Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217M7571999-10-22022 October 1999 Advises That Attachment 1 to ,Marked as Proprietary,Re Safety Limit MCPR & Fuel Vendor Change Will Be Withheld from Public Disclosure Per 10CFR2.790(b)(5) ML20217M2101999-10-19019 October 1999 Forwards NRC Rept Number 17, Requal Tracking Rept from Operator Licensing Tracking Sys.Rept Was Used by NRC to Schedule Requalification Exam for Operators & Record Requal Pass Dates ML20217H8471999-10-18018 October 1999 Discusses Completion of Licensing Action for GL 98-01 & Suppl 1, Yr 2000 Readiness of Computer Sys at Npps, to All Holders of Operating Licenses for NPPs ML18107A5601999-10-18018 October 1999 Submits 30-day Fuel Clad Temp Rept,Iaw 10CFR50.46.Rept Describes Changes to Calculated Peak Clad Temp (PCT) for Salem Generating Station Large & Small Break LOCA Analyses ML20217K8441999-10-15015 October 1999 Submits Revised Commitment to NRC Bulletin 90-01,Suppl 1 for Hope Creek Generating Station ML20217H9771999-10-13013 October 1999 Forwards SRO & RO Initial Exam Rept 50-354/98-302,suppl Rept on 990125-29,mtg Meeting on 990322,990429-30 & 0617-18 in-office Review & 990720 Telcon on Appeal Results.Overall, 11 of 16 Applicants Received NRC Licenses ML18107A5531999-10-0808 October 1999 Forwards Summary Rept of Plant Startup & Power Ascension Testing for Sgs,Unit 2 Cycle 11,per Requirements of TS 6.9.1.1 ML18107A5561999-10-0707 October 1999 Requests Relief Associated with Containment Examinations at Hope Creek & Salem Generating Stations.Attachment 1 Includes Proposed Alternatives & Supporting Justification for Relief Requests ML20217C4391999-10-0606 October 1999 Informs That Util Authorized to Administer Initial NRC Retake Written Exam to Applicant Listed,During Week of 991011 ML18107A5501999-10-0505 October 1999 Provides Current Status of Pse&G Actions Re GL 98-01, Y2K Readiness of Computer Sys at Npps, for Salem Nuclear Generating Station,Units 1 & 2 & Hope Creek Nuclear Generating Station ML18107A5521999-10-0505 October 1999 Encourages NRC to Support Abb Combustion Engineering Nuclear Power Request for Priority Review of Generic TR Re Crossflow Ultrasonic Flow Measurement Sys ML18107A5591999-10-0505 October 1999 Informs That Nj Dept of Environ Protection Has No Comments on License Change Request S99-07 for Sgs,Units 1 & 2 ML20217A9601999-10-0404 October 1999 Forwards Errata Redressing Deficiencies & Correcting Two Typos to Ufsar,Rev 10.Incorporate Attached Pages/Figures Into Controlled Copies of UFSAR ML20217A6861999-10-0101 October 1999 Forwards Insp Rept 50-354/99-05 on 990711-0829.Four Violations Occurred Re Areas of Fire Protection,Operation at Reduced Feedwater Inlet Temp & safety-related Battery Charging Operation & Being Treated as NCVs LR-N990430, Forwards Rev 10 to Hope Creek Generating Station Ufsar,Iaw 10CFR50.71(e).Details Re Each Change Also Attached to Facilitate NRC Review1999-09-28028 September 1999 Forwards Rev 10 to Hope Creek Generating Station Ufsar,Iaw 10CFR50.71(e).Details Re Each Change Also Attached to Facilitate NRC Review IR 05000272/19990071999-09-28028 September 1999 Forwards Insp Repts 50-272/99-07 & 50-306/99-07 on 990721- 0831.One Potentially Safety Significant Issue Identified Dealing with Control Room Special Ventilation System.Four Addl Issues of Low Safety Significance Identified ML18107A5341999-09-22022 September 1999 Provides Data Re Operator Licensing Exam for Salem & Hope Creek Station,In Response to NRC Form 536 (7-1999) ML18107A5421999-09-22022 September 1999 Forwards Discharge Monitoring Rept for Salem Generating Station for Aug 1999.Rept Is Required by & Prepared Specifically for EPA & Nj Dept of Environ Protection 05000354/LER-1999-009, Forwards LER 99-009-00, License Condition Violation - Min FW Temp Limits. Commitments Made by Util Encl1999-09-20020 September 1999 Forwards LER 99-009-00, License Condition Violation - Min FW Temp Limits. Commitments Made by Util Encl ML20217K7781999-09-16016 September 1999 Forwards Discharge Monitoring Rept for Hope Creek Generating Station for Month of Aug 1999. Rept Is Required by & Prepared Specifically for EPA & Nj Dept of Environ Protection ML20212B3631999-09-14014 September 1999 Forwards Rev 13 to Salem - Hope Creek Security Plan,Iaw 10CFR50.54(p).Summary of Proposed Changes to Plan,Encl. Encl Withheld ML20212B4021999-09-13013 September 1999 Submits Supplemental Info Related to Hope Creek License Change Request (LCR) H98-08,submitted to NRC on 981230, Re Flood Protection TS Changes ML18107A5321999-09-13013 September 1999 Forwards Revised 10CFR50.92 Evaluation to Clarify Util Response to Question Number 1 Re Amend to Modify TS 3/4 8.1, AC Power Sources. ML18107A5331999-09-13013 September 1999 Provides Notification That PSEG Intends to Utilize ASME Code Case N-481 During Second ISI Interval at Sgs Units 1 & 2 ML18107A5351999-09-13013 September 1999 Informs That NRC Has Reviewed Pse&G Request Proposing to Modify TS Which Allow EDG to Be Operated for 24 Surveillance Test During Any Mode,Iaw 10CFR50.91(b) & Has No Comments ML18107A5221999-09-0808 September 1999 Requests Approval to Use ASME Code Case N546,which Provides Alternative Qualification Requirements That Allow Personnel Most Familiar with Walkdown of Plant Sys,Like License Operators to Perform VT-2 Examinations ML18107A5231999-09-0808 September 1999 Forwards Salem Generating Station Semiannual Radioactive Effluent Release Rept for Jan-June 1999. Rept Summarizes Liquid & Gaseous Releases & Solid Waste Shipments from Salem Generating Station for Period of Jan-June 1999 ML20211N5421999-09-0808 September 1999 Forwards Amend 121 to License NPF-57 & Safety Evaluation. Amend Revises TSs by Relocating Procedural Details of RETS to Offsite Dose Calculation Manual LR-N990395, Provides Comments on NRC Ltr Dtd 990714, Closure of TAC Number MA1194 - Response to RAIs to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity, for Hope Creek Generating Sation. Revised GE Report Encl Also1999-09-0101 September 1999 Provides Comments on NRC Ltr Dtd 990714, Closure of TAC Number MA1194 - Response to RAIs to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity, for Hope Creek Generating Sation. Revised GE Report Encl Also ML18107A4981999-08-26026 August 1999 Forwards Response to NOV That Resulted from Predecisional Enforcement Conference Conducted on 990624.Corrective Actions:Communications to Supervisors Reinforced Employee Right & Duty to Raise Nuclear Safety Issues ML18107A5061999-08-26026 August 1999 Provides First Feedback from Observation of NRC Insp Under Pilot Nuclear Power Plant Insp Program.Attached Are Completed Insp Feedback Forms for Procedure 71111, Attachment 21 & Procedure 71151 ML18107A5181999-08-26026 August 1999 Forwards Ninety Day Rept for ISI Activities Conducted at Sgs,Unit 2 During Ninth Extended Outage & Tenth Refueling Outage.List of Encl,Provided ML18107A5051999-08-24024 August 1999 Informs That Nj Dept of Environ Protection Bureau of Nuclear Engineering Has Reviewed Request IAW Requirements of 10CFR50.91(b) & Has No Comments Re Amend to FOL Change Request S99-02 to