ML20064N477
ML20064N477 | |
Person / Time | |
---|---|
Site: | Hatch |
Issue date: | 02/10/1983 |
From: | Causey J GEORGIA POWER CO. |
To: | Stolz J Office of Nuclear Reactor Regulation |
Shared Package | |
ML20064N479 | List: |
References | |
TAC-49156, TAC-49705, NUDOCS 8302160248 | |
Download: ML20064N477 (2) | |
Similar Documents at Hatch | |
---|---|
Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARHL-5770, Application for Amends to Licenses DPR-57 & NPF-5,revising Acceptance Criteria for Diesel Fuel Oil Storage as Surveillance Requirement 3.8.1.3 Min Fuel Oil Level for DG Day Tanks Will Be Changed to Greater than 500 Gallons1999-10-0101 October 1999
[Table view]Application for Amends to Licenses DPR-57 & NPF-5,revising Acceptance Criteria for Diesel Fuel Oil Storage as Surveillance Requirement 3.8.1.3 Min Fuel Oil Level for DG Day Tanks Will Be Changed to Greater than 500 Gallons HL-5811, Application for Amends to Licenses DPR-57 & NPF-5,revising Wording Contained in LCO 3.1.7 Re Standby Liquid Control Sys1999-07-29029 July 1999 Application for Amends to Licenses DPR-57 & NPF-5,revising Wording Contained in LCO 3.1.7 Re Standby Liquid Control Sys HL-5591, Application for Amends to Licenses DPR-57 & NPF-5, Respectively.Amends Would Implement Some of Generic Changes to ITSs Previously Approved by NRC1999-02-0505 February 1999 Application for Amends to Licenses DPR-57 & NPF-5, Respectively.Amends Would Implement Some of Generic Changes to ITSs Previously Approved by NRC HL-5694, Revised Application for Amends to Licenses DPR-57 & NPF-5, Revising TS for Increase in Allowable Values for Reactor Bldg & Refueling Floor Ventilation Exhaust Radiation Monitors1999-01-21021 January 1999 Revised Application for Amends to Licenses DPR-57 & NPF-5, Revising TS for Increase in Allowable Values for Reactor Bldg & Refueling Floor Ventilation Exhaust Radiation Monitors HL-5698, Application for Amends to Licenses DPR-57 & NPF-5,revising TS 2.1.1.2 by Deleting Footnote Which Specifies That SLMCPRs Are for Cycle 18 Only & Deleting TS 5.6.5.b.21998-12-0404 December 1998 Application for Amends to Licenses DPR-57 & NPF-5,revising TS 2.1.1.2 by Deleting Footnote Which Specifies That SLMCPRs Are for Cycle 18 Only & Deleting TS 5.6.5.b.2 HL-5658, Application for Amends to Licenses DPR-57 & NPF-5,increasing Allowable Values for High Radiation Trip for Reactor Bldg & Refueling Floor Ventilation Exhaust Monitors1998-07-22022 July 1998 Application for Amends to Licenses DPR-57 & NPF-5,increasing Allowable Values for High Radiation Trip for Reactor Bldg & Refueling Floor Ventilation Exhaust Monitors HL-5400, Application for Amends to Licenses DPR-57 & NPF-5, Respectively.Amends Remove/Modify Existing License Conditions,Surveillance Requirements That Have Been Completed & Exemptions That Are No Longer in Effect1997-12-18018 December 1997 Application for Amends to Licenses DPR-57 & NPF-5, Respectively.Amends Remove/Modify Existing License Conditions,Surveillance Requirements That Have Been Completed & Exemptions That Are No Longer in Effect HL-5413, Application for Amends to Licenses DPR-57 & NPF-5,allowing Plant to Operate at Uprated Power Level of 2763 Mwt Which Represents Power Level Increase of 8%.Proprietary TR NEDC-32749P Encl1997-08-0808 August 1997 Application for Amends to Licenses DPR-57 & NPF-5,allowing Plant to Operate at Uprated Power Level of 2763 Mwt Which Represents Power Level Increase of 8%.Proprietary TR NEDC-32749P Encl HL-5362, Application for Amends to Licenses DPR-57 & NPF-5,revising Operability Requirements for Rod Block Monitor Sys1997-05-0909 May 1997 Application for Amends to Licenses DPR-57 & NPF-5,revising Operability Requirements for Rod Block Monitor Sys HL-5368, Application for Amend to License DPR-57,revising Safety Limit Minimum Critical Power Ratio in TS 2.1.1.2 to Reflect Results of Cycle Specific Calculation.Proprietary Basis for Change,Also Encl.Encl Withheld,Per 10CFR2.790(a)(4)1997-05-0909 May 1997 Application for Amend to License DPR-57,revising Safety Limit Minimum Critical Power Ratio in TS 2.1.1.2 to Reflect Results of Cycle Specific Calculation.Proprietary Basis for Change,Also Encl.Encl Withheld,Per 10CFR2.790(a)(4) ML20138H4021997-04-29029 April 1997 Application for Amend to License DPR-57,revising TS 3.4.9 Re Reactor Coolant Sys Pressure & Temp Limits HL-5345, Application for Amend to License DPR-7,requesting Rev to TS 3.4.9 Re Reactor Coolant Sys Pressure & Temp Limits1997-04-14014 April 1997 Application for Amend to License DPR-7,requesting Rev to TS 3.4.9 Re Reactor Coolant Sys Pressure & Temp Limits HL-5276, Application for Amends to Licenses DPR-57 & NPF-5,which Provides an Alternate Method of Testing S/Rvs During Shutdown Conditions Rather than During Unit Startup as Is Currently Done1997-01-0707 January 1997 Application for Amends to Licenses DPR-57 & NPF-5,which Provides an Alternate Method of Testing S/Rvs During Shutdown Conditions Rather than During Unit Startup as Is Currently Done HL-5270, Application for Amend to License NPF-5,revising SLMCPR Values Based Upon Unique plant-evaluations for Current Cycle 13 & Use of GE Fuel in Next Cycle 141996-12-0303 December 1996 Application for Amend to License NPF-5,revising SLMCPR Values Based Upon Unique plant-evaluations for Current Cycle 13 & Use of GE Fuel in Next Cycle 14 HL-5054, Application for Amends to License DPR-57 & NPF-5, Respectively,Associating Changes W/Installation of Digital Power Range Neutron Monitoring Sys & Incorporation of long- Term Stability Solution Hardware1996-10-29029 October 1996 Application for Amends to License DPR-57 & NPF-5, Respectively,Associating Changes W/Installation of Digital Power Range Neutron Monitoring Sys & Incorporation of long- Term Stability Solution Hardware HL-5230, Application for Amends to Licenses DPR-57 & NPF-5,revising SRs 3.1.7.7 & 3.4.3.1 & LCOs 3.4.3,3.5.1 & 3.6.1.6 to Increase Nominal Mechanical Pressure Relief Setpoints for All SRVs & Allow Operation W/One SRV1996-10-0707 October 1996 Application for Amends to Licenses DPR-57 & NPF-5,revising SRs 3.1.7.7 & 3.4.3.1 & LCOs 3.4.3,3.5.1 & 3.6.1.6 to Increase Nominal Mechanical Pressure Relief Setpoints for All SRVs & Allow Operation W/One SRV HL-5213, Application for Amends to Licenses DPR-57 & NPF-5,clarifying Applicability of Certain Surveillances Addressing Rvp & Temp Limits & Replacing Vessel Pressure & Temp Limit Curves W/New Curves1996-09-19019 September 1996 Application for Amends to Licenses DPR-57 & NPF-5,clarifying Applicability of Certain Surveillances Addressing Rvp & Temp Limits & Replacing Vessel Pressure & Temp Limit Curves W/New Curves HL-5163, Application for Amends to Licenses DPR-57 & NPF-5,revising TSs Re CST Level Indication to Ensure Water Level Sufficient to Provide 50,000 Gallons of Water for Core Spray Makeup to Reactor Pressure Vessel1996-05-21021 May 1996 Application for Amends to Licenses DPR-57 & NPF-5,revising TSs Re CST Level Indication to Ensure Water Level Sufficient to Provide 50,000 Gallons of Water for Core Spray Makeup to Reactor Pressure Vessel HL-5004, Application for Amends to Licenses DPR-57 & NPF-5, Respectively,Revising Changes of Drywell Air Temp LCO from 135 F to 150 F1996-02-21021 February 1996 Application for Amends to Licenses DPR-57 & NPF-5, Respectively,Revising Changes of Drywell Air Temp LCO from 135 F to 150 F HL-5051, Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Reflect Implementation of 10CFR50,App J,Option B1995-11-10010 November 1995 Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Reflect Implementation of 10CFR50,App J,Option B HL-4861, Application for Amends to Licenses DPR-57 & NPF-5.Amends Would Revise Secondary Containment Draw Down & Maintain Vacuum Surveillance Requirement Acceptance Criteria1995-06-0606 June 1995 Application for Amends to Licenses DPR-57 & NPF-5.Amends Would Revise Secondary Containment Draw Down & Maintain Vacuum Surveillance Requirement Acceptance Criteria HL-4816, Application for Amend to Licenses DPR-57 & NPF-5,minimizing Thermal Stratification Events1995-05-0404 May 1995 Application for Amend to Licenses DPR-57 & NPF-5,minimizing Thermal Stratification Events HL-4789, Application for Amend to License NPF-5 Re Elimination of Selected Response Time Testing Requirements from TS1995-04-14014 April 1995 Application for Amend to License NPF-5 Re Elimination of Selected Response Time Testing Requirements from TS HL-4724, Application for Amends to Licenses DPR-57 & NFP-5,proposing Changes to Ts,To Allow Plant to Operate at Uprated Power Level of 2558 Mwt.Also,Forwards Proprietary Power Uprate SAR for E I Hatch Plant Units 1 & 21995-01-13013 January 1995 Application for Amends to Licenses DPR-57 & NFP-5,proposing Changes to Ts,To Allow Plant to Operate at Uprated Power Level of 2558 Mwt.Also,Forwards Proprietary Power Uprate SAR for E I Hatch Plant Units 1 & 2 HL-4723, Application for Amends to Licenses DPR-57 & NPF-5,replacing Environ TS W/Environ Protection Plan (Nonradiological) & Revising OLs to Reflect Changes1994-12-0202 December 1994 Application for Amends to Licenses DPR-57 & NPF-5,replacing Environ TS W/Environ Protection Plan (Nonradiological) & Revising OLs to Reflect Changes ML20078G7051994-11-0101 November 1994 Application for Amends to Licenses DPR-57 & NPF-5,converting TS to Improved TS Consistent w/NUREG-1433 HL-4587, Application for Amends to Licenses DPR-57 & NPF-5,lowering ATWS-RPT Setpoint & Allowing Restarting Recirculation Pump Following RPT When Temp Differential Between Coolant at Reactor Bottom Head & Reactor Steam Dome Cannot Be Obtained1994-10-13013 October 1994 Application for Amends to Licenses DPR-57 & NPF-5,lowering ATWS-RPT Setpoint & Allowing Restarting Recirculation Pump Following RPT When Temp Differential Between Coolant at Reactor Bottom Head & Reactor Steam Dome Cannot Be Obtained HL-4695, Application for Amend to License DPR-57,requesting Temporary Change to Unit 1 TSs Re Emergency Diesel Generator Operability Requirements During Reactor Shut Down Conditions1994-09-20020 September 1994 Application for Amend to License DPR-57,requesting Temporary Change to Unit 1 TSs Re Emergency Diesel Generator Operability Requirements During Reactor Shut Down Conditions HL-4648, Application for Amend to License DPR-57,proposing one-time Change to TS 3.9.C to Allow Shutdown Operations W/Only One of Two Required EDGs Aligned to Corresponding Core or Containment Cooling Sys1994-08-16016 August 1994 Application for Amend to License DPR-57,proposing one-time Change to TS 3.9.C to Allow Shutdown Operations W/Only One of Two Required EDGs Aligned to Corresponding Core or Containment Cooling Sys HL-4661, Application for Amends to Licenses DPR-51 & NPF-5,revising Result of Meetings & Includes Page Change Insertion Instructions,Per NUREG-14331994-08-0808 August 1994 Application for Amends to Licenses DPR-51 & NPF-5,revising Result of Meetings & Includes Page Change Insertion Instructions,Per NUREG-1433 ML20072B7441994-08-0404 August 1994 Application for Amend to License NPF-5,revising TSs for Traversing Incore Probe Operability Requirements HL-4651, Application for Amend to License NPF-5,revising TS 3.3.6.6 Requirements for All Traversing in-core Probe Machines to Be Operable,To Allow Less than Four Machines to Be Operable1994-07-19019 July 1994 Application for Amend to License NPF-5,revising TS 3.3.6.6 Requirements for All Traversing in-core Probe Machines to Be Operable,To Allow Less than Four Machines to Be Operable HL-4620, Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Improved Insertion Instructions,Consistent w/NUREG- 14331994-07-0808 July 1994 Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Improved Insertion Instructions,Consistent w/NUREG- 1433 HL-4561, Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Allow Testing Planned at Plant to Demonstrate Capability to Operate Plant Up to Core Power Level of 2,558 Mwt1994-06-0707 June 1994 Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Allow Testing Planned at Plant to Demonstrate Capability to Operate Plant Up to Core Power Level of 2,558 Mwt HL-4495, Application for Amends to Licenses DPR-57 & DPR-5 Revising Units 1 & 2 TS to Be Consistent w/NUREG-1433 Standard TS GE Plants,BWR/41994-02-25025 February 1994 Application for Amends to Licenses DPR-57 & DPR-5 Revising Units 1 & 2 TS to Be Consistent w/NUREG-1433 Standard TS GE Plants,BWR/4 HL-3433, Application for Amend to Licenses DPR-57 & NPF-5 Revising Unit 1 TS 4.9 & Unit 2 TS 4.8 Re Diesel Generator Testing Under Hot Initial Conditions1993-11-0909 November 1993 Application for Amend to Licenses DPR-57 & NPF-5 Revising Unit 1 TS 4.9 & Unit 2 TS 4.8 Re Diesel Generator Testing Under Hot Initial Conditions HL-3416, Application for Amends to Licenses DPR-57 & NPF-5,revising Unit 1 TS 3.9.D & Unit 2 TS 3/4.8.2 to Add Time Delays to RPS Electric Power Monitoring Trips1993-10-19019 October 1993 Application for Amends to Licenses DPR-57 & NPF-5,revising Unit 1 TS 3.9.D & Unit 2 TS 3/4.8.2 to Add Time Delays to RPS Electric Power Monitoring Trips ML20045E7261993-06-28028 June 1993 Application for Amends to Licenses DPR-57 & NPF-5,revising TS 3.7.A.4 & 3.6.4.1,respectively,to Allow One or More Suppression chamber-drywell Vacuum Breakers to Open During Surveillance Testing ML20044D0771993-05-0303 May 1993 Suppl to 920921 Application for Amends to Licenses DPR-57 & NPF-5,changing TS Administrative Controls Section Re Semiannual Radioactive Effluent Release Rept to Reflect New 10CFR50.36a,per GL 89-01 HL-3048, Application for Amend to License DPR-57,revising TS Re Removal of Primary Containment Isolation Valves E11-F022 & E11-F0231992-12-21021 December 1992 Application for Amend to License DPR-57,revising TS Re Removal of Primary Containment Isolation Valves E11-F022 & E11-F023 HL-2962, Application for Amend to License NPF-5,changing TS to Temporarily Revise Containment Sys Section to Allow Unit 1 Standby Gas Treatment Sys to Be Inoperable for Up to 7 Days During Unit 2 Operation,Per Generic Ltr 89-161992-11-10010 November 1992 Application for Amend to License NPF-5,changing TS to Temporarily Revise Containment Sys Section to Allow Unit 1 Standby Gas Treatment Sys to Be Inoperable for Up to 7 Days During Unit 2 Operation,Per Generic Ltr 89-16 HL-2006, Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Remove Main Steam Line Radiation Monitor Reactor Scram & Group Isolation Functions,Per BWROG Topical Rept NEDO-31400, SE for Eliminating BWR MSIV Closure..1992-10-19019 October 1992 Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Remove Main Steam Line Radiation Monitor Reactor Scram & Group Isolation Functions,Per BWROG Topical Rept NEDO-31400, SE for Eliminating BWR MSIV