ri541827RB F-A VT-3 Fl.10 NA 2 -C 620350 TCX-1-4103-HI SI-2-089-402-C41S R1541828RB B-K B10.20 PT 92 SPRING 2 -C DATE: 01/21/0B COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS PAGE: 81 INSPECTION INTERVAL ASME SEC. XI CATGY NDE ITEM NO METH FIRST PERIOD 1 2 PLAN STATUS SECOND PERIOD THIRD PERIOD PRESERVICE YEAR I INSTRUCTIONS

  • CALIBRATION BLOCK**

SUMMARY

NUMBER EXAMINATION AREA IDENTIFICATION OUTAGE-----------

123 12 SAFETY INJECTION 6-SI-2-089-2501R-1 620400 TCX-1-4103-H3 SI-2-089-403-C41K RI541820RB F-A Fl. 10 VT-3 NA SNUBBER 2 -C 620500 TCX-1-4103-H6 SI-2-089-404-C41K R1541826RB F-A Fl. i0 VT-3 NA SNUBBER 2 -C 620600 TCX-1-4103-H5 SI-2-089-405-C41K R1541826RB F-A Fl. 10 VT -3 NA SNUBBER 2- C SAFETY INJECTION 8-SI-2-090-2501R-1 620800 TCX-1-4202-NI SI-2-090-402-C41S RI54J826RB F-A Fl. 10 VT -3 NA SPRING 2 -C 620850 TCX-1-4202-Hl SI-2-090-402-C41S Ri54J826RB B-K B10.20 PT 92 WELDED ATTACHMENT 2 -C 620900 TCX-1-4202-H3 SI-2-090-403-C41K R154J820RB F-A Fl. 10 VT -3 NA SNUBBER 621000 TCX-1-4202-H4 SI-2-090-404-C41K R154JB25RE F-A Fl. 10 VT-3 NA SNUBBER 2 -x --

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS PAGE: 82 INSPECTION INTERVAL_I FIRST ASME SEC. XI CATGY NDE ITEM NO METH PERIO 1 2 PLAN STATUS.SECOND THIRD D PERIOD PERIOD--OUTAGE-------------

1 2 3 1 2 PRESERVICE YEAR

SUMMARY

NUMBER EXAMINATION AREA IDENTIFICATION INSTRUCTIONS I **CALIBRATION BLOCK**------- -----------


SAFETY INJECTION 8-SI-2-091-2501R-1 621200 TCX-1-4302-H3 SI-2-091-401-C41R 816RB F-A VT-3 Fl. 10 NA STRUT 2 -X SAFETY INJECTION 6-SI-2-101-2501R-1 622100 TCX-1-4203-HI SI-2-101-403-C41S R154J828RB F-A Fl. 10 VT- 3 NA SPRING 2 -622150 TCX-1-4203-Hl SI-2-101-403-C41S R154J828RB B-K 210.20 PT 92 WELDED ATTACHMENT 2 -622200 TCX-1-4203-H2 SI-2-101-407-C41R R154B823RB F-A Fl. 10 VT -3 NA STRUT 2 -X -SAFETY INJECTION 6-SI-2-102-2501R-1 622400 TCX-1-4303-Hl SI-2-102-403-C41S 828RB F-A Fl. 10 VT- 3 NA SPRING 2 -622450 TCX-1-4303-HI SI-2-102-403-C41S 828RB B-K PT B10.20 92 WELDED ATTACHMENT

'2 X -

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS PAGE: 83 INSPECTION INTERVAL_ASME SEC. XI CATGY NDE ITEM NO METH---------__PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD PRESERVICE YEAR INSTRUCTIONS I **CALIBRATION BLOCK**

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION 1 2---OUTAGE--------------

1 23 1 2 RAEPTY TNJFCTTON I .R-,qT-2-027-2501R-I 624700 TCX-1-4306-HI2 SI-2-RB-007-702-1 R154D815RB 625000 TCX-1-4306-H15 SI-2-RB-007-705-1 RI54C815RB 625100 TCX-1-4306-HI6 SI-2-RB-007-706-1 R154C1S5RB 625300 TCX-1-4306-HI8 SI-2-RB-007-708-1 R154C815RB F-A Fl. 10 VT -3 NA STRUT 2 --X F-A Fl. 10 VT- 3 NA U-BOLT 2-X F-A F1. 10 VT- 3 NA STRUT 2 -X F-A F1. 10 VT-3 NA STRUT 2 ---X 625600 TCX-1-4306-H21 SI-2-RB-007-711-1 R154C817RB F-A VT-3 Fl. 10 NA U-BOLT-X 626000 TCX-1-4306-H2 SI-2-RB-008-702-1 R154D818RB F-A Fl. 10 VT- 3 VT -3 NA STRUT 2 X 626300 TCX-1-4306-HS SI-2-RB-008-707-1 R154H818RB F-A F1. 10 NA STRUT X DATE: 01/21/08 COMANCHE PEAK UNIT 2 " INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS PAGE: 84 INSPECTION INTERVAL-PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD---------. ------.- -.- -------ASME SEC. XI CATGY NDE ITEM NO METH PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION 1 2 OUTAGE---------

1 2 3 1 2 SAFETY INJECTION 1.5-SI-2-027-2501R-I 626400 TCX-1-4306-H6 SI-2-RB-008-708-1 R154H818RB F-A Fl. 10 VT -3 NA STRUT 2----X 626600 TCX-1-4306-H8 SI-2-RB -008-710-1 Rl54D817RB F-A Fl. 10 VT- 3 NA STRUT 2 -----X SAFETY INJECTION 1.5-SI-2-201-2501R-I 627400 TCX-l-4306-H29 SI-2-RB -009-707-1 R154K828RB F-A F1. 10 VT-3 NA SNUBBER 2----X 627600 TCX-l-4306-H32 SI-2-RB-009-709-1 RE54K829RB F-A F1. 10 VT -3 NA SNUBBER 2 ----X SAFETY INJECTION 2-SI-2-067-2501R-l 627800 TCX-1-4302-HI SI-2-RB-010A-705-1 81SRB F-A VT-3 F.10 NA SNUBBER X -SAFETY INJECTION l.S-SI-2-026-2501R-1 628100 TCX-l-4205-HI4 SI-2-RB-032-701-1 R154B817RB F-A F1.10 VT- 3 NA U-BOLT 2 -X --

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS PAGE: 85 INSPECTION INTERVAL_ASME___ -PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD-.. ...- 0 U T A G E SEC. XI CATGY NDE ITEM NO METH J I PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION j1 2 1 2 3 1 2 SAFETY INJECTION 1.5-SI-2-026-2501R-I 628400 TCX-1-4205-H17 SI-2-RB-032-704-1 RI54B817RB F-A Fl. 10 VT- 3 NA SNUBBER 2 -X --629100 TCX-1-4205-H4 SI-2-RB-033-703-1 R154B818RB F-A VT-3 Fl. 10 NA SNUBBER 2 X --629200 TCX-1-4205-H3 SI-2-RB-033-704-1 RI54B18RB F-A F1.10 VT- 3 NA SNUBBER 2 -X --SAFETY INJECTION 2-SI-2-0B6-2501R-1 634600 TCX-1-4404-H6 SI-2-RB-052-705-1 819RB F-A VT-3 Fl. 10 NA SPRING X REACTOR COOLANT TCX-RCPCSG-01 640040 TCX-1-3100-1CS1 TCX-RCESSG-01-SI A23 812RB 640050 TCX-1-3100-1CS2 TCX-RCESSG-01-S2 A23 812RB F-A VT-3 F1.40-X -NA S.G. COLUMN SUPPORT. 1457F29.TDLR VERIFICATION BOUNDARY.NA S.G. COLUMN SUPPORT. 1457F29.TDLR VERIFICATION BOUNDARY.F-A Fl.40 VT N

.DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS PAGE: 86 INSPECTION INTERVAL_

_I FIRST ASME PERIOD SEC. XI ---....CATGY NOE -ITEM NO METH 1 2 PLAN STATUS_ _SECOND THIRD PERIOD PERIOD PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION 0 U T A G E 1 2 3 1 2 REACTOR COOLANT TCX-RCPCRO-01 640060 TCX-1-3100-1CS3 TCX-RCESSG-01-S3 A23 812RB F-A Fl. 40 VT- 3 NA S.G. COLUMN SUPPORT. 1457F29.TDLR VERIFICATION BOUNDARY.2 ---X 640070 TCX-1-3100-1CS4 TCX-RCESSG-01-S4 A23 812RB F-A Fl. 40 VT-3 2--X -NA S.G. COLUMN SUPPORT. 1457F29.TDLR VERIFICATION BOUNDARY.NA S.G. LOWER LATERAL SUPPORT.1457F31. TDLR VERIFICATION BOUNDARY.640080 TCX-1-3100-1LS1 TCX-RCESSG-01-LI A23 835RB F-A F1.40 VT- 3 2 ---X -640090 TCX-1-3100-1LS2 TCX-RCESSG-01-L2 A23 835RB F-A F1.40 VT- 3 2 -X 640100 TCX-1-3100-1LS3 TCX-RCESSG-01-L3 A23 835RB F-A F1. 40 VT- 3 2 X NA S.G. LOWER LATERAL SUPPORT.1457F31. TDLR VERIFICATION BOUNDARY.NA S.G. LOWER LATERAL SUPPORT.1457F31. TDLR VERIFICATION BOUNDARY.NA S.G. UPPER LATERAL SUPPORT.1457F34. TDLR VERIFICATION BOUNDARY.NA S.G. UPPER LATERAL SUPPORT.1457F34. TDLR VERIFICATION BOUNDARY.640110 TCX-1-3100-1USI TCX-RCESSG-01-Ul A24 859RB F-A Fl .40 VT- 3 2 --X -640120 TCX-1-3100-1US2 TCX-RCESSG-01-U2 A24 859RB F-A F1. 40 VT -3 X DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS PAGE: 87 INSPECTION INTERVAL ASME SEC. XI CATGY NDE ITEM NO METH PLAN STATUS_FIRST SECOND THIRD PERIOD PERIOD PERIOD---OUTAGE-------------

1 2 1 2 3 1 2 PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**

SUMMARY

NUMBER EXAMINATION AREA IDENTIFICATION REACTOR COOLANT TCX-RCPCSG-01 640130 TCX-1-3100-1US3 TCX-RCESSG-01-U3 A24 859RB F -,A F1. 40 VT -3 2 --X 640140' TCX-1-3100-1SN1 TCX-RCESHS-01-SN1 A24 859RB F-A F1.40 VT- 3 NA S.G. UPPER LATERAL SUPPORT, 1457F35. RING. TDLR VERIFICATION BOUNDARY.NA S.G. HYD. SNUBBER. PD14856.TDLR VERIFICATION BOUNDARY.NA S.G. HYD. SNUBBER. PD14856.TDLR VERIFICATION BOUNDARY.2 -X --640150 TCX-1-3100-1SN2 TCX-RCESHS-01-SN2 A24 859RB F-A F1.40 VT- 3 2 X REACTOR COOLANT TCX-RCPCSG-02 640160 TCX-1-3100-2CS1 TCX-RCESSG-02-S1 R1551812RB F-A F1.40 VT -3 NA S.G. COLUMN SUPPORT. 1457F29.TDLR VERIFICATION BOUNDARY.2 X ----640170 TCX-1-3100-2CS2 TCX-RCESSG-02-S2 R1551812RB F-A F1.40 VT -3 X 640190 TCX-1-3100-2CS3 TCX-RCESSG-02-S3 R1551812RB F-A Fl. 40 VT- 3 NA S.G. COLUMN SUPPORT. 1457F29.TDLR VERIFICATION BOUNDARY.NA SG. COLUMN SUPPORT. 1457F29.TDLR VERIFICATION BOUNDARY.NA S.G. COLUMN SUPPORT. 1457F29.TDLR VERIFICATION BOUNDARY.2 -640200 TCX-1-3100-2CS4 TCX-RCESSG-02-S4 R1551812RB F-A F1. 40 VT- 3 x --

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS PAGE: 88 INSPECTION INTERVAL_ASME .SEC. XI CATGY NDE ITEM NO METH I PLAN STATUS-FIRST SECOND THIRD PERIOD PERIOD PERIOD PRESERVICE YEAR

SUMMARY

NUMBER EXAMINATION AREA IDENTIFICATION REACTOR COOLANT 1 2 0 U TAG 1 2 3 1 2--- ---------I INSTRUCTIONS

    • CALIBRATION BLOCK**TCX-RCPCSG-02 640210 TCX-1-3100-2LSI TCX-RCESSG-02-Ll R1551812RB F-A Fl. 40 VT -3 2 -X --NA S.G. LOWER LATERAL SUPPORT: 1457F31. TDLR VERIFICATION BOUNDARY.640220 TCX-1-3100-2LS2 TCX-RCESSG-02-L2 RI551835RB F-A F1.40 VT -3 NA S.G. LOWER LATERAL SUPPORT.X 1457F31. TDLR VERIFICATION BOUNDARY.640230 TCX-1-3100-2LS3 TCX-RCESSG-02-L3 R1551835RB F-A F1.40 VT- 3 X NA S.G. LOWER LATERAL SUPPORT.1457F31. TDLR VERIFICATION BOUNDARY.640240 TCX-1-3100-2US1 TCX-RCESSG-02-Ul RI551859RB F-A F1.40 VT -3 2 -X --NA S.G. UPPER LATERAL SUPPORT.1457F34. TDLR VERIFICATION

'BOUNDARY.

NA S.G. UPPER LATERAL SUPPORT.1457F34. TDLR VERIFICATION BOUNDARY.640250 TCX-1-3100-2US2 TCX-RCESSG-02-U2 R1551859RB F-A FI.40 VT -3 2 N 640260 TCX-1-3100-2US3 TCX-RCESSG-02-U3 RI518559RB F-A Fl. 40 VT- 3 NA S.0G. UPPERLATERAL SUPPORT.1457F35. RING. TDLR VERIFICATION BOUNDARY.640270 TCX-1-3100-2SN1 vTCX-RCESHS-02-SNI RI551859RB F-A F1. 40 VT- 3 NA S.G. HYD. SHOCK SUPRESSORS.

2 X -

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS PAGE: 89 INSPECTION INTERVAL_ASME SEC. XI CATGY NDE ITEM NO METH PLAN STATUS FIRST SECOND PERIOD PERIOD-~OUTAGE 1 2 1 2 3....................THIRD PERIOD PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK"*

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION 1 2 REACTOR COOLANT TCX-RCPCSG-02 640280 TCX-i-3100-2SN2 TCX-RCESHS-02-SN2 RI551859RB F-A VT-3 Fl.40 NA S.G. HYD. SNUBBER. PD14856.TDLR VERIFICATION BOUNDARY.2 --X --d REACTOR COOLANT TCX-RCPCSG-03 640290 TCX-i-3100-3CS1 TCX-RCESSG-03-S1 R154K812RB F-A F1.40 VT -3 NA S.G. COLUMN SUPPORT. 1457F29.TDLR VERIFICATION BOUNDARY.2 --X 640300 TCX-i-3100-3CS2 TCX-RCESSG-03-S2 RI54K812RB F-A F1.40 VT- 3 NA S.G. COLUMN SUPPORT. 1457F29.TDLR VERIFICATION BOUNDARY.2 -----X 640310. TCX-i-3100-3CS3 TCX-RCESSG-03-S3 R154K812RB F-A F1.40 VT- 3-X NA S.G. COLUMN SUPPORT. 1457F29.TDLR VERIFICATION BOUNDARY.NA S.G. COLUMN SUPPORT. 1457F29.TDLR VERIFICATION BOUNDARY.640320 TCX-1-3100-3CS4 TCX-RCESSG-03-S4 RI54K812RB F-A F1.40 VT -3 2 --X 640330 TCX-I-3100-3LSI TCX-RCESSG-03-Li R154K827RB F-A F1.40 VT- 3 2 -----X NA S.G. LOWER LATERAL SUPPORT.1457F31. TDLR VERIFICATION BOUNDARY.NA S.G. LOWER LATERAL SUPPORT.1457F31. TDLR VERIFICATION BOUNDARY.640340 TCX-l-3100-3LS2 TCX-RCESSG-03-L2 R154K827RB F-A Fl.40 VT-3 2 ----X DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS PAGE: 90 INSPECTION INTERVAL ASME SEC. XI CATGY ITEM NO FIRST PERIOD 1 2 PLAN STATUS- _PRESERVICE YEAR SECOND THIRD PERIOD PERIOD OU A E-----------


ISRCON 1 U T A G E -INSTRUCTIONS 1 2 3 1 2 I

SUMMARY

NUMBER EXAMINATION AREA IDENTIFICATION NDE METH N BLOCK*-REACTOR COOLANT TCX-RCPCSG-03 640350 TCX-1-3100-3LS3 TCX-RCESSG-03-L3 RI54K827RB F-A F1.40 VT- 3 2 -X NA S.G. LOWER LATERAL SUPPORT.1457F31. TDLR VERIFICATION BOUNDARY.640360 TCX-1-3100-3US1 TCX-RCESSG-03-Ul R154KS59RB F-A F1.40 VT ---NA S.G. UPPER LATERAL SUPPORT.1457F34. TDLR VERIFICATION BOUNDARY.640370 TCX-1-3100-3US2 TCX-RCESSG-03-U2 R154K859RB F-A Fl, 40 VT- 3 2 --X NA S.G. UPPER LATERAL SUPPORT.1457F34. TDLR VERIFICATION BOUNDARY.640380 TCX-1-3100-3US3 TCX-RCESSG-03-U3 R154K859RB F-A F1.40 VT- 3---X NA S.G. UPPER LATERAL SUPPORT.1457F35. RING. TDLR VERIFICATION BOUNDARY.640390 TCX-1-3100-3SN1 TCX-RCESHS-03-SNI RI54KB59RB 640400 TCX-1-3100-3SN2 TCX-RCESHS-03-SN2 R154K859RB F-A F1.40 VT- 3 2 --N NA S.G. HYD. SNUBBER. PD14856.TDLR VERIFICATION BOUNDARY.NA S.G. HYD. SNUBBER. PD14856.TDLR VERIFICATION BOUNDARY.F-A F1.40 VT- 3 2 -N REACTOR COOLANT TCX-RCPCSG-04 640410 TCX-1-3100-4CS1 TCX-RCESSG-04-SI A29 812RB F-A VT-3 Fl.40 NA S.G. COLUMN SUPPORT. 1457F29.TDLR VERIFICATION BOUNDARY.2 -C DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS PAGE: 91 INSPECTION INTERVAL ASME

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION


..-.---.---.------

SEC. XI CATGY ITEM NO FIRST PERIOD 1 2 PLAN STATUS SECOND THIRD PERIOD PERIOD_PRESERVICE YEAR I NDE METH 0 U T A G 1. 2 3 1 .2 V 3 INSTRUCTIONS

    • CALIBRATION BLOCK**REACTOR COOLANT TCX-RCPCSG-04 640420 TCX-1-3100-4CS2 TCX-RCESSG-04-S2 A29 812RB 640430 TCX-1-3100-4CS3 TCX-RCESSG-04-S3 A29 812RB F-A Fl. 40 F-A F1.40 F-A F1.40 VT-3 NA S.G. COLUMN SUPPORT. 1457F29.TDLR VERIFICATION BOUNDARY.2 -C VT -3 NA S.G. COLUMN SUPPORT. 1457F29.TDLR VERIFICATION BOUNDARY.2 -C 640440 TCX-1-3100-4CS4 TCX-RCESSG-04-S4 A29 812RB VT- 3 NA S.G. COLUMN SUPPORT. 1457F29.TDLR VERIFICATION BOUNDARY.2 -C 640450 TCX-1-3100-4LS1 TCX-RCESSG-04-Ll A29 835RB F-A Fl. 40 VT -3 2 -C NA S.G. LOWER LATERAL SUPPORT.1457F31. TDLR VERIFICATION BOUNDARY.640460 TCX-1-3100-4LS2 TCX-RCESSG-04-L2 A29 835RB F-A Fl. 40 VT-3 2 -C NA SG. LOWER LATERAL SUPPORT, 1457F31. TDLR VERIFICATION BOUNDARY.640470 TCX-l-3100-4LS3 TCX-RCESSG-04-L3 A29 835RB F-A Fl. 40 VT-3 2 -C NA S.G. LOWER LATERAL SUPPORT, 1457F31. TDLR VERIFICATION BOUNDARY.640480 TCX-l-3100-4US1 TCX-RCESSG-04-Ul A30 859RB F-A F1.40 VT- 3-x --NA S.G. UPPER LATERAL SUPPORT, 1457F34. TDLR VERIFICATION BOUNDARY.

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS PAGE: 92 INSPECTION INTERVAL_

__PLAN STATUS_FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI -.....CATGY NDE ------- 0 U T A G E-------ITEM NO METH 1 2 1 2 3 12 PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATIOI

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION N BLOCK--REACTOR COOLANT TCX-RCPCSG-04 640490 TCX-1-3100-4US2 TCX-RCESSG-04-U2 A30 859RB F-A VT-3 Fl. 40 2 -X --NA SOG. UPPER LATERAL SUPPORT.1457F34. TDLR VERIFICATION BOUNDARY.640500 TCX-1-3100-4US3 TCX-RCESSG-04-U3 A30 859RB F-A F1.40 VT- 3 2 -X NA S.G. UPPER LATERAL SUPPORT.1457F35. RING. TDLR VERIFICATION BOUNDARY.NA S.G. HYD. SNUBBER. PD14856.TDLR VERIFICATION BOUNDARY.640510 TCX-1-3100-4SNI TCX-RCESHS-04-SNI A30 859RB F-A F1.40 VT- 3 2 -X --640520 TCX-1-3100-4SN2 TCX-RCESHS-04-SN2 A30 859RB F-A F1.40 VT- 3 NA S.G. HYD. SNUBBER. PD14856.TDLR VERIFICATION BOUNDARY.X --REACTOR COOLANT TCX-RCPCPC-01 640530 TCX-1-5100-1P1 TCX-RCESPC-01-Pl R154H812RB F-A VT-3 F1.40 2 C -NA RC PUMP COLUMN SUPPORTS.1457F29. TDLR VERIFICATION BOUNDARY.640540 TCX-I-5100-1P2-TCX-RCESPC-01-P2 R154HS12RB F-A FI.40 VT -3 2 C NA RC PUMP COLUMN SUPPORTS.1457F29. TDLR VERIFICATION BOUNDARY.640550 TCX-1-5100-1P3 TCX-RCESPC-01-P3 R154HS12RB F-A Fl. 40 VT- 3 2 C NA RC PUMP COLUMN SUPPORTS.1457F29. TDLR VERIFICATION BOUNDARY.

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS PAGE: 93 INSPECTION INTERVAL_ASME SEC. XI CATGY NDE ITEM NO METH I PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD PRESERVICE YEAR* INSTRUCTIONS

    • CALIBRATION BLOCK**

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION 1 2 10 U T A 0 E --1 23 1 2 REACTOR COOLANT TCX-RCPCPC-01 640560 TCX-1-5100-1T1 TCX-RCESPC-01-Tl R154BS30RB F-A F1.40 VT- 3 NA RC PUMP TIE RODS. 1457F33.TDLR VERIFICATION BOUNDARY.2 C 640570 TCX-1-5100-1T2 TCX-RCESPC-01-T2 R154H830RB F-A Fl.40 VT- 3 NA RC PUMP TIE RODS. 1457F33.TDLR VERIFICATION BOUNDARY.2 C -640580 TCX-1-5100-1T3 TCX-RCESPC-01-T3 RI54H83ORB SF.ACTnR F-A F1.40 VT-3 NA RC PUMP TIE RODS. 1457F33.TDLR VERIFICATION BOUNDARY.2 C -TCX-RCpCPC-fl2 REACTOR COOLANT TCX-RCPCPC-02 640590 TCX-1-5100-2P1 TCX-RCESPC-02-PI A25 812RB 640600 TCX-1L5100-2P2 TCX-RCESPC-02-P2 A25 812RB F-A F1.40 F-A FP. 40 F-A FP .40 VT -3 2 X VT- 3 2 -X NA RC PUMP COLUMN SUPPORTS.1457F29. TDLR VERIFICATION BOUNDARY.NA RC PUMP COLUMN SUPPORTS.1457F29. TDLR VERIFICATION BOUNDARY.NA RC PUMP COLUMN SUPPORTS.1457F29. TDLR VERIFICATION BOUNDARY.NA RC PUMP TIE RODS. 1457F33.TDLR VERIFICATION BOUNDARY.640610 TCX-1-5100-2P3 TCX-RCESPC-02-P3 A25 812RB VT -3 2 --X 640620 TCX-1-5100-2T1 TCX-RCESPC-02-Tl A25 830RB F-A F1.40 VT-3 2 -x DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS PAGE: 94 INSPECTION INTERVAL ASME SEC. XI CATGY NDE ITEM NO METH FIRST PERIOD 1 2 PLAN STATUS SECOND PERIOD OUTAGE 1 23 THIRD PERIOD 1 2 PRESERVICE YEAR'INSTRUCTIONS

    • CALIBRATION BLOCK**

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION REACTOR COOLANT TCX-RCPCPC-02 640630 TCX-1-5100-2T2 TCX-RCESPC-02-T2 A25 83DRB F-A F1.40 VT- 3 NA RC PUMP TIE RODS. 1457F33.TDLR VERIFICATION BOUNDARY.2 -X I 640640 TCX-1-5100-2T3 TCX-RCESPC-02-T3 A25 830RB F-A F1.40 VT- 3 2 -NA RC PUMP TIE RODS. 1457F33.TDLR VERIFICATION BOUNDARY.----X RFAC'Tfl CflfT.ANT TCX-RCPCPC-03 REACTOR COOLANT TCX-RCPrPr-nl 640650 TCX-1-5100-3P1 TCX-RCESPC-03-Pl RI55J812RB F-A Fl. 40 VT- 3 2 -X -NA RC PUMP COLUMN SUPPORTS.1457F29. TDLR VERIFICATION BOUNDARY.640660 TCX-l-5100-3P2 TCX-RCESPC-03-p2 R155J812RB F-A Fl. 40 VT- 3 2 -X NA RC PUMP COLUMN SUPPORTS.1457F29. TDLR VERIFICATION BOUNDARY.NA RC PUMP COLUMN SUPPORTS.1457F29. TDLR VERIFICATION BOUNDARY.640670 TCX-l-5100-3P3 TCX-RCESPC-03-P3 R15SJ812RB F-A F1.40 VT -3 2 -X 640680 TCX-l-5100-3T1 TCX-RCESPC-03-Tl R155J830RB F-A I. 40 VT- 3 NA RC PUMP TIE RODS. 1457F33.TDLR VERIFICATION BOUNDARY.2 X ---640690 TCX-1-5100-3T2 TCX-RCESPC-03-T2 R155J83ORB F-A VT- 3 Fl.40 NA RC PUMP TIE RODS. 1457F33.TDLR VERIFICATION BOUNDARY.X -

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS PAGE: 95 INSPECTION INTERVAL_ASME SEC. XI CATGY NDE F ITEM NO METH I PLAN STATUS _ PRESERVICE YEAR FIRST SECOND THIRD PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION 1 2 OUTAGE----


1 2 3 1 2 INSTRUCTIONS

    • CALIBRATION BLOCK**640700 REACTOR COOLANT TCX-RCPCPC-03 TCX-1-5100-3T3 TCX-RCESPC-03-T3 RI55J830RB REACTOR COOLANT TCX-RCPCPC-04 F-A VT-3 F1.40 NA RC PUMP TIE RODS. 1457F33.TDLR VERIFICATION BOUNDARY.2 X -640710 TCX-1-5100-4P1 TCX-RCESPC-04-Pl RI55K812RB F-A Fl.40 VT- 3 2 -C NA RC PUMP COLUMN SUPPORTS.1457F29. TDLR VERIFICATION BOUNDARY.640720 TCX-1-5100-4P2 TCX-RCESPC-04-P2 R155KB12RB F-A Fl.40 VT- 3 2 -C NA RC PUMP COLUMN SUPPORTS.1457F29. TDLR VERIFICATION BOUNDARY.640730 TCX-1-5100-4P3 TCX-RCESPC-04-P3 RI55K812RB F-A F1.40 VT -3 2 -C NA RC PUMP COLUMN SUPPORTS.1457F29. TDLR VERIFICATION BOUNDARY.640740 TCX-1-5100-4T1 TCX-RCESPC-04-TI R155KB30RB F-A F1.40 VT- 3 NA RC PUMP TIE RODS. 1457F33.TDLR VERIFICATION BOUNDARY.2 -C 640750 TCX-1-5100-4T2 TCX-RCESPC-04-T2 RI55K83ORB F-A Fl. 40 VT- 3 NA RC PUMP TIE RODS. 1457F33.TDLR VERIFICATION BOUNDARY.2 -C 640760 TCX-1-5100-4T3 TCX-RCESPC-04-T3 R155K830RB F-A Fl.40 VT-3 NA RC PUMP TIE RODS. 1457F33.TDLR VERIFICATION BOUNDARY.2 -C PAGE: 96 DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_ASME SEC. XI CATGY NDE ITEM NO METH PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD--- ------------------PRESERVICE YEAR INSTRUCTIONS I **CALIBRATION BLOCK**1

SUMMARY

NUMBER EXAMINATION AREA IDENTIFICATION 1 2 1 2 3 1 2 REACTOR COOLANT TCX-RCPCPR-01 640770 TCX-1-2100-USI TCX-RCESPR-01-Wl RI61A905RB F-A VT-3 F1.40 2 -C NA PRESSURIZER UPPER LATERAL SUPPORTS.

