MONTHYEARML17284A9101999-10-13013 October 1999 Application for Amend to License NPF-21,revising TS 3.3.6.1, Table 3.3.6.1-1, Primary Containment Isolation Instrumentation. Footnote (D) Is Removed Since Both Inboard & Outboard Trip Sys Are Now Functional in All Modes ML17284A8501999-07-29029 July 1999 Application for Amend to License NPF-21,revising TS 3.4.9, RHR Shutdown Cooling Sys - Hot Shutdown. ML17284A8471999-07-29029 July 1999 Application for Amend to License NPF-21,revising Tech Specs SR 3.5.2.2, Condensate Storage Tank Water Level. ML17284A8441999-07-29029 July 1999 Application for Amend to License NPF-21,revising TS Table 3.3.5.1-1, ECCS Instrumentation Items 1.a,2.a,4.a & 5.a. ML17284A8431999-07-29029 July 1999 Application for Amend to License NPF-21,removing License Condition 2.C.(16),Attachment 2,Item 3(b) Re post-accident Neutron Flux Monitoring ML17284A8401999-07-29029 July 1999 Application for Amend to License NPF-21,amending Tech Specs SR 3.8.4.6 of TS 3.8.5, DC Sources - Operating & SR 3.8.5.1 of TS 3.8.5, DC Sources - Shutdown. ML17292B6891999-06-0303 June 1999 Application for Amend to License NPF-21,reflecting Change in Name of Washington Public Power Supply Sys to Energy Northwest.Marked-up Copy of Affected Pages of OL for Plant, Encl ML17292B6441999-04-20020 April 1999 Application for Amend to License NPF-21,revising TS 3.4.11 to Replace Existing Reactor Pressure Temp Limit Curves by 000630 ML17292B6321999-04-0707 April 1999 Application for Amend to License NPF-21,requesting Mod to MCPR Safety Limits by 990930 to Allow Continued Power Operation at Plant Following Restart from R-14 RFO ML17292B4861998-12-17017 December 1998 Application for Amend to License NPF-21,revising TS SR 3.8.1.8 to Allow for Capability to Manually Transfer Between Preferred & Alternate Offsite Power Sources During Modes 1 & 2 by 990125 ML17284A8071998-11-0909 November 1998 Supplemental Application for Amend to License NPF-21, Requesting Minor Wording Changes to Clarify Intent of Proposed New License Section 2.B.(6).Addl Info That Describes Physical Storage of Matls,Encl ML17284A7161998-08-0505 August 1998 Application for Amend to License NPF-21,modifying TS SR 3.8.4.7 to Allow Performance Discharge Test to Be Performed in Lieu of Battery Svc Test for Div 1 & 3,125 Vdc Batteries E-B1-1 & HPCS-B1-DG3 & Div 1,250 Vdc Battery E-B2-1 ML17284A7051998-07-17017 July 1998 Application for Exigent Amend to License NPF-21,modifying TS SR 3.8.4.7 to Allow Performance Discharge Test to Be Performed in Lieu of Battery Svc Test for Div 2,125 Vdc, Battery E-B1-2 ML17292B3401998-04-16016 April 1998 Application for Amend to License NPF-21,modifying Requirement That cold-worked Austenitic Stainless Steel Used in Newly Designed ECCS Pump Suction Strainers Must Have Yield Strength Not Greater than 90,000 Psi ML17292B1301997-12-0404 December 1997 Application for Amend to License NPF-21,modifying Min Critical Power Ratio Safety Limits by 980515 to Allow Continued Power Operation at WNP-2 Following Restart from R-13 Refueling Outage ML17292B0261997-08-14014 August 1997 Application for Amend to License NPF-21,modifying Inservice Testing Requirements Specified in TS 5.5.6 for Inboard Primary Containment Isolation Valve on Transvering in-core Probe (TIP) Sys Nitrogen Purge Line ML17292A9401997-07-16016 July 1997 Application for Amend to License NPF-21,adding New Min Reactor Vessel Pressure Versus Reactor Vessel Metal Temp (P/T) Curves,Applicable Up to 12 Efpys.Changes Support Vessel Leak Testing ML17292A8631997-05-20020 May 1997 Application for Amend to License NPF-21,requesting Mod of Minimum Critical Power Ratio Safety Limits by 970615 ML17292A7561997-03-22022 March 1997 Application for Amend to License NPF-21,modifying Response Time Testing Surveillance Requirements for RPS Instrumentation,Primary Containment Isolation Actuation Instrumentation & ECCS Actuation Instrumentation ML17292A5491996-10-15015 October 1996 Application for Amend to License NPF-21 to Modify TS for Secondary Containment & Standby Gas Treatment Sys to Reflect Revised Secondary Containment Drawdown & post-accident Analyses Results.Affidavit,Encl ML17292A5381996-10-10010 October 1996 