ML17040A566
From kanterella
Revision as of 11:42, 17 November 2017 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
ML17040A566 | |
Person / Time | |
---|---|
Site: | Davis Besse |
Issue date: | 11/21/2016 |
From: | FirstEnergy Nuclear Operating Co |
To: | Office of Nuclear Reactor Regulation |
Shared Package | |
ML17039A594 | List:
|
References | |
L-16-322 | |
Download: ML17040A566 (1) | |
Similar Documents at Davis Besse | |
---|---|
Category:Updated Final Safety Analysis Report (UFSAR)
MONTHYEARML24269A0602024-09-25025 September 2024
[Table view]Enclosure B: Davis-Besse Nuclear Power Station, Unit 1, Updated Final Safety Analysis Report, Revision 35 ML22263A4122022-09-20020 September 2022 Attachment 1 - Information Removed from DBNPS, Unit 1 UFSAR ML22263A4162022-09-20020 September 2022 Enclosure D - DBNPS UFSAR, Rev. 34, Drawings Incorporated by Reference (Public) ML20302A3372020-09-25025 September 2020 3 to Updated Final Safety Analysis Report, Drawings - Part 1 of 7 ML20302A3182020-09-25025 September 2020 3 to Updated Final Safety Analysis Report, Section 11, Radioactive Waste Management ML20302A3202020-09-25025 September 2020 3 to Updated Final Safety Analysis Report, Section 15, Accident Analysis ML20302A2912020-09-25025 September 2020 3 to Updated Final Safety Analysis Report, Section 3, Design Criteria - Structures, Components, Equipment, and Systems, Drawings, Part 2 of 3 ML20302A3212020-09-25025 September 2020 3 to Updated Final Safety Analysis Report, Section 13, Conduct of Operations ML20302A2842020-09-25025 September 2020 3 to Updated Final Safety Analysis Report, Section 5, Reactor Coolant System ML21104A3662020-09-25025 September 2020 3 to Updated Final Safety Analysis Report, Section 9, Auxiliary Systems (Redacted) L-20-234, 3 to Updated Final Safety Analysis Report, Drawings - Part 7 of 7 (Redacted)2020-09-25025 September 2020 3 to Updated Final Safety Analysis Report, Drawings - Part 7 of 7 (Redacted) ML20302A3432020-09-25025 September 2020 3 to Updated Final Safety Analysis Report, Drawings - Part 2 of 7 ML20302A3192020-09-25025 September 2020 3 to Updated Final Safety Analysis Report, Section 16, Technical Specifications ML21104A3542020-09-25025 September 2020 3 to Updated Final Safety Analysis Report, Section 3, Design Criteria- Structures, Components, Equipment, and Systems, Part 1 of 3 (Redacted) ML20302A3392020-09-25025 September 2020 3 to Updated Final Safety Analysis Report, Drawings - Part 3 of 7 ML21104A0742020-09-25025 September 2020 3 to Updated Final Safety Analysis Report, Section 1, Introduction General Description of Station (Redacted) ML20302A3462020-09-25025 September 2020 3 to Updated Final Safety Analysis Report ML20302A2932020-09-25025 September 2020 3 to Updated Final Safety Analysis Report, List of Table of Contents ML20302A2962020-09-25025 September 2020 3 to Updated Final Safety Analysis Report, Section 14, Initial Tests and Operation ML20302A2902020-09-25025 September 2020 3 to Updated Final Safety Analysis Report, Section 2, Site Characteristics ML20302A3132020-09-25025 September 2020 3 to Updated Final Safety Analysis Report, Section 18, Managing the Effects of Component Aging ML20302A3412020-09-25025 September 2020 3 to Updated Final Safety Analysis Report, Drawings - Part 4 of 7 ML20302A2822020-09-25025 September 2020 3 to Updated Final Safety Analysis Report, Section 3, Design Criteria - Structures, Components, Equipment, and Systems, Part 3 of 3 ML20302A2992020-09-25025 September 2020 3 to Updated Final Safety Analysis Report, Section 10, Steam and Power Conversion System ML21104A3652020-09-25025 September 2020 3 to Updated Final Safety Analysis Report, Section 8, Electrical Power (Redacted) ML20302A3402020-09-25025 September 2020 3 to Updated Final Safety Analysis Report, Drawings - Part 5 of 7 ML20302A3382020-09-25025 September 2020 3 to Updated Final Safety Analysis Report, Drawings - Part 6 of 7 ML20302A2852020-09-25025 September 2020 3 to Updated Final Safety Analysis Report, Section 7, Instrumentation and Control ML21104A3572020-09-25025 September 2020 3 to Updated Final Safety Analysis Report, Section 6, Engineered Safety Features (Redacted) ML20302A2892020-09-25025 September 2020 3 to Updated Final Safety Analysis Report, Section 4, Reactor ML21104A3722020-09-25025 September 2020 3 to Updated Final Safety Analysis Report, Section 12, Radiation Protection (Redacted) ML20302A2952020-09-25025 September 2020 3 to Updated Final Safety Analysis Report, Section 17, Quality Assurance Program for Station Operation L-18-206, Revision 32 to Updated Final Safety Analysis Report, Section 9, Auxiliary Systems2018-09-24024 September 2018 Revision 32 to Updated Final Safety Analysis Report, Section 9, Auxiliary Systems L-17-262, First Energy Nuclear Operating Co., Quality Assurance Program Manual, Revision 212017-11-20020 November 2017 First Energy Nuclear Operating Co., Quality Assurance Program Manual, Revision 21 ML17045A5192016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00057, Rev 7 ML17045A5162016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00054, Rev 11 ML17045A4922016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00031, Rev 9 ML17045A5582016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00064, Rev 12 ML17045A5032016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00041, Rev 8 ML17039A7662016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing E-030-00016, Rev 21 ML17045A5012016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00039, Rev 