1457F36. TDLR VERIFICATION..

BOUNDARY.640780 TCX-1-2100-US2 TCX-RCESPR-01-W2 RlGIA905RB F-A Fl.40 VT- 3 2 -C NA PRESSURIZER UPPER LATERAL SUPPORTS.

1457F36. TDLR VERIFICATION BOUNDARY.640790 TCX-1-2100-US3 TCX-RCESPR-01-W3 R161A905RB F-A Fl. 40 VT- 3 2 -C NA PRESSURIZER UPPER LATERAL SUPPORTS.

1457F36. TDLR VERIFICATION BOUNDARY.640800 TCX-1-2100-US4 TCX-RCESPR-01-W4 1 RIlA9OERP F-A Fl. 40 VT- 3 2 -C NA PRESSURIZER UPPER LATERAL SUPPORTS.

1457F36. TDLR VERIFICATION BOUNDARY.640810 TCX-1-2100-LS1 TCX-RCESPR-01 RI61A905RB F-A Fl. 40 VT- 3 NA PRESSURIZER LOWER SUPPORT.TDLR VERIFICATION BOUNDARY.2 -C SAFETY INJECTION 2-SI-2-059-2501R-I 640830 TCX-1-4108-MR2 I CP2-SISSMR-02 R154A820RB F-A VT-3 FI...40 NA MOMENT RESTRAINT.

Sl-0538-11 2 C -SAFETY INJECTION 6-SI-2-101-2501R-1 640840 TCX-1-4203-MR3 CP2-SISSMR-03 R154B823RB F-A VT-3 F1.40 NA MOMENT RESTRAINT.

SI-0538-06 X -

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS PAGE: 97 INSPECTION INTERVAL

SUMMARY

NUMBER EXAMINATION AREA IDENTIFICATION

.......................

ASME SEC. XI CATGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND THIRD PERIOD PERIOD OUTAGE-------------

1 2 3 1 2 PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**1 2 SAFETY INJECTION 8-SI-2-090-2501R-1 640870 TCX-1-4202-MR6 CP2-SISSMR-06 R154B820RB F-A F1.40 VT- 3 NA MOMENT RESTRAINT.

Sl-0538-03 2 -X ---SAFETY INJECTION 3-SI-2-303-2501R-1 640900 TCX-1-4600-MR9 CP2-SISSMR-09 R154A808RB F-A F1.40 VT- 3 NA MOMENT RESTRAINT.

S1-0538-13 2 -C DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS PAGE: 98 INSPECTION INTERVAL __PLAN STATUS FIRST SECOND THIRD ASME I PERIOD PERIOD PERIOD PRESERVICE YEAR

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION SEC. XI CATGY NDE 1/2. -ITEM NO METH 1 2-----------


I OUTAGE1--1 23 1 2-I INSTRUCTIONS

    • CALIBRATION BLOCK**CHEMICAL & VOLUME CONTROL 4-CS-2-076-2501R-2 652900 TCX-2-2569-H5 CS-2-076-402-A42R 818AB F-A Fl. 20 VT- 3 NA STRUT 2 ----X -653300 TCX-2-2569-H1 CS-2-076-407-A42K 818AB F-A F1.20 VT -3 NA SNUBBER 2 -X -MICAL & -- --- 4-C-2-8-2-1-2 653400 TCX-2-2570-H1 F-A VT-3 CS-2-085-402-A42S F1.20 2 C R194 818AB CHEMICAL & VOLUME CONTROL 4-CS-2-346-2501R-2 NA SPRING 655400 TCX-2-2570-Hll CS-2-346-401-A42R R200 816AB F-A F1.20 VT- 3 NA STRUT 2 C -CHEMICAL & VOLUME CONTROL 3 CS-2-628-2501R-2 655600 TCX-2-2569-H7 CS-0-628-402-A42K 819AB CHEMICAL & VOLUME CONTROL 3 F-A FI. 20 VT-3 NA SNUBBER 2 -X -CS-2-629-2501R-2 655700 TCX-2-2570-H7 CS-2-629-700-A42R R202 818AB F-A VT-3 Fl.20 NA STRUT 2 C -

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS PAGE: 99 INSPECTION INTERVAL I FIRST PERIOD PLAN STATUS SECOND PERIOD ASME SEC. XI CATGY NDE ITEM NO METH

SUMMARY

NUMBER EXAMINATION AREA IDENTIFICATION I g i-~OUTAGE 1 2 1 2. 3-----------.-.---------

THIRD PERIOD 12 PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**CHEMICAL & VOLUME CONTROL 2-CS-2-086-2501R-2 655800 TCX-2-2570-H9 CS-2-AB-071-004-2 R202 818AB F-A F1,20 VT- 3 NA SNUBBER 2C 655900 TCX-2-2570-H8 CS-2-AB-071-005-2 R202 818AB F-A F1. 20 VT- 3 NA SPRING 2 C -CONTAINMENT SPRAY 16-CT-2-002-151R-2 656500 TCX-2-2536-HI CT-2-002-402-S22K 788SB 656550 TCX-2-2536-HI CT-2-002-402-S22K 788SB F-A VT-3 F1.26 C-C' PT C3.20 NA SNUBBER'2 -X 92 WELDED ATTACHMENT 2 --x -CONTAINMENT SPRAY 16-CT-2-002-151R-2 656800 TCX-2-25,75-HI CT-2-003-401-S32A 802SB F-A Fl. 20 VT-3 NA BOX 2--X 656850 TCX-2-2575-Hl CT-2-003-401-S32A 802SB C-C C3 .20 PT 92 WELDED ATTACHMENT 2 -x DATE: 01/21/0B COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS PAGE; 100 INSPECTION INTERVAL_ASME SEC. XI CATGY NDE ITEM NO METH_ _ PLAN STATUS_ _ PRESERVICE YEAR FIRST SECOND THIRD PERIOD PERIOD PERIOD-OUTAGE---


ISRC ON 1 U T A G E 2 -C-INSTRUCTIONS 1 2 1 2 3 1 2 **CALIBRATION BLOCK**---------. ------.- -.- --------.- -.- --------------

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION CONTAINMENT SPRAY 16-CT-2-003-151R-2 656900 TCX-2-2575-H5 CT-2-003-402-S32R 802SB 657000 TCX-2-2575-H7 CT-2-003-403-S32R 802SB 657100 TCX-2-2575-H6 CT-2-003-404-S32R 802SB 657200 TCX-2-2575-H8 CT-2-003-405-S32S B02SB F-A F1.20 VT -3 NA STRUT 2 X --F-A Fl. 20 VT- 3 NA STRUT 2 -X F-A F1.20 VT- 3 NA STRUT 2 ---X F-A Fl. 20 VT- 3 NA SPRING 2--X 657300 TCX-2-2575-H9 CT-2-003-406-S32R 800SB F-A Fl. 20 VT- 3 NA STRUT-X --657400 TCX-2-2575-H10 CT-2-003-407-S32R 793SB F-A Fl. 20 VT -3 NA STRUT X CONTAINMENT SPRAY I6-CT-2-004-151R-2 657500 TCX-2-2577-H5 CT-2-004-401-S32R 792SB F-A VT-3 Fl. 20 NA STRUT 2 -X DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS PAGE: 101 INSPECTION INTERVAL ASME SEC. XI CATGY NDE ITEM NO METH-___ PLAN STATUS_ _FIRST SECOND THIRD PERIOD PERIOD PERIOD--OUTAGE-------------

1 2 1 2 3 1 2---------. -------. .7.- -------PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION CONTAINMENT SPRAY 12-CT-2-005-151R-2 657900 TCX-2-2576-HS CT-2-005-404-S22K 785SB 658300 TCX-2-2576-HI CT-2-005-408-S22S 780SB F-A VT-3 NA SNUBBER Fl. 20 F-A F1.20 2 -X VT- 3 NA SPRING 2 ---X 658350 TCX-2-2576-H1 CT-2-005-408-$22S 780SB C-C C3 .20 PT 92 WELDED ATTACHMENT 2 ---X --CONTAINMENT SPRAY '12-CT-2-006-151R-2 658800 TCX-2-2576-H2 CT-2-006-407-S22S 779SB F-A F1.20 VT-3 NA SPRING X --658850 TCX-2-2576-H2 CT-2-006-407-S22S 779SB C-C C3 .20 PT 92 WELDED ATTACHMENT 2-X CONTAINMENT SPRAY 12-CT-2-007-151R-2 659400 TCX-2-2578-H12 CT-2-007-406-S22R 781SB F-A VT-3 F1.20 NA STRUT 2 X DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS PAGE: 102 INSPECTION INTERVAL I l PLAN STATUS FIRST SECOND PERIOD PERIOD THIRD PERIOD ASME SEC. XI CATGY NDE ITEM NO METH

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION 1 2--OUTAGE---------------

1 2 3 1 2 PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**CONTAINMENT SPRAY 12-CT-2-007-151R-2 659600 TCX-2-2578-H14 CT-2-007-408-S22R 781SB F-A VT-3 F1.20 NA STRUT 2 X CONTAINMENT SPRAY 12-CT-2-008-151R-2 659700 TCX-2-2578-HI CT-2-008-401-$22S 779SB F-A VT-3 Fl. 20 NA SPRING 2 ---X 659750 TCX-2-2578-HI CT-2-008-401-S22S 779SB C-C C3 .20 PT 92 WELDED ATTACHMENT 2 -X 662200 CONTAINMENT SPRAY 16-CT-2-013-301R-2 TCX-2-2571-HI5 F-A CT-2-013-408-S42K F1.20 818SB CONTAINMENT SPRAY 16-CT-2-025-301R-2 VT- 3 NA SNUBBER 2 --X 664640 TCX-2-2539-H2 CT-2-025-401-S22R R62E 785SB 664670 TCX-2-2539-H5 CT-2-025-402-S22S R62E 785SB F-A Fl. 20 VT- 3 NA HANGER X F-A F1. 20 VT -3 NA HANGER 2 -X --

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS PAGE: 103 INSPECTION INTERVAL_ASME SEC. XI CATGY NDE ITEM NO METH PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD-- --T A E----I I I I PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION 12 1 2 3 1 2 1 FEEDWATER 18-FW-2-017-1303-2 666000 TCX-2-2301-H3 FW-2-017-446-C72R RI55N888 RB F-A Fl. 20 VT- 3 X NA STRUT. TDLR VERIFICATION BOUNDARY 92 WELDED ATTACHMENT 666050 TCX-2-2301-H3 FW-2-017-446-C72R R155N8BBRB C-C C3 .20 MT 2 -X ----666100 TCX-2-2301-H13 FW-2-017-450-C72S 888RB F-A Fl. 20 VT- 3 NA SPRING. TDLR VERIFICATION BOUNDARY 2 -----X 666200 TCX-2-2301-HI2 FW-2-0i7-451-C72R 888RB F-A P1.20 VT- 3 NA STRUT. TDLR VERIFICATION BOUNDARY 2 X 666300 TCX-2-2301-Hll FW-2-017-453-C62R 87 ORB F-A F1.20 VT- 3 NA STRUT. TDLR VERIFICATION BOUNDARY 2 -----X 666400 TCX-2-2301-H5 FW-2-017-454-C52K RIS5N856RB F-A F1.20 VT -3 NA SNUBBER. TDLR VERIFICATION BOUNDARY 2 X 666450 TCX-2-2301-H5 FW-2-017-454-C52K R155NB56RB C-C C3 .20 MT 92 WELDED ATTACHMENT 2 -X -

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS PAGE: 104 INSPECTION INTERVAL ASME SEC. XI

SUMMARY

EXAMINATION AREA CATGY NDE NUMBER IDENTIFICATION ITEM NO METH PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD---OUTAGE-------------

1 2 1 2 3 1 2 PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**FEEDWATER 18-FW-2-017-1303-2 666500 TCX-2-2301-HI0 FW-2-017-456-C52R 856RB F-A VT-3 F1.20 NA STRUT. TDLR VERIFICATION BOUNDARY 2---X 666600 TCX-2-2301-H24 FW-2-017-700-C42K 827RB F-A F1.20 VT-3 NA SNUBBER. TDLR VERIFICATION

'BOUNDARY 2 -X 666700 TCX-2-2301-Hl FW-2-017-701-C52R RI5SN849RB F-A F1.20 VT-3 NA HANGER. TDLR VERIFICATION BOUNDARY 2 -X ---666750 TCX-2-2301-Hl FW-2-017-701-C52R R15SN849RB 666800 TCX-2-2301-H14 FW-2-017-702-C72R 888RB C-C MT 92 WELDED ATTACHMENT C3. 20 F-A Fl. 20 2 X VT- 3 NA STRUT. TDLR VERIFICATION BOUNDARY 2 -666900 TCX-2-2301-H4 FW-2-017-703-C62R R155N873RB 666950 TCX-2-2301-H4 FWM-2-017-703-C62R R155N873RB F-A Fl. 20 VT- 3 NA STRUT. TDLR VERIFICATION BOUNDARY C-C MT C3.20 92. WELDED ATTACHMENT X -

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS PAGE: 105 INSPECTION INTERVAL ASME SEC. XI CATGY NDE ITEM NO METH PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD--OUTAGE-------------

1 2 1 2 3 1 2 PRESERVICE YEAR I INSTRUCTIONS i **CALIBRATION BLOCK**

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION FEEDWATER 18-FW-2-017-1303-2 667000 TCX-2-2301-HI5 FW-2-017-704-C72R 888RB F-A F1.20 VT -3 NA STRUT. TDLR VERIFICATION BOUNDARY 2 -----X 667100 TCX-2-2301-H20 FW-2-017-705-C72R 888RB FEEDWATER 18-FW-2-018-1303-2 F-A Fl. 20 VT -3 NA STRUT. TDLR VERIFICATION BOUNDARY 2 ---X 667400 TCX-2-2202-H6 FW-2-018-434-CS2R R15SL856RB F-A F1.20 VT -3 NA STRUT. TDLR VERIFICATION BOUNDARY 2 --X -667500 TCX-2-2201-H4 FW-2-018-441-C72R R155N888RB F-A F1.20 VT-3 NA STRUT. TDLR VERIFICATION BOUNDARY 2 X 667550 TCX-2-2201-H4 FW-2-018-441iC72R RI55N888RB C-C C3.20 MT 92 WELDED ATTACHMENT 2 X --667600 TCX-2-2201-H9 FW-2-018-443-C72R R155N8OBRB F-A F1 .20 VT -3 NA STRUT. TDLR VERIFICATION BOUNDARY 2 -X 667800 TCX-2-2201-HIO FW-2-018-445-C72R R155N888RB F-A Fl .20 VT- 3 NA STRUT. TDLR VERIFICATION BOUNDARY X DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS PAGE: 106 INSPECTION INTERVAL -PLAN STATUS _ PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. xI -------------


CATGY NDE -----------

O U T A G E- -- ------ INSTRUCTIONS ITEM NO METH 1 2 1 2 3 1 2 **CALIBRATION BLOCK**

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION FEEDWATER 18-FW-2-018-1303-2 667900 TCX-2-2201-H3 FW-2-018-446-C72R R15SN888RB F-A F1.20 VT- 3 NA STRUT. TDLR VERIFICATION BOUNDARY 2 -X 667950 TCX-2-2201-H3 FW-2-018-446-C72R R155N888RB C-C C3.20 MT 92 WELDED ATTACHMENT.

TDLR VERIFICATION BOUNDARY.2 -X --668000 TCX-2-2201-HN1 FW-2-018-447-C72R R155N888RB F-A Fl. 20 VT- 3 NA 'STRUT. TDLR VERIFICATION BOUNDARY 2 -X 668100 TCX-2-2201-H2 FW-2-018-448-C72K R155N888RB F-A F1.20 VT -3 NA SNUBBER. TDLR VERIFICATION BOUNDARY 2- -X 668150 TCX-2-2201-H2 FW-2-018-448-C72K RI55N888RB C-C C3 .20 MT X --668200 TCX-2-2201-H12 FW-2-018-449-C72R RI55N888RB F-A F1.20 VT-3 92 WELDED ATTACHMENT.

TDLR VERIFICATION BOUNDARY.NA STRUT. TDLR VERIFICATION BOUNDARY NA STRUT. TDLR VERIFICATION BOUNDARY X 668400 TCX-2-2201-H14 FW-2-018-452-C52R R154J859RB F-A Fl. 20 VT -3 2 X --

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS PAGE: 107 INSPECTION INTERVAL_ASME SEC. XI CATGY NDE ITEM NO METH FIRST PERIOD 1 2 PLAN STATUS -_PRESERVICE YEAR SECOND THIRD I PERIOD PERIOD I

SUMMARY

NUMBER EXAMINATION AREA IDENTIFICATION O U TAG 1 2 3 E ---1 21 INSTRUCTIONS

    • CALIBRATION BLOCK**FEEDWATER 18-FW-2-018-1303-2 668500 TCX-2-2201-H15 FW-2-018-453-C52R R154J856RB F-A Fl. 20 VT-3 NA STRUT. TDLR VERIFICATION 2- X BOUNDARY 668600 TCX-2-2201-H17 FW-2-018-456-C52R R154J834RB F-A F1.20 VT-3 NA STRUT. TDLR VERIFICATION BOUNDARY X ---668700 TCX-2-2201-HI9 FW-2-018-457-C42S R154J827RB F-A F1.20 VT- 3 NA SPRING. TDLR VERIFICATION BOUNDARY 2 -X -668800 TCX-2-2201-H1 FW-2-018-458-C42K R154J828RB F-A F1.20 VT -3 NA SNUBBER. TDLR VERIFICATION BOUNDARY 2 -X -668850 TCX-2-2201-H1 FW-2-018-458-C42K R154J828RB C-C C3 .20 MT 92 WELDED ATTACHMENT.

TDLR VERIFICATION BOUNDARY.2 -X 668900 TCX-2-2201-H16 FW-2-018-700-C52R Ri54JB55RB F-A VT-3 Fl. 20 NA STRUT. TDLR VERIFICATION BOUNDARY 2 -X 669000 TCX-2-2201-H7 FW-2-018-703-C72R RI55N882RB F-A FP .20 VT- 3 NA STRUT. TDLR VERIFICATION BOUNDARY 2 -X -

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS PAGE: 108 INSPECTION INTERVAL PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD PRESERVICE YEAR ASME SEC. XI CATGY- NOE ITEM NO METH

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION

--OUTAGE----

1 2 1 2 3 1 2---INSTRUCTIONS

    • CALIBRATION BLOCK**FEEDWATER 18-FW-2-018-1303-2 669100 TCX-2-2201-H5 FW-2-018-704-CG2R R155N866RB F-A F1.20 VT -3 2 --x --NA STRUT. TDLR VERIFICATION BOUNDARY 92 WELDED ATTACHMENT.

TDLR VERIFICATION BOUNDARY.669150 TCX-2-2201-H5 FW-2-0018-704-C62R RI55N866RB C-C C3 .20 MT 2 -X --FEEDWATER 18-FW-2-019-1303-2 669200 TCX-2-2101-H12 FW-2-019-401-C42S RI00AB27RB F-A Fl. 20 VT-3 NA SPRING. TDLR VERIFICATION BOUNDARY 2 C -669300 TCX-2-2101-H8 FW-2-0i9-402-C52S R1541856RB 669400 TCX-2-2101-Hl FW-2-019-404-C42K R1541827RB F-A Fl. 20 F-A F£. 20 C-C C3 .20 VT- 3 NA SPRING. TDLR VERIFICATION BOUNDARY 2 C VT- 3 NA SNUBBER. TDLR VERIFICATION BOUNDARY 2 C 669450 TCX-2-2101-Hl FW-2-019-404-C42K R1541827RB MT 92 WELDED ATTACHMENT.

TDLR VERIFICATION BOUNDARY.2 C 669500 TCX-2-2101-H7 FW-2-019-405-C52K R1541856RB F-A Fl. 20 VT -3 NA SNUBBER. TDLR VERIFICATION BOUNDARY 2 C -

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS PAGE: 109 INSPECTION INTERVAL PLAN STATUS_FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI j------------

OUTAG----.-----------

CATGY NDE T .......-H U T A G E 12....ITEM NO METH 1 2 1 2 3 1 2------. -.-----.- .- .- .- .- .- ------.- --.- -----.- ----.- ---PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**

SUMMARY

NUMBER EXAMINATION AREA IDENTIFICATION FEEDWATER 18-FW-2-019-1303-2 669600 TCX-2-2101-H2 FW-2-019-406-C52R RI0OA85ORB F-A F1.20 VT- 3 NA STRUT. TDLR VERIFICATION BOUNDARY 2 C 669650 TCX-2-2101-H2 FW-2-019-406-C52R R154185ORB C-C C3 .20 MT 92 WELDED ATTACHMENT.

TDLR VERIFICATION BOUNDARY.2 C -669700 TCX-2-2101-H6 FW-2-019-408-S62R R100A856SB F-A Fl. 20 VT- 3 NA STRUT. TDLR VERIFICATION BOUNDARY 2 C -669800 TCX-2-2101-HIO FW-2-019-411-C42K R1541827RB F-A Fl. 20 VT -3 NA SNUBBER. TDLR VERIFICATION BOUNDARY 2 C -669900 TCX-2-2101-Hl1 FW-2-019-412-C42K R1541828RB F-A F1.20 VT- 3 NA SNUBBER. TDLR VERIFICATION BOUNDARY 2 C FEEDWATER 18-FW-2-020-1303-2 670000 TCX-2-2401-Hl FW-2-020-403-C42K 827RB F-A F1. 20 VT- 3 X NA SNUBBER. TDLR VERIFICATION BOUNDARY NA SPRING. TDLR VERIFICATION BOUNDARY 670010 TCX-2-2401-H7 FW-2-020-402-C52S 827RB F-A F1.20 VT- 3 2 2 X DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS PAGE: 110 INSPECTION INTERVAL PLAN STATUS _PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI ---------------

I CATGY NDE -----------

O U T A G E ----------INSTRUCTIONS ITEM NO METH 1 2 1 2 3 1 2 **CALIBRATION BLOCK**-----. -. ----. ----. .---. --. ---. ---------. .- ---i --------------------

SUMMARY

NUMBER EXAMINATION AREA IDENTIFICATION FEEDWATER 18-FW-2-020-1303-2 670050 TCX-2-2401-HN FW-2-020-403-C42K 827RB C-C C3.20 MT 2 -X -670100 TCX-2-2401-Hll FW-2-020-410-C42S 827RB F-A Fl. 20 VT -3 2--X 92 WELDED ATTACHMENT.

TDLR VERIFICATION BOUNDARY.NA SPRING. TDLR VERIFICATION BOUNDARY NA SNUBBER. TDLR VERIFICATION BOUNDARY NA STRUT. TDLR VERIFICATION BOUNDARY.670110 TCX-2-2401-H8 FW-2-020-407-C52K 827RB F-A F1.20 VT- 3 2 -x 670200 TCX-2-2401-H6 FW-2-020-413-S62R 856CRB F-A F1.20 VT- 3 2 -X 670300 TCX-2-2401-H2 FW-2-020-700-C52R 842RB F-A F£. 20 VT- 3 NA STRUT. TDLR VERIFICATION BOUNDARY 2 X 670350 TCX-2-2401-H2 FW-2-020-700-C52R 842RB C-C C3 .20 MT 2 X 92 WELDED ATTACHMENT.