Modify TS Re Penetration Valves ML18107A4921999-08-23023 August 1999 Provides Suppl Info Re 971024 Amend Request to Modify TS 3/4 7.7, Auxiliary Bldg Exhaust Air Filtration Sys. Util Withdraws from Request All Proposed Changes Associated with Filter Testing,Per Issuance of GL 99-02 ML18107A4911999-08-20020 August 1999 Forwards Revised Plant Attribute Libraries for Salem & Hope Creek Generating Stations,Iaw 10CFR50,App E,Vi, Emergency Response Data Sys, 3.b.Changes Are Identified by Rev Bars ML20211B5341999-08-20020 August 1999 Forwards RAI Re 2nd 10-yr ISI Interval Relief Requests Re Plant.Info Requested to Be Provided within 60 Days of Receipt of Ltr ML18107A4861999-08-19019 August 1999 Forwards NPDES Discharge Monitoring Rept, for Salem Generating Station for Month of Jul 1999.Rept Required by & Prepared Specifically for EPA & Nj Dept of Environ Protection ML18107A4831999-08-18018 August 1999 Submits Licensee Comments on NRC 990730 Ltr Which Provided Notification of Close Out of TAC Numbers MA0567 & MA0568 Re GL 92-01,Rev 1,Suppl 1 ML18107A4801999-08-13013 August 1999 Requests That Pse&Gs Contact in NUREG-0383, Directory of Compliance for Radioactive Matl Packages, Be Changed ML20210R4911999-08-11011 August 1999 Forwards Insp Rept 50-354/99-04 on 990530-0711.No Violations Noted.Inspectors Reviewed Performance Indicators Submitted as Part of Pilot Program for New Regulatory Oversight Process & Verified Data ML18107A4751999-08-0505 August 1999 Forwards Fitness for Duty Performance Data Rept for Six Month Period Ending 990630 ML20210M7571999-08-0404 August 1999 Forwards Response to Requesting Addl Info Re Status of Decommissioning Funding for Lgs,Pbaps & Sngs. Attachment Provides Restatement of Questions Followed by Response ML20210H9241999-07-26026 July 1999 Informs That State of Nj Dept of Environ Protection Has No Comments on Licensee 990517 Request for Amend to TS by Adding TS 3.3.10, Instrumentation of OPRM Sys ML20210F3271999-07-22022 July 1999 Forwards SE Granting Relief Requests RR-B1,RR-C1,RR-D1 & RR-B3 Re First 10-year Interval for ISI Program at Hope Creek ML18107A4531999-07-20020 July 1999 Forwards Discharge Monitoring Rept for Salem Generating Station, for June 1999.Rept Is Required by & Prepared for EPA & Nj Dept of Environ Protection ML20210D3971999-07-16016 July 1999 Forwards Discharge Monitoring Rept for Hope Creek Generating Station, for June 1999.Rept Is Required by & Prepared for EPA & Nj Dept of Environ Protection 05000354/LER-1999-007, Forwards LER 99-007-00,re License Condition Violation - Class-1E Battery Charging Operation.Commitments Made by Util Encl1999-07-14014 July 1999 Forwards LER 99-007-00,re License Condition Violation - Class-1E Battery Charging Operation.Commitments Made by Util Encl ML20209G2831999-07-14014 July 1999 Disclosure Closure of TAC MA1194 Re Licensee Response to RAI to GL 92-01,Rev 1,Suppl 1, Rc Structural Integrity, for Plant LR-N990250, Provides Proposed Alternative & Supporting Justification for Relief from Augmented Inservice Requirements of 10CFR50.55a(g) for Volumetric Exam of RPV Circumferential Welds1999-07-0909 July 1999 Provides Proposed Alternative & Supporting Justification for Relief from Augmented Inservice Requirements of 10CFR50.55a(g) for Volumetric Exam of RPV Circumferential Welds ML18107A4431999-07-0606 July 1999 Informs That Nj Dept of Environ Protection Bureau of Nuclear Engineering Has Reviewed Pse&G License Change Request S98-17 Re Permissible Enrichment Values for New Fuel Storage & Has No Comments 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML18107A5601999-10-18018 October 1999 Submits 30-day Fuel Clad Temp Rept,Iaw 10CFR50.46.Rept Describes Changes to Calculated Peak Clad Temp (PCT) for Salem Generating Station Large & Small Break LOCA Analyses ML20217K8441999-10-15015 October 1999 Submits Revised Commitment to NRC Bulletin 90-01,Suppl 1 for Hope Creek Generating Station ML18107A5531999-10-0808 October 1999 Forwards Summary Rept of Plant Startup & Power Ascension Testing for Sgs,Unit 2 Cycle 11,per Requirements of TS 6.9.1.1 ML18107A5561999-10-0707 October 1999 Requests Relief Associated with Containment Examinations at Hope Creek & Salem Generating Stations.Attachment 1 Includes Proposed Alternatives & Supporting Justification for Relief Requests ML18107A5591999-10-0505 October 1999 Informs That Nj Dept of Environ Protection Has No Comments on License Change Request S99-07 for Sgs,Units 1 & 2 ML18107A5521999-10-0505 October 1999 Encourages NRC to Support Abb Combustion Engineering Nuclear Power Request for Priority Review of Generic TR Re Crossflow Ultrasonic Flow Measurement Sys ML18107A5501999-10-0505 October 1999 Provides Current Status of Pse&G Actions Re GL 98-01, Y2K Readiness of Computer Sys at Npps, for Salem Nuclear Generating Station,Units 1 & 2 & Hope Creek Nuclear Generating Station ML20217A9601999-10-0404 October 1999 Forwards Errata Redressing Deficiencies & Correcting Two Typos to Ufsar,Rev 10.Incorporate Attached Pages/Figures Into Controlled Copies of UFSAR LR-N990430, Forwards Rev 10 to Hope Creek Generating Station Ufsar,Iaw 10CFR50.71(e).Details Re Each Change Also Attached to Facilitate NRC Review1999-09-28028 September 1999 Forwards Rev 10 to Hope Creek Generating Station Ufsar,Iaw 10CFR50.71(e).Details Re Each Change Also Attached to Facilitate NRC Review ML18107A5341999-09-22022 September 1999 Provides Data Re Operator Licensing Exam for Salem & Hope Creek Station,In Response to NRC Form 536 (7-1999) 05000354/LER-1999-009, Forwards LER 99-009-00, License Condition Violation - Min FW Temp Limits. Commitments Made by Util Encl1999-09-20020 September 1999 Forwards LER 99-009-00, License Condition Violation - Min FW Temp Limits. Commitments Made by Util Encl ML20212B3631999-09-14014 September 1999 Forwards Rev 13 to Salem - Hope Creek Security Plan,Iaw 10CFR50.54(p).Summary of Proposed Changes to Plan,Encl. Encl Withheld ML20212B4021999-09-13013 September 1999 Submits Supplemental Info Related to Hope Creek License Change Request (LCR) H98-08,submitted to NRC on 981230, Re Flood Protection TS Changes ML18107A5321999-09-13013 September 1999 Forwards Revised 10CFR50.92 Evaluation to Clarify Util Response to Question Number 1 Re Amend to Modify TS 3/4 8.1, AC Power Sources. ML18107A5351999-09-13013 September 1999 Informs That NRC Has Reviewed Pse&G Request Proposing to Modify TS Which Allow EDG to Be Operated for 24 Surveillance Test During Any Mode,Iaw 10CFR50.91(b) & Has No Comments ML18107A5331999-09-13013 September 1999 Provides Notification That PSEG Intends to Utilize ASME Code Case N-481 During Second ISI Interval at Sgs Units 1 & 2 ML18107A5231999-09-0808 September 1999 Forwards Salem Generating Station Semiannual Radioactive Effluent Release Rept for Jan-June 1999. Rept Summarizes Liquid & Gaseous Releases & Solid Waste Shipments from Salem Generating Station for Period of Jan-June 1999 ML18107A5221999-09-0808 September 1999 Requests Approval to Use ASME Code Case N546,which Provides Alternative Qualification Requirements That Allow Personnel Most Familiar with Walkdown of Plant Sys,Like