ML17205A112

From kanterella
Revision as of 17:38, 29 June 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
2017 Point Beach Nuclear Plant Initial License Examination Form Es 301-3
ML17205A112
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 05/23/2017
From: Seymour J L
Operations Branch III
To:
NRC/RGN-III/DRS/OLB
Shared Package
ML16319A344 List:
References
Download: ML17205A112 (1)


Text

{{#Wiki_filter:ES-301Operating Test Quality Checklist Form ES-301-3Facilitv: PBNPDate of Examination: Mav B - 19,2017Test Number: 2017L General Criterialnitialsab.c#a.ThesamoperatingtestconformswiththeprevrouslyapprovedoutlinchangesareconSIstentwithuirements 10cFRmdistributl4f\-{/b.There is no day{o-day repetition between this and other operating tests to be administered durithis examination /rrThetest shall noticate items from theauditSection D.1.a.cálfr9/dOverlap with the written examination and between different parts of the operating test is withinlimits4TLre.It appears that the operating test will differentiate between competent and less-than-competent aicants at thenated license levelf\-r2. Walk-Thro h Criteriaa.Each JPM includes the following, as applicable: initial conditions initiating cuesreferences and tools, including associated procedures reasonable and validated time limits (average time allowed for completion) and specificdesignation if deemed to be time-critical by the facilty licenseeoperationally imporlant specific performance criteria that include:detailed expected actions wth exact criteria and nomenclature system response and other examiner cuesstatements describing important observations to be made by the applicant criteria for successful completion of the taskidentification of critical steps and their associated performance standards restrictions on the sequence of steps, if applicable ,/-/b.Ensure that any changes from the previously approved systems and administrative walk{hrough outlines (Forms ES-301-1 and2) have not caused the test to deviatecriteria (e.9., item distribution, bank use, repetition from the last 2from any ofthe acceptance nations) specified Nonforms and Form ES-201-2./TL//3. Simulator CriteriaThe assocated simulator operating tests (scenario sets) have beenin accordance wth Form ES-301-4 and ais attached. 4rLre / SignDate,t/zx/t ta. Authorb. Facility Reviewe(.)

c. NRC Chief Examiner

(#)üs\d. NRC Supervisor ,r*\.r"r TJ¿sçco4rs/tl').\-\¿ ) tlNOTE: . The faclity signature is not applicable for NRC-developed tests# lndependent NRC reviewer initial items in Column "c"chief examner concurrence red.}}