05000260/LER-1981-010-03, During Normal Operation, Output Signal Calibr SI 4.1.B-2 Was Not Performed as Scheduled.Caused by Personnel Error.Personnel Cautioned

From kanterella
Revision as of 01:17, 23 December 2024 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
During Normal Operation, Output Signal Calibr SI 4.1.B-2 Was Not Performed as Scheduled.Caused by Personnel Error.Personnel Cautioned
ML20009C153
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 04/09/1981
From:
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20009C152 List:
References
LER-81-010-03L, LER-81-10-3L, NUDOCS 8107200328
Download: ML20009C153 (2)


LER-1981-010, During Normal Operation, Output Signal Calibr SI 4.1.B-2 Was Not Performed as Scheduled.Caused by Personnel Error.Personnel Cautioned
Event date:
Report date:
2601981010R03 - NRC Website

text

7'[7[ " " " 7.

UPLATE REPORT - PREVIOUS REPORT DATE 3/25/81 LICENSEE EVENT REPORT

\\

..w CONTROL BLOCK: l l

l l

l l

lh (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION)

I e

10 lil l Al Ll B l R l F] 2 l@l 0 l 0 l - l 0 l 0 l 0 l 0 l 0 l-l 0 l 0 l@l 4 l 1 l 1 l 1 l 1 l@l l

l@

I 8 9 LICENSEE col)E 14 IS LICENSE NUMBEH Jb 26 LICENSE TYPE JO 67 CAT 68 l CON'T lOl,j g l ?-l@l 0 l 5 l 0 l 0 l 0 l 2 l 6 l 0 @l 0 l 3 l 0 l 6 l 8 l 1 l@l 014 l0 19 18 11 l@

1 8

60 61 DOCKET NUMBER 68 60 EVENT DATE 74 75 REPORT DATE 80

, EVENT DESCRIPTION AND PROB ABLE CONSEQUENCES Oio 10 l 2 I i During normal operation, SI 4.1.B-2 (APRM output signal calibration) was not l

,n,3, l performed as scheduled. The SI should have been performed between 2/4/81 and l

gl 2/6/81. It was performed on 1/29/81, 2/2/81, and 2/11/81. Redundant systems are l
io,,i i not applicable. There was no effect on the health or safety of the public.

l IO is l l There have been no previ6us occurrences.

l I O l 71 l l

I Lo l"I I 80 7

8 9 DE CODE S SCO E COMPONENT CODE SUSCOD'E SU E

10191 l ZI Zl@ W@ W@ l ZI ZI ZI ZI ZI ZI@ l Zi@ W @

7 8

9 to 11 12 13 18 19 20 SEQUENTIAL OCCURRENCE REPORT REVISION LE H EVENT YEAR REPOR T NO.

CODE TYPE NO.

@,aj,g/ROI al 1l L-j i 01 11 Ol y

I 01 31 LL_]

l-l Lil 21 22 23 24 26 27 28 29 30 31 32 TAK r AC O O LANT ME

' HOURS 22 S8 I E F R B.

SU PLIE MANUF CTURER l Hl@ y @

W@

l Zl@

l0 l0 l0 l0 l ]@

l Nl@

l Zl@

l Zl 9l 9l 9l@

JJ 34 35 36 31 40 el 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h iiiOi l The problem was caused by personnel error. The personnel were cautioned to perform l gij l ST's as scheduled. No further recurrence control action is plar.ned.

l I

' li i il l I i l 31 l l

l i 141 l l

80 1

8 9 A S

% POWER OTHER STATUS 015 0 RY DISCOVEHY DESCRIPTION NA l

l Algl During the review cycle l

l8 l 5 l l, E l@ l 0l 9l 8l@l I

M 6

80 AST". i i v CONTENT nELEASe AMOUNT OF ACTivlTY LOCATION OF RELEASE g l Z l @o ok '4ELEASEl Z l@l NA l

l NA l

7 8 9 10 11 44 45 80 PEniONNEL f XPOGURES NUP/RE H FYPE

DESCRIPTION

l l i l l 0 l 0 l 0 l@l Z ]@l NA l

Pr.. ON~d',~ lo'i,Es insCn pnO~@ NA Nn..m n l

ji l,ll0l0l0l@l 1

M 9 11 12 Sf' L0% r)s QH DAMA( E TO F ACILi TV fvPE DE SCitiP flON Li[2] l Zlgl NA l

<t 9

to 60 oeSCnipTiON @

NRC USE ONLY l

NA l

lllllllllllllk

,eNfhl

[.Zj o,j 4 9 10 68 69 80 3 2

8107200328 810409 gggyg.

PDR ADOCK 05000260 S

PDR

~

c O

Form DF-17

'Tr:lnessee 'falley Authority BF 15.2

~ Browns Ferry Nuclear Plant 1/10/79 LER SUPPLEMENTAL INFORMATION 41B BFR(:-50 260 f 8110 Technical Specification involved 6.7.2.b(2)

Itepccted Under Technical Specification 2

E Unit Date of Occurrence 3/6/81 Time of Occurrence Ident.ification and Description of Occurrence:

SI 4.1.B.2 (APRM Output Signal Calibration) was not performed as. scheduled.

Con:'itions Prior to Occurrence:

T!TTt i at 99A power.

Unit 2 at 98% power.

Unit 3 at 95% power.

Act',n specified in the Technical Specification Surveillance Requirements met dtig to inoperable equipment.

Describe.

None App, rent Cause of Occurrence:

Personnel error.

Analysis of Occurrence:

There was no danger to the health or safety of the public, no release of activity, no damage to plant or equipment and no resulting significant chain of events.

Corrective Action

Personnel cautioned.'

Faibire Data:

None

  • R eten tion :

Period - Lifetime', Responsibility - Administrative Supervisor y/0 CHevision:

o 1