License Operators to Perform VT-2 Examinations LR-N990395, Provides Comments on NRC Ltr Dtd 990714, Closure of TAC Number MA1194 - Response to RAIs to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity, for Hope Creek Generating Sation. Revised GE Report Encl Also1999-09-0101 September 1999 Provides Comments on NRC Ltr Dtd 990714, Closure of TAC Number MA1194 - Response to RAIs to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity, for Hope Creek Generating Sation. Revised GE Report Encl Also ML18107A4981999-08-26026 August 1999 Forwards Response to NOV That Resulted from Predecisional Enforcement Conference Conducted on 990624.Corrective Actions:Communications to Supervisors Reinforced Employee Right & Duty to Raise Nuclear Safety Issues ML18107A5181999-08-26026 August 1999 Forwards Ninety Day Rept for ISI Activities Conducted at Sgs,Unit 2 During Ninth Extended Outage & Tenth Refueling Outage.List of Encl,Provided ML18107A5061999-08-26026 August 1999 Provides First Feedback from Observation of NRC Insp Under Pilot Nuclear Power Plant Insp Program.Attached Are Completed Insp Feedback Forms for Procedure 71111, Attachment 21 & Procedure 71151 ML18107A5051999-08-24024 August 1999 Informs That Nj Dept of Environ Protection Bureau of Nuclear Engineering Has Reviewed Request IAW Requirements of 10CFR50.91(b) & Has No Comments Re Amend to FOL Change Request S99-02 to Modify TS Re Penetration Valves ML18107A4921999-08-23023 August 1999 Provides Suppl Info Re 971024 Amend Request to Modify TS 3/4 7.7, Auxiliary Bldg Exhaust Air Filtration Sys. Util Withdraws from Request All Proposed Changes Associated with Filter Testing,Per Issuance of GL 99-02 ML18107A4911999-08-20020 August 1999 Forwards Revised Plant Attribute Libraries for Salem & Hope Creek Generating Stations,Iaw 10CFR50,App E,Vi, Emergency Response Data Sys, 3.b.Changes Are Identified by Rev Bars ML18107A4831999-08-18018 August 1999 Submits Licensee Comments on NRC 990730 Ltr Which Provided Notification of Close Out of TAC Numbers MA0567 & MA0568 Re GL 92-01,Rev 1,Suppl 1 ML18107A4801999-08-13013 August 1999 Requests That Pse&Gs Contact in NUREG-0383, Directory of Compliance for Radioactive Matl Packages, Be Changed ML18107A4751999-08-0505 August 1999 Forwards Fitness for Duty Performance Data Rept for Six Month Period Ending 990630 ML20210M7571999-08-0404 August 1999 Forwards Response to Requesting Addl Info Re Status of Decommissioning Funding for Lgs,Pbaps & Sngs. Attachment Provides Restatement of Questions Followed by Response ML20210H9241999-07-26026 July 1999 Informs That State of Nj Dept of Environ Protection Has No Comments on Licensee 990517 Request for Amend to TS by Adding TS 3.3.10, Instrumentation of OPRM Sys 05000354/LER-1999-007, Forwards LER 99-007-00,re License Condition Violation - Class-1E Battery Charging Operation.Commitments Made by Util Encl1999-07-14014 July 1999 Forwards LER 99-007-00,re License Condition Violation - Class-1E Battery Charging Operation.Commitments Made by Util Encl LR-N990250, Provides Proposed Alternative & Supporting Justification for Relief from Augmented Inservice Requirements of 10CFR50.55a(g) for Volumetric Exam of RPV Circumferential Welds1999-07-0909 July 1999 Provides Proposed Alternative & Supporting Justification for Relief from Augmented Inservice Requirements of 10CFR50.55a(g) for Volumetric Exam of RPV Circumferential Welds ML18107A4431999-07-0606 July 1999 Informs That Nj Dept of Environ Protection Bureau of Nuclear Engineering Has Reviewed Pse&G License Change Request S98-17 Re Permissible Enrichment Values for New Fuel Storage & Has No Comments ML18107A4181999-06-30030 June 1999 Submits Response to NRC Request for Info Re Y2K Readiness at Npps,Per GL 98-01,suppl 1.Disclosure Encl LR-N990316, Responds to NRC Request for Info Re Y2K Readiness at Npps, Per GL 98-01,suppl 1.Disclosure Encl1999-06-30030 June 1999 Responds to NRC Request for Info Re Y2K Readiness at Npps, Per GL 98-01,suppl 1.Disclosure Encl ML18107A4131999-06-25025 June 1999 Provides Further Clarification of Licensing & Design Basis for 125 Vdc Battery Margins for Sgs & HCGS for Meeting Station SBO & Loca/Loop Loading Requirements,Per Util 990426 Ltr & Discussion with NRC ML18107A4061999-06-21021 June 1999 Provides Supplemental Info to Proposed License Amend, Modifying TS 3/4 7.7, Auxiliary Bldg Exhaust Air Filtration Sys. Info Re Acceptance Criterion Discussed ML20196E6471999-06-21021 June 1999 Forwards Revised marked-up TS Page for HCGS License Change Requests H99-02 & H99-05,dtd 990329 & 0524,respectively. Revised Pages Do Not Alter Conclusions Reached in 10CFR50.92 No Significant Hazards Analysis Previously Submitted ML20209B6441999-06-21021 June 1999 Offers No Comments on Licensee 990529 Request for Revs to Plant Radiological Effluent Ts,Per GL 89-01 ML20196E9631999-06-17017 June 1999 Informs That Util Has Made Change to Commitment Stated in NRC Ser,Suppl 5.Commitment That Has Been Changed Is Item Number 1 of First Paragraph on Page 9-3 of Ser,Suppl 5 LR-N990295, Submits Change 1 to Relief Request RR-A4,which Clarifies Requirements Re Snubber Visual Insps.Request Was Submitted as Part of Plant Second Interval ISI Program on 9905111999-06-16016 June 1999 Submits Change 1 to Relief Request RR-A4,which Clarifies Requirements Re Snubber Visual Insps.Request Was Submitted as Part of Plant Second Interval ISI Program on 990511 05000354/LER-1999-006, Forwards LER 99-006-00 Re Esfa B Channel Primary Containment Isolation Signal Actuation.Attachment a Lists Commitments Util Making to NRC Re LER1999-06-15015 June 1999 Forwards LER 99-006-00 Re Esfa B Channel Primary Containment Isolation Signal Actuation.Attachment a Lists Commitments Util Making to NRC Re LER ML18107A3691999-06-11011 June 1999 Forwards Corrected Monthly Operating Rept for Apr 1999 for Salem Generating Station,Unit 1.Original Submittal Contained Typo for year-to-date Value for Numbers of Hours Generator Was on Line (Service Hours) ML18107A3641999-06-0404 June 1999 Requests Enforcement Discretion for TS 3/4.6.2.3 Re Containment Cooling Sys for Salem Generating Station,Unit 1 ML18107A3561999-06-0303 June 1999 Informs That Nj Dept of Environ Protection Bureau of Nuclear Engineering Has Reviewed Pse&G License Change Request S99-05 & Has No Comments ML18107A3611999-05-27027 May 1999 Forwards Responses to NRC 990301 & 990323 RAIs for Salem & Hope Creek Generating Stations Relating to GL 96-05 ML18107A3301999-05-24024 May 1999 Forwards Suppl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety Related Power Operated Gate Valves. Encl Contains Methodology Used in Determination of Pressure Locking Susceptibility of PORVs Block Valves ML18107A3291999-05-20020 May 1999 Forwards Redacted Response to NRC 990322 RAI Re Notification of Licensed Operator That Tested Positive for Alcohol. Attachment 2 Withheld,Per 10CFR2.790(a)(6) ML18107A3031999-05-18018 May 1999 Provides Summary of Changes to NRC Commitments That Have Been Made But Not Reported by Other Means,Iaw with NEI Process for Managing NRC Commitments ML18107A2891999-05-13013 May 1999 Forwards Rev 36 to Pse&G Nuclear Business Unit Emergency Plan. Rev 36 Incorporates Changes to Section 1-3,6 & 7 & 9-17.Attached Copy Includes All Sections of EP for Completeness 1999-09-08