TDLR VERIFICATION BOUNDARY.NA SNUBBER. TDLR VERIFICATION BOUNDARY 670400 TCX-2-2401-H1O FW-2-020-701-C42K 830RB F-A F1. 20 VT-3*/ -

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS PAGE: ill INSPECTION INTERVAL_ASME SEC. XI CATGY NDE ITEM NO METN PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD PRESERVICE YEAR INSTRUCTIONS

--CALIBRATION BLOCK**

SUMMARY

NUMBER EXAMINATION AREA IDENTIFICATION 1 2 OUTAGE-----------

1 23 1 2 FEEDWATER 6-FW-2-095-1303-2 671900 TCX-2-2103-H7 FW-2-095-401-C62R R15SL64RB F-A F1.20 VT- 3 NA STRUT. TDLR VERIFICATION BOUNDARY 2 C -672000 TCX-2-2103-H6 FW-2-095-401-S62R RI008 70SB F-A F1.20 VT -3 NA STRUT. TDLR VERIFICATION BOUNDARY 2 C -672100 TCX-2-2102-H8 FW-2-095-402-C62R 867RB F-A Fl. 20 VT- 3 NA STRUT. TDLR VERIFICATION BOUNDARY 2 ---X --672400 TCX-2-2103-H3 FW-2-095-404-S62R RI0B863SB F-A F1.20 VT- 3 NA STRUT. TDLR VERIFICATION BOUNDARY 2 C -672500 TCX-2-2102-H13 FW-2-095-405-C62S 871RB F-A *VT-3 Fl.20 NA SPRING.6 TDLR VERIFICATION BOUNDARY 2 -X 672600 TCX-2-2102-H15 FW-2-095-408-C62S 871RB F-A Fl. 20 VT- 3 2 -X NA STANCHION.

TDLR VERIFICATION BOUNDARY NA STRUT. TDLR VERIFICATION BOUNDARY 672700 TCX-2-2102-H17 FW-2-095-410-C62R 8666RB F-A F1. 20 VT- 3 2 -X DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS PAGE: 112 INSPECTION INTERVAL_ASME SEC. XI CATGY NDE ITEM NO METH.PLAN STATUS _PRESERVICE YEAR FIRST SECOND THIRD PERIOD PERIOD PERIOD-OUTAGE- -------------------------

ISRCIN 1 U T A G E 2 -CA INSTRUCTIONS 1 2 1 2 3 1 2 -*CALIBRATION BLOCK**

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION FEEDWATER 6-FW-2-095-1303-2 672800 TCX-2-2102-H20 FW-2-095-411-C62K 862RB F-A Fl1 20 VT- 3 2 --X NA SNUBBER. TDLR VERIFICATION BOUNDARY NA SNUBBER. TDLR VERIFICATION BOUNDARY 672900 TCX-2-2102-H19 FW-2-095-412-C62K 863RB F-A F1.20 VT -3 2 ---X 673000 TCX-2-2102-HI FW-2-095-413-C62S 869RB F-A F1.20 VT -3 NA SPRING. TDLR VERIFICATION BOUNDARY 2 -X 673050 TCX-2-2102-H1 FW-2-095-413-C62S 869RB C-C C3 .20 MT 92 WELDED ATTACHMENT.

TDLR VERIFICATION BOUNDARY.-X 673100 TCX-2-2102-H16 FW-2-095-414-C62K 867RB 673200 TCX-2-2102-Hl8 FW-2-095-415-C62K 865RB F-A F1. 20 VT- 3 2--X -NA SNUBBER. TDLR VERIFICATION BOUNDARY NA SNUBBER. TDLR VERIFICATION BOUNDARY F-A VT-3 F1.20 2-X 673300 TCX-2-2102-HI4 FW-2-095-702-C62K 871RB F-A F1.20 VT- 3 NA SNUBBER. TDLR VERIFICATION BOUNDARY 2 -

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS PAGE: 113 INSPECTION INTERVAL ASME SEC. XI CATGY NDE ITEM NO METH FIRST PERIOD 1 2 PLAN STATUS SECOND THIRD PERIOD PERIOD-OUTAGE --------------

1 2 3 1 2_PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION FEEDWATER 6IFWt2-095-1303-2 673400 TCX-2-2102-Hll FW-2-095-703-C62R 869RB F-A Fl .20 VT-3 NA STRUT. TDLR VERIFICATION BOUNDARY 2 ---X 673500 TCX-2-2102-HI0 FW-2-095-704-C62K 867RB F-A Fl. 20 VT- 3 NA SNUBBER. TDLR VERIFICATION BOUNDARY 2 --X 673600 TCX-2-2103-H8 FW-2-095-705-C62K RI55L865RB F-A F£. 20 VT -3 NA SNUBBER. TDLR VERIFICATION BOUNDARY 2 -X --FEEDWATER A-FW-2-096-1I03-2 673700 TCX-2-2203-H25 FW-2-096-402-C62K 866RB F-A Fl. 20 VT- 3 NA SNUBBER. TDLR VERIFICATION BOUNDARY 2 -X X 673800 TCX-2-2203-H23 FW-2-096-403-C62K 866RB F-A Fl. 20 VT -3 NA SNUBBER. TDLR VERIFICATION BOUNDARY 2---X -673900 TCX-2-2203-121 FW-2-096-407-C62S 86BRB F-A F1.20 VT- 3 NA SPRING. TDLR VERIFICATION BOUNDARY 674000 TCX-2-2203-H18 FW-2-096-409-C62K 869RB F-A Fl. 20 VT -3 NA SNUBBER. TDLR VERIFICATION BOUNDARY X DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS PAGE: 114 INSPECTION INTERVAL ASME SEC. XI CATGY NDE ITEM NO METH PLAN STATUS FIRST SECOND PERIOD PERIOD-~OUTAGE 1 *2 1 2 3-----------.-.---------

THIRD PERIOD PRESERVICE YEAR I.-- I-I INSTRUCTIONS I **CALIBRATIOl

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION


.-.---------------

1 2 N BLOCK--FEEDWATER 6-FW-2-096-1303-2 674100 TCX-2-2203-H19 FW-2-096-410-C62R 869RB F-A F1.20 VT- 3 2 -X NA STRUT. TDLR VERIFICATION BOUNDARY NA STRUT. TDLR VERIFICATiON BOUNDARY 674200 TCX-2-2203-H14 FW-2-096-416-C62R 880RB F-A F1.20 VT-3 2 ---X 674350 TCX-2-2203-H4 FW-2-096-422-C62R 880RB C-C C3 .20 MT 92

  • WELDED ATTACHMENT.

TDLR VERIFICATION BOUNDARY.2--X -674400 TCX-2-2203-H12 FW-2-096-423-C62R 88ORB F-A F1.20 VT- 3 NA STRUT. TDLR VERIFICATION BOUNDARY, 2 -674500 TCX-2-2203-H11 FW-2-096-424-C62R B8ORB F-A F1. 20 VT- 3 X i NA STRUT. TDLR VERIFICATION BOUNDARY 92 WELDED ATTACHMENT.

TDLR VERIFICATION BOUNDARY.674650 TCX-2-2203-H3 FW-2-096-428-C62R 874RB C-C C3 .20 MT 2 X 674700 TCX-2-2203-H2 FW-2-096-432-C62R 867RB F-A Fl. 20 VT- 3 NA STRUT. TDLR VERIFICATION BOUNDARY 2 X DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS PAGE: 115 INSPECTION INTERVAL_I_ _ -PLAN STATUS FIRST SECOND PERIOD PERIOD

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION ASME 'SEC. XI CATGY NDE ITEM NO METH I 2 1 2 I THIRD PERIOD 1 2 PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**---- -OUTAGE FEEDWATER 6-FW-2-096-1303-2 674750 TCX-2-2203-H2 FW-2-096-432-C62R 867RB C-C C3.20 MT 2 ---X -92 WELDED ATTACHMENT.

TDLR VERIFICATION BOUNDARY.NA STRUT. TDLR VERIFICATION BOUNDARY 674800 TCX-2-2203-H8 PW-2-096-433-C62R 868RB F-A F1.20 VT- 3 2---X -674900 TCX-2-2203-H9 FW-2-096-434-C62R 868RB F-A Fl. 20 VT-3 2 --X NA STRUT. TDLR VERIFICATION BOUNDARY NA STRUT. TDLR VERIFICATION BOUNDARY 675000 TCX-2-2203-H6 FW-2-096-435-C62R 867RB F-A F1.20 VT- 3 2 x 675100 TCX-2-2203-H7 FW-2-096-436-C62R 867RB F-A F1.20 VT-3 NA STRUT. TDLR VERIFICATION BOUNDARY x -675200 TCX-2-2204-Hll FW-2-096-439-C62R 864RB F-A F1.20 VT- 3 2 -x -NA STRUT. TDLR VERIFICATION BOUNDARY NA STRUT. TDLR VERIFICATION BOUNDARY 675300 TCX-2-2204-H8 FW-2-096-442-S62R R100C863SB F-A Fl. 20 VT-3 x -

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS PAGE: 116 INSPECTION INTERVAL_I PLAN STATUS FIRST SECOND PERIOD PERIOD

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC. XI CATGY NDE ITEM NO METH I 2 -I THIRD PERIOD 12 PRESERVICE YEAR INSTRUCTIONS I **CALIBRATION BLOCK**---OUTAGE 1 2 3 FEEDWATER 6-FW-2-096-1303-2 675600 TCX-2-2204-Hl FW-2-096-702-C62K R155L864RB F-A Fl, 20 VT- 3 NA SNUBBER. TDLR VERIFICATION BOUNDARY 2 --X 675650 TCX-2-2204-Hl FW-2-096-702-C62K R155LL64RB C-C C3.20 MT 92 WELDED ATTACHMENT.

TDLR VERIFICATION BOUNDARY.X -675700 TCX-2-2203-HN FW-2-096-705-C62K 867RB F-A Fl.20 VT- 3 2 ---X -NA SNUBBER. TDLR VERIFICATION BOUNDARY 92 WELDED ATTACHMENT.

TDLR VERIFICATION BOUNDARY.675750 TCX-2-2203-Hl FW-2-096-705-C62K 867RB C-C C3.20 MT 2 --X -675800 TCX-2-2203-H24 FW-2-096-707-C62S 865RB F-A F1.20 VT- 3 NA SPRING. TDLR VERIFICATION BOUNDARY 2 x 675900 TCX-2-2203-H22 FW-2-096-708-CE2K 868RB F-A Fl. 20 VT --NA SNUBBER. TDLR VERIFICATION BOUNDARY NA STRUT. TDLR VERIFICATION BOUNDARY 676000 TCX-2-2203-H15 FW-2-096-709-C62R 988ORB F-A F1 .20 VT- 3---

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS ,2 SCHED/COMPL COMPONENTS PAGE: 117 INSPECTION INTERVAL_ASME SEC. XI CATGY NDE ITEM NO METH PLAN STATUS FIRST SECOND T.PERIOD PERIOD P PRESERVICE YEAR HIRD'ERIOD INSTRUCTIONS I **CALIBRATIO]

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION 1 2 o U TA 1 2 3 G E- -1 2 N BLOCK**FEEDWATER 6-FW-2-096-1303-2 676100 TCX-2-2203-H5 FW-2-096-710-C62K 88ORB F-A Fl. 20 VT -3 NA SNUBBER. TDLR VERIFICATION BOUNDARY 2---X -676150 TCX-2-2203-H5 FW-2-096-710-C62K 880RB C-C C3 .20 MT 92 WELDED ATTACHMENT.

TDLR VERIFICATION BOUNDARY.2 -X -676300 TCX-2-2203-H17 FW-2-096-712-C62R 869RB F-A F1.20 VT -3 2 ----X-NA STRUT. TDLR VERIFICATION BOUNDARY NA SNUBBER. TDLR VERIFICATION BOUNDARY 676400 TCX-2-2203-H20 FW-2-096-713-C62K 869RB F-A F1.20 VT- 3--X -676500 TCX-2-2204-H12 FW-2-096-716-C62K 864RB F-A F1.20 VT- 3 NA SNUBBER. TDLR VERIFICATION BOUNDARY 2 -X -FEEDWATER 6-FW-2-097-1303-2 676600 TCX-2-2303-H9 FW-2-097-401-S62R 863SB F-A F1.20 VT- 3 X -NA STRUT. TDLR VERIFICATION BOUNDARY NA STRUT. TDLR VERIFICATION BOUNDARY 676900 TCX-2-2302-H4 FW-2-097-405-C62R 867RB F-A Fl. 20 VT- 3 2 X -

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS PAGE: 118 INSPECTION INTERVAL_ASME SEC. XI CATGY NDE ITEM NO METH PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION 1 2 OUTAGE1--1 23 1 2 FEEDWATER 6-FW-2-097-1303-2 677000 TCX-2-2302-H6 FW-2-097-408-C62R F-A F1.20 VT- 3 X -677050 TCX-2-2302-H7 FW-2-097-412-C62R F-A F1.20 VT- 3 NA STRUT. TDLR VERIFICATION BOUNDARY I NA STRUT. TDLR VERIFICATION BOUNDARY NA STRUT. TDLR VERIFICATION BOUNDARY X -677100 TCX-2-2302-H8 FW-2-097-413-C62R 877RB F-A F1.20 VT-3 2 -X -677200 TCX-2-2302-H9.

FW-2-097-416-C62R 880RB F-A F1.20 VT X 677300 TCX-2-2302-HlO FW-2-097-417-C62R 880RB F-A Fl .20 VT- 3 2-X NA STRUT. TDLR VERIFICATION BOUNDARY NA STRUT. TDLR VERIFICATION BOUNDARY NA STRUT. TDLR VERIFICATION BOUNDARY NA STRUT. TDLR VERIFICATION BOUNDARY 677400 TCX-2-2302-H12 FW-2-097-424-C62R 88ORB F-A F1.20 VT- 3-X 677500 TCX-2-2302-H13 FW-2-097-425-C62R 88ORB F-A F1.20 VT- 3 2-X DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS PAGE: 119 INSPECTION INTERVAL_F ASME I P SEC. XI CATGY NDE -ITEM NO METH 1 2 PLAN STATUS IRST SECOND THIRD ERIOD PERIOD PERIOD PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK t t

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION 0 U -OUTAGE 1 2 3 1 2 FEEDWATER 6-FW-2-097-1303-2 677600 TCX-2-2302-H16 FW-2-097-428-C62R 876RB F-A F1.20 VT- 3 NA STRUT. TDLR VERIFICATION BOUNDARY 2 --X --677700 TCX-2-2302-H19 FW-2-097-430-C62R 86BRB F-A Fl. 20 VT -3 NA STRUT. TDLR VERIFICATION BOUNDARY 2-X -677800 TCX-2-2302-H18 FW-2-097-431-C62R 868RB F-A Fl. 20 VT- 3 NA STRUT. TDLR VERIFICATION BOUNDARY 2 --X 677900 TCX-2-2302-H20 FW-2-097-433-C62R I 868RB F-A F1.20 VT- 3 NA STRUT. TDLR VERIFICATION BOUNDARY 2-X -678000 TCX-2-2302-H15 FW-2-097-434-C62R 868RB F-A VT-3 Fl.20 NA STRUT. TDLR VERIFICATION BOUNDARY 2-X -678100 TCX-2-2302-H21 FW-2-097-435-C62S 868RB F-A F1.20 VT- 3-X -NA SPRING. TDLR VERIFICATION BOUNDARY NA SNUBBER. TDLR VERIFICATION BOUNDARY 678200 TCX-2-2302-H22 FW-2-097-436-C62K 868RB F-A F1.20 VT- 3 X DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS PAGE: 120 INSPECTION INTERVAL L J-PLAN STATUS FIRST SECOND PERIOD PERIOD ASME SEC. XI CATGY NDE ITEM NO METH

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION 11 THIRD PERIOD'1 2 2-OUTAGE 1 2 3 PRESERVICE YEAR INSTRUCTIONS

-**CALIBRATION BLOCK**FEEDWATER 6-FW-2-097-1303-2 678300 TCX-2-2302-H24 FW-2-097-439-C62K 866RB F-A VT-3 Fl,.20 F-A Fl. 20 2 X -NA SNUBBER.BOUNDARY NA SNUBBER.BOUNDARY TDLR VERIFICATION TDLR VERIFICATION 678400 TCX-2-2302-H27 FW-2-097-441-C62K 867RB VT- 3 2---X 678500 TCX-2-2303-HI3 FW-2-097-448-C62K 865RB F-A Fl. 20 VT-3 2-X NA SNUBBER. TDLR VERIFICATION BOUNDARY NA STRUT. TDLR VERIFICATION BOUNDARY 678600 TCX-2-2303-H14 FW-2-097-449-C62R 865RB F-A Fl1.20 VT- 3 2 --X 678620 TCX-2-2302-H23 FW-2-097-451-C62K 865RB F-A F1.20 VT- 3 NA SNUBBER. TDLR VERIFICATION BOUNDARY 2---X 678700 TCX-2-2302-H5 FW-2-097-702-C62R 866RB F-A F1.20 VT-3 2 -X -NA STRUT. TDLR VERIFICATION BOUNDARY NA STRUT. TDLR VERIFICATION BOUNDARY 678800 TCX-2-2302-Hl FW-2-097-703-C62R 866RB F-A F1 .20 VT- 3 2 -X -

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS PAGE: 121 INSPECTION INTERVAL PLAN FIRST SE ASME" PERIOD PE

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION SEC. XI CATGY ITEM NO I __-NDE i METH 1 STATUS -PRESERVICE YEAR COND THIRD RIOD PERIOD T A G E ----- INSTRUCTIONS 3 1 2 **CALIBPATIOI 2 0 U 1 2 N BLOCK**FEEDWATER 6-FW-2-097-1303-2 678840 TCX-2-2302-H2 FW-2-097-418-C62R 88ORB C-C C3 .20 MT 92 BOX. TDLR VERIFICATION BOUNDARY.2-X 678845 TCX-2-2302-H2 FW-2-097-418-C62R 880RB F-A F1.20 VT -3 2-X -678850 TCX-2-2302-H1 FW-2-097-703-C62R 866RB C-C C3 .20 MT 2 -X -678900 TCX-2-2302-H3 FW-2-097-704-C62R 866RB F-A F1.20 VT- 3 2 -X -NA WELDED ATTACHMENT.

TDLR VERIFICATION BOUNDARY.92 WELDED ATTACHMENT.

TDLR VERIFICATION BOUNDARY.NA STRUT. TDLR VERIFICATION BOUNDARY NA STRUT. TDLR VERIFICATION BOUNDARY NA SPRING. TDLR VERIFICATION BOUNDARY NA SNUBBER. TDLR VERIFICATION BOUNDARY 679000 TCX-2-2302-HI7 FW-2-097-706-C62R 868RB F-A F1. 20 VT- 3 2 -X -679100 TCX-2-2302-H25 FW-2-097-707-C62S 865RB F-A F1.20 VT- 3 X -679200 TCX-2-2302-H26 FW-2-097-708-C62K 867RB F-A F1.20 VT- 3 X DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS PAGE: 122 INSPECTION INTERVAL_I F ASME I P SEC. XI CATGY NDE -ITEM NO METH I 1 2 PLAN STATUS IRST SECOND THIRD ERIOD PERIOD PERIOD PRESERVICE YEAR INSTRUCTIONS I **CALIBRATION BLOCK**

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION 0 1 U T A G E 2 3 1 2 FEEDWATER 6-FW-2-098-1303-2 679300 TCX-2-2403-H8 FW-2-098-401-C62R 864RB F-A F1.20 VT- 3 NA STRUT. TDLR VERIFICATION BOUNDARY 2 ----X -679400 TCX-2-2402-H5 FW-2-098-402-C62R 866RB F-A Fl.20 VT -3 NA STRUT. TDLR VERIFICATION BOUNDARY---X -679500 TCX-2-2402-H9 FW-2-098-408-C62S 871RB F-A Fl. 20 VT-3 2 -X -NA SPRING. TDLR VERIFICATION BOUNDARY NA HANGER. TDLR VERIFICATION BOUNDARY 679600 TCX-2-2402-Hll FW-2-098-411-C62S 871RB F-A Fl. 20 VT- 3 2 -X -679700 TCX-2-2402-H13 FW-2-098-412-C62K 864RB 679900 TCX-2-2402-H14 FW-2-098-416-C62K 862RB F-A F1.20 VT- 3 2---X -NA SNUBBER. TDLR VERIFICATION BOUNDARY NA SNUBBER. TDLR VERIFICATION BOUNDARY F-A VT-3 F1.20 2 X 680000 TCX-2-2402-H4 FW-2-098-417-C62S 872RB F-A Fl. 20 VT -3 NA HANGER. TDLR VERIFICATION BOUNDARY 2 -X X DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS PAGE: 123 INSPECTION INTERVAL_ASME SEC. xi CATGY NDE ITEM NO METH'_PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD--OUTAGE-------------

1 2 1 2 3 1 2 PRESERVICE YEAR INSTRUCTIONS I **CALIBRATION BLOCK**

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION


FEEDWATER 6-FW-2-098-1303-2 680050 TCX-2-2402-H4 FW-2-098-417-C62S 872RB C-C C3 .20 MT 92 WELDED ATTACHMENT:

TDLR VERIFICATION BOUNDARY.2 -X -680600 TCX-2-2402-Hl0 FW-2-098-423-C62R 871RB F-A ,VT-3 Fl. 20 NA STRUT. TDLR VERIFICATION BOUNDARY 2 ----X 680700 TCX-2-2402-H8 FW-2-098-424-C62R 871RB F-A Fl.20 VT-3 2 -X 680800 TCX-2-2402-H3 FW-2-098-704-C62K F-A Fl. 20 VT- 3 NA STRUT. TDLR VERIFICATION BOUNDARY NA SNUBBER. TDLR VERIFICATION BOUNDARY 92 WELDED ATTACHMENT.

TDLR VERIFICATION BOUNDARY.2 -x -680850 TCX-2-2402-H3 FW-2-098-704-C62K 872RB C-C C3.20 MT X -680900 TCX-2-2402-H7 FW-2-098-706-C62R 868RB F-A F1.20 VT-3 NA STRUT. TDLR VERIFICATION BOUNDARY 2 X 681000 TCX-2-2402-H2 FW-2-098-708-C62R 871RB F-A F1. 20 VT-3 NA STRUT. TDLR VERIFICATION BOUNDARY 2 -X -

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS PAGE: 124 INSPECTION INTERVAL_FIRST PLAN STATUS SECOND ASME SEC. XI CATGY NDE ITEM NO METH I ERIOD PERIOD------i- ----THIRD PERIOD PRESERVICE YEAR INSTRUCTIONS i **CALIBRATION BLOCK*-

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION I 2 -OUTAGE 1 2 3 1 2 FEEDWATER 6-FW-2-098-1303-2 681050 TCX-2-2402-H2 FW-2-098-708-C62R 871RB C-C C3.20 MT 92 WELDED ATTACHMENT.

TDLR VERIFICATION BOUNDARY.---X -FEEDWATER 6-FW-2-099-1303-2 681100 TCX-2-2102-H7 FW-2-099-402-C62K 868RB F-A F1.20 VT- 3 NA SNUBBER. TDLR VERIFICATION BOUNDARY 2 -X 681200 TCX-2-2102-H6 FW-2-099-405-C62R 869RB F-A F1.20 VT- 3 NA STRUT. TDLR VERIFICATION BOUNDARY 2 ---X --681300 TCX-2-2102-H3 FW-2-099-408-C62R 860RB F-A F1. 20 F-A Fl.20 VT- 3 NA STRUT. TDLR VERIFICATION BOUNDARY 2--X 681400 TCX-2-2102-H4 FW-2-099-700-C62K 86ORB VT- 3 NA SNUBBER. TDLR VERIFICATION BOUNDARY 2 681500 TCX-2-2102-H5 FW-2-099-702-C62R 867RB F-A F1.20 VT -3 NA STRUT. TDLR VERIFICATION BOUNDARY 2 X 681600 TCX-2-2102-H2 FW-2-099-703-C62K 86ORB F-A Fl.20.VT- 3 NA SNUBBER. TDLR VERIFICATION BOUNDARY X DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS PAGE: 125 INSPECTION INTERVAL ASME SEC. XI CATGY NDE ITEM NO METH PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD PRESERVICE YEAR INSTRUCTIONS I **CALIBRATION BLOCK**

SUMMARY

NUMBER EXAMINATION AREA IDENTIFICATION 1--OUTAGE-------------

2 1 2 3 12 FEEDWATER 6-FW-2-100-1303-2 681700 TCX-2-2204-H13 FW-2-100-401-C62R 863RB F-A F1.20 VT-3 NA STRUT. TDLR VERIFICATION BOUNDARY 2 ---X 681850 TCX-2-2204-H4 FW-2-100-403-C62R RIS5L863RB C-C C3 .20 MT 92 WELDED ATTACHMENT.

TDLR VERIFICATION BOUNDARY.2 -X -681900 TCX-2-2204-H3 FW-2-100-406-C52R R15SL857RB F-A VT-3 F1.20 NA STRUT. TDLR VERIFICATION BOUNDARY 2 -X -681950 TCX-2-2204-H3 FW-2-100-406-C52R RI55L857RB C-C C3 .20 MT 92 WELDED ATTACHMENT.

TDLR VERIFICATION BOUNDARY.2 -X -682050 TCX-2-2204-H2 FW-2-1002 701-C52R R155L855RB C-C C3 .20 MT 92 WELDED ATTACHMENT.

TDLR VERIFICATION BOUNDARY.2 X -FEEDWATER 6-FW-2-101-1303-2 682100 TCX-2-2303-H6 FW-2-101-401-C62R 863RB F-A F1. 20 VT- 3 NA STRUT. TDLR VERIFICATION BOUNDARY 2-X 682200 TCX-2-2303-H3 FW-2-101-403-C62R 863RB F-A F1.20.VT- 3 NA STRUT, TDLR VERIFICATION BOUNDARY 2 X -

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS PAGE: 126 INSPECTION INTERVAL ASME SEC. XI CATGY NDE ITEM NO METN FIRST PERIOD 1 2 PLAN STATUS -_PRESERVICE YEAR SECOND THIRD PERIOD PERIOD-----------------

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION OUTAGE -1 2 3 1 2 INSTRUCTIONS

    • CALIBRATION BLOCK**FEEDWATER 6-FW-2-101-1303-2 682250 TCX-2-2303-H3 FW-2-101-403-C62R 863RB C-C C3 .20 MT 92 WELDED ATTACHMENT.

TDLR VERIFICATION BOUNDARY.2 --x -.682300 TCX-2-2303-H2 FW-2-101-404-C52R 856RB" F-A F1.20 VT -3 NA STRUT. TDLR VERIFICATION BOUNDARY X -682350 TCX-2-2303-H2 FW-2-101-404-C52R 856RB C-C C3 .20 MT 2 --x -682400 TCX-2-2303-H5 FW-2-101-405-C52R 857RB 682500 TCX-2-2303-H4 FW-2-101-406-C52R 855RB F-A Fl. 20 F-A F1.20 C-C C3 .20 VT- 3 92 , WELDED ATTACHMENT.

TDLR VERIFICATION BOUNDARY.NA STRUT. TDLR VERIFICATION BOUNDARY NA STRUT. TDLR VERIFICATION BOUNDARY 2 -X -VT -3 2 -K 682650 TCX-2-2303-Hl FW-2-101-700-C52R 855RB MT 92 WELDED ATTACHMENT.