Closure.. HL-2409, Application for Amends to Licenses DPR-57 & NPF-5,revising Definition of Members of the Public & Unrestricted Area, in TS & Deleting Ref in ETS Footnote Re RM Instrumentation, in Response to New 10CFR20 Requirements,Per GL 89-011992-10-14014 October 1992 Application for Amends to Licenses DPR-57 & NPF-5,revising Definition of Members of the Public & Unrestricted Area, in TS & Deleting Ref in ETS Footnote Re RM Instrumentation, in Response to New 10CFR20 Requirements,Per GL 89-01 HL-2390, Application for Amends to Licenses DPR-57 & NPF-5, Incorporating Programmatic Controls for RETS Into Administrative Controls Section of TS & Relocating Procedural Details for RETS to ODCM & Pcp,Per GL 89-011992-09-21021 September 1992 Application for Amends to Licenses DPR-57 & NPF-5, Incorporating Programmatic Controls for RETS Into Administrative Controls Section of TS & Relocating Procedural Details for RETS to ODCM & Pcp,Per GL 89-01 ML20118A5761992-09-18018 September 1992 Application for Amends to Licenses DPR-57 & NPF-5,allowing Southern Nuclear Operating Co,Inc to Possess,Manage,Use, Operate & Maintain Facilities.Certificate of Concurrence from Southern Nuclear Operating Co,Inc Encl HL-2335, Application for Amends to Licenses DPR-57 & NPF-5,changing TS Figure 2.1-1 for Unit 1 & TS Figure 3/4 3-1 for Unit 2 to Reflect Correct Top of Active Fuel Reactor Pressure Vessel Water Level1992-09-0202 September 1992 Application for Amends to Licenses DPR-57 & NPF-5,changing TS Figure 2.1-1 for Unit 1 & TS Figure 3/4 3-1 for Unit 2 to Reflect Correct Top of Active Fuel Reactor Pressure Vessel Water Level HL-2355, Application for Amend to License DPR-57,changing TS to Revise Allowable Outage Times for EDG 1B to 14 Days to Perform Work on DG & Revising DG Surveillance Requirements 4.9.B.1 & 4.9.B.2 to Correct Adminstrative Error1992-07-30030 July 1992 Application for Amend to License DPR-57,changing TS to Revise Allowable Outage Times for EDG 1B to 14 Days to Perform Work on DG & Revising DG Surveillance Requirements 4.9.B.1 & 4.9.B.2 to Correct Adminstrative Error HL-2231, Application for Amends to Licenses DPR-57 & NPF-5,proposing to Revise Several Portions of TS Involving Shutdown & Refueling Operations1992-07-17017 July 1992 Application for Amends to Licenses DPR-57 & NPF-5,proposing to Revise Several Portions of TS Involving Shutdown & Refueling Operations HL-2225, Application for Amends to Licenses DPR-57 & NPF-5,revising TSs to Add Addl Electrical Sys Requirements,Per Generic Ltr 91-11, Resolution of Generic Issues 48, 'Lcos for Class 1E' & 49, 'Interlocks & LCOs for Class 1E Tie Breakers....'1992-07-17017 July 1992 Application for Amends to Licenses DPR-57 & NPF-5,revising TSs to Add Addl Electrical Sys Requirements,Per Generic Ltr 91-11, Resolution of Generic Issues 48, 'Lcos for Class 1E' & 49, 'Interlocks & LCOs for Class 1E Tie Breakers....' HL-1946, Application for Amends to Licenses DPR-57 & NPF-5,changing Snubber Functional Test Insp Interval to 18 Months,Per Generic Ltr 90-091992-02-20020 February 1992 Application for Amends to Licenses DPR-57 & NPF-5,changing Snubber Functional Test Insp Interval to 18 Months,Per Generic Ltr 90-09 1999-07-29 Category:TEXT-LICENSE APPLICATIONS & PERMITS MONTHYEARHL-5770, Application for Amends to Licenses DPR-57 & NPF-5,revising Acceptance Criteria for Diesel Fuel Oil Storage as Surveillance Requirement 3.8.1.3 Min Fuel Oil Level for DG Day Tanks Will Be Changed to Greater than 500 Gallons1999-10-0101 October 1999
[Table view]Application for Amends to Licenses DPR-57 & NPF-5,revising Acceptance Criteria for Diesel Fuel Oil Storage as Surveillance Requirement 3.8.1.3 Min Fuel Oil Level for DG Day Tanks Will Be Changed to Greater than 500 Gallons HL-5811, Application for Amends to Licenses DPR-57 & NPF-5,revising Wording Contained in LCO 3.1.7 Re Standby Liquid Control Sys1999-07-29029 July 1999 Application for Amends to Licenses DPR-57 & NPF-5,revising Wording Contained in LCO 3.1.7 Re Standby Liquid Control Sys HL-5591, Application for Amends to Licenses DPR-57 & NPF-5, Respectively.Amends Would Implement Some of Generic Changes to ITSs Previously Approved by NRC1999-02-0505 February 1999 Application for Amends to Licenses DPR-57 & NPF-5, Respectively.Amends Would Implement Some of Generic Changes to ITSs Previously Approved by NRC HL-5694, Revised Application for Amends to Licenses DPR-57 & NPF-5, Revising TS for Increase in Allowable Values for Reactor Bldg & Refueling Floor Ventilation Exhaust Radiation Monitors1999-01-21021 January 1999 Revised Application for Amends to Licenses DPR-57 & NPF-5, Revising TS for Increase in Allowable Values for Reactor Bldg & Refueling Floor Ventilation Exhaust Radiation Monitors HL-5698, Application for Amends to Licenses DPR-57 & NPF-5,revising TS 2.1.1.2 by Deleting Footnote Which Specifies That SLMCPRs Are for Cycle 18 Only & Deleting TS 