[Table view] Category:UTILITY TO NRC
MONTHYEARML18095A4881990-09-17017 September 1990 Requests Regional Waiver of Compliance from Tech Spec 3.6.2.3, Containment Cooling Sys. Waiver Requested in Order to Allow Replacement of Containment Fan Cooler Unit Motor #22 W/O Requiring Plant Shutdown ML18095A4901990-09-13013 September 1990 Provides Supplemental Info Applicable to Clarification of 10CFR50,App R Exemption Request Re Fire Suppression Sys for Panel 335,per NRC Request ML20059H5391990-09-10010 September 1990 Forwards Data Re Bailey Solid State Logic Modules (Sslm) Reliability Program for Period Ending June 1990.Quarterly Summaries of Sslm Data Will Be Provided to End of June 1991 ML20059E6821990-09-0404 September 1990 Forwards Info Re Temporary Mod to Security Plan Concerning Protected Area.Info Withheld ML20059E6791990-09-0404 September 1990 Forwards Security Upgrade Project Status Rept,Per Regulatory Effectiveness Review.Rept Withheld (Ref 10CFR73.21) ML18095A4621990-08-31031 August 1990 Provides Revised Response to Generic Ltr 89-13, Svc Water Problems Affecting Safety-Related Equipment. Only HXs Exhibiting Unsatisfactory Test Results Will Be Inspected & Possibly Cleaned ML18095A4641990-08-31031 August 1990 Forwards Revised Response to NRC Bulletin 88-004 Re Potential pump-to-pump Interaction.Util Pursuing Permanent Solution to Issue & Will Implement Appropriate Permanent Field Change by End of Unit 1 10th Refueling Outage ML20059D2531990-08-30030 August 1990 Forwards Hope Creek Generating Station Semiannual Radioactive Effluent Release Rept RERR-9 for Jan-June 1990 & Rev 11 to ODCM for Hope Creek Generating Station ML20059E7021990-08-30030 August 1990 Forwards RERR-9, Hope Creek Generating Station Semiannual Radioactive Effluent Release Rept for Jan-June 1990 & Rev 11 to Odcm.Summary of Change to ODCM & Rationale Provided in Part G of RERR-9.W/o Rev 11 to ODCM ML18095A4431990-08-30030 August 1990 Forwards Salem Generating Station Semiannual Radioactive Effluent Release Rept,Jan-June 1990 & Rev 6 to Odcm. ML18095A4531990-08-30030 August 1990 Forwards RERR-28, Salem Generating Station Semiannual Radioactive Effluent Release Rept for Jan-June 1990 & Revised Odcm.W/O Revised ODCM ML18095A4391990-08-29029 August 1990 Forwards Semiannual Rept Re fitness-for-duty Performance Data for 6-month Period Ending 900630,per 10CFR26.71(d).Rept Includes Testing Results,Random Testing Program Results & Confirmed Positive Tests for Specific Substances ML18095A4421990-08-28028 August 1990 Clarifies 900710 Request for Amends to Licenses DPR-70 & DPR-75,changing Sections I & M.Under Proposed Change,Section I Should Be Changed to Read Section 2.J for License DPR-70 & Section M Changed to Read Section 2.N for License DPR-75 ML20059D2191990-08-27027 August 1990 Provides Change to Schedule for Implementing Generic Ltr 88-11.Revised pressure-temp Curves Will Be Submitted Prior to Completion of Second Refueling Outage.Existing pressure- Temp Curves Conservative to 32 EFPY ML20059C3051990-08-24024 August 1990 Notifies of Minor Structural Enhancements to Spent Fuel Racks Issued by Util 891101 Proposed Change to Tech Spec 5.6.3 ML20059D2491990-08-24024 August 1990 Requests Regional Waiver of Compliance from Tech Specs 4.0.3 & 4.8.1.1.2.f.2.Waiver Allows Sufficient Time to Perform Surveillance Requirement W/O Requiring Unit Shutdown.Request Involves No Irreversible Environ Consequencies ML20059B6611990-08-22022 August 1990 Confirms That 10 Anchor/Darling Model S350W Swing Check Valves Installed at Plant,Per NRC Bulletin 89-002.All 18 Valves Inspected & Retaining Block Studs Replaced W/Upgraded Matl.No Crack Noted on Any Studs Which Were Replaced ML20059C2861990-08-21021 August 1990 Provides Correction to 900810 Response to Request for Addl Info Re Util Request for Restatement of OL Expiration Dates ML18095A4151990-08-10010 August 1990 Forwards Response to Request for Addl Info Re Reinstatement of OL Expiration Dates Based on Original Issuance of Ols. Advises That Correct Expiration Date for OL Proposed to Be 200418 ML18095A4091990-08-0909 August 1990 Forwards Responses to NRC Comments Re Plant Simulator Certification for 10CFR55.45(b)(2),per 891228 Ltr ML18095A4061990-08-0808 August 1990 Forwards Corrected marked-up Pages for Tech Spec Table 3.3-11 Re Subcooling Margin Monitor & Reactor Vessel Level Instrumentation Sys,Per 900223 Ltr.Administrative Changes Made as Indicated ML18095A3861990-07-30030 July 1990 Forwards Listing of Station Blackout Major Audit Items Resolution Scope,Per Station Blackout Schedule Commitment ML18095A3761990-07-26026 July 1990 Forwards Decommissioning Repts & Certification of Financial Assurance for Plants ML18095A3661990-07-26026 July 1990 Forwards Decommissioning Repts for Hope Creek,Peach Bottom & Salem Nuclear Generating Stations ML18095A3721990-07-24024 July 1990 Forwards Rept & Certification of Financial Assurance for Decommissioning for Plants,Per 10CFR50.75 ML18095A3611990-07-18018 July 1990 Responds to NRC Bulletin 90-001, Loss of Fill-Oil in Transmitters Mfg by Rosemount. ML18095A3621990-07-18018 July 1990 Forwards Corrected Tech Spec Page 3/4 3-5 for License Change Request 89-12 Submitted on 891227 & 900521 ML18095A3741990-07-18018 July 1990 Provides Supplemental Info Re Facility sub-cooling Margin Monitor ML18095A3751990-07-18018 July 1990 Provides Status of Commitments Made to NRC by Util in 900109 Ltr Re NUREG-0737,Item II.D.1,per 900628 Telcon ML20055G1571990-07-17017 July 1990 Requests Waiver of Compliance from Tech Spec 6.3.1 Re Requirement That Facility General Manager (Gm) Hold Senior Operator License.Waiver Will Temporarily Allow Individual to Fill Position While Gm Attends off-site Mgt Program ML18095A3591990-07-13013 July 1990 Corrects Typo in 900702 Response to Generic Ltr 90-04 Re Schedule for Completion of Remaining Open Items ML18095A3471990-07-11011 July 1990 Responds to NRC 900611 Ltr Re Violations Noted in Insp Repts 50-272/90-14 & 50-311/90-14.Corrective Actions:Directive from Radiation Protection Mgt to All Radiation Protection Personnel Issued Re Control of Compliance Agreement Sheets ML20055G4721990-07-11011 July 1990 Requests Extension Until Sept 1990 to Submit Level 1 Analysis,Per Generic Ltr 88-20 Re Individual Plant Exam Completion ML18095A3461990-07-10010 July 1990 Responds to NRC 900608 Ltr Re Violations Noted in Insp Repts 50-272/90-12 & 50-311/90-12.Corrective Actions:Assessment of ECCS & Component Performance Undertaken & ECCS Flow Testing Procedure Upgraded to Address Human Factors ML18095A3481990-07-10010 July 1990 Submits Supplemental Rept Identifying Root Cause of Missed Commitment & Corrective Actions to Assure Future Compliance Re Implementation of Mods to Facility PASS ML18095A3491990-07-10010 July 1990 Forwards Jn Steinmetz of Westinghouse 900614 Ltr Re Reassessment of Util Response to Bulletin 88-002 ML18095A3451990-07-10010 July 1990 Forwards Addl Info Re License Change Request 89-03 