TDLR VERIFICATION BOUNDARY.2 FEEDWATER 6-FW-2-102-1303-2 682700 TCX-2-2402-HI5 FW-2-102-403-C62R 868RB F-A F1.20 VT- 3 NA STRUT. TDLR VERIFICATION BOUNDARY.2 --

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS PAGE: 127 INSPECTION INTERVAL PLAN STATUS _ PRESERVICE YEAR FIRST SECOND THIRD PERIOD PERIOD PERIOD ASME SEC. XI CATGY NDE ITEM NO METH

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION


..---------------

---OUTAGE-------------

1 2 1 2 3 1 2-----------.-.---------.-.--------

INSTRUCTIONS

    • CALIBRATION BLOCK**FEEDWATER 6-FW-2-102-1303-2 682800 TCX-2-2402-H18 FW-2-102-404-C62R 868RB F-A Fl. 20 VT --X -NA STRUT. TDLR VERIFICATION BOUNDARY NA STRUT. TDLR VERIFICATION BOUNDARY 682900 TCX-2-2402-Hl FW-2-102-700-C62R 863RB F-A Fl. 20 VT -3 2 -----682950 TCX-2-2402-HI FW-2-102-700-C62R 863RB C-C C3 .20 MT 92 WELDED ATTACHMENT.

TDLR VERIFICATION BOUNDARY.2 -X -683000 TCX-2-2402-H16 FW-2-102-702-C62K 868RB F-A F1.20 VT-3 NA SNUBBER. TDLR VERIFICATION BOUNDARY, 2 ---X -683100 TCX-2-2402-H17 FW-2-102-703-C62R 868RB MAIN STEAM 3-MS-2-003-1303-2 F-A Fl. 20 VT- 3 NA STRUT. TDLR VERIFICATION BOUNDARY 2 K -683200 TCX-2-2100-HG MS-2-001-402-C72S R1550890RB F-A F1. 20 VT -3 NA SPRING. TDLR VERIFICATION BOUNDARY 2 C -683400 TCX-2-2100-HI MS-2-001-405-C72K RI55089ORB F-A F1.20 VT -3 NA SNUBBER. TDLR VERIFICATION BOUNDARY 2C -

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS PAGE: 128 INSPECTION INTERVAL_ASME SEC. XI CATGY NDE ITEM NO METH PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD---OUTAGE-------------

1 2 1 2 3 1 2 PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION MAIN STEAM 32-MS-2-001-1303-2 683450 TCX-2-2100-Hl MS-2-001-405-C72K R1550890RB"MAIN STEAM 32-MS-2-002-1303-2 C-C C3 .20 MT 92 WELDED ATTACHMENT.

TDLR VERIFICATION BOUNDARY.2 C 684400 TCX-2-2200-H2 MS-2-002-408-C72K RI55N90ORB 684450 TCX-2-2200-H2 MS-2-002-408-C72K R155N900RB F-A F1.20 C-C C3.20 VT -3 NA SNUBBER. TDLR VERIFICATION BOUNDARY 2 -X -MT 92 WELDED ATTACHMENT.

TDLR VERIFICATION BOUNDARY.2 -X 684500 TCX-2-2200-H1 MS-2-002-411-C72K R155N900RB F-A VT-i F1.20 NA SNUBBER. TDLR VERIFICATION BOUNDARY 2 X --684550 TCX-2-2200-HI MS-2-002-411-C72K RI55N90ORB C-C C3 .20 MT 92 WELDED ATTACHMENT.

TDLR VERIFICATION BOUNDARY.2 -X MAIN STEAM 32-MS-2-003-1303-2 685100 TCX-2-2300-H7 MS-2-003-402-C72S 894RB F-A F1.20 VT -3 NA U-BOLT. TDLR VERIFICATION BOUNDARY X DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS PAGE: 129 INSPECTION INTERVAL_I PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC. XI CATGY NDE ITEM NO METH 1 2 0 U T A G 1 2 3-- --U T A---I-------------

1 2 PRESERVICE YEAR INSTRUCTIONS I **CALIBRATION BLOCK**MAIN STEAM 32-MS-2-003-1303-2 685200 TCX-2-2300-Hl MS-2-003-405-C72K 894RB*F-A Fl. 20 VT- 3 NA SNUBBER. TDLR VERIFICATION BOUNDARY 2 S- X --685250 TCX-2-2300-H1 MS-2-003-405-C72K 894RB C-C C3.20 MT 2 ----X--X 92 WELDED ATTACHMENT.

TDLR VERIFICATION BOUNDARY.NA SNUBBER. TDLR VERIFICATION BOUNDARY 685400 TCX-2-2300-H2 MS-2-003-407-C72K 896RB F-A F1.20 VT- 3 2 -685450 TCX-2-2300-H2 MS-2-003-407-C72K 896RB C-C C3 .20 MT 92. WELDED ATTACHMENT.

TDLR VERIFICATION BOUNDARY.2 ---X --685500 TCX-2-2300-H3 MS-2-003-409-C72K 894RB F-A Fl. 20 VT- 3.--X 685550 TCX-2-2300-H3 MS-2-003-409-C72K 894RB C-C C3.20 MT NA SNUBBER. TDLR VERIFICATION BOUNDARY 92 WELDED ATTACHMENT.

TDLR VERIFICATION BOUNDARY.NA SNUBBER. TDLR VERIFICATION BOUNDARY-X 685600 TCX-2-2300-H4 MS-2-003-410-C72K 894RB F-A F1. 20 VT- 3-X DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS PAGE: 130 INSPECTION INTERVAL ASME SEC. XI CATGY NDE ITEM NO METH* FIRST PERIOD PLAN STAT SECOND PERIOD

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION I----------

OUTA 1 2 1 2 3 us THIRD PERIOD-- -----------

12. 2 PRESERVICE YEAR INSTRUCTIONS
    • CALIBRATION BLOCK**MAIN STEAM 32-MS-2-003-1303-2 685650 TCX-2-2300-H4 MS-2-003-410-C72K 894RB C-C MT C3.20 92 WELDED ATTACHMENT.

TDLR VERIFICATION BOUNDARY.2 -X MAIN STEAM 32-MS-2-004-1303-2 686200 TCX-2-2400-H9 MS-2-004-403-C72S 877RB F-A F1.20 VT -3 NA SPRING. TDLR VERIFICATION BOUNDARY 2 --X 686600 TCX-2-2400-Hl MS-2-004-407-C72K 890RB F-A F1.20 VT -3 NA SNUBBER. TDLR VERIFICATION BOUNDARY 2 X 686650 TCX-2-2400-Hl MS-2-004-407-C72K 890RB C-C C3 .20 MT 92 WELDED ATTACHMENT.

TDLR VERIFICATION BOUNDARY.2 686800 TCX-2-2400-H2 MS-2-004-409-C72K 884RB F-A F1.20 VT- 3 2 --X NA SNUBBER. TDLR VERIFICATION BOUNDARY 92 WELDED ATTACHMENT.

TDLR VERIFICATION BOUNDARY.686850 TCX-2-2400-H2 MS-2-004-409-C72K 884RB C-C C3 .20 MT X 686900 TCX-2-2400-HIl MS-2-004-415-S72R 877SB F-A F1.20 VT -3 NA STRUT. TDLR VERIFICATION BOUNDARY X DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS PAGE: 131 INSPECTION INTERVAL_ASME SEC. XI CATGY NDE ITEM NO METH FIRST PERIOD 1 2 PLAN STATUS_ _SECOND THIRD PERIOD PERIOD OUTAGE-------------

1 2 3 1 2 PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION MAIN STEAM 8-MS-2-240-1303-2 687300 TCX-2-2200-H12 MS-2-240-401-S72K R109C885SB F-A F1.20 VT- 3 NA SNUBBER. TDLR VERIFICATION BOUNDARY 2 -X -687400 TCX-2-2200-H13 MS-2-240-402-S72K R109C885SB F-A Fl.20 VT- 3 NA SNUBBER. TDLR VERIFICATION BOUNDARY 2 -X. -RESIDUAL HEAT REMOVAL 12-RH-2-004-601R-2 688400 TCX-2-2501-Hl RH-2-004-403-S42R

.813SB F-A Fl. 20 VT- 3 NA STRUT 2- -X 688450 TCX-2-2501-Hl RH-2-004-403-S42R 813SB C-C C3 .20 PT 92 WELDED ATTACHMENT 2-X 688700 TCX-2-2501-H12 RH-2-004-407-S32S 803SB F-A Fl. 20 VT -3 NA SPRING-X 688900 TCX-2-2501-H14 RH-2-004-409-S32R 800SB F-A Fl. 20 VT- 3 INA STRUT 2 -X RESIDUAL HEAT REMOVAL 16-RH-2-007L601R-2 689000 TCX-2-2500-Hl RH-2-007-405-S22K 775SB F-A F1. 20 VT- 3 NA SNUBBER DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS PAGE: 132 INSPECTION INTERVAL PLAN STATUS FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI SCATG NDE-------------


OU AG---------------

CATGY NODE 0 U T A G E ITEM NO METH 1 2 1 2 3 1 2 PRESERVICE YEAR I INSTRUCTIONS

    • CALIBRATION BLOCK**

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION RESIDUAL HEAT REMOVAL 16-RH-2-007-601R-2 689050 TCX-2-2500-Hl RH-2-007-405-S22K 775SB C-C C3.20 PT 92 WELDED ATTACHMENT 2 ----x RESIDUAL HEAT REMOVAL 16-RH-2-008-601R-2 689400 TCX-2-2501-H15 RH-2-008-402-S22R 787SB F-A Fl. 20 VT- 3 NA STRUT----X 689600 TCX-2-2501-H2 RH-2-008-405-S22K 784SB F-A Fl. 20 VT- 3 NA SNUBBER 2 -X 689650 TCX-2-2501-H2 RH-2-008-405-S22K 784SB C-C C3.20 PT 92 WELDED ATTACHMENT 2 --X 689800 TCX-2-2501-H19 RH-2-008-407-S22S 774SB F-A F1. 20 VT -3 NA SPRING 2 -----X RESIDUAL HEAT REMOVAL 8-RH-2-028-151R-2 693500 TCX-2-2579-HI RH-2-028-402-S32A R070 806SB F-A Fl.20 VT -3 NA BOX 2 -C DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS PAGE: 133 INSPECTION INTERVAL_ASME SEC. XI CATGY NDE ITEM NO METH PLAN STATUS FIRST SECOND PERIOD PERIOD-~OUTAGE 1 2 1 2 3 THIRD PERIOD 1 2 PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION RESIDUAL HEAT REMOVAL 8-RH-2-028-151R-2 693550 TCX-2-2579-Hl RH-2-028-402-S32A R070 806SB C-C PT C3.20 92 WELDED ATTACHMENT 2 -C 693600 TCX-2-2579-H5 RH-2-028-404-S32K R076 806SB F-A Fl. 20 VT -3 NA SNUBBER 2 -C SAFETY INJECTION 4-SI-2-001-2501R-2 696300 TCX-2-2564-H13 SI-2-001-424-S42K R77N 827SB F-A VT-3 Fl. 20 NA SNUBBER 2 C -SAFETY INJECTION 4-SI-2-021-2501R-2 697000 TCX-2-2564-HI7 SI-2-021-404-S42S R77N 812SB F-A VT-3 Fl. 20 NA SPRING 2 C -SAFETY INJECTION 24-SI-2-029-151R-2 697100 TCX-2-2580-H19 SI-2-029-406-Y32R R085D802YD 697400 TCX-2-2580-H3 SI-2-029-409-$32R ROBD0802SB F-A Fl. 20 VT-3 NA qTPTIT 2 -C F-A Fl. 20 VT- 3 NA STRUT 2 -C DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS PAGE: 134 INSPECTION INTERVAL ASME SEC. XI CATGY NDE ITEM NO METH PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD-0-- -- -U-T-A-G- E--------------

1 2 1 2 3 1 2-----------.-.---------.-.--------

PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION SAFETY INJECTION 24-SI-2-029-151R-2 697450 TCX-2-2580-H3 SI-2-029-409-$32R R085D802SB C-C C3 .20 PT 92 WELDED ATTACHMENT 2 -C 697700 TCX-2-2580-H1 SI-2-029-415-Y32R R085D802YD F-A F1.20 VT- 3 NA BOX 2 -C 697750 TCX-2-2580-H1 SI-2-029-415-Y32R R085DB02YD C-C C3 .20 PT 92 WELDED ATTACHMENT 2 -C 697800 TCX-2-2580-H2 SI-2-029-424-Y32K R085D802YD F-A VT-3 Fl.20 NA SNUBBER 2 -C 697850 TCX-2-2580-H2 SI-2-029-424-Y32K R085D802YD C-C C3 .20 PT 92 WELDED ATTACHMENT 2 -C SAFETY INJECTION 18-SI-2-030-151R-2 698400 TCX-2-2579-H7 SI-2-030-401-$32R R070 802SB 698500 TCX-2-2579-H3 SI-2-030-402-$32A R070 802SB F-A F1. 20 VT-3 NA STRUT 2 -C F-A Fl .20 VT- 3 NA BOX 2 -C DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS PAGE: 135 INSPECTION INTERVAL_ASME SEC. XI CATGY NDE ITEM NO METH PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD--OUTAGE--------------

1 2 1 2 3 1 2 PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION SAFETY INJECTION 18-SI-2-030-151R-2 698550 TCX-2-2579-H3 SI-2-030-402-S32A R070 802SB C-C PT C3.20 92 WELDED ATTACHMENT 2 -C SAFETY INJECTION 12-SI-2-031-151R-2 698950 TCX-2-2582-Hl SI-2-031-425-Y32R 802YD C-C C3 .20 PT 92 WELDED ATTACHMENT X -699000 TCX-2-2582-H2 SI-2-031-429-S32K 803SB F-A F1.20 VT-3 NA SNUBBER 2 -X -699050 TCX-2-2582-H2 SI-2-031-429-S32K 803SB C-C C3.20 PT 92 WELDED ATTACHMENT 2 -X -699100 TCX-2-2582-H3 SI-2-031-430-S32A 803SB F-A F1.20 VT -3 NA BOX 2 -X 699150 TCX-2-2582-H3 SI-2-031-430-S32A 803SB 699200 TCX-2-2582-H24 SI-2-031-431-$32R 802AR C-C PT C3 .20 92 WELDED ATTACHMENT 2 X -F-A F1 .20 VT- 3 NA STRUT X -

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS PAGE: 136 INSPECTION INTERVAL ASME SEC. XI CATGY ITEM NO NDE METH FIRST PERIOD 1 2 PLAN STATUS_SECOND THIRD PERIOD PERIOD OUTAGE-------------

1 2 3 1 2-----------.-.---------.

PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION SAFETY INJECTION 12-SI-2-031-151R-2 699400 TCX-2-2583-Hl SI-2-031-439-A32K 803AB F-A VT-3 Fl. 20 NA SNUBBER 2---X 699450 TCX-2-2583-Hl SI-2-031-439-A32K 803AB C-C C3 .20 PT 92 WELDED ATTACHMENT 2 -X -SAFETY INJECTION B-SI-2-032-151R-2 699600 TCX-2-2579-H2 SI-2-032-402-$32R R070 794SB F-A Fl. 20 VT- 3 NA STRUT 2 -C 699650 TCX-2-2579-H2 SI-2-032-402-$32R R070 794SB C-C C3 .20 PT 92 WELDED ATTACHMENT 2 -C SAFETY INJECTION 4-SI-2-044-1501R-2 702500 TCX-2-2562-H4 SI-2-044-402-S22S R062 785SB F-A Fl. 20 VT-3, NA SPRING X -703800 TCX-2-2561-H2 SI-2-044-426-S42R I077B820SB F-A Fl.20 VT- 3 NA STRUT X ---

C DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS PAGE: 137 INSPECTION INTERVAL_ASME FIRST PERIOD PLAN STATUS_SECOND PERIOD SEC. XI CATGY NDE ITEM NO METH

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION


.-.---------------


OUTAG--2 0 U TAG S1 2 1 2 3-.-.---------.-.-------

PRESERVICE YEAR THIRD PERIOD INSTRUCTIONS 2 **CALIBRATION E B LOCK**SAFETY INJECTION 4-SI-2-044-1501R-2 703850 TCX-2-2561-H2 SI-2-044-426-$42R R077B820SB C-C PT C3 .20 92 WELDED ATTACHMENT 2 -X --704450 TCX-2-2562-Hl SI-2-044-700-$22R R062E788SB C-C C3 .20 PT 92 WELDED ATTACHMENT 2 -X 706900 SAFETY INJECTION 3-SI-2-050-1501R-2 TCX-2-2565-Hl F-A SI-2-050-402-$22R F1.20 R67 788SB SAFETY INJECTION 4-SI-2-051-2501R-2 VT- 3 NA STRUT 2 C 707500 TCX-2-2560-H3 SI-2-051-408-C42R R154B820RB 707550 TCX-2-2560-H3 SI-2-051-408-C42R Ri54BB20RB F-A VT-3 NA STRUT Fl. 20 C-C C3 .20 F-A F1.20 2 -X PT 92 WELDED ATTACHMENT X --707900 TCX-2-2560-H2 SI-2-051-414-C42R R154B820RB VT- 3 NA STRUT 2 N DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS PAGE: 138 INSPECTION INTERVAL_ASME SEC. XI CATGY NDE ITEM NO METH PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD PRESERVICE YEAR i INSTRUCTIONS I **CALIBRATION BLOCK**

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION 1 2 0 U T A 1 2 3-- -----T A GE--- -----------

G E 12....1 2 SAFETY INJECTION 4-SI-2-051-2501R-2 707950 TCX-2-2560-H2 SI-2-051-414-C42R R154B820RB C-C PT C3.20 92 WELDED ATTACHMENT X -708000 TCX-2-2560-Hl SI-2-051-415-C42K RI54B820RB F-A Fl. 20 VT- 3 NA SNUBBER 2 -X --708050 TCX-2-2560-HI SI-2-051-415-C42K R154B82ORB C-C C3 .20 PT 92 WELDED ATTACHMENT 2 -X 708500 TCX-2-2560-H4 SI-2-051-421-C42R R154B82ORB F-A Fl. 20 VT- 3 NA STRUT X -708550 TCX-2-2560-H4 SI-2-051-421-C42R R154B820RB C-C C3.20 PT 92 WELDED ATTACHMENT 2 -X --SAFETY INJECTION 14-ST-2-071-601R-2 710100 TCX-2-2581-Hll SI-2-071-402-$32R 792SB 710200 TCX-2-2581-H12 SI-2-071-403-S32S 792SB F-A Fl. 20 VT- 3 NA STRUT 2 -X F-A F1.20 VT- 3 NA SPRING X DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS PAGE: 139 INSPECTION INTERVAL PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD ASME SEC. XI CATGY ITEM NO

SUMMARY

NUMBER EXAMINATION AREA IDENTIFICATION NDE METH 1 2 OUTAGE 1 2 3 O-U-T-A--

E---I PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK-*1 2 SAFETY INJECTION 14-SI-2-071-601R-2 710300 TCX-2-2581-H13 SI-2-071-404-S32K 791SB F-A Fl. 20 VT-3 NA SNUBBER 2 --X 710400 TCX-2-2581-H2 SI-2-071-405-$32K 791SB F-A Fl.20 VT- 3 NA SNUBBER 2 -X 710450 TCX-2-2581-H2 SI-2-071-405-S32K 791SB C-C C3.20 PT 92 WELDED ATTACHMENT 2 X SAFETY INJECTION 14-SI-2-072-601R-2 710500 TCX-2-2581-H1 SI-2-072-401-$32R 792SB F-A Fl. 20 VT-3 2 NA BOX-X 710550 TCX-2-2581-H1 SI-2-072-401-S32R 792SB C-C C3.20 PT 92 WELDED ATTACHMENT

---X SAFETY INJECTION 16-SI-2-075-6O1R-2 710B60 TCX-2-2501-H4 SI-2-075-401-S22K R63 790SB F-A F1. 20 VT-3 NA SNUBBER 2 C -

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS PAGE: 140 INSPECTION INTERVAL

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION


..----- --------------ASME SEC. XI CATGY NDE ITEM NO METH FIRST PERIOD 112-I -----PLAN STATUS SECOND THIRD PERIOD PERIOD OUTAGE--------------

1 2 3 1 2-----------.-.---------

PRESERVICE YEAR I INSTRUCTIONS I **CALIBRATION BLOCK**SAFETY INJECTION 10-SI-2-082-2501R-2 713200 TCX-2-2533-H7 SI-2-082-402-C42K R154A82ORB F-A Fl. 20 VT -3 NA SNUBBER 2 C SAFETY INJECTION 8-SI-2-087-2501R-2 713400 TCX-2-2533-H3 SI-2-087-404-C42R R154A820RB F-A F1.20 VT -3 NA STRUT 2 C -713450+ TCX-2-2533-H3 SI-2-087-404-C42R R154AB20RB C-C C3 .20 PT 92 WELDED ATTACHMENT 2 C -713500 TCX-2-2533-H4 SI-2-087-405-C42R Ri54A82ORB F-A F1. 20 VT-3 NA STRUT 2 C 713550 TCX-2-2533-H4 SI-2-087-405-C42R R154A820RB C-C C3 .20 PT 92 WELDED ATTACHMENT 2 C 713800 TCX-2-2533-H5 SI-2-087-409-C42R RI54A820RB F-A F1. 20 VT- 3 NA STRUT 2 C 713850 TCX-2-2533-H5 SI-2-087-409-C42R R154A820RB C-C C3 .20 PT 92 WELDED ATTACHMENT 2C DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS PAGE: 141 INSPECTION INTERVAL

SUMMARY

NUMBER EXAMINATION AREA IDENTIFICATION ASME SEC. XI CATGY NDE ITEM NO METH PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD I---------

OUTAGE 1 2 1 2 3 1 2-. -.-------. -------.-.- -------PRESERVICE YEAR INSTRUCTIONS I /**CALIBRATION BLOCK--SAFETY INJECTION 8-SI-2-087-2501R-2 714000 TCX-2-2533-Hl SI-2-087-411-C42K R154A820RB F-A Fl. 20 VT -3 NA SNUBBER 2 C 714050 TCX-2-2533-Hl SI-2-087-411-C42K R154A82DRB C-C C3 .20 PT 92 WELDED ATTACHMENT 2 C -714100 TCX-2-2533-H2 SI-2-087-412-C42K R154A820RB F-A Fl. 20 VT -3 NA SNUBBER 2 C 714150 TCX-2-2533-H2 SI-2-087-412-C42K R154A820RB C-C C3.20 PT 92 WELDED ATTACHMENT 2 C 714500 TCX-2-2533-H6 SI-2-087-416-C42K R154A820RB 714550 TCX-2-2533-H6 SI-2-087-416-C42K RI54A820RB F-A F1.20 C-C C3.20 VT -3 NA SNUBBER 2 C PT 92 WELDED ATTACHMENT 2 C SAFETY INJECTION 8-SI-2-D88-2501R-2 715200 TCX-2-2534-HI SI-2-088-409-C42K R154D817RB F-A Fl. 20 VT- 3 NA SNUBBER 2 -C DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS PAGE: 142 INSP ECTION INTERVAL __PLAN STATUS F FIRST SECOND ASME J PERIOD PERIOD SEC. XI I ...........SCATG ND-----------------

--OUTAGE--CATGY NDE T ...... 0 U T A G E ITEM NO METH 1 2 1 2 3-. -.-----.- .- -.- ..- .- ------.- ---.- ----THIRD PERIOD 1 2 PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**

SUMMARY

NUMBER EXAMINATION AREA IDENTIFICATION SAFETY INJECTION 8-SI-2-088-2501R-2 715250 TCX-2-2534-Hl 9I-2-088-409-C42K 9154D817RB C-C C3.20 PT 92 WELDED ATTACHMENT 2 -C ---715300 TCX-2-2534-H2 SI-2-088-410-C42K R154D817RB F-A VT-3 F1.20 NA SNUBBER 2 -C 715350 TCX-2-2534-H2 SI-2-088-410-C42K R154D817RB C-C C3 .20 PT 92 WELDED ATTACHMENT 2 -C SAFETY INJECTION 10-SI-2-095-2501R-2 716500 TCX-2-2530-H1 SI-2-095-403-$42R Z77N 823SB F-A Fl. 20 VT- 3 NA STRUT 2 C -716550 TCX-2-2530-H1 SI-2-095-403-$42R R77N 823SB 717100 TCX-2-2535-H2 SI-2-095-409-C42R 823RB C-C C3.20 PT 92 WELDED ATTACHMENT' 2 C -F-A VT-3 F1.20 NA STRUT X 717150 TCX-2-2535-H2 SI-2-095-409-C42R 823RB C-C C3.20 PT 92 WELDED ATTACHMENT 2 -X -

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS PAGE: 143 INSPECTION INTERVAL_ASME SEC. XI CATGY NDE ITEM NO METH PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD--OUTAGE-------------

1 2 1 2 3 1 2 PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**

SUMMARY

NUMBER EXAMINATION AREA IDENTIFICATION SAFETY INJECTION 10-SI-2-095-2501R-2 717500 TCX-2-2535-H1 SI-2-095-415-C42R 823RB F-A F1.20 VT-3 NA STRUT---X -717550 TCX-2-2535-HI SI-2-095-415-C42R 823RB C-C C3.20 PT 92 WELDED ATTACHMENT

---X -SAFETY INJECTION r-SI-2-171-2501R-2 717700 TCX-2-2535-H3 SI-2-171-401-C42R 823RB F-A Fl. 20 VT-3 NA STRUT X -717750 TCX-2-2535-H3 SI-2-171-401-C42R 823RB C-C C3.20 PT 92 WELDED ATTACHMENT 2 ----X SAFETY INJECTION 4-SI-2-00-1501R-2 718100 TCX-2-2561-Hl SI-2-300-404-S22A R067 789SB F-A F1.20 VT- 3 NA BOX .X --718150 TCX-2-2561-HI SI-2-300-404-$22A R067 789SB C-C C3. 20 PT 92 WELDED ATTACHMENT 2 X -

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS PAGE: 144 INSPECTION INTERVAL ASME SEC. XI CATGY NDE ITEM NO METH FIRST PERIOD 1 2 PLAN STATUS _ PRESERVICE YEAR SECOND THIRD I PERIOD PERIOD I

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION 0 U T A G 1 .2 3 1 2-I INSTRUCTIONS