5.6.5.b.21998-12-0404 December 1998 Application for Amends to Licenses DPR-57 & NPF-5,revising TS 2.1.1.2 by Deleting Footnote Which Specifies That SLMCPRs Are for Cycle 18 Only & Deleting TS 5.6.5.b.2 HL-5658, Application for Amends to Licenses DPR-57 & NPF-5,increasing Allowable Values for High Radiation Trip for Reactor Bldg & Refueling Floor Ventilation Exhaust Monitors1998-07-22022 July 1998 Application for Amends to Licenses DPR-57 & NPF-5,increasing Allowable Values for High Radiation Trip for Reactor Bldg & Refueling Floor Ventilation Exhaust Monitors HL-5400, Application for Amends to Licenses DPR-57 & NPF-5, Respectively.Amends Remove/Modify Existing License Conditions,Surveillance Requirements That Have Been Completed & Exemptions That Are No Longer in Effect1997-12-18018 December 1997 Application for Amends to Licenses DPR-57 & NPF-5, Respectively.Amends Remove/Modify Existing License Conditions,Surveillance Requirements That Have Been Completed & Exemptions That Are No Longer in Effect ML20211J9351997-10-0606 October 1997 Corrected TS Pps to Amends 208 & 150 for Licenses DPR-57 & NPF-5,respectively,consisting of Pps 3.4-8 & 3.5-6 for Unit 1 & Pps 3.4-8 & 3.5-5 for Unit 2 to Reflect Revised SRV Setpoints HL-5413, Application for Amends to Licenses DPR-57 & NPF-5,allowing Plant to Operate at Uprated Power Level of 2763 Mwt Which Represents Power Level Increase of 8%.Proprietary TR NEDC-32749P Encl1997-08-0808 August 1997 Application for Amends to Licenses DPR-57 & NPF-5,allowing Plant to Operate at Uprated Power Level of 2763 Mwt Which Represents Power Level Increase of 8%.Proprietary TR NEDC-32749P Encl HL-5368, Application for Amend to License DPR-57,revising Safety Limit Minimum Critical Power Ratio in TS 2.1.1.2 to Reflect Results of Cycle Specific Calculation.Proprietary Basis for Change,Also Encl.Encl Withheld,Per 10CFR2.790(a)(4)1997-05-0909 May 1997 Application for Amend to License DPR-57,revising Safety Limit Minimum Critical Power Ratio in TS 2.1.1.2 to Reflect Results of Cycle Specific Calculation.Proprietary Basis for Change,Also Encl.Encl Withheld,Per 10CFR2.790(a)(4) HL-5362, Application for Amends to Licenses DPR-57 & NPF-5,revising Operability Requirements for Rod Block Monitor Sys1997-05-0909 May 1997 Application for Amends to Licenses DPR-57 & NPF-5,revising Operability Requirements for Rod Block Monitor Sys ML20138H4021997-04-29029 April 1997 Application for Amend to License DPR-57,revising TS 3.4.9 Re Reactor Coolant Sys Pressure & Temp Limits HL-5345, Application for Amend to License DPR-7,requesting Rev to TS 3.4.9 Re Reactor Coolant Sys Pressure & Temp Limits1997-04-14014 April 1997 Application for Amend to License DPR-7,requesting Rev to TS 3.4.9 Re Reactor Coolant Sys Pressure & Temp Limits ML20137N1751997-04-0404 April 1997 Amends 206 & 147 to Licenses DPR-57 & NPF-5,respectively, Revising Surveillance Requirements Addressing Reactor Vessel Pressure & Temperature HL-5276, Application for Amends to Licenses DPR-57 & NPF-5,which Provides an Alternate Method of Testing S/Rvs During Shutdown Conditions Rather than During Unit Startup as Is Currently Done1997-01-0707 January 1997 Application for Amends to Licenses DPR-57 & NPF-5,which Provides an Alternate Method of Testing S/Rvs During Shutdown Conditions Rather than During Unit Startup as Is Currently Done HL-5270, Application for Amend to License NPF-5,revising SLMCPR Values Based Upon Unique plant-evaluations for Current Cycle 13 & Use of GE Fuel in Next Cycle 141996-12-0303 December 1996 Application for Amend to License NPF-5,revising SLMCPR Values Based Upon Unique plant-evaluations for Current Cycle 13 & Use of GE Fuel in Next Cycle 14 HL-5054, Application for Amends to License DPR-57 & NPF-5, Respectively,Associating Changes W/Installation of Digital Power Range Neutron Monitoring Sys & Incorporation of long- Term Stability Solution Hardware1996-10-29029 October 1996 Application for Amends to License DPR-57 & NPF-5, Respectively,Associating Changes W/Installation of Digital Power Range Neutron Monitoring Sys & Incorporation of long- Term Stability Solution Hardware HL-5230, Application for Amends to Licenses DPR-57 & NPF-5,revising SRs 3.1.7.7 & 3.4.3.1 & LCOs 3.4.3,3.5.1 & 3.6.1.6 to Increase Nominal Mechanical Pressure Relief Setpoints for All SRVs & Allow Operation W/One SRV1996-10-0707 October 1996 Application for Amends to Licenses DPR-57 & NPF-5,revising SRs 3.1.7.7 & 3.4.3.1 & LCOs 3.4.3,3.5.1 & 3.6.1.6 to Increase Nominal Mechanical Pressure Relief Setpoints for All SRVs & Allow Operation W/One SRV HL-5213, Application for Amends to Licenses DPR-57 & NPF-5,clarifying Applicability of Certain Surveillances Addressing Rvp & Temp Limits & Replacing Vessel Pressure & Temp Limit Curves W/New Curves1996-09-19019 September 1996 Application for Amends to Licenses DPR-57 & NPF-5,clarifying Applicability of Certain Surveillances Addressing Rvp & Temp Limits & Replacing Vessel Pressure & Temp Limit Curves W/New Curves HL-5163, Application for Amends to Licenses DPR-57 & NPF-5,revising TSs Re CST Level Indication to Ensure Water Level Sufficient to Provide 50,000 Gallons of Water for Core Spray Makeup to Reactor Pressure Vessel1996-05-21021 May 1996 Application for Amends to Licenses DPR-57 & NPF-5,revising TSs Re CST Level Indication to Ensure Water Level Sufficient to Provide 50,000 Gallons of Water for Core Spray Makeup to Reactor Pressure Vessel HL-5004, Application for Amends to Licenses DPR-57 & NPF-5, Respectively,Revising Changes of Drywell Air Temp LCO from 135 F to 150 F1996-02-21021 February 1996 Application for Amends to Licenses DPR-57 & NPF-5, Respectively,Revising Changes of Drywell Air Temp LCO from 135 F to 150 F HL-5051, Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Reflect Implementation of 10CFR50,App J,Option B1995-11-10010 November 1995 Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Reflect Implementation of 10CFR50,App J,Option B HL-4861, Application for Amends to Licenses DPR-57 & NPF-5.Amends Would Revise Secondary Containment Draw Down & Maintain Vacuum Surveillance Requirement Acceptance Criteria1995-06-0606 June 1995 Application for Amends to Licenses DPR-57 & NPF-5.Amends Would Revise Secondary Containment Draw Down & Maintain Vacuum Surveillance Requirement Acceptance Criteria HL-4816, Application for Amend to Licenses DPR-57 & NPF-5,minimizing Thermal Stratification Events1995-05-0404 May 1995 Application for Amend to Licenses DPR-57 & NPF-5,minimizing Thermal Stratification Events HL-4789, Application for Amend to License NPF-5 Re Elimination of Selected Response Time Testing Requirements from TS1995-04-14014 April 1995 Application for Amend to License NPF-5 Re Elimination of Selected Response Time Testing Requirements from TS HL-4724, Application for Amends to Licenses DPR-57 & NFP-5,proposing Changes to Ts,To Allow Plant to Operate at Uprated Power Level of 2558 Mwt.Also,Forwards Proprietary Power Uprate SAR for E I Hatch Plant Units 1 & 21995-01-13013 January 1995 Application for Amends to Licenses DPR-57 & NFP-5,proposing Changes to Ts,To Allow Plant to Operate at Uprated Power Level of 2558 Mwt.Also,Forwards Proprietary Power Uprate SAR for E I Hatch Plant Units 1 & 2 HL-4723, Application for Amends to Licenses DPR-57 & NPF-5,replacing Environ TS W/Environ Protection Plan (Nonradiological) & Revising OLs to Reflect Changes1994-12-0202 December 1994 Application for Amends to Licenses DPR-57 & NPF-5,replacing Environ TS W/Environ Protection Plan (Nonradiological) & Revising OLs to Reflect Changes ML20078G7051994-11-0101 November 1994 Application for Amends to Licenses DPR-57 & NPF-5,converting TS to Improved TS Consistent w/NUREG-1433 HL-4587, Application for Amends to Licenses DPR-57 & NPF-5,lowering ATWS-RPT Setpoint & Allowing Restarting Recirculation Pump Following RPT When Temp Differential Between Coolant at Reactor Bottom Head & Reactor Steam Dome Cannot Be Obtained1994-10-13013 October 1994 Application for Amends to Licenses DPR-57 & NPF-5,lowering ATWS-RPT Setpoint & Allowing Restarting Recirculation Pump Following RPT When Temp Differential Between Coolant at Reactor Bottom Head & Reactor Steam Dome Cannot Be Obtained HL-4695, Application for Amend to License DPR-57,requesting Temporary Change to Unit 1 TSs Re Emergency Diesel Generator Operability Requirements During Reactor Shut Down Conditions1994-09-20020 September 1994 Application for Amend to License DPR-57,requesting Temporary Change to Unit 1 TSs Re Emergency Diesel Generator Operability Requirements During Reactor Shut Down Conditions HL-4648, Application for Amend to License DPR-57,proposing one-time Change to TS 3.9.C to Allow Shutdown Operations W/Only One of Two Required EDGs Aligned to Corresponding Core or Containment Cooling Sys1994-08-16016 August 1994 Application for Amend to License DPR-57,proposing one-time Change to TS 3.9.C to Allow Shutdown Operations W/Only One of Two Required EDGs Aligned to Corresponding Core or Containment Cooling Sys HL-4661, Application for Amends to Licenses DPR-51 & NPF-5,revising Result of Meetings & Includes Page Change Insertion Instructions,Per NUREG-14331994-08-0808 August 1994 Application for Amends to Licenses DPR-51 & NPF-5,revising Result of Meetings & Includes Page Change Insertion Instructions,Per NUREG-1433 ML20072B7441994-08-0404 August 1994 Application for Amend to License NPF-5,revising TSs for Traversing Incore Probe Operability Requirements HL-4651, Application for Amend to License NPF-5,revising TS 3.3.6.6 Requirements for All Traversing in-core Probe Machines to Be Operable,To Allow Less than Four Machines to Be Operable1994-07-19019 July 1994 Application for Amend to License NPF-5,revising TS 3.3.6.6 Requirements for All Traversing in-core Probe Machines to Be Operable,To Allow Less than Four Machines