Forwards Weekly Status Summary of Joint Ebasco & C-E Verification Program for 821004-08
ML17213A558
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 10/08/1982
From: Blodgett T
EBASCO SERVICES, INC.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
EVP-119-SL-2, NUDOCS 8210150431
Download: ML17213A558 (9)


Text

REGULATOR NFORMATION DISTRIB'AGCY<SION NBR: 8210150431 DOC, DATE;82/10/08 FACIL:50-389 St, Lucia P lant'niit 2, Florida AUTH~NAME AUTHOR AFFILIATION BLODGETT~T.HE Ebasco Services<Inc.(sub'HCIP~NAME RECIPIENT'AFFILIATION EISENHUT~D,G

~Division of Licensing

SUBJECT:

For wards weekly status summary of Jo engineering verification program for DISTRIBUTION CODE: B001S COPIES RECEI>ED;LTR TITLE: Licensing Submittal:

PSAR/FSAR Amdts 8 NOTES: UT ION EM (R IDS)NOTARIZED:

NO Power L Light Co~of Enserch Corp,)int Ebasco L C E 8?.1004"08

~/ENCL JSIZE: Rel*ated Correspondence DOCKET 05000389 RECIPIENT ID CODE/NAME A/D LICENSNG LIC BR 03 LA INTERKAL: ELD/HDS2 ,IE/DEP EPDS 35 NRR/DE/AEAB NRR/DE/EQB 13 NRR/DE/HGEB 30 NRR/DE/MTEB 17 NRR/DE/SAB 24 NRR/DHFS/HFEB40 NRR/DHFS/OLB 34 NRR/DS I/AEB 26 NRR/DSI/CP8 10 NRR/DS I/ETSB 12 NRR/DS I/PSB 19 23 G 04 RM/DDAMI/MIB EXTERNAL;ACRS 41 DMB/DSS (AMDTS)LPDR 05 NSIC 05 COPIES LTTR ENCL 1 0 1, 0 1 0 1 1 0 3 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 6 6 1 1 1 1 1 1 RECIPIENT ID CODE/NAME LIC BR P3'BC NERSESrV~01 IE FILE IE/DEP/EPLB 36 NRR/DF/CEB 11 NRR/DE/GB'8 NRR/DE/MEB 18 NRR/DE/QAB 21 NRR/DE/SES

'5 NRR/DHFS/LQB 32 NRR/DHFS/PTRB20 NRR/DS I/ASB 27 NRR/DSI/CSB 09 NRR/DS I/ICSB 16 NRR/DS I/RAB 22 NRR/DST/LGB 33 RGN2 BNL(AMDTS ONLY)'EMA<<REP DIV 39 NRC PDR 02 NTIS COPIES LTTR ENCL 0 1 1 1',3 3 1 1 2'1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2?1 1 1.TOTAL NUMBER OF COPIES REQUIRED: LTTR 55 ENCL 49 I Itth$f hll<<h'w<<ffh I'h h y h Iti hc)tip 1EI4IH)II ll ti f'fh>>E E f hl tt IC f Nt, p I t!$CI h<<<<I I','l h C, E<<II r I<<'E J'><<Itt<<,J, Engineering Verification Task Force Ebasco Services Incorporated Two World Trade Center-15th Floor New York, N.Y.10048 October 8,1982 Ltr No.EVP-119/SL-2 Office of Nuclear Reactor Regulation Attention:

Mr Darrell G Eisenhut, Director Division of Licensing U S Nuclear Regulatory Commission Washington, D.C.20555

Dear Mr Eisenhut:

Re: ST.LUCIE UNIT NO.2 DOCKET NO.50-389 ENGINEERING VERIFICATION PROGRAM WEEKLY STATUS

SUMMARY

FOR PERIOD OCTOBER 4-OCTOBER 8 1982 Attached for your information is the Weekly Status Summary of the joint Ebasco and Combustion Engineering Task Force for the period October 4 through October 8,1982.Very truly yours, Mi'8 T H Blodgett Joint Task Force Chairman THB/rob Attachment cc: Robert E Uhrig, FPL w/att D L Christian, FPL w/att 8210150431 821008 PDR PDR ADOCK 0500038'P s

ENGINEERING VERIFICATION PROGRAM/SL-2 EBASCO TASK FORCE WEEKLY STATUS SKlMARY FOR PERIOD OCTOBER 4-OCTOBER 8,1982 l.Independent design packages for the following items were completed during the period: a.HEPA Filter.for the ECCS Area Ventilation System (Verification Item 8)b.Area Radiation Monitor GM-26-22 (Verification Item 5)c.Tornado Missile Shield Door RA-109 (Verification Item 6)Copies were transmitted/distributed to members of the Review Committee for review of packages for completeness,-Items 8 and 5 via Federal Express on October 4,and Item 6 by hand on October 6.Committee approval to release these existing designs for ETF comparison is anticipated by October 13.2.A request for additional existing design documents for the Hydrogen Recombiner (Item 4)was made on October 4.A portion has been transmitted from the Project Team to the ETF and the balance is being assembled for transmittal.

3.K Comparison of the independent and existing designs continued for the Hydrogen Recombiner.

-4..Comparison of independent and existing designs for the Control Room Emergency Cleanup System Valve (Item 3)commenced following receipt of the first existing design documents from the Project Team.Receipt of the balance is expected early next period, including one additionally requested drawing.5.A response was received re two requested, design input items per ETF letter EVP-306/SL-2 of September 2.This is related to preparation of the.independent design package for Verification Item 7,'ain Steam-Isolation Valve.The completed design package is now scheduled for transmittal to Review Committee members on October'l.

for package completeness review.6.A meeting of the FPL,C-E and Ebasco EVP Task Force Managers.was held October 6 in Juno Beach, Florida to review program progress.'.

~On October 7, the Task Force Managers were at the,S't.Lucie jobsite t'o continu planning for the field installation verification phase of t: he program.1

ENGINEERING VERIFICATION PROGRAM/SL-2 C-E TASK FORCE WEEKLY STATUS

SUMMARY

OCTOBER 4-OCTOBER 8,1982 1.Portions of the existing design package for the Safety Injection Tank Isolation Valve (C-E Verification Item 2)have been received from the C-E Project Team.Comparison of the independent and existing designs has begun using a standard comparison form.Design comparison, planned for October 18 completion, is dependent on receipt of the balance of existing design information from the Ebasco Project Team by October 14.~2.The independent design package for the High Pressure Safety Injection Pump (C-E Verification Item 1)was completed and transmitted to Review Committee members on October 5.Release of the existing design package for'omparison is expected by October 11.3., On-site verification arrangements were discussed during an October 7 meeting of the Task Force Managers at the St.Lucie 2 construction site.

TELEPHONE CONVERSATION LOG ENGINEERING VERIFICATION PROGRAM-.SL2~~OF 10-4-82.DATE OF TELECON PARTICIPATING ORGANIZATIONS

'GENERAL SUBJECT OF TELECON PREPARER OF TELECON RECORD October 4 October 4 C-E/FPL/Ebasco/C-E Existing design info Program planning Transmittal via Fed.Exp.of Ind.Design Pkgs.to Review Committee;

'Preparation for EVP Task Force Mgrs mtg.C-E EVP task Force Mgr Ebasco EVP Task Force Mgr October 4 FPL/Ebasco Response to September 2 request for MSIV design input Ebasco EVP.Task Force Mgr