    • CALIBRATION BLOCK**SAFETY INJECTION 4-SI-2-306-2501R-2 718200 TCX-2-2566-H18 SI-2-306-401-C42R R154B817RB 718300 TCX-2-2566-RIl SI-2-306-402-C42R RI54B817RB 718400 TCX-2-2566-H8 SI-2-306-403-C42R RI54B817RB 718500 TCX-2-2566-Hl SI-2-306-404-C42R Ri54B823RB F-A Fl.20 VT- 3 NA STRUT 2 C -F-A Fl. 20 VT- 3 NA STRUT 2 C -F-A F1.20 VT-3 NA STRUT 2 C -F-A Fl. 20 VT-3 NA STRUT 2 C -718550 TCX-2-2566-Hl SI-2-306-404-C42R RI54B823RB C-C C3 .20 PT 92 WELDED ATTACHMENT 2 C -718600 TCX-2-2566-H9 SI-2-306-405-C42R R154B817RB F-A Fl. 20 VT- 3 NA STRUT 2 C 718700 TCX-2-2566-H12 SI-2-306-406-C42R R154B817RB F-A F1.20 VT -3 NA STRUT 2 C DATEý 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS PAGE: 145 INSPECTION INTERVAL PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.. XI CATGY NDE ITEM NO METH--------------.-.-----.-.--

1 2-OUTAGE------------

1 2 3 1 2--.-.---------.-.-------

PRESERVICE YEAR INSTRUCTIONS

--CALIBRATION BLOCK-SAFETY INJECTION 4-SI-2-306-2501R-2 718800 TCX-2-2566-HI6 SI-2-306-407-C42R R154B817RB 718900 TCX-2-2566-H20 SI-2-306-408-C42R RI54B817RB 719000 TCX-2-2566-H24 SI-2-306-410-C42R R154B817RB F-A Fl. 20 VT -3 NA STRUT 2 C -F-A Fl. 20 VT- 3 NA STRUT 2 C -F-A F1.20 VT- 3 NA STRUT 2 C 719400 TCX-2-2566-H6 SI-2-306-414-C42K R154B818RB F-A F1.20 VT- 3 NA SNUBBER 2 C 719600 TCX-2-2566-H2 SI-2-306-416-C42R R154B817RB F-A Fl. 20 VT- 3 NA STRUT 2 C -719650 TCX-2-2566-H2 SI-2-306 -416 -C42R RI54B817RB C-C C3 .20 PT 92 WELDED ATTACHMENT 2 C 719900 xTCX-2-2566-H3 SI-2-306-420-C42R R154B817RB F-A VT-3 Fl.20 NA STRUT 2 C -

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS PAGE: 146 INSPECTION INTERVAL PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC. XI CATGY NDE ITEM NO METH 1 2 PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**OUTAGE 1 2 3 1 2 SAFETY INJECTION 4-SI-2-306-2501R-2 719950 TCX-2-2566-H3 SI-2-306-420-C42R RI54B817RB C-C PT C3.20 92 WELDED ATTACHMENT 2 C -SAFETY INJECTION I1-qI-2-325-G01R-2 721200 TCX-2-2501-N3 SI-2-325-700-$32R R63 803SB F-A VT-3 Fl. 20 NA STRUT 2 C -SAFETY INJECTION 16-SI-2-326-2501R-2 721210 TCX-2-2500-H2 SI-2-326-401-532R 798SB F-A Fl. 20 VT- 3 NA STRUT 2 -X SAFETY INJECTION 3-SI-2-336-1501R-2 721300 TCX-2-2563-HIO SI-2-336-403-$22K R066 789SB F-A Fl. 20 VT -3 NA SNUBBER 2 -X SAFETY INJECTION 16-SI-2-914-151R-2 721700 TCX-2-2579-H4 SI-2-914-402-$32A R075 802SB F-A VT- 3 NA BOX Fl. 20 C-C C3.20 2 -C 721750 TCX-2-2579-H4 SI-2-914-402-532A R075 802SB PT 92 WELDED ATTACHMENT 2 -C DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS PAGE: 147 INSPECTION INTERVAL_ASME SEC. XI CATGY NDE ITEM NO METH FIRST PERIOD 1 2 PLAN SEC PER OUT 1 2 STATUS OND THIRD ioD PERIOD AGE-------------

3 1 2 PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION CAVTYrm TN.Trr'TfNN 9qT-9r)C0-2Rnl P-9 SAFETY INJECTION 2-SI-2-066-2501R-2 721900 TCX-2-2566-H41 SI-2-RB-010A-702-2 R154B815RB F-A Fl. 20 VT- 3 NA SNUBBER 2 C -722100 TCX-2-2566-H43 SI-2-RB-O1OA-704-2 R154B815RB F-A F1.20 VT-3 NA STRUT 2 C -SAFETY INJECTION 2-SI-2-064-25D1R-2 722200 TCX-2-2566-H44 SI-2-RB-010B-701-2 R154B813RB F-A F1.20 VT- 3 NA SNUBBER 2 C -722300 TCX-2-2566-H45 SI-2-RB-01OB-703-2 RI54B812RB F-A F1.20 VT- 3 NA SNUBBER 2 C SAFETY INJECTION 2-SI-2-068-2501R-2 725300 TCX-2-2566A-H1O SI-2-RB-058-704-2 R154D821RR F-A Fl. 20 VT -3 NA U-BOLT 2 C FEEDWATER 18-FW-2-036-2003-2 750000 TCX-2-2101-MR1 CP2-FWSSMR-01 RI0OA856SB F-A F1. 40 VT -3 NA MOMENT RESTRAINT DWG S2-0681 2 C -

DATE: 01/21/08* COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS PAGE: 148 INSPECTION INTERVAL ASME SEC. XI CATGY NDE ITEM NO METH-_ PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD---OUTAGE-------------

1 2 1 2 3 1 2 PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**

SUMMARY

NUMBER EXAMINATION AREA IDENTIFICATION MAIN STEAM 32-MS-2-001-1303-2 750400 TCX-2-2100-MR1 CP2-MSMEMR-01 R108 877SB F-A Fl.40 VT- 3 NA MOMENT RESTRAINT DWG S2-0684 2 C -RESIDUAL HEAT REMOVAL TCX-RHAHRS-01 750800 TCX-2-1120-1S1 RHR HX 01 TOP SUPPORTS R89 828SB 750900 TCX-2-112D-1S2 RHR HX 01 INTERMEDIATE SUPPORTS R69 810SB F-A Fl.40 F-A Fl.40 VT -3 NA DWG 2323-S2-0654 2 -----X VT-3 NA DWG 2323-S2-0654 2 ----X 751000 TCX-2-1120-1S3 F-A RHR HX 01 FOUNDATION SUPPORTS F1.40 R69 795SB VT- 3 NA DWG 2323-S2-0654 2 --X RESIDUAL HEAT REMOVAL TCX-RHAPRH-01 751401 TCX-2-3100-1-1WS RHR PUMP 01 SUPPORT R53 773SB F-A VT-3 F1.40D 2 -C NA FEET. DWG C-8X20WDF86X16D.

1S1 SPLIT INTO 3(1-1WS,1-2WS, AND l-3WS EXAMS.)751402 TCX-2-3100-1-2WS RHR PUMP 01 SUPPORT R53 773SB F-A Fl.40 VT -3 2 -C NA FEET. DWG C-8X20WDF86Xl6D.

IS1 SPLIT INTO 3(l-lWS,l-2WS, AND 1-3WS EXAMS.)

DATE: .01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS PAGE: 149 INSPECTION INTERVAL PLAN STATUS FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI .------------------------------

PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION CATGY NDE ITEM NO METH 1 2 0 U OUTAGE 1 2 3, 1 2 RESIDUAL HEAT REMOVAL TCX-RHAPRH-01 751403 TCX-2-3100-1-3WS RHR PUMP 01 SUPPORT R53 773SB F-A VT-3 Fl.40 2 -C NA FEET. DWG C-8X20WDF8GXlID.

151 SPLIT INTO 3(1-IWS,I-2WS, AND l-3WS EXAMS.)SAFETY INJECTION TCX-SIAPSI-02 751700 TCX-2-3140-1S1 SI PUMP 02 SUPPORT R060 773SB F-A Fl. 40 VT- 3 NA FEET. DWG 300-J49738 2 X --CHEMICAL & VOLUME CONTROL TCX-CSAPCH-01 751800 TCX-2-3110-lS1 F-A CENTRIFUGAL CHARGING PUMP 01 F1.40 R195 810AB VT-3 NA SUPPORT CRADLE. DWG B49745 2 -X CONTAINMENT SPRAY CP2-CTAHCS-01 752000 TCX-2-1180-1S1 CT HX 01 TOP SUPPORTS R69' 828SB F-A F1.40 VT-3 NA DWG. 2323-S2-0654 2 X 752100 TCX-2-1180-1S2 F-A CT HX 01 INTERMEDIATE SUPPORTS F1.40 R69 810SB VT-S3 NA DWG. 2323-S2-0654 2 -X 752200 TCX-2-1180-1S3 F-A CT HX 01 FOUNDATION SUPPORTS F1.40 R69 79SSB VT-3 NA DWG. 2323-S2-0654

-X -

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS PAGE: 150 INSPECTION INTERVAL PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD PRESERVICE YEAR ASME SEC. XI CATGY NDE ITEM NO METH

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION

---OUTAGE --1 2 1 2 3 1 2--_ J INSTRUCTIONS

    • CALIBRATION BLOCK**CONTAINMENT SPRAY CP2-CTAPCS-02 752700 TCX-2-2578-2PS1 CT PUMP 02 SUPPORT R51 773SB F-A VT-3 F1.40 NA SUPPORT CRADLE. DWG 15210085/88 X --CHEMICAL & VOLUME CONTROL TCX-CSAHRG-01 753000 TCX-2-1150-1S1 REGENERATIVE HX 01 SUPPORT RI55C833RB F-A VT-3 F1.40 NA DWG D-4314-4, 3 SUPPORTS 2 -x ----

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS PAGE: 151 INSPECTION INTERVAL ASME SEC. XI CATGY ITEM NO PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD-OUTAGE ------1 2 1 2 3 1 2-----------..- ---------.-.-- --.PRESERVICE YEAR I INSTRUCTIONS I **CALIBRATION BLOCK--

SUMMARY

NUMBER EXAMINATION AREA IDENTIFICATION NDE METH AUXILIARY FEEDWATER 810500 AF-2-SB-001-H6 AF-2-001-428-S33R 2-074 F-A FI.30 VT- 3 NA STRUT 2 C 810550 AF-2rSB-001-H6 AF-2-001-428-S33R 2-074 D-A D1.20 VT-1 NA WELDED ATTACHMENT 2 C -810700 AF-2-SB-001-H8 AF-2-059-401-S33R 2-074 F-A Fl.30 VT- 3 NA STRUT 2 C -811800 AF-2-SB-002-H9 AF-2-002-439-S23R F-A F1.30 VT-3 NA STRUT 2 C 811850 AF-2-SB-002-H9 AF-2-002-439-S23R D-A D1.20 VT-1 NA WELDED ATTACHMENT 2 C -811900 AF-2-SB-003-H1 AF-2-035-402-S33R 2-073 F-A VT-3 F1.30 NA STRUT X -812250 AF-2-SB-003-H4 AF-2-035-428-S33R 2-070 D-A 'D1 .20 VT-i NA WELDED ATTACHMENT 2 -X -

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS PAGE: 152 INSPECTION INTERVAL I I PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD ASME SEC. XI CATGY NDE ITEM NO METH I -I-Ii PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION AUXILIARY FEEDWATER 812400 AF-2-SB-003-H6 AF-2-035-700-S33A 2-074 2 U T A 2 1 2 3 G E- --1 2 F-A Fl. 30 VT-3 NA BOX 2 ----X -812450 AF-2-SB-003-H6 AF-2-035-700-S33A 2-074 D-A Dl. 20 VT-i NA WELDED ATTACHMENT X -812460 AF-2-SB-003-H7 AF-2-035-424-S33A R074 808SB F-A Fl. 30 VT- 3 NA BOX 2 ----X -812470 AF-2-SB-003-H7 AF-2-035-424-S33A R074 808SB D-A D1.20 VT- i NA WELDED ATTACHMENT 2--X -812500 AF-2-SB-004-H1 AF-2-003-402-S33R 2-072 F-A F1.30 VT- 3 NA STRUT 2 ----X 812600 AF-2-SB-004-H2 AF-2-003-404-S33R 2-071 F-A Fl. 30 VT- 3 NA STRUT-X -812700 AF-2-SB-004-H3

'AF-2-003-407-S33A 2-072 F-A F1 .30 VT- 3 NA FRAME----

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS PAGE: 153 INSPECTION INTERVAL_ASME SEC. XI CATGY NDE ITEM NO METH PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION AUXILIARY FEEDWATER 812750 AF-2-SB-004-H3 AF-2-003-407-S33A 2-072 812800 AF-2-SB-004-H4 AF-2-058-407-S33R 2-072 1 2-OUTAGE-----------

1 2 3 1 2....................D-A D0. 20 F-A F1.30 VT-i NA WELDED ATTACHMENT 2 VT- 3 NA STRUT 2 ----X 812900 AF-2-SB-005-H1 AF-2-003-405-S33R 2-071 F-A F1.30 VT -3 NA STRUT 2 --X -813000 AF-2-SB-005-H2 AF-2-003-406-S33R 2-071 F-A Fl. 30 VT- 3 NA STRUT 2 ---X -814000 AF-2-SB-006-H4 AF-2-004-405-S33A 2-073 F-A Fl. 30 VT- 3 NA BOX 2 C -814050 AF-2-SB-006-H4 AF-2-004-405-S33A 2-073 D-A D1.20 VT-1 NA WELDED ATTACHMENT 2 C 814800 AF-2-SB-010-H2 AF-2-006-412-S33A 2-074 F-A F1.30 VT- 3 NA BOX 2 C DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS PAGE: 154 INSPECTION INTERVAL_ASME, SEC. XI CATGY NDE ITEM NO METH-PLAN STATUS FIRST SECOND PERIOD PERIOD THIRD PERIOD 1 2 PRESERVICE YEAR'INSTRUCTIONS I **CALIBRATION BLOCK**

SUMMARY

NUMBER EXAMINATION AREA IDENTIFICATION 1 2 OUTAGE 1 2 3 AUXILIARY FEEDWATER 814850 AF-2-SB-010-H2 AF-2-.006-412-S33A 2-074 D-A Dl. 20 VT- 1 NA WELDED ATTACHMENT 2 C -815000 AF-2-SB-011-H2 AF-2-005-700-S33A 2-070 815050 AF-2-SB-011-H2 AF-2-005-700-S33A 2-070 , F-A F£.30 D-A Dl. 20 VT -3 NA BOX 2 C -VT-1 NA WELDED ATTACHMENT 2 C 815100 AF-2-SB-011-H3 AF-2-084-401-S33A 2-070 F-A F1.30 VT- 3 NA BOX 2 C -815150 AF-2-SB-011-H3 AF-2-084-401-S33A 2-070 D-A D1.20 VT-i NA WELDED ATTACHMENT 2 C -815500 AF-2-SB-012-H4

-AF-2-010-403-S33A 2-072 F-A F£. 30 VT -3 NA BOX 2 C -815550 AF-2-SB-012-H4 AF-2-010-403-S33A 2-072 D-A D1.20 VT-1 NA WELDED ATTACHMENT 2 C -

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS PAGE: 155 INSPECTION.

INTERVAL_ASME SEC. XI CATGY NDE ITEM NO METH PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD--- OU- TAGF-------------

PRESERVICE YEAR I INSTRUCTIONS'

-**CALIBRATION BLOCK**

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION AUXILIARY FEEDWATER-816600 AF-2-SB-013-H7 AF-2-009-413-S33A 2-073 1 2 1 2 3/ 1 2 F-A Fl. 30 VT -3 NA BOX 2 C 816650 AF-2-SB-013-H7 AF-2-009-413-S33A 2-073 D-A Dl,. 20 VT-1 NA WELDED ATTACHMENT 2 C -816800 AF-2-SB-014-HI AF-2-061-401-S33A 2-072 816850 AF-2-SB-014-H1 AF-2-061-401-S33A 2-072 F-A Fl. 30 D-A D1.20 VT- 3 NA BOX 2 C -VT-i NA WELDED ATTACHMENT 2 C 817100 AF-2-SB-014-H4 AF-2-099-401-S33R 2-072 818600 AF-2-SB-017-HI AF-2-028-402-S33R 2-072 819000 AF-2-SB-017-H5S AF-2-039-401-S33R 2-072 F-A Fl 30 VT -3 NA STRUT 2 C F-A F1. 30 VT- 3 NA STRUT 2 C F-A Fl.30 VT -3 NA STRUT 2 C -

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS PAGE: 156/INSPECTION INTERVAL PLAN STATUS_____

FIRST SECOND THIRD PERIOD PERIOD PERIOD ASME SEC. XI CATGY NDE ITEM NO METH PRESERVICE YEAR I INSTRUCTIONS I **CALIBRATION BLOCK**

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION AUXILIARY FEEDWATER 819500 AF-2-SB-019-H1 AF-2-050-401-S33R 2-072 I----------

OUTAGE-1 2 1 2 3 1 2 F-A F1. 30 VT-23 NA STRUT 2 C -- ----820000 AF-2-SB-019-H6 AF-2-097-402-S33R 2-071 F-A F1.30 VT -3 NA STRUT 2 C -820100 AF-2-SB-019-H7 AF-2-097-403-S33R 2-071 F-A Fl. 30 VT- 3 NA STRUT 2 C -820200 AF-2-SB-019-H8 AF-2-097-406-S33R 2-071 F-A F1.30 VT-3 NA STRUT 2 C VT -1 820250 AF-2-SB-019-H8 AF-2-097-406-S33R 2-071 D-A D1. 20 NA WELDED ATTACHMENT 2 C 820400 AF-2-SB-020-H2 AF-2-099-408-S33R R071 807SB 820700 AF-2-SB-020-H5 AF-2-099-411-S33R R071 807SB F-A F1.30 VT -3 NA STRUT F-A F1.30 VT- 3 NA STRUT 2 -X DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS PAGE: 157 INSPECTION INTERVAL_ASME SEC. XI CATGY NDE ITEM NO METH PLAN STATUS FIRST SECOND PERIOD PERIOD-~OUTAGE 1 21 2 3 THIRD PERIOD 1 2 PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION AUXILIARY FEEDWATER 820800 AF-2-SB-020-H6 AF-2-099-412-$33R R071 807SB 820900 AF-2-SB-020-H7 AF-2-099-413-S33P, R082 807SB 821800 AF-2-SB-021-H3 AF-2-097-410-S3315 R082 807SB F-A Fl. 30 VT -3 NA STRUT 2 -X --F-A Fl.30 VT-3 NA STRUT X --F-A F1.30 VT- 3 NA STRUT 2 --X -821850 AF-2-SB-021-H3 AF-2-097-410-S33R R071 807SB 822700 AF-2-SB-021-H12 AF-2-097-423-S33A R082 807SB D-A D1. 20 F-A F1.30 D-A D1.20 VT- 1 NA WELDED ATTACHMENT 2 -X VT-3 NA BOX 2 -X 822750 AF-2-SB-021-H12 AF-2-097-423-S33A R082 807SB VT-i NA WELDED ATTACHMENT 2 -X 825750 AF-2-SB-027-H6 AF-2-030-403-S33R R073 794SB D-A VT-I Dl .20 NA WELDED ATTACHMENT 2 -X -

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS PAGE: 158 INSPECTION INTERVAL_ASME SEC. XI CATGY NDE ITEM NO METH PLAN STATUS_FIRST SECOND THIRD PERIOD PERIOD PERIOD PRESERVICE YEAR INSTRUCTIONS I **CALIBRATION BLOCK**

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION AUXILIARY FEEDWATER 826150 AF-2-SB-028ý-H1 AF-2-011-401-S33R R074 805SB 1 2 OUTAGE ---1 2 3 1 2 D-A D0. 20 VT-1 NA WELDED ATTACHMENT X 827600 AF-2-SB-030A-H1 AF-2-025-401-$33S R074 793SB F-A F1.30 VT- 3 NA SPRING 2 -X 827610 AF-2-SB-030A-H1 AF-2-025-401-S33S R074 793SB D-A D0. 20 VT-1 NA WELDED ATTACHMENT.

ADDEDIN 2RF10.2 -IX --829400 AF-2-SB-032-H2 AF-2-101-402-S33R R073 792SB 829500 AF-2-SB-032-H3 AF-2-101-431-S33A R073 792SB F-A F1.30 VT- 3 NA U-BOLT X F-A Fl. 30 VT -3 NA BOX X 829550 AF-2-SB-032-H3 AF-2-101-431-S33A R073 792SB D-A D1.20 VT- i NA WELDED ATTACHMENT 2 -X 836500 AF-2-SB-042-H11 AF-2-100-407-S33A R082 809SB F-A F1.30 VT-3 NA BOX 2 ---X DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS PAGE: 159 INSPECTION INTERVAL_ASME SEC. XI CATGY NDE ITEM NO METH PLAN STATUS FIRST SECOND PERIOD PERIOD-~OUTAGE 1 21 2 3 PRESERVICE YEAR THIRD PERIOD 1 2,

SUMMARY

NUMBER EXAMINATION AREA IDENTIFICATION INSTRUCTIONS

    • CALIBRATION BLOCK**AUXILIARY FEEDWATER 836550 AF-2-SB-042-H11 AF-2-100-407-S33A R082 809SB*D-A D1.20 VT-1 NA WELDED ATTACHMENT

--X 837500 AF-2-SB-044-HI AF-2-102-405-S33A 2-074 F-A Fl. 30 VT -3 NA BOX 2 -'X 837550 AF-2-SB-044-H1 AF-2-102-405-S33A 2-074 838600 AF-2-SB-044-HI2 AF-2-102-416-S33K 2-082 D-A D1.20 F-A Fl .30 VT- i NA WELDED ATTACHMENT X -VT-3 NA SNUBBER--X 839000 AF-2-SB-045-HI AF-2-096-405-S33A 2-074 F-A F1.30 VT-3 NA BOX---X 839050 AF-2-SB-045-H1 AP-2-096-405-S33A 2-074 D-A Dl. 20 VT- I NA WELDED ATTACHMENT 2--X 839600 AF-2-SB-045-H7 AR-2-096-413-S33R 2-082 F-A Fl. 30 VT -3 NA STRUT 2---X DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS PAGE: 160 INSPECTION INTERVAL PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION AUXILIARY FEEDWATER 839650 AF-2-SB-045-H7 AF-2-096-413-S33R 2-082 ASME SEC. XI CATGY NDE ITEM NO METH-----------

I 2-------0 U TAG 1 2 3 PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**E- ------1 2 D-A D1.20 VT-1 NA WELDED ATTACHMENT 2 -X -841000 AF-2-SB-046-H6 AF-2-098-412-S33A 2-082 F-A F1.30 IVT-3 NA BOX 2 -X -841050 AF-2-SB-046-H6 AF-2-098-412-S33A 2-082 D-A D1.20 VT-1 NA WELDED ATTACHMENT 2 -X -841500 AF-2-SB-047-H3 AF-2-096-439-S43R 2-078 F-A F1.30 VT- 3 NA STRUT X 841550 AF-2-SB-047-H3 AF-2-096-439-S43R 2-078 845800 AF-2-SB-055A-H3 AF-2-097-433-S53R 2-094 D-A VT-I D1.20 NA WELDED ATTACHMENT X F-A F1.30 VT -3 NA STRUT 2 X 845850 AF-2-SB-055A-H3 AF-2-097-433-S53R 2-094 D-A VT-i D1.20 NA WELDED ATTACHMENT 2 -X -

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS PAGE: 161 INSPECTION INTERVAL PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD PRESERVICE YEAR ASME SEC. XI CATGY NDE ITEM NO METH

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION AUXILIARY FEEDWATER 849200 AF-2-SB-063A-H1 AF-2-103-411-S53R 2-089 I -Ii S OUTAGE 2 1 23 1 2 INSTRUCTIONS

    • CALIBRATION BLOCK-*F-A F1.30 VT- 3 NA STRUT 2 -X -849250 AF-2-SB-063A-HI AF-2-103-411-S53R 2-089 D-A D01 20 VT- I NA WELDED ATTACHMENT 2 ----X 849700 AF-2-SB-063A-HG AF-2-111-401-S63R 2-100A F-A F1.30 VT -3 NA BOX X -849750 AF-2-SB-063A-H6 AF-2-111-401-S63R 2-100A D-A D1.20 VT- i NA WELDED ATTACHMENT 2 -X -850900 AF-2-YD-001-H1O AF-2-001-421-Y33R 2-085D F-A F1.30 VT-3 NA STRUT 2---X 850950 AF-2-YD-001-H10 AF-2-001-421-Y33R 2-085D D-A VT-I D0.20 NA WELDED ATTACHMENT 2- -x -851450 AF-2-SB-010-H15 AF-2-006-402-S33R 2-074 D-A D1.20 VT-1 NA WELDED ATTACHMENT 2 ---X DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS PAGE: 162 INSPECTION INTERVAL I I-PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD ASME SEC. XI CATGY NDE ITEM NO METH

SUMMARY

NUMBER EXAMINATION AREA IDENTIFICATION 1 2 PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**--- --OUTAGE--------------

1 2 3 1 2 AUXILIARY FEEDWATER 851650 AF-2-SB-010-H17 AF-2-006-405-S33R 2-074 D-A Dl. 20 VT- 1'NA WELDED ATTACHMENT 2 -X -852200 AF-2-YD-002-H5 AF-2-002-418-Y33R 2-085D F-A F1.30 VT-3 NA STRUT X 852250 AF-2-YD-002-H5 AF-2-002-418-Y33R 2-085D D-A D1.20 VT-1 NA WELDED ATTACHMENT 2 -X 855000 AF-2-YD-006-H3 AF-2-043-4 03-Y43R 2-085D COMPONENT COOLING 856600 CC-2-AB-001-H5 CC-2-019-706-A43R X-204 F-A F1.30 VT -3 NA STRUT 2 -X F-A Fl. 30 VT -3 NA STRUT 2 C 856650 CC-2-AB-001-H5 CC-2-019-706-A43R X-204 856700 CC-2-AB-001-H6 CC-2-019-707-A43S D-A D1.20 F-A Fl.30 VT -1 NA WELDED ATTACHMENT 2 C VT -3 NA SPRING 2 C DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPE6TION PLAN CLASS 3 SCHED/COMPL COMPONENTS PAGE: 163 INSPECTION INTERVAL ASME SEC. XI CATGY NDE ITEM NO METH_ _ PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD--- ---TT A GE--------------

