ML18137A173

From kanterella
Revision as of 09:16, 19 April 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
April 17, 2018 Section XI, Appendix, R - NRC Presentation
ML18137A173
Person / Time
Issue date: 07/23/2018
From: Stephen Cumblidge
NRC/NRR/DMLR/MPHB
To: Steve Ruffin
NRC/NRR/DMLR/MPHB
Cumblidge S, NRR-DMLR 415-2823
Shared Package
ML18137A170 List:
References
Download: ML18137A173 (4)


Text

Risk-Informed InserviceInspectionSection XI, Appendix RApril 17, 2018 Original Risk

-Informed Application In-service Inspection: RG 1.178 EPRI method based code case, including PRA quality, approved -could simply be made part of Appendix RWCAP method based code case review abandoned All issues that caused WCAP method code case review to be abandoned must be revived and resolved.Rather then repeating EPRI method review, better to simply complete WCAP code case review then combine in Appendix RCompleting WCAP code case review may require re

-visiting entire methodology Risk-Informed In

-service InspectionsWCAP methodology needs some clarificationAll degradation mechanism in one weld versus every weld calculatedBetter definition of a segment Crediting of non

-ISI inspections as ISI inspections (e.g., FAQ)Overwhelming of relative importance measures with a few very high estimated risk welds.Quality of the PRA when using the relative importance measuresOther?

Risk-Informed In

-service InspectionsWCAP methodology needs some clarificationPFM calculations used to estimate frequency for importance measures and for change in riskApplicability of newer PFM calculationsConsistency with other applications that use PFMOther?