to Be Operable HL-4620, Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Improved Insertion Instructions,Consistent w/NUREG- 14331994-07-0808 July 1994 Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Improved Insertion Instructions,Consistent w/NUREG- 1433 HL-4561, Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Allow Testing Planned at Plant to Demonstrate Capability to Operate Plant Up to Core Power Level of 2,558 Mwt1994-06-0707 June 1994 Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Allow Testing Planned at Plant to Demonstrate Capability to Operate Plant Up to Core Power Level of 2,558 Mwt HL-4495, Application for Amends to Licenses DPR-57 & DPR-5 Revising Units 1 & 2 TS to Be Consistent w/NUREG-1433 Standard TS GE Plants,BWR/41994-02-25025 February 1994 Application for Amends to Licenses DPR-57 & DPR-5 Revising Units 1 & 2 TS to Be Consistent w/NUREG-1433 Standard TS GE Plants,BWR/4 HL-3433, Application for Amend to Licenses DPR-57 & NPF-5 Revising Unit 1 TS 4.9 & Unit 2 TS 4.8 Re Diesel Generator Testing Under Hot Initial Conditions1993-11-0909 November 1993 Application for Amend to Licenses DPR-57 & NPF-5 Revising Unit 1 TS 4.9 & Unit 2 TS 4.8 Re Diesel Generator Testing Under Hot Initial Conditions ML20059E6831993-10-21021 October 1993 Amends 190 & 129 to Licenses DPR-57 & NPF-5,respectively, Relocating Procedural Details Contained in Radiological Effluent Ts,Incorporating New Part 20 & Revising Frequency of Reporting Radiological Effluent Releases HL-3416, Application for Amends to Licenses DPR-57 & NPF-5,revising Unit 1 TS 3.9.D & Unit 2 TS 3/4.8.2 to Add Time Delays to RPS Electric Power Monitoring Trips1993-10-19019 October 1993 Application for Amends to Licenses DPR-57 & NPF-5,revising Unit 1 TS 3.9.D & Unit 2 TS 3/4.8.2 to Add Time Delays to RPS Electric Power Monitoring Trips ML20045E7261993-06-28028 June 1993 Application for Amends to Licenses DPR-57 & NPF-5,revising TS 3.7.A.4 & 3.6.4.1,respectively,to Allow One or More Suppression chamber-drywell Vacuum Breakers to Open During Surveillance Testing ML20044D0771993-05-0303 May 1993 Suppl to 920921 Application for Amends to Licenses DPR-57 & NPF-5,changing TS Administrative Controls Section Re Semiannual Radioactive Effluent Release Rept to Reflect New 10CFR50.36a,per GL 89-01 HL-3048, Application for Amend to License DPR-57,revising TS Re Removal of Primary Containment Isolation Valves E11-F022 & E11-F0231992-12-21021 December 1992 Application for Amend to License DPR-57,revising TS Re Removal of Primary Containment Isolation Valves E11-F022 & E11-F023 HL-2962, Application for Amend to License NPF-5,changing TS to Temporarily Revise Containment Sys Section to Allow Unit 1 Standby Gas Treatment Sys to Be Inoperable for Up to 7 Days During Unit 2 Operation,Per Generic Ltr 89-161992-11-10010 November 1992 Application for Amend to License NPF-5,changing TS to Temporarily Revise Containment Sys Section to Allow Unit 1 Standby Gas Treatment Sys to Be Inoperable for Up to 7 Days During Unit 2 Operation,Per Generic Ltr 89-16 HL-2006, Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Remove Main Steam Line Radiation Monitor Reactor Scram & Group Isolation Functions,Per BWROG Topical Rept NEDO-31400, SE for Eliminating BWR MSIV Closure..1992-10-19019 October 1992 Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Remove Main Steam Line Radiation Monitor Reactor Scram & Group Isolation Functions,Per BWROG Topical Rept NEDO-31400, SE for Eliminating BWR MSIV Closure.. HL-2409, Application for Amends to Licenses DPR-57 & NPF-5,revising Definition of Members of the Public & Unrestricted Area, in TS & Deleting Ref in ETS Footnote Re RM Instrumentation, in Response to New 10CFR20 Requirements,Per GL 89-011992-10-14014 October 1992 Application for Amends to Licenses DPR-57 & NPF-5,revising Definition of Members of the Public & Unrestricted Area, in TS & Deleting Ref in ETS Footnote Re RM Instrumentation, in Response to New 10CFR20 Requirements,Per GL 89-01 HL-2390, Application for Amends to Licenses DPR-57 & NPF-5, Incorporating Programmatic Controls for RETS Into Administrative Controls Section of TS & Relocating Procedural Details for RETS to ODCM & Pcp,Per GL 89-011992-09-21021 September 1992 Application for Amends to Licenses DPR-57 & NPF-5, Incorporating Programmatic Controls for RETS Into Administrative Controls Section of TS & Relocating Procedural Details for RETS to ODCM & Pcp,Per GL 89-01 ML20118A5761992-09-18018 September 1992 Application for Amends to Licenses DPR-57 & NPF-5,allowing Southern Nuclear Operating Co,Inc to Possess,Manage,Use, Operate & Maintain Facilities.Certificate of Concurrence from Southern Nuclear Operating Co,Inc Encl HL-2335, Application for Amends to Licenses DPR-57 & NPF-5,changing TS Figure 2.1-1 for Unit 1 & TS Figure 3/4 3-1 for Unit 2 to Reflect Correct Top of Active Fuel Reactor Pressure Vessel Water Level1992-09-0202 September 1992 Application for Amends to Licenses DPR-57 & NPF-5,changing TS Figure 2.1-1 for Unit 1 & TS Figure 3/4 3-1 for Unit 2 to Reflect Correct Top of Active Fuel Reactor Pressure Vessel Water Level HL-2355, Application for Amend to License DPR-57,changing TS to Revise Allowable Outage Times for EDG 1B to 14 Days to Perform Work on DG & Revising DG Surveillance Requirements 4.9.B.1 & 4.9.B.2 to Correct Adminstrative Error1992-07-30030 July 1992 Application for Amend to License DPR-57,changing TS to Revise Allowable Outage Times for EDG 1B to 14 Days to Perform Work on DG & Revising DG Surveillance Requirements 4.9.B.1 & 4.9.B.2 to Correct Adminstrative Error 1999-07-29 |