PRESERVICE YEAR INSTRUCTIONS i **CALIBRATION BLOCK**

SUMMARY

NUMBER EXAMINATION AREA IDENTIFICATION COMPONENT COOLING 1 2 1 2 3 1 2 856750 CC-2-AB-001-H6 CC-2-019-707-A43S D-A D1.20 VT-1 NA WELDED ATTACHMENT 2 C 856800 CC-2-AB-001-H7 CC-2-019-713-A43S X-207 F-A Fl. 30 VT -3 NA SPRING 2 C 856850 CC-2-AB-001-H7 CC-2-0i9-713-A43S X-207 D-A D1.20 VT-1 NA WELDED ATTACHMENT 2 C -857050 CC-2-AB-001-HI0 CC-2-019-715-A43K F-A Fl.30 VT -3 NA SNUBBER 2 C 857100 CC-2-AB-002-H1 CC-2-045-001-A33R F-A F1.30 VT-3 NA STRUT 2 C 857200 CC-2-AB-002-H2 CC-2-045-002-A33R F-A Fl. 30 VT-3 NA STRUT 2 C -857300 CC-2-AB-002-H3 CC-2-045-004-A33R F-A F1.30 VT -3 NA STRUT 2 C DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS PAGE: 164 INSPECTION INTERVAL ASME SEC. XI CATGY NDE ITEM NO METH I I I PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**I

SUMMARY

NUMBER EXAMINATION AREA IDENTIFICATION COMPONENT COOLING 112 OUTAGE---------------

1 23 1 2 859250 CC-2-AB-003-H6 CC-2-012-707-A43R X-207 D-A D1.20 VT-1 NA WELDED ATTACHMENT 2 C 859400 CC-2-AB-004-H1 CC-2-969-700-A43S R197 800AB F-A F1.30 VT-3 NA SPRING 2 -X 859450 CC-2-AB-004-H1 CC-2-969-700-A43S R197 800AB D-A D1.20 VT-1 NA WELDED ATTACHMENT 2 -X --862300 CC-2-AB-006-H6 CC-2-028-401-A33R X-174 F-A Fl. 30 VT- 3 V NA STRUT 2 C -862350 CC-2-AB-006-H6 CC-2-028-401-A33R X-174 D-A D0. 20 VT- I NA WELDED ATTACHMENT 2 C -862500 CC-2-AB-006-H8 CC-2-028-404-A33R X-174 F-A Fl. 30 VT-3 NA STRUT 2 C 862550 CC-2-AB-006-H8 X-174 D-A 01.20 VT- i NA WELDED ATTACHMENT 2 C DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS PAGE: 165 INSPECTION INTERVAL_ASME SEC. XI CATGY NDE ITEM NO METH PLAN STATUS_FIRST SECOND THIRD PERIOD PERIOD PERIOD---OUTAGE-------------

1 2 2 3 1 2 PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION COMPONENT COOLING 862700 CC-2-AB-006-H10 CC-2-028-424-A33R X-174 F.-A F1.30 VT-I NA STRUT 2 C 862750 CC-2-AB-006-H1O CC-2-028-424-A33R X-174 D-A D1.20 VT -1 NA WELDED ATTACHMENT 2 C -862800 CC-2-AB-006-H11 CC-2-028-704-A33A F-A Fl. 30 VT- 3 NA BOX 2 C 862850 CC-2-AB-006-H1I CC-2-028-704-A33A D-A D0.20 VT-i NA WELDED ATTACHMENT 2 C -863100 CC-2-AB-007-H2 CC-2-045-007-A43A"F-A Fl. 30 VT- 3 NA BOX 2 C 863150 CC-2-AB-007-H2 CC-2-045-007-A43A D-A D1.20 VT -1 NA WELDED ATTACHMENT 2 C -863900 CC-2-AB-008-H6 CC-2-015-701-A43S X-204 F-A Fl. 30 VT- 3 NA SPRING 2 C -

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS PAGE: 166 INSPECTION INTERVAL ASME SEC. XI CATGY ITEM NO PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD---------OUTAGE---


1 2 1 2 3 1 2 PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION NDE METH COMPONENT COOLING 863950 CC-2-AB-008-H6 CC-2-015-701-A43S X-204 0D-A VT-I Dl. 20 NA WELDED ATTACHMENT 2 C 864000 CC-2-AB-008-H7 CC-2-044-700-A43K X-204 F-A F1.30 VT-3 NA SNUBBER 2 C 864050 CC-2-AB-008-H7 CC-2-044-700-A43K X-204 D-A D1.20 VT-1 NA WELDED ATTACHMENT 2 C 864200 CC-2-AB-009-H1 CC-2-050-001-A43S X-207 F-A F1.30 VT- 3 NA SPRING 2 C 864250 CC-2-AB-009-H1 CC-2-050-Q01-A43S X-207 D-A D1.20 VT-1 NA WELDED ATTACHMENT 2 C 864500 CC-2-AB-009-H4.

CC-2-050-701-A43S X-197 F-A Fl. 30 VT-3 NA SPRING 2 C 864550 CC-2-AB-009-H4 CC-2-050-701-A43S X-197 D-A D1.20 VT-1 NA WELDED ATTACHMENT 2 C DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS PAGE: 167 INSPECTION INTERVAL l i PLAN STATUS FIRST SECOND PERIOD PERIOD ASME SEC. XI CATGY NDE ITEM NO METH

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION I-Ii THIRD PERIOD 1 2 PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**S OUTAGE 2 12 3 COMPONENT COOLING 864600 CC-2-AB-009-H5 CC-2-050-702-A43K X-197 F-A VT-3 F1. 30 NA SNUBBER 2 C 864650 CC-2-AB-009-H5 CC-2-050-702-A43K X-197 D-A D1.20 VT-1 NA WELDED ATTACHMENT 2 C -864700 CC-2-AB-009-H6 CC-2-050-703-A43S F-A Fl. 30 VT- 3 NA SPRING 2 C -864750 CC-2-AB-009-H6 CC-2-050-703-A43S D-A D1.20 VT-1 NA WELDED ATTACHMENT 2 C 865200 CC-2-AB-010-H2 CC-2-116-701-A43R X-207 F-A Fl. 30 VT- 3 NA STRUT 2 C 865300 CC-2-AB-011-HI CC-2-110-700-A43R X-207 865800 CC-2-AB-011-H6 CC-2-155-701-A43A X-194 F-A VT-3 NA STRUT FI. 30 F-A F1.30 2 C -VT-3 NA BOX 2 C DATE: 01/21/08 f COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS PAGE: 168 INSPECTION INTERVAL_ASME SEC. XI CATGY NDE ITEM NO METH FIRST PERIOD 1 2 PLAN SE PE STATUS COND THIRD RIOD PERIOD IADE--- -----------

TAG E j 1 2 PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION 0 1 U 2-----------

COMPONENT COOLING 865850 CC-2-AB-011-M6 CC-2-155-701-A43A X-194 D-A D1.20 VT-1 NA WELDED ATTACHMENT 2 C 866100 CC-2-AB-012-H3 CC-2-126-401-A43R F-A F1.30 VT -3 NA STRUT 2 C -866300 CC-2-AB-012-H5 CC-2-133-401-A43R F-A Fl. 30 VT- 3 NA STRUT 2 C 866400 CC-2-AB-012-H6 CC-2-133-700-A43A F-A Fl.30 VT- 3 NA BOX 2 C 866450 CC-2-AB-012-H6 CC-2-133-700-A43A D-A D1.20 VT-1 NA WELDED ATTACHMENT 2 C 866800 CC-2-AB-012-H1O CC-2-158-407-A43K X-207 F-A VT-3 Fl.30 NA SNUBBER 2u2 -866850 CC-2-AB-012-H1O CC-2-158-407-A43K X-207 D-A Di.20 VT- 1 NA WELDED ATTACHMENT 2 C

, DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS PAGE: 169 INSPECTION INTERVAL PLAN STATUS_FIRST SECOND THIRD PERIOD PERIOD PERIOD ASME SEC. XI CATGY NDE ITEM NO METH

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION I 2 S12 OUTAGE 12 3 2 PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**I COMPONENT COOLING 866900 CC-2-AB-012-H11 CC-2-158-408-A43K X-207 F-A Fl. 30 VT -3 NA SNUBBER 2 C 866950 CC-2-AB-012-H11 CC-2-158-408-A43K X-207 D-A D1.20 VT-i NA WELDED ATTACHMENT 2 C -871600 CC-2-AB-017-H12 CC-2-008-719-A33A R174 800AB F-A F1.30 VT -3 NA BOX 2 X ----871650 CC-2-AB-017-H12 CC-2-008-719-A33A R174 800AB D-A D1.20 VT-1 NA WELDED ATTACHMENT 2 -X -872000 CC-2-AB-018-H3 CC-2-040-403-A33R RI80 800AB F-A F1.30 VT -3 NA BOX X ---872050 CC-2-AB-018-H3 CC-2-040-403-A33R R180 800AB 872100 CC-2-AB-018-H4 CC-2-040-404-A33R RI80 800AB D-A VT-I D1.20 NA WELDED ATTACHMENT x --F-A F1.30 VT-3 NA STRUT DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS PAGE: 170 INSPECTION INTERVAL ASME SEC. XI.CATGY NDE ITEM NO METH FIRST PERIOD 12 PLAN STATUS SECOND PERIOD

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION 0 1 U T A G E 2 3 THIRD PERIOD 12 PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**COMPONENT COOLING 872150 CC-2-AB-018-H4 CC-2-040-404-A33R R180 800AB D-A D1. 20 VT-1 NA WELDED ATTACHMENT 2 X 872200 CC-2-AB-018-H5 CC-2-048-401-A33R R170 800AB F-A F1.30 VT-3 NA STRUT 2 -X -872900 CC-2-AB-018-H12 CC-2-048-410-A33S RI80 80OAB F-A Fl. 30 VT -3 NA SPRING 2 X 876200 CC-2-AB-026-H2 CC-2-057-014-A33A R180 800AB F-A F1.30 VT- 3 NA BOX X I 876250 CC-2-AB-026-H2 CC-2-057-014-A33A R180 800AB D-A D1.20 VT-1 NA WELDED ATTACHMENT X 876700 CC-2-AB-027A-H4 CC-2-043-714-A33K RI80 800AB F-A F1.30 VT- 3 NA SNUBBER 2 X --876750 CC-2-AB-027A-H4 CC-2-043-714-A33K RI80 800AB D-A D1. 20 VT-1 NA WELDED ATTACHMENT 2 -X DATE:. 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS PAGE: 171 INSPECTION INTERVAL_FIRST ASME PERIO PLAN STATUS SECOND THIRD D PERIOD PERIOD---OUTAGE-------------

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION COMPONENT COOLING 877100 CC-2-AB-027A-H8 CC-2-066-700-A33A R180 800AB SEC. XI CATGY NDE ITEM NO METH I 2 11 PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**1 2 3 1 2 F-A F1.30 VT73 NA BOX x --877150 CC-2-AB-027A-H8 CC-2-066-700-A33A RI80 800AB D-A D1.20 VT- 1 NA WELDED ATTACHMENT 2 -X --877200 CC-2-AB-027A-H9 CC-2-068-700-A33A R180 800AS F-A Fl. 30 VT- 3 NA BOX 2 X --877250 CC-2-AB-027A-H9 CC-2-068-700-A33A R180 800AB D-A D1.20 VT- 1 NA WELDED ATTACHMENT 2 -878700 CC-2-AB-032-H9 CC-2-011-708-A63R X-241 F-A F1.30 VT-3 NA U-BOLT 2 -X -879800 CC-2-AB-033-H5 CC-2-007-010-A63R X-241 F-A VT-3 NA STRUT Fl. 30 D-A D1.20 2 --x 879850 CC-2-AB-033-H5 CC-2-007-010-A63R X-241 VT- 1 NA WELDED ATTACHMENT

--X DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS PAGE: 172 INSPECTION INTERVAL ASME SEC. XI CATGY NDE ITEM NO METH I[L I f--PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD I J J PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION COMPONENT COOLING 880200 CC-2-AB-033-H9 CC-2-007-017-A63R X-241 1-OUTAGE 21 2 '3 1 2 F-A Fl. 30 VT -3 NA STRUT 2 ---X 880250 CC-2-AB-033-H9 CC-2-007-017-A63R X-241 880700 CC-2-AB-038-H3 CC-2-164-403-A53S D-A D1.20 VT- 1 NA WELDED ATTACHMENT 2 X --F-A Fl.30 VT- 3 NA SPRING 2 -X --880750 CC-2-AB-038-H3 CC-2-164-403-A53S D-A D1.20 VT- 1 NA WELDED ATTACHMENT 2 ---X 881000 CC-2-AB-038-H6 CC-2-164-407-A63K X-235 F-A F1.30 VT-3 NA SNUBBER 2 -X 882900 CC-2-AB-039-H9 CC-2-156-710-A53R X-194 F-A Fl. 30 VT -3 NA STRUT 2-X -882950 CC-2-AB-039-H9 CC-2-156-710-A53R X-194 D-A D1.20 VT-i NA WELDED ATTACHMENT 2 --X -

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS PAGE: 173 INSPECTION INTERVAL_FIR ASME PER SEC. XI -CATGY NDE -ITEM NO METH 1 2 ST IOD PLAN STATUS SECOND THIRD PERIOD PERIOD PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**

SUMMARY

NUMBER EXAMINATION AREA IDENTIFICATION COMPONENT COOLING OUTAGE 1 2 3 12 883000 CC-2-AB-049-HI CC-2-007-001-A73K X-245 F-A Fl. 30 VT- 3 NA SNUBBER 2 X 883050 CC-2-AB-049-H1 CC-2-007-001-A73K X-245 D-A D0.20 VT-1 NA WELDED ATTACHMENT 2 -X 883400 CC-2-AB-050-H1 CC-2-011-001-A63R X-241 F-A F1.30 VT- 3 NA STRUT X 883450 CC-2-AB-050-H1 CC-2-011-001-A63R X-241 D-A D1.20 VT-.1 NA WELDED ATTACHMENT 2 -883600 CC-2-AB-050-H3 CC-2-011-003-A73R X-245 F-A Fl. 30 VT- 3 NA STRUT 2 --X ---883650 CC-2-AB-050-H3 CC-2-011-003-A73R X-245 D-A D1.20 VT- 1 NA WELDED ATTACHMENT 2 --X 885100 CC-2-EC-001-H7 CC-2-035-709-E33S X-115B F-A F1.30 VT-3 NA SPRING 2 ---X DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN, CLASS 3 SCHED/COMPL COMPONENTS PAGE: 174 INSPECTION INTERVAL ASME SEC. XI CATGY NDE ITEM NO METH PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD---OUTAGE-------------

1 21 2 3 1 2 PRESERVICE YEAR F INSTRUCTIONS I **CALIBRATION BLOCK**

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION COMPONENT COOLING 885150 CC-2-EC-001-H7 CC-2-035-709-E33S X-I15B D-A D1.20 VT-1 NA WELDED ATTACHMENT 2-X 885400 CC-2-EC-001-H10 CC-2-035-714-A33A X-180 F-A Fl. 30 VT -3 NA BOX 2 X 885450 CC-2-EC-001-H1O CC-2-035-714-A33A X-180 D-A D1.20 VT-i NA WELDED ATTACHMENT 2 ---X 886300 CC-2-EC-003A-H1 CC-2-107-700-E23R X-115B 887000 CC-2-EC-004-H1 CC-2-105-401-E23R X-115B F-A Fl.30 VT -3 NA STRUT-X F-A F1.30 VT -3 NA STRUT 2 ---X 887050 CC-2-EC-004-HI CC-2-105-401-E23R X-115B D-A Dl. 20 VT- 1 NA WELDED ATTACHMENT

-X 888300 CC-2-FB-002-Hl CC-2-126-004-F43K F-A FI.30 VT -3 NA SNUBBER 2 --X DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS PAGE: 175 INSPECTION INTERVAL_ASME SEC. xI -CATGY NDE -ITEM NO METH I1 PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD-----------------


I----OUTAGE-2 1 23 1 2 PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**

SUMMARY

NUMBER EXAMINATION AREA IDENTIFICATION COMPONENT COOLING 891200 CC-2-RB-046-H2 CC-2-204-407-C53A 2-155E F-A VT-3 Fl.30 NA BOX 2 --X 891250 CC-2-RB-046-H2 CC-2-204-407-C53A 2-155E D-A D1.20 VT-1 NA WELDED ATTACHMENT X -891600 CC-2-RB-046-H6 CC-2-204-421-C53R 2-155E F-A F1.30 VT-3 NA STRUT 2 --X 891650 CC-2-RB-046-H6 CC-2-204-421-C53R 2-155E D-A Dl. 20 VT-I NA WELDED ATTACHMENT

-X 892000 CC-2-RB-086-H2 CC-2-246-423-C53R 2-155D 892050 CC-2-RB-086-H2 CC-2-246-423-C53R 2-155D F-A Fl .30 VT -3 NA STRUT 2 X D-A VT-I Dl. 20 NA WELDED ATTACHMENT 2 X 892200 CC-2-RB-084-H4 CC-2-249-404-C53R 2-155D F-A Fl. 30 VT- 3 NA STRUT X -

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS PAGE: 176 INSPECTION INTERVAL_ASME SEC. XI CATGY NDE ITEM NO METH PLAN STATUS_ _FIRST SECOND THIRD PERIOD PERIOD PERIOD---OUTAGE-------------

1 2 1 2 3 1 2----------. ----. ----.- --------PRESERVICE YEAR INSTRUCTIONS I **CALIBPATION BLOCK**

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION COMPONENT COOLING.892250 CC-2-RB-084-H4 CC-2-249-404-C53R 2-155D D-A D1.20 VT-i NA WELDED ATTACHMENT 2 X -892900 CC-2-RB-085-H6 CC-2-204-420-C53R 2-155E F-A F1.30 VT- 3 NA STRUT 2---X -892950 CC-2-RB-085-H6 CC-2-204-420-C53R 2-155E D-A D1.20 VT- 1 NA WELDED ATTACHMENT

---X -893600 CC-2-RB-086-H4 CC-2-246-419-C53R 2-155D F-A Fl. 30 VT- 3 NA STRUT X 893650 CC-2-RB-086-H4 CC-2-246-419-C53R 2-155D D-A D1.20 VT- 1 2 -NA WELDED ATTACHMENT

---X 893800 CC-2-RP-086-H6 CC-2-246-422-C53A 2-155D F-A F1.30 VT -3 NA BOX 2 X -893850 CC-2-RB-086-H6 CC-2-246-422-C53A 2-155D D-A D0.20 VT- 1 NA WELDED ATTACHMENT 2 X DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS PAGE: 177 INSPECTION INTERVAL_ASME SEC. XI EXAMINATION AREA CATGY NDE IDENTIFICATION ITEM NO METH PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD---OUTAGE-------------

1 21 2 3 1 2 PRESERVICE YEAR I.INSTRUCTIONS I **CALIBRATION BLOCK**

SUMMARY

NUMBER COMPONENT COOLING 894000 CC-2-RB-097-H1 CC-2-201-402-C53R 2-155G F-A Fl. 30 VT -3 NA STRUT-x 894050 CC-2-RB-097-H1 CC-2-201-402-C53R 2-155G D-A Dl.20 VT-1 NA WELDED ATTACHMENT

-x -894100 CC-2-RB-097-H2 CC-2-201-404-C53R 2-155G F-A F1.30 VT -3 NA STRUT-x 894150 CC-2-RB-097-H2 CC-2-201-404-C53R 2-155G D-A D1.20 VT-i NA WELDED ATTACHMENT 2 -X --894700 CC-2-SB-034B-H1 CC-2-008-406-$33R 2-070 F-A F1.30 VT -3 NA STRUT 2-X 894750 CC-2-SB-034B-H1 CC-2-008-406-$33R 2-070 D-A Dl. 20 VT- I NA WELDED ATTACHMENT 2 X 894900 CC-2-SB-034B-H3 CC-2-030-401-S33R 2-070 F-A F1.30 VT-3 NA STRUT 2--X DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS PAGE: 178 INSPECTION.INTERVAL ASME SEC. XI CATGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS_SECOND THIRD PERIOD PERIOD OUTAGE-------------

PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION


..------------------

COMPONENT COOLING 895600 CC-2-SB-035-H4 CC-2-028-428-$33R 2-070 112 1 2 3 1 2 F-A F1.30 VT- 3 NA BOX X 895650 CC-2-SB-035-H4 CC-2-028-428-S33R 2-070 D-A D1.20 VT -1 NA WELDED ATTACHMENT

--X 895700 CC-2-SB-035-H5 CC-2-031-409-$33R 2-070 F-A F1.30 VT-3 NA BOX 2 ---X --895750, CC-2-SB-035-H5 , CC-2-031-409-$33R 2-070 D-A Dl. 20 VT -1 NA WELDED ATTACHMENT X 896600 CC-2-SB-036-H3 CC-2-028-417-$33R 2-071 F-A F1. 30 VT- 3 NA STRUT-X -896650 CC-2-SB-036-H3 CC-2-028-417-S33R 2-071 D-A D1.20 VT- i NA WELDED ATTACHMENT 2 -896700 CC-2-SB-036-H4 CC-2-028-422-S33R 2-071 F-A Fl. 30 VT- 3 NA STRUT-X DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS PAGE: 179 INSPECTION INTERVAL_I FIRST PERIOD ASME SEC. XI CATGY NDE ITEM NO METH I

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION COMPONENT COOLING 896750 CC-2-SB-036-H4 CC-2-028-422-S33R 2-071 I 11 2 PLAN STATUS SECOND THIRD PERIOD PERIOD OUTAGE---


1 2 3 1 2 PRESERVICE YEAR INSTRUCTIONS

~CALIBRATION BLOCK**D-A D1.20 VT- I NA WELDED ATTACHMENT X -896900 CC-2-SB-037-H2 CC-2-077-403-S43S 2-069 F-A Fl. 30 VT- 3 NA SPRING 2 --X -896950 CC-2-SB-037-H2 CC-2-077-403-S43S 2-069 D-A D1.20 VT-i NA WELDED ATTACHMENT 2 --X 897200 CC-2-SB-037-H5 CC-2-077-406-$43S 2-069 F-A Fl .30 VT -3 NA SPRING 2 X -897250 CC-2-SB-037-H5 CC-2-077-406-S43S 2-069 D-A D1.20 VT- i NA WELDED ATTACHMENT 2 X -897400 CC-2-SB-038-H1 CC-2-031-401-S33K 2-069 F-A F1.30 VT- 3 NA SNUBBER 2 C -897450 CC-2-SB-038-HI CC-2-031-401-S33K 2-069 D-A D1.20 VT- 1 NA WELDED ATTACHMENT 2 C -

DATE: 01121108 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION-PLAN CLASS 3 SCHED/COMPL COMPONENTS PAGE: 180 INSPECTION INTERVAL

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION COMPONENT COOLING 897600 CC-2-SB-038-H3 CC-2-031-407-S43S 2-069 ASME SEC. XI CATGY NDE ITEM NO METH____ PLAN STATUS_FIRST SECOND PERIOD PERIOD-~OUTAGE 1 21 2 3 PRESERVICE YEAR THIRD PERIOD 12 INSTRUCTIONS

    • CALIBRATION BLOCK**F-A Fl. 30 VT- 3 NA SPRING 2 C -897650 CC-2-SB-038-H3 CC-2-031-407-S43S 2-069 D-A D1.20 VT-1 NA WELDED ATTACHMENT 2 C 898200 CC-2-SB-039-H2 CC-2-028-409-$33R 2-063 F-A Fl. 30 VT -3 NA STRUT 2 C -898250 CC-2-SB-039-H2 CC-2-028-409-$33R 2-063 D-A D0. 20 VT-1 NA WELDED ATTACHMENT 2 C 898400 CC-2-SB-039-H4 CC-2-028-411-S33K 2-063 898450 CC-2-SB-039-H4 CC-2-028-411-S33K 2-063 F-A Fl. 30 D-A D1.20 VT- 3 NA SNUBBER 2 C -VT- I NA WELDED ATTACHMENT 2 C -898500 CC-2-SB-039-H5 CC-2-028-412-$33R 2-064 F-A Fl. 30 VT- 3 NA SNUBBER 2 C -

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS PAGE: 181 INSPECTION INTERVAL ASME SEC. XI CATGY NDE ITEM NO METH-_____PLAN STATUS_ _ _ _FIRST -SECOND THIRD I PRESERVICE YEAR

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION COMPONENT COOLING 898550 CC-2-SB-039-H5 CC-2-028-412-$33R 2-064 PERIOD PERIOD------------

O--TA--1 0 U T A 1[1 2 1 2 3 .PERIOD l--------------

1E 2 1 2 INSTRUCTIONS

    • CALIBRATION BLOCK**D-A D1.20 VT-1 NA WELDED ATTACHMENT 2 C -898600 CC-2-SB-039-H6 CC-2-028-413-$33R 2-064 F'A Fl.30 VT- 3 NA STRUT 2 C 898650 CC-2-SB-039-H6 CC-2-028-413-$33R 2-064 D-A D1.20 VT-1 NA WELDED ATTACHMENT 2 C 899700 CC-2-SB-039-H7 CC-2-028-414-$33R 2-065 F-A F£.30 VT- 3 NA STRUT 2 C -898750 CC-2-SB-039-H7 CC-2-028-414-$33R 2-065 D-A D1.20 VT-1 NA WELDED ATTACHMENT 2 C 899300 CC-2-SB-040-H5 CC-2-065-411-S43S 2-068 899350 CC-2-SB-040-H5 CC-2-065-411-S43S 2-068 F-A F1.30 D-A D1.20 VT -3 NA SPRING 2 C VT-1 NA WELDED ATTACHMENT 2 C DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS PAGE: 182 INSPECTION INTERVAL PLAN STATUS FIRST SECOND THIRD ASME I PERIOD PERIOD PERIOD

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION COMPONENT COOLING 900200 CC-2-SB-042-H5 CC-2-065-402-$33R 2-070 SEC. XI CATGY NDE ITEM NO METH 112 PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**OUTAGE 1 2 3 1 2 F-A Fl. 30 VT- 3 NA BOX 2 C 900250 CC-2-SB-042-HS CC-2-065-402-$33R 2-070 D-A D1.20 VT-1 NA WELDED ATTACHMENT 2 C 900300 CC-2-SB-042-HN CC-2-065-404-$33R 2-068 F-A Fl. 30 VT-3 2 C NA STRUT 900350 CC-2-SB-042-H6 CC-2-065-404-533R 2-068 D-A D1.20 VT- 1 NA WELDED ATTACHMENT 2 C 900500 CC-2-SB-042-H8 CC-2-078-401-$33R 2-070 F-A Fl. 30 VT- 3 NA STRUT 2 C 900550 CC-2-SB-042-H8 CC-2-078-401-$33R 2-070 D-A D1.20 VT- 1 NA WELDED ATTACHMENT 2 C 902500 CC-2-SB-047-H2 CC-2-008-402-$33R R063 800AB F-A Fl. 30 VT -3 NA STRUT 2 X -

