ML18065A758

From kanterella
Revision as of 22:27, 13 December 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Rept for May 1996 for Palisades Nuclear Plant.W/960604 Ltr
ML18065A758
Person / Time
Site: Palisades Entergy icon.png
Issue date: 05/31/1996
From: KOBIATA K A, WILLIAMS A L
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9606070198
Download: ML18065A758 (5)


Text

consumers . Power POW ERi Nii MICHlliAN"S PROliRESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 June 4, 1996 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-259

  • Enclosed is a copy of the Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month of May 1996.
  • If you have any questions or concerns, please feel free to contact me at (616) 764-2013.

Sincerely, AL Williams Reactor Engineering Supervisor CC: RA Vincent, Palisades Senior Resident Inspector, Palisades DRHahn, Div of Rad Health Services, Lansing, Ml BWJorgensen, Michigan Dept of Labor, Lansin*g, Ml JPadgett, Michigan Public Service Commission Records Center, iNPO, Atlanta, GA CWMain, Palisades SMMclntyre, P13-121 Region Ill Administrator, USNRC Document Control, 950*22*35*1 OIL Cycle 12 Reports 5 PDR ADOCK 0500025 R_ PDR I ) A CMS' ENERGY COMPANY OPERATING STATUS: 1. UNIT NAME 2. REPORTING PERIOD: 3. LICENSED THERMAL POWER (MWt) 4. NAMEPLATE RATING (GROSS MWe) 5. DESIGN ELECTRICAL RATING (NET MWe) 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe) 7. MAXIMUM DEPENDABLE CAPACITY (NET MWe)

  • OPERATING DATA REPORT Palisades 960501-960531 2530 811. 7 805 **770 **730 8. IF CHANGES OCCUR IN CAPCITY RATINGS (ITEM NUMBERS 3 THROUGH 7AND 7) SINCE LAST REPORT, GIVE REASONS: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe): 10. REASONS FOR RESTRICTIONS, IF ANY: 11 .. HOURS IN REPORTING PERIOD 12. NuMeER OF HOURS REACTOR WAS CRITICAL 13. REACTOR RESERVE. SHUTDOWN HOURS 14. HOURS GENERATOR ON-LINE 15. UNIT RESERVE SHUTDOWN HOURS 16. GROSS THERMAL ENERGY GENERATED (MWH) 17.' GROSS ELECTRICAL ENERGY GENERATED (MWH) 18. NET ELECTRICAL ENERGY GENERATED (MWH) 19.*UNIT SERVICE FACTOR 20. UNIT AVAILABILITY FACTOR 21. UNIT CAPACITY FACTOR (USING MDC NET) 22. UNIT CAPACITY FACTOR (USING DER NET) 23". UNIT. FORCED OUTAGE RATE This Month 744.0 744.0 744 .o 1874810.9 603891 574846 100.0t 100.0t 105.8\ 96.0t o:ot 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE,. DATE AND DURATION OF Rll.CH): A 51 day refueling outage is scheduled to beg.in on November 2, 1996. 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

    • Based on condenser backpressure
  • Weighted Average (635 MWe used as MDC Net* prior to October 1985) Yr-to-Date 3647.0 3326.3 3317.6 8254802.7 2670965 2542130 91. Ot 91.0t *95.5\ 86.6\ 9.0\ Forecast DOCKET NO DATE 50-255 06-04-96 COMPLETED BY KAKobiata TELEPHONE (616)764-8913 NOTES: cumulative 214334.0 124277.6 119472. 3 262373493.2 8314 7219 78495549 55.7\ 55.7\ 53.9\* 45.5\ 28.3\ Achieved
  • AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-255 UNIT Palisades DATE 06/04/96 COMPLETED BY KAKobiata
  • MONTH May TELEPHONE (616)764-2572 AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) (MWe Net) 1. 777 17. 761 2. 777 18. 755 3. 776 19. 756 4. 776 20. 766 5. 776 21. 772 6. 776 22. 770 7. 775 23. 769 8. 771 24. 772 9. 770 25. 777 10. 772 26. 775 11. 776 27. 776 12. 779 28. 773 13. 778 29. 776 14. 777 30. 778 15. 774 31. 775 16. 770 INSTRUCTIONS:

On this format, list the average daily unit power. level in MWe-NET for each day in the reporting month. Compute to the nearest whole megawatt.

.... . . **

SUMMARY

OF OPERATING EXPERIENCE FOR MAY 1996 The Unit operated at 100 percent power for the entire .month.

REPORT MONTH MAY 1996 No. Date NONE 1. F: Forced S: Scheduled Type 1 2. Reason Duration (Hours) A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & Lie;anse Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

UNIT SHUTDOWNS AND POWER REDUCTIONS Reason 2 Method of Licensee Shutting Event Down Reactor Report# 3. 4. Method: Exhibit G -Instructions 1-Manual for Preparation of Data 2-Manual Scram Entry Sheets for Licensee 3-Automatic Scram Event Report (LER) File 4-0ther (Explain) (NUREG-0161)

5. System Code' Component Code 5 Exhibit I -Same Source , '* '*' DOCKET NO 50-255 UNIT Palisades DATE 06/04/96 COMPLETED BY iKAKobiata TELEPHONE 616-764-2572 Cause & Corrective Action to Prevent Recurrence