Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr
ML17355A447
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 09/30/1999
From: HOVEY R J, LAFLEUR D R
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-99-221, NUDOCS 9910190173
Download: ML17355A447 (80)


Text

Distribution Sheet y j~tu Distri-5.txt 99lo/'1 Ol W~Priority: Normal From: Stefanie Fountain Action Recipients:

K Jabbour Copies: 1, Paper Copy Internal Recipients:

Rids Rgn2MailCenter RidsResDraaOerab RidsOcfoDpbaPab Rids Manager RidsAcrsAcnwMailCenter RGN2.RES/DRAA/OERAB OCFO/DPBA.iLE CEHTTER 0 ACR External Recipients:

NOAC Internet: dsq@ornl.gov INEEL Marshall 0 0 0 0 OK OK OK OK 0 OK Paper Copy Paper Copy Paper Copy Paper Copy Paper Copy Paper Copy~r v.Paper Copy Total Copies: Item: ADAMS Document Library: ML ADAMS" HQNTAD01 ID'03691931:1

Subject:

February, 2000, Operating Data Report and Summary of Operating Experience for Turke y Point Units 3 and 4.Body: ADAMS DISTRIBUTION NOTIFICATION.

Electronic Recipients can RIGHT CLICK and OPEN the first Attachment to View the Document in ADAMS.The Document may also be viewed by searching for Accession Number ML003691931

~Page 1

'a if 1 kl r E I Distri-5.txt IE24-Monthiy Operating Report (per Tech Specs)Docket: 05000250 Docket: 05000251 Page 2

R 07,moo L-2000-062 10 CFR 50.36 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Re: Turkey Point Units 3 and 4 Docket Nos.50-250 and 50-251 Monthl 0 eratin Re ort-Februa 2000 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the February, 2000, Operating Data Report and Summary of Operating Experience for Turkey Point Units 3 and 4.Very truly yours, R.J.Hovey Vice President Turkey Point Plant OIH Attachments cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant an FPL Group company oo@LoQAB i Wr AVERAGE DAILY UNIT PO%'ER LEVEL DOCKET NO.UNIT: DATE: 50-250 6 March 2 2000 COMPLETED BY: O.I.Hanek TEE HONE.H0066-660 ltE OliT MON H 00 DAY 2/1/2000 2/2/2000 2/3/2000 2/4/2000 2/5/2000 2/6/2000 2/7/2000 2/8/2000 2/9/2000 2/1 0/2000 2/1 1/2000 2/1 2/2000 2/1 3/2000 2/1 4/2000 2/1 5/2000 2/1 6/2000 2/17/2000 2/18/2000 2/19/2000 2/20/2000 2/21/2000 2/22/2000 2/23/2000 2/24/2000 2/25/2000 2/26/2000 2/27/2000 2/28/2000 2/29/2000 AVERAGE DAILY POWER LEVEL (MWe-Net)717 717 719 719 723 730 726 724 728 729 727 721 715 712 709 708 711 711 709 706 706 718 723 723 715 314 281 0 0 OPERATING DATA REPORT DOCKET NO.UNIT NAME DATE COMPLETED BY TELEPHONE 50-250 TURKEY POINT UNIT 3 March 2 2000 0.I.Hanek 305 246-6607 (Month/Year) 1.Design Electrical Rating (MWe-Net)720 2.Maximum Dependable Capacity (MWe-Net)693 3.Number of Hours Reactor Was Critical 4.Number of Hours Generator Was On Line MONTH 648.3 648.3 1392.3 168794.4-YTD-CUMULATIVE 1392.3 171009.7 5.Unit Reserve Shutdown Hours 6.Net Electrical Energy (MWH)0.0 444470 0.0 981826 121.8 108915034

UNIT SHUTDOWNS DOCKET NO.50-250 ONIP NAME: I I M DATE: March 2 2000 COMPLETED BY: O.I.Hanek PHLEPHOMI:

~6-000 RHPORP MONER I'000 No.Date Duration{Hours)Reason Method of Shutting Down Reactor'ause

&Corrective Action Cocntents 2000005 2/28/2000 41.7 Shut down for refueling.

F-Forced S-Scheduled Reason A-Equipment Failure B-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Training&License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)Method l-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation 5-Other (Explain)

SUMMARY

OF>>OPERATING EXPERIENCE DOCKET NO.50-250 UNIT:~¹DATE: March 2 2000 COMPLETED BY: O.I.Hanek TELE<<ONE.'~6-660 EEPOET MONTE~b2000 Unit 3 operated essentially at 100%reactor power until February 25, 2000.Then reactor power was lowered in preparation for a refueling outage which started on February 28, 2000.The unit remained shutdown for refueling for the remainder of the month, and is expected to restart on or about March 26, 2000.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.50-251 UNIT'.~kP I PP DATE: March 2 2000 COMPLETED BY: O.I.Hanek E E<<ONE:~6-<<TEPEE MONTE I DAY 2/1/2000 2/2/2000 2/3/2000 2/4/2000 2/5/2000 2/6/2000 2/7/2000 2/8/2000 2/9/2000 2/1 0/2000 2/11/2000 2/12/2000 2/13/2000 2/14/2000 2/15/2000 2/1 6/2000 2/17/2000 2/18/2000 2/19/2000 2/20/2000 2/21/2000 2/22/2000 2/23/2000 2/24/2000 2/25/2000 2/26/2000 2/27/2000 2/28/2000 2/29/2000 Y POWER e-Net)AVERAGE DAIL LEVEL (MW 719 719 720 721 725 731 728 726 729 731 730 724 719 717 714 710 712 714 712 713 713 722 728 729 726 724 724 722 717 OPERATING DATA REPORT DOCKET NO.UNIT NAME DATE COMPLETED BY TELEPHONE 50-251 TURKEY POINT UNIT 4 March 2 2000 0.I.Hanek 305 246-6607 (Month/Year) 1.Design Electrical Rating (MWe-Net)720 2.Maximum Dependable Capacity (MWe-Net)693 3.Number of Hours Reactor Was Critical 4.Number of Hours Generator Was On Line 5.Unit Reserve Shutdown Hours MONTH 696 696 0.0 0.0 577.2-YTD-CUMULATIVE 1387.6 167661.8 1369.3 163291.6 6.Net Electrical Energy (MWH)502055 980345 10638871 5 UNIT SHUTDOWNS DOCKET NO.50-251 DNIINBMB:~k*I 66 DATE: March 2 2000 COMPLETED BY: O.I.Hanek TBLBPHDNB:

MPPP-66 RBPDRTMDNTH

~bOOO No.Duration (Hours)Reason*Method of Shutting Down Reactor'ause

&Corrective Action Cosrents N/A N/A N/A N/A N/A N/A N/A F-Forced S-Scheduled Reason A-Equipment Failure B-Maintenance or Test C-Refueling D Regulatory restriction E-Operator Training a License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Other (Explain)

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.UNIT: DATE: COMPLETE BY: TELEPHONE:

50-251 Turke Point¹4 March 2 2000 O.I.Hanek 305 246-6607 REPORTMQNTH~00 Unit 4 operated at essentially 100%reactor power for the month of February, 2000.

t t v Distribution Sheet Distri25.txt Priority: Normal From: Stefanie Fountain Action Recipients:

K Jabbour Copies: 1 Not Found Internal Recipients:

Rids Res DraaOerab RGN 2.RES/DRAA/OERAB OCFO/DPBA==

--6 FILE-CENTER 01 ACRS External Recipients:

NOAC INEEL Marshall OK Not Found Not Found Not Found Not Found Not Found Not Found Not Found Total Copies: Item: ADAMS Document Library: ML ADAMS" HQNTAD01 ID: 003683954

Subject:

Turkey Point 3 and 4 Monthly Operation Report-January, 2000.With February 9, 2000 I etter.Body: Docket: 05000250, Notes: N/A Docket: 05000251, Notes: N/A Page 1 f

PEB P9 2000 L-2000-034 10 CFR 50.36 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Re: Turkey Point Units 3 and 4 Docket Nos.50-250 and 50-251 Monthl 0 eratin Re ort-Janua 2000 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the January, 2000, Operating Data Report and Summary of Operating Experience for Turkey Point Units 3 and 4.Very truly yours, R.J.Hovey Vice President Turkey Point Plant OIH Attachments cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant an FPL Group company f30 Q (Qg~a]'

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.UNIT: DATE: 50-250 Februa 4 2000 COMPLETED BY: O.I.Hanek TELEPHONE:

LOD6-66 ll¹PDET MDNTH~000 DAY.1/1/2000 1/2/2000 1/3/2000 1/4/2000 1/5/2000 1/6/2000 1/7/2000 1/8/2000 1/9/2000 1/1 0/2000 1/1 1/2000 1/12/2000 1/1 3/2000 1/14/2000 1/1 5/2000 1/16/2000 1/1 7/2000 1/1 8/2000 1/1 9/2000 1/20/2000 1/21/2000 1/22/2000 1/23/2000 1/24/2000 1/25/2000 1/26/2000 1/27/2000 1/28/2000 1/29/2000 1/30/2000 1/31/2000 AVERAGE DAILY POWER LEVEL (MWe-Net)720 717'17 716 710 715 717 716 714 714 713 711 711 716 730 735 730 729 726 726 728 730 726 720 728 733 736 735 729 725 719 OPERATING DATA REPORT DOCKET NO.UNIT NAME DATE COMPLETED BY TELEPHONE 50-250 TURKEY POINT UNIT 3 Februa 4 2000 0.I.Hanek 305 246-6607 (Month/Year) 1.Design Electricai Rating (MWe-Net)720 2.Maximum Dependable Capacity(MWe-Net) 693 3.Number of Hours Reactor Was Critical 4.Number of Hours Generator Was On Line 5.Unit Reserve Shutdown Hours MONTH 744 744 0.0 744 0.0 168146.1 121.8-YTD-CUMULATIVE 744 170361.4 6.Net Electrical Energy (MWH)537356 537356 108470564 UNIT SHUTDOWNS DOCKET NO.50-250 ENII NAME: I I M APE: I I 4 EM COMPLETED BY: O.I.Hanek PELHPHHNH:

~66-660 REPQRPMDNI'H I~000 No.Date Type'uration (Hours)Reason'ethod of Shutting Down Reactor'ause a Corrective Action Cocaents N/A N/A F-Forced S-Scheduled Reason A-Equipment Failure B-Maintenance or Test.C-Refueling D-Regulatory restriction E-Operator Training&License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation 5-Other (Explain)

SUMMARY

OF OPKRATING KXPKRIKNCK DOCKET NO.50-250 UNIT:~kN DATE: M COMPLETED BY: O.I.Hanek HIHPHONH:~6M HH OHT MONTH~0 Unit 3 operated essentially at 100%for the month of January, 2000.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.50-251 UNIT:~k¹DATE: bbb 000 COMPLETED BY: O.I.Hanek TEL<<ONE:~0-<<OETMOIITN DAY 1/1/2000 1/2/2000 1/3/2000 1/4/2000 1/5/2000 1/6/2000 1/7/2000 1/8/2000 1/9/2000 1/10/2000 1/11/2000 1/1/2000 1/13/2000 1/14/2000 1/1 5/2000 1/1 6/2000 1/1 7/2000 1/1 8/2000 1/1 9/2000 1/20/2000 1/21/2000 1/22/2000 1/23/2000 1/24/2000 1/25/2000 1/26/2000 1/27/2000 1/28/2000 1/29/2000 1/30/2000 1/31/2000 POWER e-Net)AVERAGE DAILY LEVEL (MW 723 721 720 716 716 718 718 717 716 715 714 712 714 718 730 734 729 730 726 726 728 730 726 337 0 0 142 720 725 727 723 OPERATING DATA REPORT DOCKET NO.UNIT NAME DATE COMPLETED BY TELEPHONE 50-251 TURKEY POINT UNIT 4 Februa 4 2000 O.I.Hanek 305 246-6607 (Month/Year) 1.Design Electrical Rating (MWe-Net)720 2.Maximum Dependable Capacity (MWe-Net)693 MONTH-YTD-CUMULATIVE 3.Number of Hours Reactor Was Critical 4.Number of Hours Generator Was On Line 5.Unit Reserve Shutdown Hours 6.Net Electrical Energy (MWH)691.6 673.3 0.0 478290 691.6 673.3 0.0 478290 166965.8 162595.6 577.2 105886660 UNIT SHUTDOWNS DOCKET NO.50-251 UNIT NAME: 0 I~DATE: 0~000 COMPLETED BY: O.I.Hanek TEAEPHDNH:

H006-660 EEPUET MUNTH~00 Ho.Date Duration (Hours)Reason Method of Shutting Down Reactor Cause&Corrective Action Comments 20000001 1/24/2000 10.'7 The cause of the feedwater control valve failure, that required a manual reactor trip, was a failure in the valve internals.

Disassembly of the valve confirmed that the valve cage had disengaged from the valve body web.Corrective actions included repair of the valve and Post Maintenance Testing.A Licensee Event Report (No.2000-001-00) is being prepared for submittal to the NRC.F-Forced S-Scheduled Reason A-Equipment Failure B-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Training&License Exa~ination F-Administrative G-Operational Error (Explain)H-Other (Explain)Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Other (Explain)

~'

~~~'UMMARY OF OPERATING EXPERIENCE DOCKET NO.UNIT: DATE: COMPLETE BY: TELEPHONE:

50-251 Turke Point P4 000 00 O.I.Hanek 305 246-6607 RRPOR MONTH 00 Unit 4 operated at essentially 100%for the month of January, 2000, except between January 24-27, 2000.The reactor was manually tripped on January 24, 2000, aAer experiencing problems with the feedwater control valve to the 4A steam generator.

Unit 4 returned to 100%power on January 27, 2000.A Licensee Event Report (No.2000-001-00) is being prepared for submittal to the NRC.

'SAN 0 6 2000 L-2000-004 10 CFR 50.36 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Re: Turkey Point Units 3 and 4 Docket Nos.50-250 and 50-251 Monthl 0 eratin Re ort-December 1999 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the December, 1999, Operating Data Report and Summary of Operating Experience for Turkey Point Units 3 and 4.Very truly yours, R.J.Hovey Vice President Turkey Point Plant OIH Attachments f cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant pQp~~a C)g~~~+~3<griggg an FPL Group company

)

Distri61.txt Distribution Sheet Priority: Normal From: Esperanza Lomosbog Action Recipients:

K Jabbour Copies: 1 Not Found Internal Recipients:

RGN 2 RES/DRAA/OERAB OCFO J32BA L CENTER eRS=-~Not Found Not Found Not Found Not Found Not Found External Recipients:

NOAC INEEL Marshall Not Found Not Found Total Copies: Item: ADAMS Document Library: ML ADAMS"HQNTAD01 ID: 003674568

Subject:

Monthly operating reports for December 1999 for Turkey Point, Units 3 and 4.With 000106 letter.Body: PDR ADOCK 05000250 R Docket: 05000250, Notes: N/A Docket: 05000251, Notes: N/A Page 1 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.50-250 UNI:>>I¹DATE: I COMPLETED BY: O.I.Hanek I¹I<<ONE:~6 REPORT MONTH December 1999 DAY 12/1/99 12/2/99 12/3/99 12/4/99 12/5/99 12/6/99 12/7/99 12/8/99 12/9/99 12/10/99 12/11/99 12/12/99 12/13/99 12/14/99 12/1 5/99 12/16/99 12/17/99 12/18/99 12/19/99 12/20/99 12/21/99 12/22/99 12/23/99 12/24/99 12/25/99 12/26/99 12/27/99 12/28/99 12/29/99 12/30/99 12/31/99 AVERAGE DAILY POWER LEVEL (MWe-Net)730 733 732 731 728 724 720 708 719 721 720 718 719 718 713 715 720 716 714 711 712 714 710 713 726 733 732 730 730 728 725 OPERATING DATA REPORT DOCKET NO.UNIT NAME DATE COMPLETED BY TELEPHONE 50-250 TURKEY POINT UNIT 3 Janua 3 2000 O.I.Hanek 305 246-6607 REPORTING PERIOD December 1999 (Month/Year) 1.Design Electrical Rating (MWe-Net)720 2.Maximum Dependable Capacity (MWe-Net)693 3.Number of Hours Reactor Was Critical 4.Number of Hours Generator Was On Line 5.Unit Reserve Shutdown Hours 6.Net Electrical Energy (MWH)744 8684.5 167402.1 0.0 0.0 121.8 536729 6112349 107933208 MONTH-YTD-CUMULATIVE 744 870?.4 169617.4 UNIT SHUTDOWNS DOCKET NO.50-250 UNIT NANH: T~HP I 66 DATE: I>>66 COMPLETED BY: O.I.Hanek TH HPHUNN:~06-66 REPORT MONTH December 1999 No.Date Duration (Hours)Reason*Method of Shutting Down Reactor*Cause 4 Corrective Action Comments N/A N/A F-Forced S-Scheduled Reason A-Equipment Failure B-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Training&License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation 5-Other (Explain)

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.50-250¹¹¹¹.: "" i~DATE: J>>¹COMPLETED BY: O.I.Hanek¹¹¹¹¹ON¹:~¹¹-66 REPORT MONTH December 1999 Unit 3 operated essentially at 100%for the month of December, 1999.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.50-251 IINI DATE:~I""'OMPLETED BY: O.I.Hanek PPLPPNONN~06-66 REPORT MONTH December 1999 DAY 12/1/99 12/2/99 12/3/99 12/4/99 12/5/99 12/6/99 12/7/99 12/8/99 12/9/99 12/10/99 12/11/99 12/12/99 12/1 3/99 12/14/99 12/15/99 12/16/99 12/17/99 12/18/99 12/19/99 12/20/99 12/21/99 12/22/99 12/23/99 12/24/99 12/25/99 12/26/99 12/27/99 12/28/99 12/29/99 12/30/99 12/31/99 POWER e-Net)AVERAGE DAILY LEVEL (MW 730 733 733 732 730 726 718 718 719 721 720 719 719 718 714 715 721 718 716 715 715 717 711 714 727 734 734 732 730 729 727 OPERATING DATA REPORT DOCKET NO.UNIT NAME DATE COMPLETED BY TELEPHONE 50-251 TURKEY POINT UNIT 4 Janua 3 2000 O.I.Hanek 305 246-6607 REPORTING PERIOD December 1999 (Month/Year) 1.Design Electrical Rating (MWe-Net)720 2.Maximum Dependable Capacity (MWe-Net)693 3.Number of Hours Reactor Was Critical 4.Number of Hours Generator Was On Line 5.Unit Reserve Shutdown Hours MONTH 744 744 0.0 8206.7 8185.8 166274.2 161922.3 0.0 577.2-YTD-CUMULATIVE 6.Net Electrical Energy (MWH)537706 5735272 105408370 UNIT SHUTDOWNS DOCKET NO.50-251 HNN NAME: 6 6 6 DATE: COMPLETED BY: O.I.Hanek PE EPHHNE'666 6-666 REPORT MONTH December 1999 No.Date Type'uration (Hours)Reason Method of Shutting Down Reactor'ause

&Corrective Action Comments N/A N/A F-Forced S-Scheduled Reason A-Equipment Failure B-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Training a License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Other (Explain)

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.UNIT: DATE: COMPLETE BY: TELEPHONE:

50-251 Turke Point 84 Janua 3 2000 O.I.Hanek~6-66 REPORT MONTH December 1999 Unit 4 operated at essentially 100%for the month of December, 1999.

)AN>~Kg P S V~