14 ML17045A5072016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00045, Rev 9 ML17039A6442016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Fire Hazard Analysis Report, Rev. 27, Section 6, Emergency Lighting and Communications ML17045A5702016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00075, Rev 11 ML17045A5172016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00055, Rev 11 ML17045A4962016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00035, Rev 9 ML17045A5122016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00050, Rev 6 ML17045A5542016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00060, Rev 6 ML17045A5152016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00053, Rev 7 ML17045A5142016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00052, Rev 6 2024-09-25 Category:Drawing MONTHYEARML24269A0622024-09-25025 September 2024
[Table view]Enclosure D: Davis-Besse Nuclear Power Station, Unit 1, Drawings Incorporated by Reference L-20-234, 3 to Updated Final Safety Analysis Report, Drawings - Part 7 of 7 (Redacted)2020-09-25025 September 2020 3 to Updated Final Safety Analysis Report, Drawings - Part 7 of 7 (Redacted) ML20302A3382020-09-25025 September 2020 3 to Updated Final Safety Analysis Report, Drawings - Part 6 of 7 ML20302A3402020-09-25025 September 2020 3 to Updated Final Safety Analysis Report, Drawings - Part 5 of 7 ML20302A3412020-09-25025 September 2020 3 to Updated Final Safety Analysis Report, Drawings - Part 4 of 7 ML20302A3392020-09-25025 September 2020 3 to Updated Final Safety Analysis Report, Drawings - Part 3 of 7 ML20302A3432020-09-25025 September 2020 3 to Updated Final Safety Analysis Report, Drawings - Part 2 of 7 ML20302A3372020-09-25025 September 2020 3 to Updated Final Safety Analysis Report, Drawings - Part 1 of 7 ML17045A5012016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00039, Rev 14 ML17045A4902016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00029, Rev 13 ML17039A8042016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Dwg E-030-00047, Rev 15, ML17039A7982016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Dwg E-030-00037, Rev 20, ML17045A4862016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00016, Rev 14 ML17045A5532016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00059, Rev 13 ML17039A7612016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing E-030-00005, Rev 6 ML17045A4312016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00001, Rev 3 ML17045A4822016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00012, Rev 14 ML17045A5032016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00041, Rev 8 ML17039A7662016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing E-030-00016, Rev 21 ML17045A5652016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00071, Rev 5 ML17045A5192016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00057, Rev 7 ML17045A5582016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00064, Rev 12 ML17045A4302016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing M-180Q-00014, Rev 13 ML17045A4922016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00031, Rev 9 ML17045A4872016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-0001, Rev 12 ML17045A5162016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00054, Rev 11 ML17045A5092016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00047, Rev 8 ML17045A4882016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00018, Rev 12 ML17039A9362016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing E-030AQ-00036, Rev 2 ML17045A4852016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00015, Rev 11 ML17045A4912016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00030, Rev 6 ML17039A8152016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Dwg E-030-00345, Rev 1 ML17039A8142016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Dwg E-030-00344, Rev 1 ML17039A8062016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Dwg E-030-00340, Rev 1 ML17039A8122016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Dwg E-030-00342, Rev 2 ML17045A5682016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00073, Rev 5 ML17039A8112016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report Dwg E-030-00341, Rev 2 ML17039A8132016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Dwg E-030-00343, Rev 3 ML17045A5642016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00070, Rev 8 ML17045A5562016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00062, Rev 7 ML17045A5112016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00049, Rev 13 ML17039A8172016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Dwg E-030-00346, Rev 4 ML17045A5572016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00063, Rev 7 ML17039A7642016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing E-030-00014, Rev 15 ML17045A5152016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00053, Rev 7 ML17045A5122016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00050, Rev 6 ML17045A4962016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00035, Rev 9 ML17045A5172016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00055, Rev 11 ML17045A5702016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00075, Rev 11 ML17045A5072016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00045, Rev 9 2024-09-25 |
Retrieved from "https://kanterella.com/w/index.php?title=ML17040A566&oldid=175610"