Application for Amend to License NPF-21,requesting Addition of Section 2B(6) Re Allowance of Storage of Byproduct, Source & Special Nuclear Materials ML17292A4081996-08-0909 August 1996 Requests Amend to License NPF-21,revising TS Section 6.3 Re Unit Staff Qualifications,By Changing Operations Manager Qualification Requirements Associated W/Operations Knowledge from Meeting Ansi/Ans N18.1-1971 GO2-96-089, Application for Amend to License NPF-21,modifying TS to Support Cycle 12,scheduled to Begin Subsequent to Spring 1996 Outage1996-04-24024 April 1996 Application for Amend to License NPF-21,modifying TS to Support Cycle 12,scheduled to Begin Subsequent to Spring 1996 Outage ML17291B2781996-03-19019 March 1996 Application for Amend to License NPF-21,revising Containment Leakage Testing ML17291B2071996-01-19019 January 1996 Application for Amend to License NPF-21 Re Primary Containment Leakage Testing GO2-95-265, Application for Amend to License NPF-21,revising TS to Be Consistent w/NUREG-1434, STS GE Plants,Bwr 6, Including Improved TS Submittal,Consisting of Application of Selection Criteria,Ts,Comparison Document & NSHC1995-12-0808 December 1995 Application for Amend to License NPF-21,revising TS to Be Consistent w/NUREG-1434, STS GE Plants,Bwr 6, Including Improved TS Submittal,Consisting of Application of Selection Criteria,Ts,Comparison Document & NSHC ML17291B0921995-10-26026 October 1995 Application for Amend to License NPF-21,revising TS to Reflect Replacement of Existing Reactor Recirculation Flow Control Sys W/Adjustable Speed Drive Sys ML17291A8421995-06-0606 June 1995 Application for Amend to License NPF-21,changing TS 6.0, Administrative Controls by Revising Assistant Managing Director,Operations & Plant Manager Position Titles ML17291A8381995-06-0606 June 1995 Application for Amend to License NPF-21,modifying Index of TS by Deleting Ref to Bases Pages.Future Changes to Bases Info Will Be Evaluated Per 10CFR50.59 ML17291A8321995-06-0606 June 1995 Application for Amend to License NPF-21,modifying TS 6.9.3.2 by Adding Re to Three TRs Describing Analytical Methods That May Be Used in Determining Reactor Core Operating Limits for Reload Licensing Applications,Consistent W/Gl 88-16 ML17291A7551995-04-25025 April 1995 Application for Amend to License NPF-21,adding RWCU Sys High Blowdown Containment Isolation Trip Function & Associated LCO & SRs to Tables 3.3.2-1,3.3.2-2 & 4.3.2.1-1 ML17291A4791994-10-31031 October 1994 Application for Amend to License NPF-21,revising TSs to Relocate Safety/Relief Valve Position Indication Instrumentation Requirements ML17291A4741994-10-31031 October 1994 Application for Amend to License NPF-21,revising TS 3/4.1.3.1, Reactivity Control Sys. ML17291A4201994-09-26026 September 1994 Suppl to 930709 Application for Amend to License NPF-21 Re Increase in Power Operation,Changing Power/Flow Maps in TS 3/4.2.6,3/4.2.7,3/4.2.8 & 3/4.4.1 & Bases to Reflect Use of Siemens Power Corp Staif Code for Stability Analysis ML17291A3941994-09-18018 September 1994 Application for Amend to License NPF-21,changing TS Table 3.6.3-1 Re Primary Containment Isolation Valve Requirements ML17291A3171994-08-0808 August 1994 Application for Amend to License NPF-21,amending TS 4.0.5, Surveillance Requirements for Inservice Insp & Testing Program. ML17291A2151994-07-12012 July 1994 Application for Amend to License NPF-21,requesting Amend to Ts,Relocating TS Table for Instrument Response Time Limits ML17291A2201994-07-0808 July 1994 Application for Amend to License NPF-21,revising TS W/Regard to Control Rod Scram Insertion Testing Under Emergency Circumstances ML17290B1711994-05-0606 May 1994 Application for Amend to License NPF-21,revising TSs 3/4.3.7.5,3/4.4.2 & 3/4.5.1 for Main Steam Relief Valve Position Indication ML17290B1551994-05-0505 May 1994 Application for Amend to License NPF-21,requesting Mod of Three Equipment Piece Numbers Included in Table 3.6.3-1, Primary Containment Isolation Valves. ML17290A9631994-02-17017 February 1994 Application for Amend to License NPF-21,revising TS to Support Hydrostatic Testing ML17290A9601994-02-17017 February 1994 Application for Amend to License NPF-21,revising TS Section 