Re Reactor Trip Sys Instrumentation ML18095A3441990-07-0909 July 1990 Provides Written Notification Re Change in Calculated Peak Clad Temp,Per 900606 Verbal Notification ML20055E5181990-07-0303 July 1990 Suppls Request for Noncode Temporary Repair of Svc Water Sys.Ultrasonic Exam of Area Surrounding Patch Will Include Samples,In Accessible Areas,Out to Diameter of 14 Inches ML18095A3281990-07-0202 July 1990 Responds to NRC 900530 Ltr Re Violations Noted in Insp Repts 50-272/90-09 & 50-311/90-09.Corrective Actions:Util Intends to Use Nuclear Shift Supervisor as Procedure Reader & EOP, Rev 2 Under Development ML18095A3301990-07-0202 July 1990 Responds to Generic Ltr 90-04 Re Status of Licensee Implementation of Generic Safety Issues.Table Describing Status of Generic Safety Issue Implementation Encl ML18095A3391990-06-29029 June 1990 Forwards Correction to 890913 License Change Request 88-09, Consisting of Tech Spec Page 3/4 4-13 ML18095A3231990-06-28028 June 1990 Responds to NRC 900518 Ltr Re Violations Noted in Insp Repts 50-272/90-10,50-311/90-10 & 50-354/90-07.Two Noncited Violations Disputed.Util fitness-for-duty Program Exceeds Part 26 Requirements for Positive Blood Alcohol Limits ML18095A3241990-06-28028 June 1990 Forwards Retyped Pages to 871224 License Change Request 87-15 & Modified,Per 900620 Ltr ML18095A3221990-06-28028 June 1990 Provides Supplemental Info Re 900223 Proposed Revs to Tech Specs for Reactor Vessel Level Instrumentation Sys.Tables 3.3-11a & 3.3-11b Should Be Combined Into Single Table ML20055D0351990-06-26026 June 1990 Forwards Addl Info Re Svc Water Sys Noncode Temporary Repair,Per 900621 Application.Util Will Perform Ultrasonic Testing of Pipe Wall Adjacent to Fillet Weld Repair & on Patch.Insps Will Be Performed at 90-day Intervals ML18095A3211990-06-26026 June 1990 Requests 30-day Extension Until 900730 to Provide Completion Schedule to Resolve Audit Findings Re Station Blackout ML18095A3201990-06-25025 June 1990 Responds to NRC 900524 Ltr Re Violations Noted in Insp Repts 50-272/90-11 & 50-311/90-11.Corrective Actions:All Overdue Operations & Maint Procedure Files Reviewed for Outstanding Rev Requests & Procedure Upgrade Program Initiated ML18095A3161990-06-25025 June 1990 Forwards Supplemental Info Re Response to Generic Ltr 88-14. All Committed Actions Complete as of 900613 ML18095A3141990-06-25025 June 1990 Provides Schedule Change for Implementation of Control Room Mods.Schedule Modified to Address Overhead Annunciator Human Engineering Discrepancies During Phase III 1990-09-04
[Table view] |
Text
' ' Public Service Electric and Gas Company Stanley LaBruna Public Service Electric and Gas Company P.O. Box 236, Hancocks Bridge, NJ 08038 609-339-4800 Vice President
-Nuclear Operations AUG 2 9 1999 NLR-N90164 United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Gentlemen:
SEMI-ANNUAL REPORT OF FITNESS FOR DUTY (FFD) PERFORMANCE DATA SALEM AND HOPE CREEK GENERATING STATIONS DOCKET NOS. 50-272, 50-311 AND 50-354 In accordance with the requirements of 10CFR26.7l(d), Public Service Electric and Gas Company (PSE&G) forwards the attached report regarding FFD Performance Data, for the six month period ending June 30, 1990. This report includes the following categories of information:
testing results, random testing program results, confirmed positive tests for specific substances, summary of management actions and summary of events reported by telephone.
Should you have any questions concerning this transmittal, please contact us. Sincerely, Attachment Document Control Desk NLR-N90164 c Mr. J. c. stone 2 Licensing Project Manager -Salem Mr. c. Y. Shiraki Licensing Project Manager -Hope Creek Mr. L. L. Bush, Chief Program Development and Review Mr. T. Johnson Senior Resident Inspector Mr. T. Martin, Administrator Region I Mr. Kent Tosch, Chief New Jersey Department of Environmental Protection Division of Environmental Quality Bureau of Nuclear Engineering CN 415 Trenton, NJ 08625 AUG 2 9 199@
§i§MijitW#J5**?&
-¥ff+/- ffi' H+ff -WM11£W"&;
++ + ¥*MM FITNESS FOR DUTY PROGRAM Performance Data Personnel Subject to lOCFR 26 Public Service Electric & Gas Company 6/30/90 COMPANY 6 MONTHS ENDING Hancock's Jersey 08038 LOCATION Marcia D. Walton, Medical Administrator
-Nuclear 609-339-5601 CONTACT NAME PHONE (INCLUDE AREA CODE) CUTOFFS: SCREEN/CONFIRMATION (ng/ml) D APPENDIX A TO 10CFR 26 MARIJUANA 50 ; 15 AMPHETAMINES 1000 / 500 COCAINE 300 ; 150 PHENCYCLIDINE 25 ; OPIATES 300 I 300 ALCOHOL(%
BAC) 0.04 TESTING RESULTS AVERAGE NUMBER WITH UNESCORTED ACCESS CATEGORIES PRE-EMPLOYMENT PRE-BADGING PERIODIC FOR CAUSE POST ACCIDENT RANDOM FOLLOW-UP OTHER TOTAL LICENSEE EMPLOYEES Includes Contractor 3702 # # TESTED POSITIVE 243 1 83 0 N/A N/A 4 I 0 0 1330 6 13 0 N/A N/A 1673 8 8 1 25 LONG-TERM CONTRACTOR PERSONNEL N/A N/A I I I SHORT-TERM CONTRACTOR PERSONNEL N/A N/A # # # # TESTED POSITIVE TESTED POSITIVE N/A N/A N/A N/A 191 4 1490 28 N/A N/A N/A N/A 1 0 3 1 0 0 0 0 392 I i 183 4 0 0 0 0 N/A N/A N/A N/A 584 5 1676 33 7 /21/89 Random Testing Program Results ---------*-* *-*------* Individuals Tested 1969 1990 1991 1992 1993 /1X // /:/ ---7 ---*--:7 I// I/ d % Positive 0.00 0.58 --Graph of 5 .. % Positive 4 3 -*. -*--2 * -1 J:l ;..'*-.... d "" Confirrned Positive Tests for Specific Substances
Marijuana>
100 ng/ml 0 12 *-----t-------+-------t---------
--*-*---------Cocaine 0 19 t-----------+--------<------+-----+----__,r-----+----------
-*----------------------
Opiates 0 0 Amphetamines 0 3 -+--_...___
_
+------
Phencycfidine Qr' 1 ----+----.
*------------------Alcohol > 0 .04% BAC 0 9 Mariauana 50-100 ng/ml 0 5 ----*-----
*-----*-*---------
* ---------------
Alcohol < 0.04% BAC 0 1 >-----------+-------<-----*-----
+-------------* --------...---------------
*----*----
... ---------*
---**---**----
SUMMARY
OF MANAGEMENT ACTIONS INITIATIVES TAKEN 1. PSE&G has instituted a site photo identification requirement for all employees and contractors.
Individuals are required to present photo identification for Fitness-for-Duty (FFD) testing, access training and processing.
There was no site photo identification requirement previously and many individuals arrived at the collection facility without photo identification.
As a result, the individual's supervisor was called for identification.
This situation resulted in confusion and unnecessary delays. The new requirement was a result of our experience during the initial stages of program implementation.
- 2. Referral to an Employee Assistance Program (EAP) Counselor is required for all employees and contractors determined to be positive.
This referral provides an opportunity for substance abuse evaluation and/or assessment for addictive potential.
Those individuals who do comply with our EAP requirements are potential candidates for reinstatement of unescorted access. Those individuals who do not wish to comply with our EAP requirements waive their opportunity for regaining unescorted access at PSE&G's nuclear facilities.
We believe that our EAP program has been very successful.
- 3. PSE&G developed an alcohol policy that exceeds the rule requirements.
Any individual determined to have had a blood alcohol level of greater than or equal to 0.04% BAC, at any time during their workday, is considered positive and subject to the same sanctions as individuals testing greater than or equal to 0.04% BAC. One (1) individual has been declared a positive under this policy for the period ending June 30, 1990. 4. PSE&G found that supervisors need additional guidance on the support available from Administration, Medical, Employee Relations and Industrial Relations in implementing the FFD Program. Supervisors need additional guidance in making job assignment decisions for individuals whose performance may be affected by illness, fatigue, stress, prescribed medications, and over-the-counter medications.
To address these issues, PSE&G developed a video and added a module to the supervisory FFD training.
The training module enhances supervisory awareness and provides guidance on PSE&G's policy as it relates to FFD Program implementation and supervisory responsibility.
PSE&G has taken a proactive approach to FFD beyond mere drug and alcohol testing.
. -LESSONS LEARNED 1. PSE&G recommends that the NRC consider removing opiates from the panel of drugs to be tested. We have found that testing for opiates significantly delays preaccess processing, and significantly undermines the program acceptance and credibility.
M-A-M is only present for a very short period of time, and there is wide-spread use of opiate cough suppressants and analgesics.
The present requirement that demands expensive GC/MS confirmation to supposedly "rule out heroin abuse" is extremely expensive due to the type of testing required for detection.
In the five (5) years of testing by PSE&G at its nuclear facilities, there have been no detected cases of heroin abuse. In addition to the problem with cough suppressants and analgesics, wide-spread consumption of poppy seed containing food and the common knowledge that poppy seeds may result in a positive drug test result, makes it almost impossible to declare a positive per the rule. A significant amount of expense can be eliminated by removing opiates from the panel of drugs tested in areas of the country and/or states where heroin abuse does not appear to be common. 2. PSE&G strongly believes that a FFD Program cannot be functionally practiced as only a drug and alcohol detection/deterrence program. The level of decision making involves more than just review of drug and alcohol results. Medical Review Officer (MRO) involvement is essential and critical to a properly functioning FFD Program. PSE&G mentions this since the DOT is considering the removal of the MRO review requirement for all test results. EFFECTIVENESS EVALUATIONS
- 1. PSE&G has undergone two (2) thorough audits of its FFD Program; one by an internal auditing group and the other by the NRC. PSE&G's Medical Department periodically conducts self-assessment audits. Audit results to date have detected no significant problems and confirmed PSE&G's commitment to a premiere program. 2. PSE&G conducts informal trending (i.e., recognizing the expense of testing for opiates, popularity of certain drugs, population resulting in the most positives, client availability for testing, etc.) to obtain feedback on program effectiveness.
The NRC is emphasizing the need for trending mechanisms, as evidenced by our recently completed audit. Since the rule is vague on this matter, PSE&G has requested that the NRC provide licensees with additional guidance.
Sample reports containing FFD testing results are attached for your review. PSE&G is presently developing additional reports to assist the trending effort.
SUMMARY
OF EVENTS REPORTED BY TELEPHONE
- 1. PSE&G reported an incident on March 5, 1990, involving the first "random" drug test determined to be positive.
The tested drug was cocaine. The individual was a long-term contractor laborer. In accordance with PSE&G policy, the individual was referred to EAP for assessment and evaluation.
Individuals must comply with EAP recommendations to be eligible for future unescorted access. summary of Incident The incident was reportable because the individual's unescorted access was not terminated quickly enough to prevent re-entry into the protected area. The duty nurse escorted the individual to the Psychological Services Department (across the hall from the Medical Department) to schedule a followup interview with an Employee Assistance Counselor.
The nurse then returned to her work area to notify the Screening Supervisor to terminate this individual's badge. After several unsuccessful attempts to reach the Screening Supervisor by telephone, she hand-carried the revocation paperwork to the Screening Supervisor's office. The Screening Supervisor immediately notified Security to terminate the individual's badge and was informed that the individual had re-entered the protected area. PSE&G subsequently determined that the individual returned to his work location because the EAP Counselor was off-site that day and thus unavailable to conduct/schedule the interview.
Approximately one (1) elapsed from determination of a positive drug test to termination of unescorted access. A number of factors contributed to this incident.
PSE&G conducted a fact-finding investigation that resulted in appropriate corrective actions. The corrective actions involved counselling the nurse and revising the associated procedure.
- 2. PSE&G reported an incident on May 23, 1990, involving a supervisor testing positive.
A breathalizer test yielded an alcohol level above the 0.04% BAC limit during the individual's workday. This individual is a permanent licensee employee in the position of Project Manager. In accordance with PSE&G policy, the individual was referred to EAP for assessment and evaluation.
Individuals must comply with EAP recommendations to be eligible for future unescorted access. Summary of Incident This incident was reported, as required by the FFD Rule, because it involved a supervisor found to be positive.
8/20/90 CTGRY PRE-EMPLOYMENT PRE-BADGING PERIODIC FOR CAUSE POST ACCIDENT RANDOM FOLLOW-UP OTHER TOTAL PUBLIC SERVICE ELECTRIC & GAS COMPANY NUCLEAR DEPARTMENT I MEDICAL FITNESS-FOR-DUTY STATISTICS REPORT FOR PERIOD: 11/27/89 THRU 11/30/89 ------PERMANENT EMPLOYEES------
SHORT-TERM CONTRACTORS----
SCH ED TEST POS % TEST % POS SCH ED TEST POS % TEST % POS 0 0 0 0.00 0.00 0 0 0 0.00 0.00 0 0 0 0.00 0.00 6 6 0 100.00 0.00 0 0 0 0.00 0.00 0 0 0 0.00 0.00 0 0 0 0.00 0.00 0 0 0 0.00 0.00 0 0 0 0.00 0.00 0 0 0 0.00 0.00 64 47 0 73.43 0.00 26 11 0 42.30 0.00 0 0 0 0.00 0.00 0 0 0 0.00 0.00 0 0 0 0.00 0.00 0 0 0 0.00 0.00 64 47 0 73.43 0.00 32 17 0 53. 12 0.00 PAGE l . -----LONG-TERM CONTRACTORS-----
SCH ED TEST POS % TEST % POS 0 0 0 0.00 0.00 2 2 0 100.00 0.00 0 0 0 0.00 0.00 0 0 0 0.00 0.00 0 0 0 0.00 0.00 45 14 0 31. 11 0.00 0 0 0 0.00 0.00 0 0 0 0.00 0.00 47 16 0 34.04 0.00
-.,,..,., . 8/20/90 PUBLIC SERVICE ELECTRIC & GAS COMPANY NUCLEAR DEPARTMENT I MEDICAL FITNESS-FOR-DUTY STATISTICS REPORT POSITIVE TEST
SUMMARY
BY SUBSTANCE FOR PERIOD: 11/27/89 THRU 11/30/89 SUBSTANCE OCCURANCES
.........
!1111 ..................................................................................