tI=PIL.999 L-99-267 10 CFR 50.36 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Re: Turkey Point Units 3 and 4 Docket Nos.50-250 and 50-251 Monthl 0 eratin Re ort-November 1999 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the November, 1999, Operating Data Report and Summary of Operating Experience for Turkey Point Units 3 and 4.Very truly yours, R.J.Hovey Vice President Turkey Point Plant OIH Attachments cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant an FPL Group company f t$f N i v J AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.UNIT: DATE: COMPLETED BY: TELEPHONE:

50-250 Turke Point¹3 December 3 1999 O.I.Hanek~5-MO REPORT MONTH November 1999 DAY 11/1/99 11/2/99 11/3/99 11/4/99 11/5/99 11/6/99 11/7/99 11/8/99 11/9/99 11/1 0/99 11/11/99 11/12/99 11/1 3/99 11/14/99 11/1 5/99 11/1 6/99 11/17/99 11/18/99 11/19/99 11/20/99 11/21/99 11/22/99 11/23/99 11/24/99 11/25/99 11/26/99 11/27/99 11/28/99 11/29/99 11/30/99 AVERAGE DAILY POWER LEVEL (MWe-Net)710 709 716 724 726 724 718 722 722 722 720 720 721 720 692 317 0 348 720 723 722 720 717 717 716 714 716 722 725 726 OPERATING DATA REPORT DOCKET NO.UNIT NAME DATE COMPLETED BY TELEPHONE 50-250 TURKEY POINT UNIT 3 December 3 1999 O.I.Hanek 305 246-6607 REPORTING PERIOD November 1999 (Month/Year) 1.Design Electrical Rating (MWe-Net)720 2.Maximum Dependable Capacity (MWe-Net)693 MONTH-YTD-CUMULATIVE 3.Number of Hours Reactor Was Critical 4.Number of Hours Generator Was On Line 5.Unit Reserve Shutdown Hours 6.Net Electrical Energy (MWH)693.8 677.2 0.0 481025 7963.4 7940.5 0.0 5575620 168873.4 166658.1 121.8 107396479 UNIT SHUTDOWNS DOCKET NO.50-250 LPNNN¹NE: 3 3¹3 DATE: December 3 1999 COMPLETED BY: O.I.Hanek PELEPNDNE:

333 6-666 REPORT MONTH November 1999 No.Date Type'uration (Hours)Reason'ethod of Shutting Down Reactor'ause

&Corrective Action Cosments 19900032 11/16/99 42.8 Turbine control valve inoperable, testing and repairs F-Forced S-Scheduled Reason A-Equipment Failure B-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Training&License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation S-Other (Explain)

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.50-250 UNIT:~k¹3 DATE: December 3 1999 COMPLETED BY: O.I.Hanek TELE¹NUNE.

~6-66 REPORTMONTH November 1999 Unit 3 operated essentially at 100%in the beginning of the month of November, 1999.On November 15, 1999, power reduction was commenced to test the No.2 turbine control valve.On November 16, 1999, the unit was taken offline to repair the No.2 turbine control valve.On November 18, 1999, Unit 3 resumed 100%power operation and remained at that power level for the rest of the month.

l AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.50-251 UNIT.~ki¹DATE: December 3 1999 COMPLETED BY: O.I.Hanek TELEPHONE.

'666 6-66 REPORT MONTH November 1999 DAY 11/1/99 11/2/99 11/3/99 11/4/99 11/5/99 11/6/99 11/7/99 11/8/99 11/9/99 11/1 0/99 11/11/99 11/12/99 11/1 3/99 11/14/99 11/1 5/99 11/1 6/99 11/1 7/99 11/1 8/99 11/1 9/99 11/20/99 11/21/99 11/22/99 11/23/99 11/24/99 11/25/99 11/26/99 11/27/99 11/28/99 11/29/99 11/30/99 POWER e-Net)AVERAGE DAILY LEVEL (MW 710 710 717 725 727 726 723 687 290 516 715 720 724 723 722 714 724 728 726 725 722 719 718 719 716 714 716 722 725 725

OPERATING DATA REPORT DOCKET NO.UNIT NAME DATE COMPLETED BY TELEPHONE 50-251 TURKEY POINT UNIT 4 December 3 1999 0.I.Hanek 305 246-6607 REPORTING PERIOD November 1999 (MonthNear) 1.Design Electrical Rating (MWe-Net)720 2.Maximum Dependable Capacity (MWe-Net)693 3.Number of Hours Reactor Was Critical 4.Number of Hours Generator Was On Line 5.Unit Reserve Shutdown Hours MONTH 720 720 0.0 7441.8 161178.3 0.0 577.2-YTD-CUMULATIVE 7462.7 165530.2 6.Net Electrical Energy (MWH)502823 5197566 104870664 UNIT SHUTDOWNS DOCKET NO.50-251 HNIINENI!.

  • I 66 DATE: December 3 1999 COMPLETED BY: O.I.Hanek TELEPHONE:

H666-66 REPORT MONTH November 1999 No.Date Duration (Hours)Reason*Method of Shutting Down Reactor'ause 6 Corrective Action Comments N/A N/A F-Forced S-Scheduled Reason A-Equipment Failure B-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Training&License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)" Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Other (Explain)

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.UNIT: DATE: COMPLETE BY: TELEPHONE:

50-251 December 3 1999 O.I.Hanek~6-66 REPORT MONTH November 1999 Unit 4 operated at essentially 100%until November 8, 1999, when reactor power was reduced to approximately 40%for turbine valve testing.The unit returned to 100%power on November 10, 1999, and operated at that power level for the rest of the month of November, 1999.

fp]8 girg 0'~P II

.Distri50.txt Distribution Sheet Priority: Normal From: Linda Eusebio Action Recipients:

K Jabbour Copies: 1 Not Found Internal Recipients:

RGN 2 RES/DRAA/OERAB OC g PEN ER 01 ACRS Not Found Not Found Not Found Not Found Not Found External Recipients:

NRC PDR NOAC INEEL Marshall 1 1 1 Not Found Not Found Not Found Total Copies: Item: ADAMS Document Library: ML ADAMS"HQNTAD01 ID: 993480234

Subject:

Monthly operating reports for November 1999 for Turkey Point, Units 3 and 4.With 991208 letter.Body: PDR ADOCK 05000250 R Docket: 05000250, Notes: N/A Docket: 05000251, Notes: N/A Page 1