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS PAGE: 183 INSPECTION INTERVAL_ASME SEC. XI CATGY NDE ITEM NO METH PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD---OUTAGE-------------

PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION COMPONENT COOLING 902550 CC-2-SB-047-H2 CC-2-008-402-533R R063 800SB 1 1 2 2 3 1 2 VT-1 D-A D1,20 NA WELDED ATTACHMENT 2 --x 903100 CC-2-SB-048-H3 CC-2-159-409-$53R R088 839SB F-A F1.30 VT- 3 NA STRUT-With App RR D-1 2--X 903150 CC-2-SB-048-H3 CC-2-159-409-S53R R088 839SB D-A D1.20 VT-1 NA WELDED ATTACHMENT-App RR D-1 X --903800 CC-2-SB-052-H3 CC-2-155-408-$53R ROBS 839SB F-A Fl. 30 VT-3 NA STRUT-with APP RR D-1--X I- -903850 CC-2-SB-052-H3 CC-2-155-408-$53R R088 839SB D-A D1.20 VT- 1 NA WELDED ATTACHMENT-App RR D-1 2 X 904000 CC-2-SB-052-H5 CC-2-202-401-$53A 2-088 F-A F1. 30 VT- 3 NA BOX 2---X -904050 CC-2-SB-052-H5 CC-2-202-401-$53A 2-088 D-A D1.20 VT-i NA WELDED ATTACHMENT 2 X DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS PAGE: 184 INSPECTION INTERVAL_ASME SEC. XI CATGY NDE ITEM NO METH FIRST PERIO PLAN STATUS SECOND THIRD D PERIOD PERIOD I I PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION 1* OUTAGE-2 1 2 3 1.---, -I.21 COMPONENT COOLING 907750 CC-2-SB-063-H4 CC-2-146-405-$43R 2-086 908100 CC-2-SB-063-H8 CC-2-167-402-$43R 2-086 908150 CC-2-SB-063-H8 CC-2-167-402-$43R 2-086 D-A Dl. 20 F-A F1.30 D-A D1.20 VT- 1 NA WELDED ATTACHMENT 2 --X VT-3 NA STRUT-x -VT-I NA WELDED ATTACHMENT 2 -X -DIESEL OIL 9i0600 DO-2-DG-018-H2 DO-2-056-402-D53A R085 838DG F-A F1.30 VT-3 NA BOX X -910650 DO-2-DG-018-H2 DO-2-056-402-D53A R085 838DG D-A D1.20 VT-1 NA WELDED ATTACHMENT 2 X 910900 DO-2-DG-020-H2 DO-2-053-402 D53A R085 838DG F-A Fl.30 VT- 3 NA BOX 2 X -910950 DO-2-DG-020-H2 DO-2-053-402-D53A 5R05 Ri2Dn D-A D0.20 VT- i NA WELDED ATTACHMENT 2 X --

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS PAGE: 185 INSPECTION INTERVAL ASME SEC. XI CATGY NDE ITEM NO METH F 1 2 p IRST ERIOD PLAN STATUS SECOND THIRD PERIOD PERIOD

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION 0 U T A G 2 1 2 3------ ---U T A--------------

1 2 PRESERVICE YEAR INSTRUCTIONS I CALIBRATION BLOCK**MAIN STEAM 912800 MS-2-SB-001-H1 MS-2-415-001-S23R 2-074 F-A F1.30 VT--3 NA BOX 2- X 912850 MS-2-SB-001-Hl MS-2-415-001-S23R 2-074 D-A D1.20 VT -1 X NA WELDED ATTACHMENT NA STRUT 912900 MS-2-SB-001-H2 MS-2-416-401-S33R 2-074 F-A Fl. 30 VT-3 2 ---X -913600 MS-2-SB-002-Hl MS-2-416-405-S43R 2-082 F-A Fl. 30 VT- 3 NA STRUT 2 -X 913650 MS-2-SB-002-Hl MS-2-416-405-S43R 2-082 SERVICE WATER 915800 SW-2-AB-003-HI SW-2-004-001-A33R R175 800AB 915900 SW-2-AB-003-H2 SW-2-004-002-A33R R175 800AB D-A D1.20 VT- I NA WELDED ATTACHMENT-CX F-A Fl.30 VT- 3 NA STRUT 2 X -F-A Fl. 30 VT- 3 NA STRUT 2 -X -

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS PAGE: 186 INSPECTION INTERVAL PLAN STATUS E I FIRST PERIOD ASME SEC. XI CATGY ITEM NO

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION SERVICE WATER 916100 SW-2-AB-003-H4 SW-2-004-005-A33R R175 800AB 916200 SW-2-AB-003-N5 SW-2-004-006-A33R R175 800AB 917200 SW-2-AB-005-H3 SW-2-102-020-A43R R204 817AB NDE METH 1 2 SECOND THIRD PERIOD PERIOD OUTAGE-------------

1 2 3 1 2 PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**-----------

F-A Fl. 30 VT-3 NA STRUT 2 --X F-A Fl. 30 VT- 3 NA STRUT 2 x F-A Fl.30 VT-3 NA STRUT 2 -X -917250 SW-2-AB-005-H3 SW-2-102-020-A43R R204 817AB D-A D1.20 VT -1 NA WELDED ATTACHMENT X 918600 SW-2-AB-006-H7 SW-2-173-022-A43R R207 810AB 918650 SW-2-AB-006-H7 SW-2-173-022-A43R R207 810AB F-A F1.30 VT-3 NA STRUT 2 -x D-A VT-I D1.20 NA WELDED ATTACHMENT X -919700 SW-2-AB-007-H2 SW-2-012-022-F33K RFBSW787AB F-A F1.30 VT-3 NA SNUBBER DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS PAGE: 187 INSPECTION INTERVAL_ASME SEC. XI CATGY NDE ITEM NO METH FIRST PERIOD 1 2 PLAN STATUSE_SECOND THIRD PERIOD PERIOD PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK-*

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION 1 2 3 D U E--- -1 2 SERVICE WATER 919750 SW-2-AB-007-H2 SW-2-012-022-F33K RFBSW787AB D-A D0.20 VT-i NA WELDED ATTACHMENT X 920600 SW-2-AB-008-H2 SW-2-010-002-A33K R175 787AB F-A F1.30 VT-3 NA SNUBBER X -921600 SW-2-AE-008-H13 SW-2-129-004-A33K R175 787AB F-A F1.30 VT- 3 NA SNUBBER--x 921650 SW-2-AB-008-H13 SW-2-129-004-A33K R175 787AB D-A Dl1 20.VT- i NA WELDED ATTACHMENT 2 X 924500 SW-2-AB-010-H14 SW-2-129-025-A43R R207 787AB F-A F1.30 VT- 3 NA STRUT 2 X 924550 SW-2-AB-010-H14 SW-2-129-025-A43R R207 787AB D-A Dl. 20 VT-1 NA WELDED ATTACHMENT x 925650 SW-2-AB-012-HI SW-2-132-006-A43R X-207 D-A VT-I D1.20 NA WELDED ATTACHMENT

-X DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS PAGE: 188 INSPECTION INTERVAL_ASME SEC. XI CATGY NDE ITEM NO METH 1 FIRST PERIO 2 PLAN STATUS SECOND THIRD D PERIOD PERIOD--OUTAGE-------------

1 2 3 1 2---.-.---------.-.--------

PRESERVICE YEAR INSTRUCTIONS

--CALIBRATION BLOCK*

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION SERVICE WATER 927000 SW-2-AB-012-H15 SW-2-132-021-A43R X-207 F-A F1. 30 VT-3 NA STRUT 2-X 927050 SW-2-AB-012-H1S SW-2-132-021-A43R X-207 D-A D1.20 VT -1 NA WELDED ATTACHMENT 2 -X 931300 SW-2-FB-001-H7 SW-2-001-021-F33R F-A F1.30 VT- 3-X NA STRUT NA WELDED ATTACHMENT 931350 SW-2-FB-001-H7 SW-2-001-021-F33R D-A Dl. 20 VT- I 2---X 934000 SW-2-FB-004-H8 SW-2-012-024-F33K X-FBSWT F-A F1.30 VT- 3 NA SNUBBER 2 X 934050 SW-2-FB-004-H8 SW-2-012-024-F33K X-FBSWT D-A Dl. 20 VT-1 NA WELDED ATTACHMENT 934500 SW-2-SB-013-Hl SW-2-102-429ýS43A 2-082 F-A Fl. 30 VT-3 NA BOX DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS PAGE: 189 INSPECTION INTERVAL_ASME SEC. XI CATGY NDE ITEM NO METH-----------.-.-----.-.--

PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD---OUTAGE-------------

1 2 1 2 3 1 2 PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION


----------

SERVICE WATER 934550 SW-2-SB-013-H1 SW-2-102-429-S43A 2-082 D-A D1.20 VT-I NA WELDED ATTACHMENT 2 X 934700 SW-2-SB-013-H3 SW-2-102-431-S43R 2-082 F-A F1.30 VT- 3 NA STRUT 2 --X 934750 SW-2-SB-013-H3 SW-2-102-431-S43R 2-082 D-A D1.20 VT-1 NA WELDED ATTACHMENT 2-X 934900 SW-2-SB-013-H5 SW-2-102-433-S43R 2-082 F-A Fl. 30 VT- 3 NA STRUT X 934950 SW-2-SB-013-H5 SW-2-102-433-S43R 2-082 935100 SW-2-SB-013-H7 SW-2-102-435-S43R 2-082 D-A D1.20 F-A F1.30 D-A D1.20 VT-1 NA WELDED ATTACHMENT X VT- 3 NA STRUT X 935150 SW-2-SB-013-H7 SW-2-102-435-S43R 2-082 VT- i NA WELDED ATTACHMENT x

DATE: 01/21/08 COMANCHE PEAK UNIT 2 PAGE: 190 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_I FIRST ASME PERIO[SEC. XI -CATGY NDE -ITEM NO METH 1 2...........--------........- -D PLAN STATUS SECOND THIRD PERIOD PERIOD PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION SERVICE WATER 935300 SW-2-SB-013-H9 SW-2-102-437-S43R 2-082 OUTAGE 1 2 3 1 2 F-A FP.30 VT -3 NA STRUT 2-X 935350 SW-2-SB-013-H9 SW-2-102-437-S43R 2-082 D-A D1.20 VT-i NA WELDED ATTACHMENT 2 X 935800 SW-2-SB-014-H5 SW-2-129-445-S43A 2-082 F-A F1.30 VT -3 NA BOX 2 ----X 935850 SW-2-SB-014-H5 SW-2-129-445-S43A 2-082 D-A Dl.20 VT- I NA WELDED ATTACHMENT

---X 936500 SW-2-SB-018-H1 SW-2-100-401-S33R 2-070 F-A F1.30 VT- 3 NA STRUT 2----X 936550 SW-2-SB-018-H1 SW-2-100-401-S33R 2-070 D-A D1.20 VT-1 NA WELDED ATTACHMENT X 936700 aW-2-SB-019-H2 SW-2-102-439-S43R 2-082 F-A F1.30 VT-3 NA STRUT 2 --N DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS PAGE: 191 INSPECTION INTERVAL ASME SEC. XI CATGY NDE ITEM NO METH PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD--OUTAGE-------------

1 2 1 2 3 1 2 PRESERVICE YEAR INSTRUCTIONS I *CALIBRATION BLOCK**

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION SERVICE WATER 936750 SW-2-SB-019-H2 SW-2-102-439-S43R 2-082 D-A D1. 20 VT-1 NA WELDED ATTACHMENT 2 -937000. SW-2-SB-019-H5 SW-2-102-443-S43R 2-082 F-A F1.30 VT- 3 NA STRUT----X 937050 SW-2-SB-019-H5 SW-2-102-443-S43R 2-082 D-A D1. 20 VT-I NA WELDED ATTACHMENT

-X, 938500 SW-2-SB-021-H6 SW-2-132-416-S43R 2-082 F-A Fl. 30 VT- 3 NA STRUT X 938550 SW-2-SB-021-HG SW-2-132-416-S43R 2-082 D-A D1.20 VT-i NA WELDED ATTACHMENT 2 --X 938800 SW-2-SB-021-H9 SW-2-132-443-S33R 2-070 F-A F1.30 VT- 3 NA STRUT 2 X 938850 SW-2-SB-021-H9 SW-2-132-443-S33R 2-070 D-A D1. 20 VT- 1 NA WELDED ATTACHMENT 2 -----X DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS PAGE: 192 INSPECTION INTERVAL_ASME SEC. XI CATGY NDE.ITEM NO METH PLAN STATUS FIRST' SECOND THIRD PERIOD PERIOD PERIOD-OUT---A-GE-------------------

1 U T A G 1E ......1 2 1 2 3 1 2 PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION SERVICE WATER 939200 SW-2-SB-022-H4 SW-2-173-410-S43A F-A Fl. 30 VT-3 NA BOX 2 939250 SW-2-SB-022-H4 SW-2-173-410-S43A D-A Dl. 20 VT- 1 NA WELDED ATTACHMENT 2 -939700 SW-2-SB-023-H5 SW-2-132-439-S43A 2-082 F-A Fl. 30 VT- 3 NA BOX 2 939750 SW-2-SB-023-HS SW-2-132-439-S43A 2-082 D-A D1. 20 VT- 1 NA WELDED ATTACHMENT 2 -X 943150 SW-2-YD-005-H17 SW-2-173-704-S33R 2-070 D-A D1. 20 VT-1 NA WELDED ATTACHMENT 2 --X 943200 SW-2-YD-005-H18 SW-2-173-705-Y33A 2-085D F-A F1.30 VT-3 NA BOX 2 --x 943250 SW-2-YD-005-H18 SW-2-173-705-Y33A 2-085D D-A D1.20 VT- I NA WELDED ATTACHMENT X

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS PAGE: 193 INSPECTION INTERVAL ASME SEC. XI CATGY NDE ITEM NO METH FIRST PERIOD-1 PLAN STATUS SECOND THIRD PERIOD PERIOD OUTAGE---


1 2 3 1 2 PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK"*

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION SERVICE WATER 943900 SW-2-YD-006-H6 SW-2-132-428-Y33R R085D800YD F-A Fl. 30 VT- 3 NA BOX 2 -X 943950 SW-2-YD-006-H6 SW-2-132-428-Y33R R085DBOOYD D-A Dl. 20 VT-1i NA WELDED ATTACHMENT 2 -X 945000 SW-2-YD-006-H17 SW-2-132-701-Y33A R085DBOOYD F-A Fl.30 VT- 3 NA BOX 2 -x 945050 SW-2-YD-006-H17 SW-2-132-701-Y33A R085D800YD D-A D1.20 VT- 1 NA WELDED ATTACHMENT 2 -X -946950 SW-2-YD-007-HI8 SW-2-102-471-S33R 2-070 D-A D0. 20 VT-1 NA WELDED ATTACHMENT 2 ---X 947100 SW-2-YD-007-H20 SW-2-102-482-Y33R 2-085D F-A F1. 30 VT -3 NA STRUT X 947150 SW-2-YD-007-H20 SW-2-102-482-Y33R 2-085D D-A D1.20 VT-1 NA WELDED ATTACHMENT 2-X DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS PAGE: 194 INSPECTION INTERVAL ASME SEC. XI CATGY NDE ITEM NO METH----------.-.-----.-.-

PLAN STATUS FIRST SECOND PERIOD PERIOD--PRESERVICE YEAR THIRD PERIOD-INSTRUCTIONS 1 2 j **CALIBRATION BLOCK*-

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION

............---.-----------

SW-2-YD-007-H21 947200 SW-2-YD-007-H21 SW-2-102-700-Y33A 2-085D SERVICE WATER 947250 SW-2-YD-007-H21 SW-2-102-700-Y33A 2-085D 1 2 OUTAGE 1 2 3 F-A Fl.30 VT -3 NA BOX 2 -X I VT- I D-A D1.20 NA WELDED ATTACHMENT 2 -X 948150 SW-2-YD-008-H8 SW-2-129-456-Y33R 2-085D D-A D1.20 VT-1 NA WELDED ATTACHMENT 2-X 948950 SW-2-YD-008-H16 SW-2-129-464-Y33R 2-095D D-A D1.20 VT-I NA WELDED ATTACHMENT 2-X AUXILIARY FEEDWATER 4-AF-2-104-2003-3 I NA MOMENT RESTRAINT, S2-0688-10 950000 AF-2-SB-055B-MR1 CP2-AFSSMR-01 R100A861SB F-A F1.40 VT- 3--X -AUXILIARY FEEDWATER 4-AF-2-107-2003-3 950200 AF-2-SB-027B-MR3 CP2-AFSSMR-03 R100AB61SB F-A F1.40 VT- 3----X NA MOMENT RESTRAINT, S2-0688-12.

REPLACES SW-2-SI-004-PS1,-PS2, AND -PS3. REFER TO SECTION 6.0 OF THE ISI PROGRAM PLAN.

DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS PAGE: 195 INSPECTION INTERVAL PLAN STATUS FIRST SECOND PERIOD PERIOD ASME SEC. X CATGY ITEM VT THIRD PERIOD 1 2 PRESERVICE YEAR INSTRUCTIONS

    • CALIBRATION BLOCK**

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION NDE 1 2 NO METH 1 2 OUTAGE 1 2 3 COMPONENT COOLING WATER CP2-CCAPCC-01 951400 CC-2-AB-001-PS1 CCW PUMP SUPPORTS R205 810AB F-A VT-3 Fl. 40 NA BASE. DWG FP-1421067417 X COMPONENT COOLING WATER CP2-CCAHHX-01 951600 CC-2-AB-005-HXS1 CCW HX SUPPORT R174 790AB 951700 CC-2-AB-005-HXWS1 CCW HX SUPPORT WELDED ATTACHMENT R174 790AB F-A F1.40 D-A D1.10 VT- 3 NA DWG 2-74-06-32467D3 2 -----X VT-1 NA SADDLES. DWG 2-74-06-32467D3


X COMPONENT COOLING WATER CP2-CCATST-01 952000 'CC-2-AB-045-TS1 CCW SURGE TANK SUPPORTS R245 873AB F-A F1.40 VT- 3 NA DWG N-2640-359 2 -X 952100 CC-2-AB-045-TWS1 D-A CCW SURGE TANK SUPPORTS WELDED D1.10 ATTACH.R245 873AB VT-1 NA SADDLE. DWG N-2640-359 2-X CHEMICAL & VOLUME CONTROL TCX-CSAHLD-01 952200 CS-2-SB-104-HXS1 LETDOWN HX SUPPORTS R81 790SB F-A F1.40 VT- 3 NA DWG 5665 2 -C DATE: 01/21/08 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 3 SCHED/COMPL COMPONENTS PAGE: 196 INSPECTION INTERVAL_I F PLAN STATUS IRST SECOND ERIOD PERIOD THIRD PERIOD PRESERVICE YEAR ASME, P SEC. XI CATGY NDE -ITEM NO METH j 1 2

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION O-UT- AG-E.-------------

1 2 3 1 2 INSTRUCTIONS

    • CALIBRATION BLOCK-*CHEMICAL & VOLUME CONTROL TCX-CSAHLD-01 952300 CS-2-SB-104-HXWS1 LETDOWN HX SUPPORTS WELDED ATTACHMENTS RS1 790SB D-A D1. 10 VT- 1 NA SADDLE. DWG 5665 2 -C APPENDIX A APPENDIX A RELIEF REQUESTS It is impractical within the limitations of the CPNPP plant design, geometry and accessibility for TU Electric to meet certain requirements of Articles IWA, IWB, IWC, IWD and IWF of the Code. Compliance with these requirements would result in hardships or unusual difficulties without a compensating increase in the level of plant quality or safety. Therefore, pursuant to IOCFR50.55a(g)(5)(iii), the relief requested from the Inservice Inspection requirements of IOCFR50.55a(g)(4)(I) is discussed in detail in this appendix.

Relief is requested for the second 120 month interval of the CPSES inservice inspection program.Appendix A -Page I of 3 APPENDIX A STATUS OF CPSES UNIT 2 ISI PLAN / RELIEF REQUESTS (UNIT2: 1998 EDITION OF ASME CODE SECTION XI TO 2000 ADDENDA INTERVAL START DATE -AUGUST 3, 2004. SECOND INTERVAL)REVISION RELIEF REQUEST Revision 0 Revision I Revision 2 Revision 3 SUBJECT Unit 2 ISI Program Plan Unit 2 ISI Program Plan Unit 2 ISI Program Plan Unit 2 ISI Program Plan A-I B-1 B-2 B-3 B-4 Re-submittal of the Relief Request for alternative RI-ISI examinations for selected class I and 2 piping welds ( ASME Code Categories B-F, B-J, C-F-I, and C-F-2)Relief is requested to allow the use of Code Case N-566-2 for leakage at bolted connections Relief is requested for a reduction in examination coverage (>10%) for a RC pipe to valve weld.(TCX-1-4105-6)

Relief is requested for a reduction in examination

'coverage

(>10%) for a RC pipe to flange weld (TCX- 1-4501 -1)Relief is requested for allowing the application of full structural weld overlays for the nozzle-to-safe end dissimilar metal and safe end-to-piping stainless steel butt welds associated with the Pressurizer and connected piping Relief is requested for the repair/replacement of the CRDM canopy seal welds and for not performing surface examination (PT) per Code Case N-504-2.Relief is requested for a reduction in examination coverage (>10%) for the Excess Letdown Fleat Exchanger head to flange weld.(TCX-2-11 10-1)SUBMITTED TO NRC TXX-04131, 07/28/2004 CPSES-200401770 TXX-05137, 08/23/2005 CPSES-200501743 TXX-06128 CPSES-200601367 TXX-CPSES-2008 TXX-05204, t2/l 5/2005 CPSES-200502480 TXX-06101, 6/28/2005 CPSES-200601 TXX-04165, 09/15/2004 CPSES-2004021 10 TXX -07177, 12/19/2007 CP-200700181 Pending issuance of TXX letter TXX-07095, 8/22/2007 CPSES-200701302 TXX-07176, 12/19/2007 CP-200700178 APPROVAL OR DENIAL ISSUED 0 Approved, 10/5/2006 CPSES-200602151 NRR- 10580 Approved, 4/29/2005 NRR-10435, 2 3 B-5 C- I TXX-05203, 12/0112005 CPSES-200502474 Approved, 3/15/2007 CPSES-200700621 NRR-10618 General Notes: 1/ .A revision to the ISI Plan is usually issued after completion of the each refueling outage and prior to the next refueling outage. ISI Plan revisions include items such as rescheduled exaims and updated drawings.

A request for relief from the ASME Code is requested separately from Plan revisions.

A relief request is assigned a unique identifier, which consists of a letter representing the Code Subsection, followed by a sequential number. (e.g., B-6 is assigned as the sixth request for relief from a requirement in Subsection IWB.)2. Copies of the ISI Program Plan Revisions are forwarded to the a) NRC Document Control Desk, b) NRC Region IV. c) NRC Resident Inspectors, d) NRR Project Manager, and e) Texas Depairtment of Licensing and Regulation (TDLR) and f) authorized Nuclear Inservice Inspector (ANII).Appendix A Page 2 of 2 APPENDIX B APPENDIX B UNIT VT-2 TEST PACKAGESINTERVAL, SECOND PERIOD DESCRIPTION OWNER DATE STATUS COMMENTS PACKAGE #2-AF-2-2-1 MDAFWP-01 2RFI I @ POWER (PM 343599)TEST LOOP 2-AF-2-2-2 MDAFWP-01 2RFI I OUTAGE (PM 343600)(SG 1/2)2-AF-2-2-3 MDAFWP-02 2RFI I OUTAGE (PM 343601)(SG 3/4)2-AF-2-2-4 TDAFWP 2RF1I OUTAGE (PM 343602)2-AF-2-2-5 AF OPS 2RF1 I @ POWER (PM 343603)2-CC-2-2-1 CC TRAIN A ORC 2RF10 @ POWER (PM 343604)2-CC-2-2-2 CC TRAIN B ORC 2RF10 @ POWER (PM 343605)2-CC-2-2-3 CC IRC 2RFI0 OUTAGE (WO 3-07-343606-01) 2-CH-2-2-1 CH 2RF10 @ POWER Separated into 2 pkgs;(a, b) (PM 343607 & PM 346274)2-CS-2-2-1 CS ORC 2RFIO @ POWER Separated into 2 pkgs; (PM (a,b) 343608 & PM 346275)2-CS-2-2-2 CS PDP 2RF10 @ POWER (PM 343609)2-CS-2-2-3 CS IRC 2RF10 OUTAGE Separated into 2 pkgs (PM (al, a2, b) 343610 & PM 343945).Former PM has two parts. (al & a2)Appendix B -Page lof3 APPENDIX B UNIT VT-2 TEST PACKAGES.2.d INTERVAL, SECOND PERIOD DESCRIPTION OWNER DATE STATUS COMMENTS PACKAGE#2-CS-2-2-4 CS BORATE 2RF10 'Separated into 3 pkgs; 2 @ POWER (PM (a,b,c) 343611 & PM 343612 & I during the OUTAGE ( PM 343613)2-CT-2-2-1 CT TRAIN A 2RF10 @ POWER (PM 343615)(al, a2)2-CT-2-2-2 CT TRAIN B 2RF10 @ POWER (PM 343616)2-CT-2-2-3 CT NORMAL OPS 2RFI 0 @ POWER (PM 343617)2-DD-2-2-1 DD 2RF10 @ POWER PM 343618 & OUTAGE (PM (al,a2,b,)

_343614)2-DO-2-2-1 DO 2RF1 I @ POWER -2 DO pkgs (PM 343619 &(a,b) PM 343620) and @POWER -2 DG pkgs 2-DG-2-2-1 DG 2RFI 1 (PM 343623 & PM 343624)(a,b)2-FW-2-2-1 FW ORC 2RFI I @ POWER (PM 343627)2-FW-2-2-2 FW IRC 2RFlI OUTAGE (PM 343628): 2-MS-2-2-1 MS ORC 2RF I @ POWER (PM 343629) and during (a,b) OUTAGE (PM 343621-01);

MS Line to_ __Terry Turbine)2-MS-2-2-2 MS IRC 2RF] I OUTAGE (PM 343630)2-RC-2-2-1 RC CLASS I 2RF10 OUTAGE Separated into 5 pkgs.(PM (a,b,c,d,e)