6.0, Administrative Controls, Including Changing Reporting Relationship for QA Functions in Section 6.2.1.e of TS from Managing Director to Assistant Managing Director,Operations ML17290A9551994-02-0808 February 1994 Application for Amend to License NPF-21,consisting of Changes to TS Table 3.6.3-1,for RCIC-V-8,increasing Stroke Time from 13 Seconds to 26 Seconds & Deleting Note (J) Reference from RCIC-V-8 & RCIC-V-63 ML17290A9031994-01-13013 January 1994 Application for Amend to License NPF-21,requesting Continued Plant Operation W/Eccs Functional,But Not in Strict Compliance W/Requirements for Demonstrating That Response Time within Limits of TS 3/4.3.3, ECCS Instrumentation. ML17290A8961994-01-0606 January 1994 Application for Amend to License NPF-21,requesting Changes to TS to Clarify Instrumentation Testing Requirements ML17290A8781994-01-0606 January 1994 Application for Amend to License NPF-21,requesting Rev to TS to Relocate Requirements for Seismic Monitoring Instrumentation to FSAR & Plant Procedures ML17290A8921994-01-0606 January 1994 Suppl to 930709 Application for Amend to License NPF-21, Increasing Licensed Power Level from 3,323 Mwt to 3,486 Mwt W/Extended Load Line Limit & Changing SRV Setpoint Tolerance to Include Changes to TS Paragraph 6.9.3.2 ML17290A8391993-12-20020 December 1993 Application for Amend to License NPF-21,revising TS 3/4.6.1.8, Drywell & Suppression Chamber Purge Sys. ML17290A8181993-12-0606 December 1993 Application for Amend to License NPF-21,requesting TS Surveillance Requirement 4.6.6.1.b.3 Be Revised to Provide Appropriate Acceptance Criteria for Demonstrating Operability of Primary Containment Hydrogen Recombiner Sys ML17290A8221993-12-0606 December 1993 Application for Amend to License NPF-21,adding Footnote to TS Table 4.3.7.5-1, Accident Monitoring Instrumentation Srs, Exempting Channel Calibr of Safety/Relief Valve Position Indicators from Spec 4.0.4 for 24 H 1999-07-29
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML17284A9101999-10-13013 October 1999 Application for Amend to License NPF-21,revising TS 3.3.6.1, Table 3.3.6.1-1, Primary Containment Isolation Instrumentation. Footnote (D) Is Removed Since Both Inboard & Outboard Trip Sys Are Now Functional in All Modes ML17284A8501999-07-29029 July 1999 Application for Amend to License NPF-21,revising TS 3.4.9, RHR Shutdown Cooling Sys - Hot Shutdown. ML17284A8471999-07-29029 July 1999 Application for Amend to License NPF-21,revising Tech Specs SR 3.5.2.2, Condensate Storage Tank Water Level. ML17284A8441999-07-29029 July 1999 Application for Amend to License NPF-21,revising TS Table 3.3.5.1-1, ECCS Instrumentation Items 1.a,2.a,4.a & 5.a. ML17284A8431999-07-29029 July 1999 Application for Amend to License NPF-21,removing License Condition 2.C.(16),Attachment 2,Item 3(b) Re post-accident Neutron Flux Monitoring ML17284A8401999-07-29029 July 1999 Application for Amend to License NPF-21,amending Tech Specs SR 3.8.4.6 of TS 3.8.5, DC Sources - Operating & SR 3.8.5.1 of TS 3.8.5, DC Sources - Shutdown. ML17292B6891999-06-0303 June 1999 Application for Amend to License NPF-21,reflecting Change in Name of Washington Public Power Supply Sys to Energy Northwest.Marked-up Copy of Affected Pages of OL for Plant, Encl ML17292B6441999-04-20020 April 1999 Application for Amend to License NPF-21,revising TS 3.4.11 to Replace Existing Reactor Pressure Temp Limit Curves by 000630 ML17292B6321999-04-0707 April 1999 Application for Amend to License NPF-21,requesting Mod to MCPR Safety Limits by 990930 to Allow Continued Power Operation at Plant Following Restart from R-14 RFO ML17292B4861998-12-17017 December 1998 Application for Amend to License NPF-21,revising TS SR 3.8.1.8 to Allow for Capability to Manually Transfer Between Preferred & Alternate Offsite Power Sources During Modes 1 & 2 by 990125 ML17284A8071998-11-0909 November 1998 Supplemental Application for Amend to License NPF-21, Requesting Minor Wording Changes to Clarify Intent of Proposed New License Section 2.B.