ML17354A626

From kanterella
Revision as of 09:21, 10 September 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Documents That FPL Has No Concerns or Challenges Re site- Specific Written Exam Admininstered at Plants on 970912
ML17354A626
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 09/15/1997
From: HOVEY R J
FLORIDA POWER & LIGHT CO.
To: PEEBLES T A, REYES L A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
RTR-NUREG-1021 L-97-241, NUDOCS 9709230098
Download: ML17354A626 (2)


Text

CATEGORY 0 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION MBR:9709230098 DOC.DATE: 97/09/15 NOTARIZED:

NO FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C AUTH.NAME AUTHOR AFFILIATION HOVEY,R.J.

Florida Power&Light Co.RECIP.NAME RECIPIENT AFFILIATION REYES,L.A.

Region 2 (Post 820201)PEEBLES,T.A:

Region 2 (Post 820201)

SUBJECT:

Documents that FPL has no concerns or challenges re site-specific written exam admininstered at plants on 970912.DISTRIBUTION CODE: IE42D COPIES RECEIVED:LTR L ENCL 0 SIZE: TITLE: Operator Licensing Examination Reports NOTES: DOCKET 05000250 05000251 RECIPIENT ID CODE/NAME PD2-3 PD INTERN: FILE CENTER RR/DRCH/KOLB EXTERNAL: NOAC COPIES LTTR ENCL RECIPIENT ID CODE/NAME CROTEAUPR NRR/DRCH/HHFB RGN2 FILE 01 NRC PDR COPIES LTTR ENCL 0 D N NOTE TO ALL NRIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415"2083 0 TOTAL NUMBER OF COPIES REQUIRED: LTTR 8 ENCL A APL SEP 15 1997 L-97-241 V Mr.Luis A.Reyes Regional Administrator, Region II Attn: Thomas A.Peebles U.S.Nuclear Regulatory Commission Atlanta Federal Center 61 Forsyth Street, S.W., Suite 23T85 Atlanta, GA 30303

Dear Mr.Reyes:

Re: Turkey Point Units 3 and 4 Docket Nos.50-250 and 50-251 The provisions of NUREG-1021, Operator Licensing Examiner Standards, Examiner Standards ES-402, Attachment 3, Policies for Facility Review of Written Examinations, allow the opportunity for submittal of comments on the written portion of the SRO/RO License Examination to the NRC.This letter documents that Florida Power and Light Co.has no concerns or challenges related to the site-specific written examination administered at Turkey Point on September 12, 1997.Should there be any cyxestions, please contact Mr.Bill Miller at (305)246-6650.Very truly yours, R.J.Hov y Vice President Turkey Point Plant OIH cc: T.A.Peebles, Chief, Operations Branch, Region II, USNRC D.C.Payne, Chief Examiner, Region II, USNRC T.P.Johnson, Senior Resident Inspector, USNRC, Turkey Point Plant Document Control Desk, USNRC, Washington, D.C.--.-.~nQ3 9709230098 970915 PDR ADQCK 05000250 V PDR an FPL Group company IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII