ML12171A610

From kanterella
Revision as of 22:33, 29 April 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Waste Confidence Secy Order - Order of Acting Secretary to the Parties Inviting Answers to Suspend Final Licensing Decisions by 12 PM Edt, Monday, June 25, 2012
ML12171A610
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 06/19/2012
From: Bates A L
NRC/SECY
To:
Entergy Operations, NRC/OGC
SECY RAS
References
License Renewal, RAS 22637, 50-416-LR
Download: ML12171A610 (4)


Text

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of

CALVERT CLIFFS NUCLEAR PROJECT, L.L.C.

(Calvert Cliffs Nuclear Power Plant, Unit 3)

DETROIT EDISON CO.

(Fermi Nuclear Power Plant, Unit 3)

DUKE ENERGY CAROLINAS, L.L.C.

(William States Lee III Nuclear Station, Units 1 and 2)

ENTERGY OPERATIONS, INC.

(Grand Gulf Nuclear Station, Unit 1)

ENTERGY OPERATIONS, INC. (Grand Gulf Nuclear Station, Unit 3)

FIRSTENERGY NUCLEAR OPERATING CO.

(Davis-Besse Nuclear Power Station, Unit 1)

FLORIDA POWER AND LIGHT CO. (Turkey Point, Units 6 and 7)

LUMINANT GENERATION CO. L.L.C.

(Comanche Peak Nuclear Power Plant, Units 3 and 4)

NEXTERA ENERGY SEABROOK, L.L.C. (Seabrook Station, Unit 1)

PACIFIC GAS AND ELECTRIC CO.

(Diablo Canyon Power Plant, Units 1 and 2)

PPL BELL BEND, L.L.C. (Bell Bend Nuclear Power Plant)

PROGRESS ENERGY CAROLINAS, INC.

(Shearon Harris Nuclear Power Plant, Units 2 and 3)

PROGRESS ENERGY FLORIDA, INC.

(Levy County Nuclear Power Plant, Units 1 and 2)

SOUTH TEXAS PROJECT NUCLEAR OPERATING CO. (South Texas Project, Units 1 and 2)

) )

)

)

) ) )

)

)

)

) ) )

)

)

) ) )

)

)

)

) ) )

)

)

) ) )

)

)

)

) ) )

)

)

) ) )

)

)

) ) )

)

Docket No. 52-016-COL

Docket No. 52-033-COL

Docket Nos. 52-018-COL, 52-019-COL Docket No. 50-416-LR

Docket No. 52-024-COL

Docket No. 50-346-LR

Docket Nos. 52-040-COL, 52-041-COL

Docket Nos. 52-034-COL, 52-035-COL

Docket No. 50-443-LR

Docket Nos. 50-275-LR, 50-323-LR

Docket No. 52-039-COL

Docket Nos. 52-022-COL, 52-023-COL Docket Nos. 52-029-COL, 52-030-COL

Docket Nos. 50-498-LR, 50-499-LR

SOUTH TEXAS PROJECT NUCLEAR OPERATING CO. (South Texas Project, Units 3 and 4)

TENNESSEE VALLEY AUTHORITY (Bellefonte Nuclear Power Plant, Units 3 and 4)

TENNESSEE VALLEY AUTHORITY (Watts Bar, Unit 2)

UNION ELECTRIC CO. (Callaway Plant, Unit 1)

VIRGINIA ELECTRIC AND POWER CO.

d/b/a DOMINION VIRGINIA POWER and OLD DOMINION ELECTRIC COOPERATIVE (North Anna, Unit 3) ) )

)

)

) ) )

)

)

) ) )

)

)

)

) ) Docket Nos. 52-012-COL, 52-013-COL

Docket Nos. 52-014-COL, 52-015-COL

Docket No. 50-391-OL

Docket No. 50-483-LR

Docket No. 52-017-COL ORDER The Commission has received a series of substantively identical petitions to suspend final licensing decisions, and requesting additional related relief, in the captioned matters.

1 Any answers to these petitions may be filed no later than 12:00 p.m. EDT, Monday, June 25, 2012.

Answers should not exceed ten pages. Replies to the answers will not be entertained. This order is issued pursuant to my authority under 10 C.F.R. §§ 2.346(a) and (j). IT IS SO ORDERED. For the Commission [NRC Seal]

/RA/ ___________________________ Andrew L. Bates Acting Secretary of the Commission

Dated at Rockville, Maryland, this 19th day of June, 2012

1 See, e.g., Petition to Suspend Final Decisions in All Pending Reactor Licensing Proceedings Pending Completion of Remanded Waste Confidence Proceedings (June 18, 2012).

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of )

)

Entergy Operations, Inc. ) Docket No. 50-416-LR (Grand Gulf Nuclear Station, Unit 1) )

) (License Renewal) )

CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing Order of the Acting Secretary to the parties inviting Answers to the petitions to su spend final licensing decisions by 12:00 p.m., EDT Monday, June 25, 2012, have been served upon the following persons by Electronic Information Exchange and by electroni c mail as indicated by an asterisk*.

U.S. Nuclear Regulatory Commission Atomic Safety and Licensing Board

Mail Stop T-3F23 Washington, DC 20555-0001

E. Roy Hawkens, Chief Administrative Judge

roy.hawkens@nrc.gov

U.S. Nuclear Regulatory Commission Office of the Secretary of the Commission

Mail Stop O-16C1 Washington, DC 20555-0001 Hearing Docket: hearingdocket@nrc.gov

U.S. Nuclear Regulatory Commission Office of Commission Appellate Adjudication Mail Stop O-16C1 Washington, DC 20555-0001 OCAA Mail Center:

ocaamail@nrc.gov U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop O-15D21 Washington, DC 20555-0001 Catherine Kanatas, Esq.

Beth Mizuno, Esq. Edward Williamson, Esq.

Brian Newell, Paralegal catherine.kanatas@nrc.gov beth.mizuno@nrc.gov edward.williamson@nrc.gov brian.newell@nrc.gov

OGC Mail Center:

OGCMailCenter@nrc.gov

. Grand Gulf Nuclear Station, Units 1 Docket No. 50-416-LR Order of the Acting Secretary to the parties inviting Answers to the petitions to suspend final licensing decisions by 12:00 p.m., EDT Monday, June 25, 2012 2Entergy Services, Inc. 639 Loyola Avenue New Orleans, LA 70113 Joseph A. Aluise Assistant General Counsel

jaluise@entergy.com Beyond Nuclear 6930 Carroll Avenue, Suite 400

Takoma Park, MD 20912

Paul Gunter, Director, Reactor Oversight

Project paul@beyondnuclear.org Erich Pica, President*

Friends of the Earth

1100 15 th Street, NW 11 th Floor Washington, D.C. 20555

mkeever@foe.org

[original signed by R. Giitter ] Office of the Secretary of the Commission

Dated at Rockville, Maryland

this 19 th day of June, 2012