ML092020110

From kanterella
Revision as of 20:32, 11 July 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
E-mail from R. Conte of USNRC to Various, Regarding Summary of Telecon - Oyster Creek
ML092020110
Person / Time
Site: Oyster Creek
Issue date: 11/14/2008
From: Conte R
Engineering Region 1 Branch 1
To: Ashley D, Brian Holian, Mcnamara N, Modes M, David Pelton, Darrell Roberts
Office of Nuclear Reactor Regulation
References
FOIA/PA-2009-0070
Download: ML092020110 (3)


Text

Subject:

RE: Summary of Telecon -Oyster Creek Donnie, good summary -Darrell, Nancy, John Richmond and I talked to her also between 400 and 500pm Thursday.New Jersey will be invited to listen in to information call at 100pm conducted by Amergen today.Her additional point to us was well taken on Amergen's apparent failure to correct the monitoring of the poly bottles in the torus room (current CLB issue), apparently two tygons tubes came loose and were not connected from the tell tails to poly bottles. We will look into it before exit not a startup issue. She also noted that the isolation valve on the cavity trough drain line was found shut but (I believe) that was before the strippable coating started to give way.NJ will be invited to ask questions of Amergen at the end of call after NRC summary and they can call Nancy if they want to talk with NRC separately but not in front of NRC.I do not believe NJ (Lipoti) has any startup concerns but the outrage factor is HIGH right now. I will establish a caucus bridge for Friday PM.Richard J. Conte Chief, Engineering Branch No. 1, DRS, Reg. I C' (b)(6) IýOff. 610-337-5183

[ The information contained in this e-mail, including any attachment(s), is intended solely for use by the named addressee(s).

If you are not the intended recipient, you are not authorized to disclose, copy, distribute or retain this message, in whole or in part, without written consent from the sender. This e-mail may also contain confidential or privileged information so consult with the sender before disclosing.

If you have received this message in error, please notify the sender immediately.]

From: Donnie Ashley Sent: Thursday, November 13, 2008 3:58 PM To: David Pelton; Richard Conte; Darrell Roberts; Brian Holian Cc: Lisa Regner

Subject:

Summary of Telecon -Oyster Creek Importance:

High (b)(5)belnlnitn fth Feedowas 016f8W InM accordanc with fth Freedom of Infowndflo 04 (b)(5)Senior Project Manager Division of License Renewal 301-415-3191 mail stop 0-11 F1 mailto:donnie.ashleyvnrc.qov 2

Received:

from R1CLSTR01r.nrc.gov

([148.184.99.7])

by R1 MS01.nrc.gov

([148.184.99.10])

with mapi; Fri, 14 Nov 2008 07:39:00 -0500 Content-Type:

application/ms-tnef; name="winmail.dat" Content-Transfer-Encoding:

binary From: Richard Conte <Richard.Conte@nrc.gov>

To: Donnie Ashley <Donnie.Ashley@nrc.gov>, David Pelton<David. Pelton@rirc.gov>, Darrell Roberts <Darrell.

Roberts@nrc.gov>, Brian Holian <Brian.Holian@nrc.gov>, Darrell Roberts <DarrelI.Roberts@nrc.gov>, Nancy McNamara <Nancy. McNamara@nrc.gov>, Marjorie McLaughlin

<Marjorie.McLaughlin@nrc.gov>, Ronald Bellamy <Ronald.Bellamy@nrc.gov>, Mary Baty <Mary.Baty@nrc.gov>, Edward Williamson

<Edward.Williamson@nrc.gov>, John Richmond <John. Richmond@rirc.gov>, Michael Modes <Michael.

Modes@nrc.gov>

CC: Lisa Regner <Lisa.Regner@nrc.gov>

Date: Fri, 14 Nov 2008 07:38:48 -0500

Subject:

RE: Summary of Telecon -Oyster Creek Thread-Topic:

Summary of Telecon -Oyster Creek Thread-Index:

AclFOoPb2KhTOOs4RWigjmPeuqulhwAfyYeg Message-ID:

<2856BC46F6A308418F033D973BBOEE72AA547F58AC@R1 CLSTR01 .nrc.gov>

References:

<CB87FC66F95637428C5EOD066E756B6F9354ACF334@HQCLSTRO1 .nrc.gov>In-Reply-To:

<CB87FC66F95637428C5EOD066E756B6F9354ACF334@HQCLSTR01 .nrc.gov>Accept-Language:

en-US Content-Language:

en-US X-MS-Has-Attach:

X-MS-Exchange-Organization-SCL:

-1 X-MS-TN EF-Correlator:

<2856BC46F6A308418F033D973BBOEE72AA547F58AC@R1 CLSTR01. nrc.gov>MIME-Version:

1.0