(6).Addl Info That Describes Physical Storage of Matls,Encl ML17284A7161998-08-0505 August 1998 Application for Amend to License NPF-21,modifying TS SR 3.8.4.7 to Allow Performance Discharge Test to Be Performed in Lieu of Battery Svc Test for Div 1 & 3,125 Vdc Batteries E-B1-1 & HPCS-B1-DG3 & Div 1,250 Vdc Battery E-B2-1 ML17284A7051998-07-17017 July 1998 Application for Exigent Amend to License NPF-21,modifying TS SR 3.8.4.7 to Allow Performance Discharge Test to Be Performed in Lieu of Battery Svc Test for Div 2,125 Vdc, Battery E-B1-2 ML17292B3401998-04-16016 April 1998 Application for Amend to License NPF-21,modifying Requirement That cold-worked Austenitic Stainless Steel Used in Newly Designed ECCS Pump Suction Strainers Must Have Yield Strength Not Greater than 90,000 Psi ML17292B1301997-12-0404 December 1997 Application for Amend to License NPF-21,modifying Min Critical Power Ratio Safety Limits by 980515 to Allow Continued Power Operation at WNP-2 Following Restart from R-13 Refueling Outage ML17292B0261997-08-14014 August 1997 Application for Amend to License NPF-21,modifying Inservice Testing Requirements Specified in TS 5.5.6 for Inboard Primary Containment Isolation Valve on Transvering in-core Probe (TIP) Sys Nitrogen Purge Line ML17292A9401997-07-16016 July 1997 Application for Amend to License NPF-21,adding New Min Reactor Vessel Pressure Versus Reactor Vessel Metal Temp (P/T) Curves,Applicable Up to 12 Efpys.Changes Support Vessel Leak Testing ML17292A8631997-05-20020 May 1997 Application for Amend to License NPF-21,requesting Mod of Minimum Critical Power Ratio Safety Limits by 970615 ML17292A7561997-03-22022 March 1997 Application for Amend to License NPF-21,modifying Response Time Testing Surveillance Requirements for RPS Instrumentation,Primary Containment Isolation Actuation Instrumentation & ECCS Actuation Instrumentation ML17292A5491996-10-15015 October 1996 Application for Amend to License NPF-21 to Modify TS for Secondary Containment & Standby Gas Treatment Sys to Reflect Revised Secondary Containment Drawdown & post-accident Analyses Results.Affidavit,Encl ML17292A5381996-10-10010 October 1996 Application for Amend to License NPF-21,requesting Addition of Section 2B(6) Re Allowance of Storage of Byproduct, Source & Special Nuclear Materials ML17292A4081996-08-0909 August 1996 Requests Amend to License NPF-21,revising TS Section 6.3 Re Unit Staff Qualifications,By Changing Operations Manager Qualification Requirements Associated W/Operations Knowledge from Meeting Ansi/Ans N18.1-1971 GO2-96-089, Application for Amend to License NPF-21,modifying TS to Support Cycle 12,scheduled to Begin Subsequent to Spring 1996 Outage1996-04-24024 April 1996 Application for Amend to License NPF-21,modifying TS to Support Cycle 12,scheduled to Begin Subsequent to Spring 1996 Outage ML17291B2781996-03-19019 March 1996 Application for Amend to License NPF-21,revising Containment Leakage Testing ML17291B2071996-01-19019 January 1996 Application for Amend to License NPF-21 Re Primary Containment Leakage Testing GO2-95-265, Application for Amend to License NPF-21,revising TS to Be Consistent w/NUREG-1434, STS GE Plants,Bwr 6, Including Improved TS Submittal,Consisting of Application of Selection Criteria,Ts,Comparison Document & NSHC1995-12-0808 December 1995 Application for Amend to License NPF-21,revising TS to Be Consistent w/NUREG-1434, STS GE Plants,Bwr 6, Including Improved TS Submittal,Consisting of Application of Selection Criteria,Ts,Comparison Document & NSHC ML17291B0921995-10-26026 October 1995 Application for Amend to License NPF-21,revising TS to Reflect Replacement of Existing Reactor Recirculation Flow Control Sys W/Adjustable Speed Drive Sys ML17291A8421995-06-0606 June 1995 Application for Amend to License NPF-21,changing TS 6.0, Administrative Controls by Revising Assistant Managing Director,Operations & Plant Manager Position Titles ML17291A8381995-06-0606 June 1995 Application for Amend to License NPF-21,modifying Index of TS by Deleting Ref to Bases Pages.Future Changes to Bases Info Will Be Evaluated Per 10CFR50.59 ML17291A8321995-06-0606 June 1995 Application for Amend to License NPF-21,modifying TS 6.9.3.2 by Adding Re to Three TRs Describing Analytical Methods That May Be Used in Determining Reactor Core Operating Limits for Reload Licensing Applications,Consistent