~~~g Distribution Sheet Priority: Normal From: Stefanie Fountain Distri13.txt

~i/e)(<Action Recipients:

KJabbour Copies: 1 Not Found Internal Recipients:

RGN 2.RES/DRAA/OERAB OC/DBA/PAD F C TEB ACRS Not Found Not Found 1 Not Found 1 Not Found Not Found External Recipients:

NRC PDR NOAC INEEL Marshall Not Found Not Found Not Found Total Copies: Item: ADAMS Document Library: ML ADAMS" HQNTAD01 ID: 993220052

Subject:

Monthly Operating Reports for October 1999 for Turkey Point, Units 3 and 4, With Nove mber 8, 1999 Letter.Body: PDR ADOCK 05000250 R Docket: 05000250, Notes: N/A Docket: 05000251, Notes: N/A Page 1

NOV 08'f999 L-99-242 10 CFR 50.36 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Re: Turkey Point Units 3 and 4 Docket Nos.50-250 and 50-251 Monthl 0 eratin Re ort-October 1999 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the October, 1999, Operating Data Report and Summary of Operating Experience for Turkey Point Units 3 and 4.r Very truly yours, R.J.Hovey Vice President Turkey Point Plant DRL Attachments cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant an FPL Group company AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.UNIT: DATE: COMPLETED BY TELEPHONE:

50-250 I6 November 2 1999 D.R.Lafleur 305 246-7150 REPORT MONTH October 1999 DAY 10/1/99 10/2/99 10/3/99 10/4/99 10/5/99 10/6/99 10/7/99 10/8/99 10/9/99 10/10/99 10/11/99 10/12/99 10/13/99 10/14/99 10/1 5/99 10/16/99 10/17/99 10/1 8/99 10/1 9/99 10/20/99 10/21/99 10/22/99 10/23/99 10/24/99 10/25/99 10/26/99 10/27/99 10/28/99 10/29/99 10/30/99 10/31/99 AVERAGE DAILY POWER LEVEL (MWe-Net)698 703 707 708 706 702 703 706 707 709 707 698 691 710 717 716 711 708 700 703 702 706 713 719 723 723 723 723 721 719 715 OPERATING DATA REPORT DOCKET NO.UNIT NAME DATE COMPLETED BY TELEPHONE 50-250 TURKEY POINT UNIT 3 November 2 1999 D.R.Lafleur 305 246-7150 REPORTING PERIOD October 1999 (Month/Year) 1.Design Electrical Rating (MWe-Net)720 2.Maximum Dependable Capacity (MWe-Net)693 3.Number of Hours Reactor Was Critical 4.Number of Hours Generator Was On Line 5.Unit Reserve Shutdown Hours 6.Net Electrical Energy (MWH)MONTH-YTD-CUMULATIVE 745.0 7269.6 168179.6 745.0 7263.3 165980.9 0.0 0.0 121.8 528619 5094595 106915454

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.UNIT: DATE: COMPLETED BY TELEPHONE:

50-250 N November 2 1999 D.R.Lafleur 305 246-7150 REPORT MONTH October 1999 Unit 3 operated essentially at 100%in the beginning of the month of October, 1999.On October 12, 1999, power was reduced to 90%for repair of the Heater Drain Tank Level Control Valve, CV-3-1510A.

