Ack Receipt of 980122 & 0313 Ltr Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-254/97-14 & 50-265/97-14
ML20217C364
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 04/13/1998
From: Caldwell J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Kingsley O
COMMONWEALTH EDISON CO.
References
50-254-97-14, 50-265-97-14, NUDOCS 9804230282
Download: ML20217C364 (2)


Text

'

o'

April 13, 1998 Mr. Oliver President, Nuclear Generation Group Commonwealth Edison Company ATTN: Regulatory Services  !

Executive Towers We t til 1400 Opus Place, Suite 500 Downers Grove, IL 60515 SUBJECT: NOTICE OF VIOLATION (NRC INSPECTION REPORT NO. 50-254/97014(DRP);

50-265/97014(DRP))

Dear Mr. Kingsley:

This will acknowledge receipt of your letters dated January 22 and March 13,1998, in response to our letter dated December 16,1997, transmitting a Notice of Violation and a Notice of Deviation associated with inspection Report No. 50-254/97014(DRP); SC-265/97014(DRP). The Notice of Violation for this inspection report documented four violations with multiple examples.

We have reviewed your corrective actions to each of the violations and the deviation. We note that while you accepted and agreed with the first portion of violation 97014-07, involving incorporation of design requirements into surveillance testing for the safe shutdown makeup pump, you specifically disagreed with the last sentence of the violation involving the incorporation of instrument tolerances to ensure flow and system head design requirements would be met.  !

Further, you noted that the AE inspection, in progress at the time of your response, had similar instrument uncertainty issues. With respect to the incorporation of instrument tolerances for l violation 97014-07, we are continuing to review your response with the assistance of the Office of Nuclear Reacter Regulation. We will inform you by separate correspondence of our resolution on this aspect of the violation. With respect to the first portion of violation 97014-07, the other violations in Inspection Report 97014, and the deviation in Inspectior. Report 97014, we have reviewed your corrective actions and have no further questions at this time. These corrective actions will be examined during future inspections.

Sincerely, James L. Caldwell Deputy Regional Administrator Docket Nos.: 50-254;50-265 See Attached Distribution:

"To receive a copy of this document, Indicate in the box "C" = Copy without attach /enci "E" = Copy with attach /enci N" = No copy OFFICE DRP/m M DRP G DRP EIC b RAO NAME Lerch/sn RinM Grant h Clayton k ell DATE 4/9/98 4/10/98 440/9h b 4//o/98 4/13/98 OFFICIAL RECORD COPY 9804230282 980413 PDR ADOCK 05000254 i G PDR i

-

'

.

.

O. Kinglsey -2 cc: M. Wallace, Senior Vice President D. Helwig, Senior Vice President G. Stanley, PWR Vice President J. Perry, BWR Vice President D. Farrar, Regulatory Services Manager 1. Johnson, Licensing Director DCD - Licensing D. Sager, Site Vice President W. Pearce, Quad Cities Station Manager C. C. Peterson, Regulatory Affairs Manager Richard Hubbard Nathan Schloss, Economist Office of the Attomey General State Liaison Officer Chairman, Illinois Conimerce Commission W. D. Leech, Manager of Nuclear .

MidAmerican Energy Company

.

Distribution:

SAR (E-Mail)

Project Mgr., NRR A. Beach J. Caldwell B. Clayton SRI Quad Cities DRP TSS DRS (2)

RlliPRR PUBLIC IE-01 Docket File GREENS I

LEO (E-Mail)

l DOCDESK (E-Mail)

I i

4300;"7 l

l l

l