W/Gl 88-16 ML17291A7551995-04-25025 April 1995 Application for Amend to License NPF-21,adding RWCU Sys High Blowdown Containment Isolation Trip Function & Associated LCO & SRs to Tables 3.3.2-1,3.3.2-2 & 4.3.2.1-1 ML17291A4791994-10-31031 October 1994 Application for Amend to License NPF-21,revising TSs to Relocate Safety/Relief Valve Position Indication Instrumentation Requirements ML17291A4741994-10-31031 October 1994 Application for Amend to License NPF-21,revising TS 3/4.1.3.1, Reactivity Control Sys. ML17291A4201994-09-26026 September 1994 Suppl to 930709 Application for Amend to License NPF-21 Re Increase in Power Operation,Changing Power/Flow Maps in TS 3/4.2.6,3/4.2.7,3/4.2.8 & 3/4.4.1 & Bases to Reflect Use of Siemens Power Corp Staif Code for Stability Analysis ML17291A3941994-09-18018 September 1994 Application for Amend to License NPF-21,changing TS Table 3.6.3-1 Re Primary Containment Isolation Valve Requirements ML17291A3171994-08-0808 August 1994 Application for Amend to License NPF-21,amending TS 4.0.5, Surveillance Requirements for Inservice Insp & Testing Program. ML17291A2151994-07-12012 July 1994 Application for Amend to License NPF-21,requesting Amend to Ts,Relocating TS Table for Instrument Response Time Limits ML17291A2201994-07-0808 July 1994 Application for Amend to License NPF-21,revising TS W/Regard to Control Rod Scram Insertion Testing Under Emergency Circumstances ML17290B1711994-05-0606 May 1994 Application for Amend to License NPF-21,revising TSs 3/4.3.7.5,3/4.4.2 & 3/4.5.1 for Main Steam Relief Valve Position Indication ML17290B1551994-05-0505 May 1994 Application for Amend to License NPF-21,requesting Mod of Three Equipment Piece Numbers Included in Table 3.6.3-1, Primary Containment Isolation Valves. ML17290A9631994-02-17017 February 1994 Application for Amend to License NPF-21,revising TS to Support Hydrostatic Testing ML17290A9601994-02-17017 February 1994 Application for Amend to License NPF-21,revising TS Section 6.0, Administrative Controls, Including Changing Reporting Relationship for QA Functions in Section 6.2.1.e of TS from Managing Director to Assistant Managing Director,Operations ML17290A9551994-02-0808 February 1994 Application for Amend to License NPF-21,consisting of Changes to TS Table 3.6.3-1,for RCIC-V-8,increasing Stroke Time from 13 Seconds to 26 Seconds & Deleting Note (J) Reference from RCIC-V-8 & RCIC-V-63 ML17290A9031994-01-13013 January 1994 Application for Amend to License NPF-21,requesting Continued Plant Operation W/Eccs Functional,But Not in Strict Compliance W/Requirements for Demonstrating That Response Time within Limits of TS 3/4.3.3, ECCS Instrumentation. ML17290A8961994-01-0606 January 1994 Application for Amend to License NPF-21,requesting Changes to TS to Clarify Instrumentation Testing Requirements ML17290A8781994-01-0606 January 1994 Application for Amend to License NPF-21,requesting Rev to TS to Relocate Requirements for Seismic Monitoring Instrumentation to FSAR & Plant Procedures ML17290A8921994-01-0606 January 1994 Suppl to 930709 Application for Amend to License NPF-21, Increasing Licensed Power Level from 3,323 Mwt to 3,486 Mwt W/Extended Load Line Limit & Changing SRV Setpoint Tolerance to Include Changes to TS Paragraph 6.9.3.2 ML17290A8391993-12-20020 December 1993 Application for Amend to License NPF-21,revising TS 3/4.6.1.8, Drywell & Suppression Chamber Purge Sys. ML17290A8181993-12-0606 December 1993 Application for Amend to License NPF-21,requesting TS Surveillance Requirement 4.6.6.1.b.3 Be Revised to Provide Appropriate Acceptance Criteria for Demonstrating Operability of Primary Containment Hydrogen Recombiner Sys ML17290A8221993-12-0606 December 1993 Application for Amend to License NPF-21,adding Footnote to TS Table 4.3.7.5-1, Accident Monitoring Instrumentation Srs, Exempting Channel Calibr of Safety/Relief Valve Position Indicators from Spec 4.0.4 for 24 H 1999-07-29
[Table view] |
Text
ACCELERATED DISTRIBUTION DEMONS'ION SYSTEM I REGULA-INFORMATION DISTRIBUTIOh, SYSTEM (RIDS)ACCESSION NBR:9202i280005 DOC.DATE: 92/02/21 NOTARIZED:
YES DOCKET FAICIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION SORENSEN,G.C.
Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Application for amend to license NPF-21 TS 3/4.4.2&3/4/3/7/5 recognizing redundancy in SRV position indication.
Direct reading SRV stem position indicator to be installed in outage in addition to accoustic monitoring indication.
DISTRIBUTION CODE: ROOID COPIES RECEIVED:LTR I ENCL Q SIZE: 6+7 TITLE: OR Submittal:
General Distribution NOTES: RECIPIENT ID CODE/NAME PD5 LA ENG,P.L.COPIES LTTR ENCL 1 1 2 2 RECIPIENT ID CODE/NAME PD5 PD COPIES LTTR ENCL 1 1 INTERNAL: ACRS NRR/DET/ESGB NRR/DST 8E2 NRR/DST/SICB8H7 NUDOCS-ABSTRACT OGC/HDS1 RES/DSIR/EIB EXTERNAL: NRC PDR 6 6 1 1 1 1 1 1 1 1 1 0 1 1 1 1 NRR/DET/ECMB 7D NRR/DOEA/OTSB11 NRR/DST/SELB 7E NRR/DST/SRXB 8E OC B EG FIL 01 NSIC 1 1 1 1 1~1 1 1 1 0 1 1 1 1 NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE!CONTACI'HE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISIS FOR DOCUMENTS YOU DON'T NEEDl TOTAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL 22 1 Cl F~/4 ll A WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Bm968~3000 George Wasbtngton Way~Rfcbland, Wasbtngton 99352-0968
~(509)372-5000 February 21, 1992 G02-92-046 Docket No.50-397 U.S.Nuclear Regulatory Commission.
Attn: Document Control Desk Washington, D.C.20555
Subject:
WNP-2, OPERATING LICENSE NPF-21 REQUEST FOR AMENDMENT TO TECHNICAL SPECIFICATIONS 3/4.4.2, SAFETY/RELIEF VALVES AND 3/4.3.7.5, ACCIDENT MON ITORING INSTRUMENTATION
References:
1)Letter, G02-92-032, GC Sorensen to NRC,"Acoustic Monitors for Safety Relief Valve Position Indication", dated February 4, 1992 2)NUREG-0892, Safety Evaluation Report for WNP-2, dated March 1982 In accordance with the Code of Federal Regulations, Title 10, Parts 50.90 and 2.101, the Supply System hereby submits a request for amendment to the WNP-2 Technical Specifications.
This proposal requests that Specifications 3.4.2, Safety Relief Valves and 3.3.7.5, Accident Monitoring Instrumentation, be revised to recognize recently installed redundancy in SRV position indication.
A direct reading SRV stem position indicator will be installed during the 1992 refueling outage.This system will be in addition to the presently installed acoustic monitoring position indication instrumentation.
As such, the proposed changes provide the flexibility of allowing inoperability of either the stem position indicator or acoustic monitor instrument associated with a specific SRV without invoking compensatory action (see attached).
Action c of Specification 3.4.2, Safety Relief Valve and Action 80.a for Technical Specification Table 3.3.7.5-1, Accident Monitoring Instrumentation, require compensatory actions, including shutdown, should an SRV position indicator fail.Further, Specification 3.0.4 prohibits entry into OPERATIONAL CONDITIONS unless the conditions for the Limiting Condition for Operation are satisfied.
As stated in Reference 1, the Supply System is installing a direct 9202280005i)920221 PDR i ADOCg 05000397 P PDR I'\t PI,J lI>'
Page Two RigUEST FOR AMENDMENT TO TECHNICAL SPECIFICATIONS 3/4.4.2, SAFETY/RELIEF VALVES AND 3/4.3.7.5, ACCIDENT HON ITORI NG I NSTRUH ENTAT ION reading valve stem position indicator during the 1992 refueling outage.The system util'izes linear voltage differential transformers mounted directly on the relief valves to provide a closed/not closed indication and annunciation.
The design is safety grade with seismic and environmental qualifications and is powered from a 1E source.Both the presently installed acoustic monitoring system and the valve stem position indicator system satisfy the same design requirements (see below).As such, failure of one device has no impact on the ability to provide adequate SRV position indication.
Accordingly, the attached changes provide the flexibility of using either instrument to satisfy the ACTION statement and SURVEILLANCE REQUIREMENTS of Technical Specification 3/4.4.2.with respect to SRV position indication.
For Accident Monitoring Technical Specification 3.3.7.5, the operability of the SRV position monitoring instrumentation is based on providing assurance that sufficient information is available on selected plant parameters (e,g., SRV position indication) to monitor and assess important variables following an accident.THI Action Plan Item II.D.3"Direct Indication of Relief and Safety-Valve Position" requires that"reactor coolant system relief and safety valves shall be provided with a positive indication in the control room derived from a reliable valve-position detection device or a reliable indication of flow in the discharge pipe." Both the present acoustic monitoring system and the valve stem position indicator satisfy this requirement.
The changes to Specification 3.3.7.5 propose to use either instrument to satisfy the requirement.
Presently Technical Specification 3.3.7.5 stipulates two instrumentation channels for providing this parameter.
One channel is the acoustic monitor, the second channel, a backup, is a thermocouple in the SRV discharge tailpipe that detects a temperature increase indicative of flow past the valve.The thermocouples do not fully satisfy the requirements of THI Action Plan Item II.D.3, however in combination with other plant instrumentation they can provide indirect indication of the SRV position.Supplement 4 to Reference 2, paragraph 7,5.2.5 documents review and approval of the acoustic monitors with the tailpipe temperature backup.As a result, upon failure of either monitor, Specification 3.3.7.5 presently invokes a seven day, restore operability or shutdown, ACTION statement.
Failure of both invokes a 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> restore operability or shutdown ACTION.Because the SRV stem position indication instrument is equal to and independent of the acoustic monitor, a new ACTION statement (82)in addition to a change to the RE(VIREO NUMBER OF CHANNELS column of Table 3.3.7.5-1 is proposed that maintains the same ACTION statement requirements as presently required.
t Page Three RE/VEST FOR AMENDMENT TO TECHNICAL SPECIFICATIONS 3/4.4.2, SAFETY/RELIEF VALVES AND 3/4.3.7.5, ACCIDENT MONITORING INSTRUMENTATION As discussed above, failure of either the stem position indicator or acoustic monitor does not impact compliance to TMI Action Plan Item II.D.3.Hence, the change to Table 3.3.7.5-1 proposes that the RE(UIRED NUMBER OF CHANNELS be changed from"2" to"1" such that both stem position indicator and acoustic monitoring instruments must fail before an ACTION statement is entered.With one of the two independent channels operable compliance to TMI Action Item II.D.3 is not compromised.
The associated ACTION statement change from 80 to the proposed 82 retains the present seven day and 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />, restore or shutdown, requirements by verifying the operability of the backup tailpipe temperature monitor and directing plant response accordingly.
These changes provide the same plant response as presently required when compliance to II.D.3 cannot be met, yet a forced shutdown and the concomitant plant exposure to potential transient events during a shutdown and startup maneuver is avoided.The addition of the SRV stem position indicator increases the reliability of the SRV position indication system and, with the proposed Technical Specification changes, enhances overall plant safety.The change in RE(VIREO NUMBER OF CHANNELS from"2" to"1" on Table 3.3.7.5-1 implies that only one channel of position indication (stem position indicator or acoustic monitor)will be required in order to proceed into OPERATIONAL CONDITIONS 1 and 2.The present Technical Specificat'ions require both acoustic and tailpipe temperature monitors.However, Regulatory Guide 1.97, revision 2 (the'bases for TMI Action Plan Item II.D.3)identified SRV position indication as a category two, Type 0 variable.Category two, Type D variables are not required to be redundant.
As such the requirement to have two channels is overly restrictive and beyond the recognized guidelines for assuring SRV position indication, (Technical Specifications for LaSalle 2, Susquehanna 1 5.2, Fermi, and Limerick all require"1" channel per valve).Although the tailpipe temperature thermocouples in combination with other plant indications are a reliable backup method of indirect valve position indication, they were not designed as safety related.Relying on the operability of non-safety grade equipment for movement into Operational Conditions is overly restrictive and.beyond the intent of the Technical Specifications.
While the change from"2" to"1" represents a slight decrease in the present requirement, the enhanced plant safety achieved by using either stem position or acoustic monitor indication offsets this decrease.In support of this change a note stating,"Either the acoustic monitor or valve stem position indicator satisfies these requirements" has been added to Technical Specification Tables 3.3.7.5-1 and 4.3.7.5-1.