.. .... 8/20/90 CTGRY PRE-EMPLOYMENT PRE-BADGING PERIODIC FOR CAUSE POST ACCIDENT RANDOM FOLLOW-UP OTHER TOTAL PUBLIC SERVICE ELECTRIC & GAS COMPANY NUCLEAR DEPARTMENT I MEDICAL FITNESS-FOR-DUTY STATISTICS REPORT FOR PERIOD: 12/01/89 THRU 01/02/90 ------PERMANENT EMPLOYEES------
SHORT-TERM CONTRACTORS----
SCH ED TEST POS % TEST % POS SCH ED TEST POS % TEST % POS 13 13 0 100.00 0.00 0 0 0 0.00 0.00 0 0 0 0.00 0.00 38 38 4 100.00 10.52 0 0 0 0.00 0.00 0 0 0 0.00 0.00 0 0 0 0.00 0.00 0 0 0 0.00 0.00 0 0 0 0.00 0.00 0 0 0 0.00 0.00 382 248 0 64.92 0.00 63 11 0 17.46 0.00 0 0 0 0.00 0.00 0 0 0 0.00 0.00 0 0 0 0.00 0.00 0 0 0 0.00 0.00 395 261 0 66.07 0.00 101 49 4 48.51 8. 16 -----LONG-TERM SCH ED TEST 0 0 10 10 0 0 0 0 0 0 180 7 1 0 0 0 0 190 81 PAGE CONTRACTORS-----
POS % TEST % POS 0 0.00 0.00 1 100.00 10.00 0 0.00 0.00 0 0.00 0.00 0 0.00 0.00 0 39.44 0.00 0 0.00 0.00 0 0.00 0.00 42.63 1. 23 '. ' -
8/20/90 PUBLIC SERVICE ELECTRIC & GAS COMPANY NUCLEAR DEPARTMENT I MEDICAL FITNESS-FOR-DUTY STATISTICS REPORT POSITIVE TEST
SUMMARY
BY SUBSTANCE FOR PERIOD: 12/01/89 THRU 01/02/90 SUBSTANCE OCCURANCES COCAINE 4 MARIJUANA 100NG *** TOTAL *** 5 PAGE I 8/13/90 CTGRY PRE-EMPLOYMENT PRE-BADGING PERIODIC FOR CAUSE POST ACCIDENT RANDOM FOLLOW-UP OTHER TOTAL PUBLIC SERVICE ELECTRIC & GAS COMPANY NUCLEAR DEPARTMENT I MEDICAL FITNESS-FOR-DUTY STATISTICS REPORT FOR PERIOD: 01/03/90 THRU 01/31/90 ------PERMANENT EMPLOYEES------
SHORT-TERM CONTRACTORS----
SCH ED TEST POS % TfST % POS SCHED TEST POS % TEST % POS 26 26 0 100.00 0.00 0 0 0 0.00 0.00 18 18 0 100.00 0.00 142 142 1 100.00 0.70 0 0 0 0.00 0.00 0 0 0 0.00 0.00 0 100.00 0.00 0 0 0 0.00 0.00 0 0 0 0.00 0.00 0 0 0 0.00 0.00 256 216 0 84.37 0.00 31 11 0 35.48 0.00 6 6 0 100.00 0.00 0 0 0 0.00 0.00 0 0 0 0.00 0.00 0 0 0 0.00 0.00 307 267 0 86.97 0.00 173 153 88.43 0.65 PAGE J * -----LONG-TERM CONTRACTORS-----
SCHEO TEST POS % TEST % POS 0 0 0 0.00 0.00 19 19 0 100.00 0.00 0 0 0 0.00 0.00 e 0 0 0 0.00 0.00 0 0 0 0.00 0.00 103 67 65.04 1. 49 0 0 0 0.00 0.00 0 0 0 0.00 0.00 122 86 70.49 1. 16
' -8/13/90 PUBLIC SERVICE ELECTRIC & GAS COMPANY NUCLEAR DEPARTMENT I MEDICAL FITNESS-FOR-DUTY STATISTICS REPORT POSITIVE TEST
SUMMARY
BY SUBSTANCE FOR PERIOD: 01/03/90 THRU 01/31/90 SUBSTANCE OCCURANCES MARIJUANA
-1001-JG -< COCAINE *** TOTAL *** 2 PAGE ' ,. i 8/13/90 CTGRY PRE-EMPLOYMENT PRE-BADGING PERIODIC FOR CAUSE POST ACCIDENT RANDOM FOLLOW-UP OTHER TOTAL L_ PUBLIC SERVICE ELECTRIC & GAS COMPANY NUCLEAR DEPARTMENT I MEDICAL FITNESS-FOR-DUTY STATISTICS REPORT FOR PERIOD: 02/01/90 THRU 02/28/90 ------PERMANENT EMPLOYEES------
SHORT-TERM CONTRACTORS----
SCH ED TEST POS % TEST % POS SCH ED TEST POS % TEST % POS 46 46 1 100.00 2. 17 0 0 0 0.00 0.00 8 8 0 100.00 0.00 194 194 5 100.00 2.57 0 0 0 0.00 0.00 0 0 0 0.00 0.00 2 2 1 100.00 50.00 0 0 0 0.00 0.00 0 0 0 0.00 0.00 0 0 0 0.00 0.00 233 172 73.81 0.58 38 11 28.94 9.09 0 100.00 0.00 0 0 0 0.00 0.00 0 0 0 0.00 0.00 0 0 0 0.00 0.00 290 229 3 78.96 1. 31 232 205 6 88.36 2.92 PAGE ,, -----LONG-TERM CONTRACTORS-----
SCH ED TEST POS % TEST % POS 0 0 0 0.00 0.00 6 6 0 100.00 0.00 0 0 0 0.00 0.00 -0 0 0 0.00 0.00 0 0 0 0.00 0.00 129 69 0 53.48 0.00 0 0 0 0.00 0.00 0 0 0 0.00 0.00 135 75 0 55.55 0.00 B/13/90 PUBLIC SERVICE ELECTRIC & GAS COMPANY NUCLEAR DEPARTMENT I MEDICAL FITNESS-FOR-DUTY STATISTICS REPORT POSITIVE TEST
SUMMARY
BY SUBSTANCE FOR PERIOD: 02/01/90 THRU 02/28/90 SUBSTANCE OCCURANCES MARIJUANA
-lOONG + 4 COCAINE 2 ALCOHOL: BAC > .04 MARIJUANA lOONG AMPHETAMINES
.... 8/13/90 CTGRY PRE-EMPLOYMENT PRE-BADGING PERIODIC FOR CAUSE POST ACCIDENT RANDOM FOLLOW-UP OTHER TOTAL L __ *PUBLIC SERVICE ELECTRIC & GAS COMPANY NUCLEAR DEPARTMENT I MEDICAL FITNESS-FOR-DUTY STATISTICS REPORT FOR PERIOD: 03/01/90 THRU 03/31/90 ------PERMANENT EMPLOYEES------
SHORT-TERM CONTRACTORS----
SCH ED TEST POS % TEST % POS SCH ED TEST POS % TEST % POS 24 24 0 100.00 0.00 0 0 0 0.00 0.00 16 16 0 100.00 0.00 647 647 16 100.00 2.47 0 0 0 0.00 0.00 0 0 0 0.00 0.00 0 0 0 0.00 0.00 1 100.00 100.00 0 0 0 0.00 0.00 0 0 0 0.00 0.00 250 226 90.40 0.44 50 24 0 48.00 0.00 0 0 0 0.00 0.00 0 0 0 0.00 0.00 0 0 0 0.00 0.00 0 0 0 0.00 0.00 290 266 91. 72 0.37 698 672 1 7 96.27 2.52 PAGE -----LONG-TERM CONTRACTORS-----
SCH ED TEST POS % TEST % POS 0 0 0 0.00 0.00 131 131 3 100.00 2.29 0 0 0 0.00 0.00 0 0 0 0.00 0.00 0 0 0 0.00 0.00 117 62 0 52.99 0.00 0 0 0 0.00 0.00 0 0 0 0.00 0.00 248 193 3 77. 82 1. 55 8/13/90 l PUBLIC SERVICE ELECTRIC & GAS COMPANY NUCLEAR DEPARTMENT I MEDICAL FITNESS-FOR-DUTY STATISTICS REPORT POSITIVE TEST
SUMMARY
BY SUBSTANCE FOR PERIOD: 03/01/90 THRU 03/31/90 SUBSTANCE OCCURANCES ALCOHOL: SAC > .04 4 COCAINE 9 PHENCYCLI DI NE MARIJUANA 100NG 3 MARIJUANA