Unit 3 resumed 100%power on October 13, and stayed essentially at 100%power for the rest of the month of October, 1999.

UNIT SHUTDOWNS DOCKET NO.50-250 NNHHNANH:~i03 DATE: November 2 1999 COMPLETED BY: D.R.Lafleur HHLHHHDNH:

43303 240-0 REPORT MONTH October 1999 No.Date Duration (Hours)Reason Method of Shutting Down Reactor'ause

&Corrective Action Ccecnents N/A N/A N/A N/A N/A N/A N/A F-Forced S-Scheduled Reason A-Equipment Failure B-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Training&License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation 5-Other (Explain AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.UNIT: DATE: COMPLETED BY: TELEPHONE:

50-251 November 2 1999 D.R.Lafleur 305 246-7150 REPORT MONTH October 1999 DAY 10/1/99 10/2/99 10/3/99 10/4/99 10/5/99 10/6/99 10/7/99 10/8/99 10/9/99 10/10/99 10/11/99 10/12/99 10/13/99 10/14/99 10/1 5/99 10/16/99 10/1 7/99 10/18/99 10/19/99 10/20/99 10/21/99 10/22/99 10/23/99 10/24/99 10/25/99 10/26/99 10/27/99 10/28/99 10/29/99 10/30/99 10/31/99 AVERAGE DAILY POWER LEVEL (MWe-Net)698 701 706 708 705 703 707 706 708 710 709 706 708 711 715 718 716 711 705 702 696 698 712 719 721 722 724 723 720 719 716 OPERATING DATA REPORT DOCKET NO.UNIT NAME DATE COMPLETED BY TELEPHONE 50-251 TURKEY POINT UNIT 4 November 2 1999 D.R.Lafleur 305 246-7150 REPORTING PERIOD October 1999 (Month/Year) 1.Design Electrical Rating (MWe-Net)720 2.Maximum Dependable Capacity (MWe-Net)693 MONTH-YTD-CUMULATIVE 3.Number of Hours Reactor Was Critical 4.Number of Hours Generator Was On Line 5.Unit Reserve Shutdown Hours 6.Net Electrical Energy (MWH)745.0 745.0 0.0 6742.7 6721.8 0.0 529238 4694743 164810.2 160458.3 577.2 104367841

UNIT SHUTDOWNS DOCKET NO.50-251 0 0 TNT NAME: 2~TEE 4 i 4044 DATE: November 2 1999 COMPLETED BY: D.R.Lafleur TELEPHONE:

42200 240->>0 REPORT MONTH October 1999 No.Date Duration (Hours)Reason'ethod of Shutting Down Reactor'ause

&Corrective Action Corments N/A N/A N/A N/A N/A N/A H/A F-Forced S-Scheduled Reason A-Equipment Failure B-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Training a License Examination

" F-Mministrative G-Operational Error (Explain)H-Other (Explain)Method l-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Other (Explain) h~~

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.UNIT: DATE: COMPLETE BY: TELEPHONE:

50-251 November 2 1999 D.R.Lafieur~06-7 5 REPORT MONTH October 1999 Unit 4 operated at essentially 100%for the entire month of October, 1999.

.~~~Itl>res~r' CATZaOaz 1 REGULAT Y INFORMATION DISTRIBUTIO SYSTEM (RIDS)ACCESSION NBR:9910190173 DOC.DATE: 99/09/30 NOTARXZED:

NO DOCKET¹FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-253, Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAME AUTHOR AFFILIATION LAFLEUR,D.R.

Florida Power&Light Co.HOVEY,R.J.

Florida Power&Light Co.RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for Sept 1999 for Turkey Point, Units 3&4.With 991008 ltr.DISTRIBUTION CODE: IE24D COPIES RECEXVED:LTR ENCL SXZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: E COPIES LTTR ENCL 1 1 EXTERNAL: LMXTCO MARSHALL NRC PDR'1 1 1 RECIPIENT XD CODE/NAME JABBOUR,.K INTERNAL: FILE CENTER 01 1 RES/DRAA/OERAB 1 RECIPIENT ID CODE/NAME OC/DBA/PAD RGN2 NOAC COPIES LTTR ENCL 1 1 1 1 1 1 0 D i.>su>tjfJ<Jil~4 N NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF.COPIES REQUIRED: LTTR 8 ENCL 8 OCTO8 1999 L-99-221 10 CFR 50.36 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Re: Turkey Point Units 3 and 4 Docket Nos.50-250 and 50-251 Monthl 0 eratin Re ort-Se tember 1999 t k 1k In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the September, 1999, Operating Data Report and Summary of Operating Experience for Turkey Point Units 3 and 4.l'ery truly yours, R.J.Hovey Vice President Turkey Point Plant DRL Attachments cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant'I 99iQi90i73 990930 I l PDR'ADOCK 05000250, I R PDR an FPL Group company II if AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.50-250 UM.~ki N DATE: October 5 1999 COMPLETED BY: D.R.Lafleur TELWHDMI:~56-REPORT MONTH Se tember 1999 DAY 9/1/99 9/2/99 9/3/99 9/4/99 9/5/99 9/6/99 9/7/99 9/8/99 9/9/99 9/1 0/99 9/11/99 9/12/99 9/1 3/99 9/14/99 9/1 5/99 9/1 6/99 9/17/99 9/18/99 9/19/99 9/20/99 9/21/99 9/22/99 9/23/99 9/24/99 9/25/99 9/26/99 9/27/99 9/28/99 9/29/99 9/30/99 AVERAGE DAILY POWER LEVEL (MWe-Net)687 686 687 686 687 686 689 694 697 666 230 458 698 707 711 708 701 701 705 707 710 714 709 709 712 712 708 700 703 703