The Supply System has evaluated this amendment request per 10CFR 50.92 and determined that it does not represent a significant hazard because it does not: 1)Involve a significant increase in the probability or consequences of an accident previously evaluated because no credit is taken for SRV position indication functioning in the initiation or mitigation of any analyzed accident.Although no credit is taken for operator action as a result of SRV position indication alarm and annunciation, the addition of a second qualified instrument increases the probability that the Operator will be t Page Four RE(VEST FOR AMENDMENT TO TECHNICAL SPECIFICATIONS 3/4.4.2, SAFETY/RELIEF VALVES AND 3/4.3.7.5, ACCIDENT MONITORING INSTRUMENTATION alerted to an open SRV well before the point that the accident analysis presently recognizes (high suppression pool temperature).
Hence, the addition of the stem position indicator represents a decrease in the probability or consequences of an accident previously evaluated.
The change in RE(UIRED NUMBER OF CHANNELS from"2" to"1" for movement into Operational Conditions is offset by enhanced overall plant safety in the avoidance of forced shutdowns and the exposure to potential transient events in the shutdown and startup maneuvers.
Further, the proposed change preserves at least the same level of SRV position indication reliability as presently provided.Therefore, this change does not involve a significant increase in the probability or consequences of an accident previously evaluated.
2)Create the possibility of a new or different kind of accident from any accident previously evaluated because SRV operation, including the ADS function, remains unaffected.
No new modes of operation of any equipment result due to this change.The addition of the SRV stem position indication is a non-intrusive design that does not affect the operation of the SRV.Therefore this change does not create the possibility of a new or different kind of accident from any accident previously evaluated.
3)Involve a significant reduction in a margin of safety because, as discussed above, the changes preserve at least the same level of SRV position indication reliability as presently required by the Technical Specifications.
Further, the addition of a second qualified instrument and the flexibility provided by this change avoids possible forced shutdown situations (on failure of one instrument).
Startup and shutdown maneuvers expose the plant to more transient conditions than steady state operation does.Hence, avoidance of an unnecessary shutdown enhances the margin of safety.The change in RE(UIRED NUMBER OF CHANNELS from"2" to"1" for movement into Operational Conditions is offset by the above enhancement to overall plant safety.Therefore, this change does not involve a significant reduction in the margin of safety.As discussed above, the Supply System considers that these changes do not involve a significant hazards consideration, nor is there a potential for significant change in the types or significant increase in the amount of any effluents that may be released offsite, nor do they involve a significant increase in individual or cumulative occupational radiation exposure.Accordingly, the proposed changes meet the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(C)(9) and therefore, per 10 CFR 51.22(b), an environmental assessment of these changes is not required.This Technical Specification change request has been reviewed and approved by the WNP-2 Plant Operations Committee (POC)and the Supply System Corporate Nuclear Safety Review Board (CNSRB).In accordance with 10 CFR 50.91, the State of Washington has been provided a copy of this letter.
0~4 tl h 5 4 1 4 C t II I t 1 Page Five REQUEST FOR AMENDMENT TO TECHNICAL SPECIFICATIONS 3/4.4.2, SAFETY/RELIEF VALVES AND 3/4.3.7.5, ACCIDENT MONITORING INSTRUMENTATION It is requested that this change be approved prior to restart from the 1992 refueling outage.Restart is currently scheduled for June 29, 1992.With installation of the fully qualified valve stem position indicator, lack of approval past this date would subject WNP-2 to an unnecessary forced shutdown or relief request should an acoustic monitor fail.Sincerely, G.C.Sorensen, Manager Regulatory Programs (Hail Drop 280)PLP/bk Attachments CC: JB Hartin-NRC RV NS Reynolds-Winston&Strawn PL Eng-NRC DL Williams-BPA/399 NRC Site Inspector-901A RG Waldo-EFSEC STATE OF WASHINGTON COUNTY OF BENTON)
Subject:
AMENDMENT REQUEST TS 3/4.4.2, 3/4.3.7.5))I, G.C.SORENSEN, being duly sworn, subscribe to and say that I am the Manager, Regulatory Programs, for the WASHINGTON PUBLIC POWER SUPPLY SYSTEM, the applicant herein;that I have full authority to execute this oath;that I have reviewed the foregoing; and that to the best of my knowledge, information, and belief the statements made in it are true.DATE: , 1992 G.C.Sorensen, Manager Regulatory Programs On this date personally appeared before me G.C.SORENSEN, to me known to be the individual who executed the foregoing instrument, and acknowledged that he signed the same as his free act and deed for the uses and purposes herein mentioned.
GIVEN under my hand and seal this~+}day of 1992.Notary Pu'cin for th STATE OF WASHINGTON My Commission Expires
-~,z;illositggg~
co~~0~iv 4 Q/~~>Nllllll:~"