Text
s Georg=a Power Company
- 333 Padmont Avenue Atlanta, Georg a 30308 Te!eprene 404 S267/895 Maing Address Post Off ce Box 4545 Atianta. Georg.a 30302 gm Georgia Power the southern e!ectrc system Vice Preoioent Foss,1 and Hydro Generat:en gg Director of Nuclear Reactor Regulation Attention: Mr. John F. Stolz Operating deactors Branch No. 4 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.C. 20555 NRC DOCKET 50-321 OPERATING LICENSE DPR-57 EDWIN I. HATCH NUCLEAR PLANT UNIT 1 RECIRCULATION AND RFR SYSTEMS PIPING REPAIRS Gentlemen:
As a result of repairs by means of weld overlay on several Recirculation Systs and Residual Heat Rmoval (RHR) System piping welds which were observed to have unacceptchie ultrasonic indications during examinations conducted during the 1982 maintenance / refueling outage at Plant Hatch Unit 1, Georgia Power Company (GPC) proposes herein an amendment to the Technical Specifications related to reactor coolant leakage detection measures. In addition, augmented inservice inspection of Class 1 austenitic stainless steel piping welds to be examined during the next maintenance / refueling outage is addressed herein.
In accordance with the provisions of 10 CFR 50.90, as required by 10 CFR 50.59(c)(1), GPC proposes an amendment to the Technical Specifications (Appendix A to the Operating License) for Plant Hatch Unit 1. The proposed amendment will incorporate revised specifications for reactor coolant leakage (limiting conditions for operation and surveillance requirements). The proposed changes to the Technical Specifications, enclosed herein, provide:
the addition of an action statment for a 2 gpm increase in unidentified leakage averaged over a 24-hour period; an increase in the monitoring frequency of drywell leakage to at least once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />; and, in the event of drywell atmosphere monitor inoperability, the measurment of drywall
/jfCffC pf I
gaseous radioactivity and atmospheric particulate at least once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
The Plant Review Board has reviewed the proposed changes to the Plant Hatch Unit 1 Technical Specifications, and has concluded that no degradation g gfl'f P
n in plant operation is involved and that operation with the reactor coolant leakage limiting conditions for operation and surveillance requirements, as revised by this submittal, will maintain existing margins of safety. Thus, the proposed changes to the Technical Specifications for Plant Hatch Unit 1 do not increase the probability of occurrence or consequences of a previously analyzed accident or malfunction of equipment important to safety, nor has the possibility of a previously unanalyzed accident or malfunction of equipment been created. Margins of safety have not been decreased.
r302160248 830210 PDR ADOCK 050C0321 P PDR
Georgia Power A Director of Nuclear Reactor Regulation Attention: Mr. John F. Stolz February 10, 1983 Page Two As discussed in Attachment 1, the proposed changes to Plant Hatch Unit 1 Technical Specifications have been evaluated to be a single Class III amendment. Enclosed as the amendment fee is a check for $4,000.00.
With regard to augmented inservice inspection, GPC hereby commits to propose an augmented inservice inspection program to NRC three (3) months -
prior to the next scheduled maintenance / refueling outage. Consideration will be given in the augmented program to the inservice inspection guidance to be addressed by NRC in the Safety Evaluation Report for the Recirculation System and Rift System piping weld repairs performed during the 1982 maintenance / refueling outage.
Should you have any questions in this regard, please contact this office.
J. C. Causey states that he is Vice President of Georgia Power Company and is authorized to execute this oath on behalf of Georgia Power Company, and that to the best of his knowledge and belief the facts set forth in this letter are true.
GEORGIA POWER COMPANY By: eg J. C-Causey Sworn to and subscribed before me this 10th day e February,1983 / '
/ uy I pr 20N3 Notary Public JAE/mb Enclosure xc: J. T. Beckham, Jr.
H. C. Nix, Jr.
Senior Resident Inspector J. P. O'Reilly (NRC Region-lI) 70077$