~s~OPERATING DATA REPORT DOCKET NO.UNIT NAME DATE COMPLETED BY TELEPHONE 50-250 TURKEY POINT UNIT 3 October 5 1999 D.R.Lafleur 305 246-7150 REPORTING PERIOD Se tember 1999 (Month/Year) 1.Design Electrical Rating (MWe-Net)720 2.Maximum Dependable Capacity (MWe-Net)693 MONTH-YTD-CUMULATIVE 3.Number of Hours Reactor Was Critical 4.Number of Hours Generator Was On Line 5.Unit Reserve Shutdown Hours 720.0 720.0 0.0 6524.6 6518.3 0.0 167434.6 165235.9 121.8 6.Net Electrical Energy (MWH)486444 4565976 106386835

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.50-250 UNI1'.: i N DATE: October 5 1999 COMPLETED BY: D.R.Lafleur TELEPHONE:

~36->>0 REPORT MONTH Se tember 1999 Unit 3 operated essentially at 100%in the beginning of the month of September, 1999.On September 10, 1999, power was reduced to 35%for Turbine Plant Cooling Water Heat Exchanger cleaning, turbine valve testing, and waterbox cleaning.Unit 3 resumed 100%power on September 12, 1999 and stayed essentially at 100%power for the rest of the month of September, 1999.

UNIT SHUTDOWNS DOCKET NO.50-250 ONIIN¹MH:~k'DATE: October 5 1999.COMPLETED BY: D.R.Lafleur THLHPHONH:

999 9->>9 HH OHT'ONTH~Sb 999 No.Date Type Duration (Hours)Reason'ethod of Shutting Down Reactor'ause a Corrective Action Coements N/A N/A N/A N/A N/A N/A N/A F-Forced S-Scheduled Reason A-Equipment Failure B-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Training&License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation 5-Other (Explain AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.UNIT: DATE: COMPLETED BY: TELEPHONE:

50-251 N October 5 1999 D.R.Lafleur 6->>REPORTMONTH Se tember 1999 DAY 9/1/99 9/2/99 9/3/99 9/4/99 9/5/99 9/6/99 9/7/99 9/8/99 9/9/99 9/10/99 9/11/99 9/12/99 9/13/99 9/14/99 9/1 5/99 9/1 6/99 9/1 7/99 9/1 8/99 9/19/99 9/20/99 9/21/99 9/22/99 9/23/99 9/24/99 9/25/99 9/26/99 9/27/99 9/28/99 9/29/99 9/30/99 POWER e-Net)AVERAGE DAILY LEVEL (MW 693 693 695 693 693 694 697 702 705 705 705 699 700 706 708 706 699 700 703 705 709 711 707 708 712 711 706 704 705 702 e~~OPERATING DATA REPORT DOCKET NO.UNIT NAME DATE COMPLETED BY TELEPHONE 50-251 TURKEY POINT UNIT 4 October 5 1999 D.R.Lafleur REPORTING PERIOD Se tember 1999 (Month/Year) 1.Design Electrical Rating (MWe-Net)720 2.Maximum Dependable Capacity (MWe-Net)693 MONTH-YTD-CUMULATIVE 3.Number of Hours Reactor Was Critical 4.Number of Hours Generator Was On Line 5.Unit Reserve Shutdown Hours 720.0 720.0 0.0 5997.7 5976.8 0.0 164065.2 159713.3 577.2 6.Net Electrical Energy (MWH)505807 4165505 103838603

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.UNIT: DATE: COMPLETE BY: TELEPHONE:

50-251 Turke Point P4 October 5 1999 D.R.Lafleur~06->>REPDHTMONTHS b 999 Unit 4 operated at essentially 100%for the entire month of September, 1999.

UNIT SHUTDOWNS DOCKET NO.50-251 D Ill N EM!:~9k**I M'ATE: October 5 1999 COMPLETED BY: D.R.Lafleur PELEPHDMI:

tktl I->>I REPDRP MDNtH 9*I 999 No.Date TFpe'uration (Hours)Reason'ethod of Shutting Down Reactor'ause

&Corrective Action Coaments N/A N/A N/A N/A N/A N/A N/A F-Forced S-Scheduled Reason A-Equipment Failure B-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Training&License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Other (Explain) l/h