-100NG + 5 AMPHETAMINES ALCOHOL: SAC < .04 *** TOTAL *** 24 PAGE 8/13/90 CTGRY PRE-EMPLOYMENT PRE-BADGING PERIODIC FOR CAUSE POST ACCIDENT RANDOM FOLLOW-UP OTHER TOTAL PUBLIC SERVICE ELECTRIC & GAS COMPANY NUCLEAR DEPARTMENT I MEDICAL FITNESS-FOR-DUTY STATISTICS REPORT FOR PERIOD: 04/01/90 THRU 04/30/90 ------PERMANENT EMPLOYEES------
SHORT-TERM CONTRACTORS----
SCH ED TEST POS % TEST % POS SCH ED TEST POS % TEST % POS 33 33 0 100.00 0.00 0 0 0 0.00 0.00 19 19 0 100.00 0.00 395 395 5 100.00 1. 26 0 0 0 0.00 0.00 0 0 0 0.00 0.00 0 0 0 0.00 0.00 0 100.00 0.00 0 0 0 0.00 0.00 0 0 0 0.00 0.00 249 21 2 85. 14 D.47 97 61 62.88 1. 63 0 100.00 0.00 0 0 0 0.00 0.00 0 0 0 0.00 0.00 0 0 0 0.00 0.00 302 265 87.74 0.37 493 457 6 92.69 1. 31 .* PAGE -----LONG-TERM CONTRACTORS-----
SCH ED TEST POS % TEST % POS 0 0 0 0 ."00 0.00 27 27 100.00 3.70 0 0 0 0.00 0.00 0 100.00 0.00 0 0 0 0.00 0.00 111 62 0 55.85 0.00 0 0 0 0.00 0.00 0 0 0 D.OD D.00 139 90 64.74 1. 11
' 8/13/90 PUBLIC SERVICE ELECTRIC & GAS COMPANY NUCLEAR DEPARTMENT I MEDICAL FITNESS-FOR-DUTY STATISTICS REPORT POSITIVE TEST
SUMMARY
BY SUBSTANCE FOR PERIOD: 04/01/90 THRU 04/30/90 SUBSTANCE OCCURANCES ALCOHOL: BAC > .04 2 MARIJUANA 100NG COCAINE 3 AMPHETAMINES MARIJUANA
-100NG + *** TOTAL *** 8 PAGE 8/13/90 CTGRY PRE-EMPLOYMENT PRE-BADGING PERIODIC FOR CAUSE POST ACCIDENT RANDOM FOLLOW-UP OTHER TOTAL PUBLIC SERVICE ELECTRIC & GAS COMPANY NUCLEAR DEPARTMENT I MEDICAL FITNESS-FOR-DUTY STATISTICS REPORT FOR PERIOO: 05/01/90 THRU 05/31/90 ------PERMANENT EMPLOYEES------
SHORT-TERM CONTRACTORS----
SCH ED TEST POS % TEST % POS SCH ED TEST POS % TEST % POS 88 88 0 100.00 0.00 0 0 0 0.00 0.00 11 11 0 100.00 0.00 72 72 1 100.00 1. 38 0 0 0 0.00 0.00 0 0 0 0.00 0.00 0 100.00 0.00 0 0 0 0.00 0.00 0 0 0 0.00 0.00 0 0 0 0.00 0.00 285 238 2 83.50 0.84 111 47 42.34 2. 12 0 0 0 0.00 0.00 0 0 0 0.00 0.00 0 0 0 0.00 0.00 0 0 0 0.00 0.00 385 338 2 87.79 0.59 183 119 2 65.02 1. 68 PAGE .* -----LONG-TERM CONTRACTORS-----
SCH ED TEST POS % TEST % POS 0 0 0 0.00 0.00 5 5 0 100.00 0.00 0 0 0 0.00 0.00 0 0 0 0.00 0.00 0 0 0 0.00 0.00 127 76 0 59.84 0.00 0 0 0 0.00 0.00 0 0 0 0.00 0.00 132 81 0 61. 36 0.00
- !At -8/13/90 L_ PUBLIC SERVICE ELECTRIC & GAS COMPANY NUCLEAR DEPARTMENT I MEDICAL FITNESS-FOR-DUTY STATISTICS REPORT POSITIVE TEST
SUMMARY
BY SUBSTANCE FOR PERIOD: 05/01/90 THRU 05/31/90 SUBSTANCE OCCURANCES ALCOHOL: BAC > .04 COCAINE 3 *** TOTAL *** 4 PAGE 8/13/90 CTGRY PRE-EMPLOYMENT PRE-BADGING PERIODIC FOR CAUSE POST ACCIDENT RANDOM FOLLOW-UP OTHER TOTAL PUBLIC SERVICE ELECTRIC & GAS COMPANY NUCLEAR DEPARTMENT I MEDICAL FITNESS-FOR-DUTY STATISTICS REPORT FOR PERIOD: 06/01/90 THRU 06/30/90 ------PERMANENT EMPLOYEES------
SHORT-TERM CONTRACTORS----
SCH ED TEST POS % TEST % POS SCH ED TEST POS % TEST % POS 26 26 0 100.00 0.00 0 0 0 0.00 0.00 11 11 0 100.00 0.00 40 40 0 100.00 0.00 0 0 0 0.00 0.00 0 0 0 0.00 0.00 0 0 0 0.00 0.00 0 100.00 0.00 0 0 0 0.00 0.00 0 0 0 O .*DO 0.00 421 266 63. 18 0.37 143 29 20.27 3.44 5 5 0 100.00 0.00 0 0 0 0.00 0.00 0 0 0 0.00 0.00 0 0 0 0.00 0.00 463 308 66.52 0.32 184 70 38.04 1. 42 PAGE -----LONG-TERM CONTRACTORS-----
SCH ED TEST POS % TEST % POS 0 0 0 0.00 0.00 3 3 0 100.00 0.00 0 0 0 0.00 0.00 0 0 0 0.00 0.00 0 0 0 0.00 0.00 138 56 0 40.57 0.00 0 0 0 0.00 0.00 0 0 0 0.00 0.00 141 59 0 41 .84 0.00 8/13/90 L PUBLIC SERVICE ELECTRIC & GAS COMPANY NUCLEAR DEPARTMENT I MEDICAL FITNESS-FOR-DUTY STATISTICS REPORT POSITIVE TEST
SUMMARY
BY SUBSTANCE FOR PERIOD: 06/01/90 THRU 06/30/90 SUBSTANCE OCCURANCES COCAINE MARIJUANA
-100NG + ALCOHOL: BAC > .04 *** TOTAL *** 3 ',' PAGE B/13/90 CTGRY PRE-EMPLOYMENT PRE-BADGING PERIODIC FOR CAUSE POST ACCIDENT RANDOM FOLLOW-UP OTHER TOTAL PUBLIC SERVICE ELECTRIC & GAS COMPANY NUCLEAR DEPARTMENT I MEDICAL FITNESS-FOR-DUTY STATISTICS REPORT FOR PERIOD: 01/03/90 THRU 06/30/90 ------PERMANENT EMPLOYEES------
SHORT-TERM CONTRACTORS----
SCH ED TEST POS % TEST % POS SCH ED TEST POS % TEST % POS 243 243 1 100.00 0.41 0 0 0 0.00 0.00 83 83 0 100.00 0.00 1490 1490 28 100.00 1. 87 0 0 0 0.00 0.00 0 0 0 0.00 0.00 4 4 1 100.00 25.00 3 3 1 100.00 33.33 0 0 0 0.00 0.00 0 0 0 0.00 0.00 1694 1330 6 78.51 0.45 470 183 4 38.93 2. 1 B 13 13 0 100.00 0.00 0 0 0 0.00 0.00 0 0 0 0.00 0.00 0 0 0 0.00 0.00 2037 1673 B 82. 13 0.47 1963 1676 33 85.37 1 .96 PAGE -----LONG-TERM CONTRACTORS-----
SCH ED TEST POS % TEST % POS 0 0 0 0.00 0.00 191 191 4 100.00 2.09 0 0 0 0.00 0.00 0 100.00 0.00 0 0 0 0.00 0.00 725 392 54.06 0.25 0 0 0 0.00 0.00 0 0 0 0.00 0.00 917 584 5 63.68 0.85
-.. 8/13/90 L_ PUBLIC SERVICE ELECTRIC & GAS COMPANY NUCLEAR DEPARTMENT I MEDICAL FITNESS-FOR-DUTY STATISTICS REPORT POSITIVE TEST
SUMMARY
BY SUBSTANCE FOR PERIOD: 01/03/90 THRU 06/30/90 SUBSTANCE OCCURANCES ALCOHOL: BAC > .04 9 COCAINE 19 MARIJUANA
-100NG + 12 PHENCYCLI DI NE MARIJUANA 100NG 5 AMPHETAMINES 3 ALCOHOL: BAC < .04 *** TOTAL *** 50 PAGE