Monthly Operating Rept for July 1999 for WNP-2.With 990813 Ltr
ML17284A869
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 07/31/1999
From: Kasko B, Galen Smith
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-99-156, NUDOCS 9908200110
Download: ML17284A869 (8)


Text

ACCESSION NBR:9908200110 DOC.DAT FACXL:50-397+WPPSS Nuclear Project, Unit AUTH.NAME>>+AUTHOR AFFILIATION KASKO,B..Washington Public Power SMITH,G.O.

Washington Public Power RECIP.NAME RECIPXENT AFFILIATION OTARIZED: NO DOCKET¹2, Washington Public Powe 05000397 Supply System Supply System

SUBJECT:

Monthly operating rept for July 1999 for WN-2.With 990813 ltr.DISTRIBUTION CODE: XE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: RECIPIENT XD CODE/NAME CUSHING, J XNTERNAL: ACRS OC/DBA/PAD RGN4 COPIES LTTR ENCL 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME FILE CENTER 01 COPIES LTTR ENCL 1 1 1 EXTERNAL: LMITCO MARSHALL NRC PDR 1 1 1 1 NOAC 1 1 D'E N NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE.'TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DZSTRZBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 9 V

~~~e 8ÃESR" NORTH WES T PO.Box 968 o Richland, Washington 99352-0968 August 13, 1999 GO2-99-156 Docket No.50-397 U.S.Nuclear Regulatory Commission Document Control Desk Washington, D.C.20555 Gentlemen:

Subject:

WNP-2 OPERATING LICENSE NPF-21 MONTHLY OPERATING REPORT JULY 1999 Transmitted herewith is the Monthly Operating Report for the month of July 1999 as required by Technical Specification 5,6.4.Respectfully,\.O.Smith Vice President, Generation Mail Drop 927M cc: EW Merschoff-NRC RIV JS Cushing-NRR NRC Sr.Resident Inspector-927N PD Robinson-Winston&Strawn INPO ANI Library'..-.,Utility Data Institute DL Williams-BPA/1399"~(>>>>.>>(>>>>t=r~>>,~,~908VOOXXO ee07SalPDR AMCK OS000397 (q(t>>R PDRI't-I'~~'~

A OPERATING STATUS REPORT for WNP-2 Date: August 1, 1999 2.3.4.5.Docket: 50-397 Reporting Period: July 1999 Utility Contact: Bernice Kasko (509)377-4473 Design Electrical Rating (Net MW,): Maximum Dependable Capacity-summer (Net MW,): 1153 1107 6.7.8.9.Hours Reactor Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy (MWH)MONTH 744.0 674.8 0.0 629,109 YEAR 3,292.5 3,221.0 167.7 3,252,133 CUMULATIVE 92,133.8 89,095.2 3,205.2 86,582,064 10.Challenges to safety/relief valves: None

~'I h" h I I 4 l v I I~C,h~e I It ,I tt I I UNIT SHUTDOWNS REPORT PERIOD: JULY 1999 DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: August 1, 1999 COMPLETED BY: B K8ko TELEPHONE:

(509)377M>~3 No.Date Type F: Forced S: Scheduled Duration (Hours)Reason (1)Method (2)Cause and Corrective Action To Prevent Recurrence

SUMMARY

The Plant exited the Fuel Savings Dispatch and achieved 100%power on July 13~.1 REASON A-qulpment Failure B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training&License Examination F-Administration G-Operational Error H-Other 2 METHOD 1-anua 2-Manual Scram 3-Auto Scram 4-Continued 5-Reduced Load 9-Other 0 k a