/ 343635 thru PM 343638 and PM 343631)Appendix B -Page 2 of 3 APPENDIX B UNIT VT-2 TEST PACKAGES 2nd INTERVAL, SECOND PERIOD DESCRIPTION OWNER DATE STATUS COMMENTS PACKAGE#2-RC-2-2-2 RC CLASS I 2RF1 I OUTAGE Separated into 5 pkgs (PM (a,b,c,d,e) 343635 thru PM 343638 and PM 343631)2RF12 OUTAGE Separated into 5 pkgs ( PM 2-RC-2-2-3 RC.CLASS 1 343635 thru PM 343638 and PM 343631)(a,b,c,d,e) 2-RC-2-2-4 RC CLASS 2 2RF12 OUTAGE Separated into 4 pkgs. (PM (a,b,c,d) 343639 thru PM 343642)2-RH-2-2-1 RH TRAIN A 2RF12 OUTAGE (PM 343643)2-RH-2-2-2 RH TRAIN B 2RF12 OUTAGE (PM 343644)2-RH-2-2-3 RH/RC TIE 2RF12 OUTAGE (PM 343645)2-SI-2-2-1 SI NORM. OPS 2RF12 @ POWER (PM 343646)2-SI-2-2-2 SI PUMPS 2RF12 OUTAGE/@ POWER (a,b,c,d,e,f,g, Separated into 8 pkgs, with 6 @ POWER h) (PM 3436471 thru PM 343651 & PM 346056 and 2 for OUTAGE (PM 343652 and 343653). Operations TSP req'd for 4 PMs 2-SI-2-2-3 SI ACCUM. 2RF 12 OUTAGE (PM 343654)Scaffold required.2-SW-2-2-1 SW TRAIN A 2RF1 I @ POWER (PM 343655)2-SW-2-2-2 SW TRAIN B 2RFI I @ POWER (PM 343656)Appendix B -Page 3 of 3 APPENDIX C APPENDIX C ADOPTED CODE CASES CODE CASE A N-416-1 B N-435-1 C N-457 D N-460 E N-461-1 F N-481 G N-491-2 H N-498-4 I N-504-2 II N-513-2 J N-522 K N-524 L N-526 M N-528-1 N N-532-1 SUBJECT Alternative Pressure Test Requirement for Welded Repairs or Installation of Replacement Items by Welding Alternative Examination Requirements for Vessels with Wall Thicknesses 2 inches or less Qualification Specimen Notch Location for Ultrasonic Examination of Bolts and Studs Alternative Examination Coverage for Class I and Class 2 Welds Alternative Rules for Piping Calibration Block Thickness Alternative Examination Requirements for Cast Austenitic Pump Casing Alternative Rules for Examination of Class 1, 2, 3 and MC Component Supports of Light-Water Cooled Power Plants Alternative Requirements for 10-Year System Hydrostatic Testing for Class 1, 2 and 3 Systems Alternative Rules for Repair of Class 1, 2, and 3 Austenitic Stainless Steel Piping Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Pressure Testing of Containment Isolation Piping Alternative Requirements for Longitudinal Welds in Class I and 2 Piping Alternative Requirements for Successive Inspections of Class I and 2 Vessels Purchase, Exchange, or Transfer of Material Between Nuclear Plant Sites Alternative Requirements for Repair and Replacement Documentation Requirements and In-service Summary Report Preparation and Submission as Required by IWA-4000 and IWA-6000 NRC APPROVAL DOCUMENT R.G.1.147 Rev 13 R.G.1.147 Rev. 14 R.G.1.147 Rev. 13 R.G.1.147 Rev. 15 R.G.1.147 Rev. 13 R.G.l.147 Rev. 14 R.G.1.147 Rev. 15 R.G.1.147 Rev. 15 R.G.1.147 Rev. 14 R.G. 1.147 Rev.15 R.G.1.147 Rev. 15 R.G.1.147 Rev. 13 R.G. 1.147 Rev. 15'R.G.1.147 Rev. 15 R.G.1.147 Rev. 14 Appendix C -Page 1 of 3 APPENDIX C ADOPTED CODE CASES CODE CASE SUBJECT 0 N-533-1 P N-552 Q N-566-2 R N-573 S N578 T N-597-2 T1 N-613-1 U N-616 V N-639 VI N-647 W N-648-1 X N-649 Y N-652-1 Z N-661 AA N-685 Alternative Requirements for VT-2 Visual Examination of Class 1, 2 and 3 Insulated Pressure-Retaining Bolted Connections Alternative Methods -Qualification of Nozzle Inside Radius Section From-the Outside Surface Corrective Action for Leakage Identified at Bolted Connections Transfer of Procedure Qualification Records Between Owners Risk Informed Requirements for Class 1, 2, and 3 Piping, Method B Requirements for'Analytical Evaluation of Pipe Wall Thinning Ultrasonic Examination of Penetration Nozzles in Vessels, Examination Category B-D, Item Nos. B3.10 and B3.90, Reactor Nozzle-to-Vessel Welds, Figs. IWB-2500-7(a), (b), and (c)Alternative Requirements for VT-2 Visual Examination of Classes 1,2, 3 Insulated Pressure Retaining Bolted Connections Alternative Calibration Block Material Alternative to Augmented Examination Requirements of IW-2500 Alternative Requirements for Inner Radius Examination of Class I Reactor Vessel Nozzles Alternative Requirements for IWE-5240 Visual Examination Alternative Requirements to Categorize B-G-1, B-G-2, and C-D Bolting Examination Methods and Selection Criteria Alternative Requirements for Wall Thickness Restoration of Classes 2 and 3 Carbon Steel Piping for Raw Water Service Lighting Requirements for Surface Examination NRC APPROVAL DOCUMENT R.G.I.147 Rev. 15 R.G.1.147 Rev. 15 R.G.1.147 Rev. 15 R.G.1.147 Rev. 15 NRC Approval Recd RR A-I Approved R.G. 1.147 Rev 15 R.G. 1.147 rev.15 R.G&l.147 Rev. 15 R.G.1.147 Rev. 15 R.G.1.147 Rev. 15 R.G.1.147 Rev. 15 R.G. 1.147 Rev. 15 R.G. 1.147 Rev. 15 R.G. 1.147 Rev. 15 R.G.l.147 Rev. 15 Appendix C L Page 2 of 3' APPENDIX C ADOPTED CODE CASES SUBJECT CODE CASE BB N-686 CC N-695 DD N-696 Alternative Requirements for Visual Examinations, VT-1, VT-2, and VT-3.Qualification for Dissimilar Metal Welds Qualification Requirements for Appendix VIII Piping Examinations Conducted from the Inside Surface NRC APPROVAL DOCUMENT R.G. 1.147 Rev. 15 R.G. 1.147 Rev. 15 R.G.I.147 Rev. 15 NOTES: Code Cases used in 2RF08 -( B,D,L,M,N,O,U)

Code Cases used in 2RF09 -(B,DL,M,N,O,U,X)

Code Cases proposed for 2RFI 0 -(B,D,L,M,N,O,U,X)

Appendix C -Page 3 of 3 APPENDIX D APPENDIX D ULTRASONIC CALIBRATION BLOCKS Calibration Block No.TBX-1 TBX-2 TBX-3 TBX-4 TBX-5 TBX-6 TBX-7 TBX-8 TBX-9 TBX-10 TBX-11 TBX-12 TBX-13 TBX-14 TBX-15 TBX-16 Block Size Pipe Schedule 12.25"L x 6.00"W x 3.50"T 8.00"L x 3.00"W x 3.00"T 3" sch. 160 4" sch. 160 6" sch. 160 6" sch. 40S 8" sch. 40S 8" sch. 140 10" sch. 140 10" sch. 40S 12" sch. 40S 12" sch. 140 14" sch. 140 14" sch. 40 16" sch. 40S 9.00"L x 4.00"W x .468"T Material SA-533 Gr. B, Class-1 C.S.A351 CF8M A376 Type-316 A376 Type-304 A376 Type-304 A376 Type-304 A376 Type-304 A376 Type-316 A376 Type-304 A312 Type-316 A312 Type-316 A376 Type-304 A376 Type-316 A358 Type-316 A312 Type-304 A240 Type-304 System / Component Pressurizer Reactor Coolant Pipe (1982)Piping Control Rod Drive Mech.Housings Piping Piping Letdown Reheat Heat Exchanger Excess Letdown Heat Exchanger Regenerative Heat Exchanger Piping Piping Piping Piping Piping Piping Seal Water Heat Exchanger nn-nrliý n -P-n I nf APPENDIX D ULTRASONIC CALIBRATION BLOCKS Block Size Pipe Schedule Material Calibration Block No.TBX-17 TBX-18 TBX-19 System / Component 8" sch. 80 8" sch. 160 14" sch. 160 16" sch. 80 18" sch. 80 TBX-20 TBX-21 TBX-22 TBX-23 TBX-24 TBX-25 TBX-26 TBX-27 TBX-28 TBX-29 TBX-30 TBX-31 TBX-32 24" sch. 80 1.50 sch. 160 2" sch. 160 7" Lg. Stud 22.10"L x 6.00'W x 6.30"T 20.8"L x 6.00"W x 4.00"T 19.10"L x 6.00"W x 5.45"T 30.10"L x 6.00"W x8.60"T 13.00"L x 4.00"W x 1.00"T 9.00"L x 4.00"W x.625"T 9.00"L x 4.00"W x .312"T A106 Grade-B C.S.A312 Type-304 A312 Type-304 A106 Grade-B C.S.A106 Grade-B C.S.A106 Grade-B C.S.A376 Type-316 A376 Type-316 SA-540 C.S.SA-533 Grade-A Class-1 C.S.SA-533 Grade-A Class-1 C.S.SA-508 Grade-A Class-1 C.S.SA-533 Grade-A Class-1 C.S.SA-240 Type-304 SA-240 Type-304 SA-240 Type-304 Piping Piping Piping Piping Piping Piping Piping Piping R.V. Stud & R.C. Pump Bolting (1982)Reactor Vessel Bottom Head Steam Generator Secondary side Steam Generator Channel Head to Tubesheet Reactor Vessel Closure Head Residual Heat Exchanger Horizontal Letdown Heat Exchanger Volume Control Tank Aooendix D -Paoe 2 of 5 Calibration Block No.TBX-33 TBX-34 TBX-35 TBX-36 TBX-37 TBX-38 TBX-39 ,TBX-40 TBX-41 TBX-42 TBX-43,-TBX-44 TBX-45 TBX-46 TBX-47 APPENDIX D ULTRASONIC CALIBRATION BLOCKS Block Size Pipe Schedule Material SA-106 Grade-B 32'x 1.25"T C.S.SA-333 Grade-B 6" sch. 120 C.S.SA-333 Grade-B 6" sch. 80 C.S.SA-106 Grade-B 6" sch. 160 C.S.SA-106 Grade-B 8" sch., 160 C.S.SA-106 Grade-B 18" sch. 140 C.S.SA-106 Grade-B 24" sch. 100 C.S.SA-515-74B Grade-13.00"L x 4.00"W x 1.502"T 70 SA-106 Grade-B 12' sch. 30 C.S.SA-333 Grade-B 8" sch. 40S C.S.12" sch. 20 A-312 Type-304 3" sch. 80 SA-312 Type-304 4" sch. 80 SA-312 Type-304 14" sch. 40 SA-312 Type-304 14" x .500"T SA-312 Type-304 System / Component 32" Main Steam Piping Piping Piping Piping Piping Piping Pressurizer Skirt Weld R.C. Drain Tank Heat Exchanger Excess Letdown Heat Exchanger R.C. Drain Tank Heat Exchanger Piping Piping Piping Piping Appendix D -Page 3 of 5 Calibration Block No.TBX-48 TBX-49 TBX-50 TBX-51 TBX-52 TBX-53 TBX-54 TBX-55 TBX-56 TBX-57 TBX-58 TBX-59 TBX-60 TBX-61 TBX-62 TBX-63 TBX-64 TBX-65 TBX-RV-1 TBX-RV-2 APPENDIX D ULTRASONIC CALIBRATION BLOCKS Block Size Pipe Schedule Material 16" sch. 30 SA-312 Type-304 18" x .375"T SA-312 Type-304 24" sch. 20 SA-312 Type-304 12" sch. 80 SA-312 Type-304 24"L x 6.812" dia. SA-540 Gr. B24 9.25"L x 2.125" dia. SA-193Gr.B7 35"L x 4.5" dia. SA-540 Gr. B24 5.5" x 4.5" x 5.8" SA-508 Cl. 2 11" x 4.5" x 9.93" SA-508 Cl. 2 12" x 12" x 2.7" 7-1/2" x 7" x 8'7" x 7" x 7" 16.07"L x 16.24"/7.65"W x 6.0"T 15.29"L x 13.39"/7.76"W x 4.0"T 11.81 "L x 6.0"W x 3.0"T 17.32"L x 6.0"W x 5.0"T 17.32"L x 6.0"W x 5.0"T 13.78"L x Pipe x 4.83"T 45.00"L x 11.00"W x 11.00"T 36.00"L x 9.00"W x 9.00"T A-351 Gr. CF8M SA-508 CI. 2 SA-508 Cl. 2 SA-508 Cl. 3a SA-508 Cl. 3a SA-508 Cl. 3a SA-508 CI. 3a SA-508 Cl. 3a SA-336 F 316 LN SA-533 Gr. B Cl. 1 SA-533 Gr. B Cl. 1 System / Component Piping Piping Piping Piping RPV Stud (1993)SI Pump Stud RC Pump Stud (1993)Pr Spr Nozzle IR SG FW Nozzle IR Reactor Coolant Pipe (1993)Pr Surge Nozzle IR Pr. Sfty / RIf Nozzle IR New SG Primary Nozzle IR New SG FW Nozzle IR New SG Shell to TS New SG FW / AFW Nozzle to Vessel New SG TS to Channel Head New SG Safe-end Basic 11" RPV Block Basic 9" RPV Block Appendix D -Page 4 of 5 APPENDIX D ULTRASONIC CALIBRATION BLOCKS Calibration Block No.TBX-RV-3 TBX-RV-4 TBX-RV-5 TBX-RV-6 TBX-RV-7 TCX-RV-1 TCX-RV-2 TCX-RV-3 TCX-RV-4 TCX-RV-5 TCX-RV-6 SS-CB-1 CS-BC-1 DM-CB-1 PDI-01 PDI-02 PDI-03 PDI-04 SAP 10294 SG-IR Block Size Pipe Schedule 28.00"L x 6.00"W x 7.00"T 20.00"L x 6.00"W x 5.00"T 33.00"L x 11.00"W x 11.00"T 10.00"L x 6.00"W x 3.00"T 41.50"L x 7.00"W x 15.25"T 45.00"L X 11.00"W x 11.00"T 36.00"L x 9.00"W x 9.00"T 28.00"L x 6.00"W x 7.00"T 20.00"L x 6.00"W x 5.00"T 33.00"L x 11.00"W x 1 1.00"T 10.00"L x 6.00"W x 3.00"T 1/2"T to 3"T x 3"W step 1/2"T to 3"T x 3W step 9"L x 4"W x 2"T 14.00"L x 2.00"W x 14.00"T 9.5"L x 2.00"W x 4 Steps 9.5"L x 2.00"W x 4 Steps 9.5"L x 2.00"W x 4 Steps 6.797"dia x 57.687" long 12.00"L x 12.00"W x 1.5"T Material SA-533 Gr. B CI. 1 SA-533 Gr. B Cl. 1 SA-533 Gr. B Cl. 1 SA-503 Cl. 2 ASTM A508 CI. 2 SA-533 Gr. BCI. 1 SA-533 Gr. B Cl. 1 SA-533 Gr. B Cl. 1 SA-533 Gr. B Cl. 1 SA-533 Gr. B CI. 1 SA-503 Cl. 1 SA-312 Type 304 SA-516 Gr. 70 SA-312 / SA-516 A-508 Cl. 2 SA-516 Gr. 70 SA-312 Type 304 SA-312 Type 316 SA-540 Gr. B24 Lucite System / Component Basic 7" RPV Block Basic 5" RPV Block RPV Flange Ligament RPV Safe End RPV Shell Basic 11" RPV Block Basic 9" RPV Block Basic 7" RPV Block Basic 5" RPV Block RPV Flange Ligament RPV Safe End Stainless Steel Alt Block Carbon Steel Block Dissimilar Metal Alt Block RPV Block C.S. Piping Alt Block S.S. Piping Alt Block S.S. Piping Alt Block RPV Closure Stud Steam Generator Inner Radius APoendix D -Paae 5 of 5 APPENDIX E APPENDIX E TCX ISOMETRIC DRAWINGS TABLE TCX-1-1100 2 TCX-1-1100A 2 TCX-1-1200 Sh. 1 I TCX-I-1200 Sh. 2 1 TCX-1-1300 I TCX-1 -1300A I TCX-1 -1400 2 TCX-1-2100 1 TCX-1-3100 I TCX-1-4100 1 TCX-1-4101 I TCX-1-4102 3 TCX-1 -4103 3 TCX-1 -4104 1 TCX- 1 -4105 1 TCX-1-4106 1 TCX-1-4107 2 TCX-1-4108 2 TCX-1 -4109 1 TCX-1-4110 1 TCX- 1-4200 1 TCX-1 -4201 3 TCX-1 -4202 4 TCX-1-4203 3 TCX-1 -4204 1 TCX-1-4205 2 TCX- 1 -4206 1 TCX-1-4207 1 TCX-1-4300 1 TCX-1-4301 2 TCX-1-4302 2 TCX-1.-4303 4 A ýA~- 'P .I nf r APPENDIX E TCX ISOMETRIC DRAWINGS TABLE TCX R N TCX-1-4304 I TCX-1 -4305 1 TCX-1-4306 I TCX-1 -4307 1 TCX- 1-4308 I TCX- 1-4400 1 TCX-1-4401 I TCX- 1 -4402 2 TCX- 1 -4403 2 TCX- 1 -4404 .2 TCX- 1 -4405 1 TCX- 1 -4406 1 TCX- 1-4407 2 TCX-1.-4408 1 TCX- 1-4409 I TCX-1-4500 2 TCX-1.-4501 1 TCX-1 -4502 1 TCX-1-4503 I TCX-1-4504 I TCX-1 -4505 4 TCX-1-4506 4 TCX-1.-4507 2 TCX-1-4600 2 TCX- 1-5100 1 TCX- 1 -5100A A TCX-2-1 100 1 TCX-2-1 110 1 TCX-2-1120 I TCX-2-1130, 1 TCX-2-1140 1 Avwý,,vli -P -1,. ') ,,

APPENDIX E TCX ISOMETRIC DRAWINGS TABLE TCX-2-1150 1 TCX-2-1180 2 TCX-2-2 100 3 TCX-2-21 01 2 TCX-2-2 102 2 TCX-2-2103 1 TCX-2-2200 3 TCX-2-2201 2 TCX-2-2202 I TCX-2-2203 3 TCX-2-2204 2 TCX-2-2300 3 TCX-2-2301 2 TCX-2-2302 3 TCX-2-2303 3 TCX-2-2400 3 TCX-2-2401 2 TCX-2-2402 2 TCX-2-2403 2 TCX-2-2500 3 TCX-2-2501 3 TCX-2-2520 2 TCX-2-2521 1 TCX-2-2530 2 TCX-2-2531 1 TCX-2-2532 I TCX-2-2533 2 TCX-2-2534 2 TCX-2-2535 2 TCX-2-2536 2 TCX-2-2537 I TCX-2-2538 I Arwmerncii F. -Pave 31 of 5 APPENDIX E TCX ISOMETRIC DRAWINGS TABLE TCX # 1 TCX-2-2538A I TCX-2-2539 I TCX-2-2539A I TCX-2-2540 2 TCX-2-2541 2 TCX-2-2542 I TCX-2-2550 I TCX-2-2551 I TCX-2-2560 3 TCX-2-2561 2 TCX-2-2562 2 TCX-2-2563 1 TCX-2-2564 I TCX-2-2565 1 TCX-2-2566 2 TCX-2-2566A 1I TCX-2-2567 1 TCX-2-2568 I TCX-2-2569 I1 TCX-2-2570 1 TCX-2-2571 1 TCX-2-2572 1 TCX-2-2573 I TCX-2-2574 1 TCX-2-2575 2 TCX-2-2576 2 TCX-2-2577

.2 TCX-2-2578 2 TCX-2-2579 2 TCX-2-2580 2 TCX-2-2581 2 TCX-2-2582 2 Amedix E -Pane 4 of 5 APPENDIX E TCX ISOMETRIC DRAWINGS TABLE TCX TCX-2-2583 2 TCX-2-2584 I TCX-2-2585 TCX-2-2586 TCX-2-3100 1 TCX-2-3110 TCX-2-3140 1 Arm-ndix E- Page 5 of 5 APPENDIX F APPENDIX F RECORD OF REVISIONS Revision 0 -Original issue Revision 1 -Added adopted Code Cases in Appendix C and corrected the typographical error in the ISI Summary Table of Section 4.0.(There is no Attachment 1 to Appendix F.)Revision 2 -Identified owner as Owner/Designated Agent in Sections 1.3 and 1.10-Added information relative to RI-ISI for selected class 1 and 2 piping welds-Added information relative to drawings in Section 2.2-Revised section 4.3 for snubbers-Revised section 5.3 for insulated bolted connections

-Revised section 4.0 for the Section XI Summary Table and Sections 4.1, 4.2, and 4.3 (ISI Examination Tables for class 1, 2, and 3 components) to reflect completed, rescheduled, removed, and added exams per 2RF08 and the RI-ISI evaluation/update for the third period of the first interval for Unit 2. The summary numbers (examination items) affected by this revision are listed in Attachment 2 to Appendix F of this Plan.-Updated Appendix A to reflect the current status of relief requests-Updated Appendix C to reflect the current list of approved, adopted Code Cases-Updated Appendix F to add the record of revision and corresponding Attachment 2 to the Appendix for Plan revision 2.Revision 3 -Made editorial changes to various sections identifying the owner as Luminant and the plant as CPNPP-Made editorial changes to the Table of Contents to match respective sections-Revised section 1.4 for scope noting that the RI-ISI program for ASME Code Class 1 and 2 welds had been accepted by the NRC as an alternative to requirements in ASME Section XI-Removed the metric notation in section 1.6.-Added more detail in section 2.3 concerning system pressure tests.-Made editorial changes in sections 3.2, 3.3, and 4.0 Clarified paragraph 3.2.3 to read "... Appendix IV of the Code." Appendix F -Page 1 of 2 APPENDIX F RECORD OF REVISIONS Revision 3 -Revised section 4.4 to more clearly state the testing requirements for steam (cont'd) generator tubes and to remove LAR 98-009, which does not apply.-Revised paragraph 6.0 to read "... IWA-2420(b)(5)."-Revised the Section XI Summary Table in section 4.0 for Category F-A, Item F1l.20, Category F-A, Item F1l.40, Category R-A, and other categories to reflect completed and rescheduled examinations from 2RF09.Revised sections 4.1, 4.2, and 4.3 (ISI Examination Tables for class 1,2, and 3 components) to reflect completed and rescheduled examinations from 2RF09.The summary numbers (examination items) affected by this revision are listed in Attachment 3 to Appendix F of this Plan.Revised Summary number 108600 to reflect this examination as R-A, Item R1.20 in the listing of ASME Code Class 2 welds in the Class 2 Tables of scheduled/

completed components.

Updated Appendix A to reflect the current status of relief requests.Added Appendix B to reflect VT-2 system pressure test listing.-Updated Appendix C to reflect the current status of approved, adopted Code-Updated Appendix D to reflect the current listing of ultrasonic calibration blocks.-Updated Appendix F to add the record of revision and corresponding Attachment 3 to the Appendix for Plan revision 3.Appendix F -Page 2 of 2 Revision 2 -AFFECTED

SUMMARY

NUMBERS : The following summary numbers identify examination items completed during the first refueling outage (2RF08) of the first period, second interval.003100 669400 722100 862800 014400 669450 722200 862850 014500 669500 722300 863100 014800 669600 725300 863150 015300 669650 750000 863900 020200 669700 750400 863950 020900 669800 810500 864000 021000 669900 810550 864050 022550 671900 810700 864200 048800 672000 .811800 864250 094244 672400 811850 864500 094249 683200 814000 864550 094282 683400 814050 864600 094300 683450 814800 864650 094400 696300 814850 864700 094800 697000 815000 864750 094900 706900 815050 865200 095300 710860 815100 865300 183900 713200 815150 865800 184000 713400 815500 865850 184500 713450 815550 866100 186100 713500 816600 866300 500700 713550 816650 866400 600000 713800 816800 866450 6036010 713850 816850 866800 603700 714000 817100 866850 603800 714050 818600 866900 603900 714100 819000 866950 604100 714150 819500 897400 605400 714500 820000 897450 605500 714550 820100 897600 608800 716500 820200 897650 608900 716550 820250 898200 618800 718200 856600 898250 618900 718300 856650 898400 619200 718400 856700 898450 640530 718500 856750 898500 640540 718550 856800 898550 640550 718600 856850 898600 640560 718700 857050 898650 640570 718800 857100 898700 640580 718900 857200 898750 640830 719000 857300 899300 653400 719400 859250 899350 655400 719600 862300 900200 655700 719650 862350 .900250 655800 719900 862500 900300 655900 719950 862550 900350 669200 721200 862700 900500 669300 721900 862750 900550 Appendix F Attachment 2 -Page 1 of 2 Revision 2 -AFFECTED

SUMMARY

NUMBERS: The following summary numbers identify examination items that have been added to the schedule based on the RI-ISI Evaluation/Update for the third period, first interval: 108500 108600 108700 124200 124300 124400 141000 141100 141200 156800 156900 157000 192200 192300 192900 193000 215200 215300 215400 215400 216600 216700 217000 217100 221500 221000 221900 312921 312937 312947 312948 312951 312952 312960 312961 312976 The following summary numbers identify examination items that have been removed from the schedule based on the RI-ISI Evaluation/Update for the third period, first interval: 312911 312914 312937 312942 312944 312947 312965 312975 The following summary numbers identify examination items that have been rescheduled:

002800 094244 094249 094282 096400 313000 313100 313200 676600 751400 952200 952300 Appendix F Attachment 2- Page 2 of 2 Revision 3 -AFFECTED

SUMMARY

NUMBERS: The following summary numbers identify examination items completed during the second refueling outage (2RF09).of the first period, second interval.002800 009100 009300 009600 009650 009700 009750 009800 009850 009900 009950 010000 010050 010100 015900 016000 016100 061500 061800 076400 076500 076600 096400 156800 156900 157000 158100 158500 158600 160900 162000 162800 162900 165700 166900 167000 192200 192300 192900 193000 312960 312961 313000 313100 313200 314000 501000 620300 620350 620400 620500 620600 620800 620850 640410 640420 640430 640440 640450 640460 640470 640710 640720 640730 640740 640750 640760 640770 640780 640790 640800 640810 640900 693500 693550 693600 697100 697400 697450 697700 697750 697800 697850 698400 698500 698550 699600 699650 715200 715250 715300 715350 721700 721750 751401 751402 751403 952200 952300 Summary Numbers 061700 and 061800 are examination items that have been rescheduled Appendix F Attachment 3 -Page I of I